Site Visit Meeting Doc.docx

DOCX document 18 KB Posted

Attached to
Z2DA--(CON)(660) Engineering Site Prep Patient Lifts COVID 660-20-111 (VA-20-00090697)
Solicitation number
36C25921Q0049
Issued by

View the file

Other files

File Type Posted
RFIs and Answers.docx DOCX document
36C25921Q0049 0001.docx DOCX document
Site Visit Sign-in sheets.pdf PDF
36C25921Q0049_1.pdf PDF
660-20-111 Site Prep Patient Lifts - Covid Spec.pdf PDF
660-20-111 Site Prep Patient Lifts - Covid Drawing and safety Doc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Proposal Site Visit Meeting 36C25921Q0049 Site Prep for Patient Lifts at SLC VAMC

The contractor is to provide all labor, tools, materials, equipment and supervision required to complete the construction of the Site Prep for Patient Lifts at the Salt Lake City VA Medical Center. Work to include preparing area for the lift installations and ICRA preparation located throughout the facility.

Location: Salt Lake City VA Medical Center

AGENDA:

· Introduction of Joseph Wingfield CO, Jeremiah Percy COR

· The pre-proposal meeting/site walk is not mandatory

· QUESTIONS During site visit MUST BE WRITTEN DOWN

· Address where to send RFP:

· Electronic submissions to Christina.Beeler-Blackburn@va.gov

· Pertinent Dates:

· Questions due November 18, 2020 no later than 1:00 PM MT prior to closing of RFP, any questions submitted after this time will not be reviewed or answered! Submit to Christina.Beeler-Blackburn@va.gov

· We’ll get the answers back to you timely

· Proposals due on 12/4/2020 at 10:30 AM MT via email

· Prospective offerors are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.

· Prospective offerors are prohibited from visiting site other than through formal invitation by Contracting Officer.

· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded.

· All VA campuses are Tobacco Free, including but not limited to, smokeless tobacco and vaping.

· Masks are to be worn at all times while on VA property.

· Confirmation of construction range is between $100,000 and $250,000.

· Bid Guarantee & Payment/Performance Bonds: Are required at 20% of bid price or $3,000,000.00 whichever is less.

· Contractor shall begin performance within 10 days after Notice To Proceed (NTP) and complete within 60 days.

· Post Award Compliance:

· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice.