36C25920Q0312-0002000.docx
DOCX document Posted
- Attached to
- H961--Inspect & Test Electrical Power Distribution System Sheridan VA Healthcare System Sheridan WY 82801
- Solicitation number
- 36C25920Q0312
About this file
36C25920Q0312 0002 36C25920Q0312 0002.docx
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25920Q0312 Amendment #2
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 05-14-2020 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
1011 Honor Heights Drive Muskogee OK 74401 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
1011 Honor Heights Drive Muskogee OK 74401 To all Offerors/Bidders
36C25920Q0312 05-20-2020
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
See CONTINUATION Page The Purpose of this Amendment (Amendment #2) is to answer a Vendors' Questions and to adjust all line items.
Use the below line items to submit your quote.
The Closing date and time of this solicitation is still 5-20-2020 at 16:00 (CST) No other questions will be accepted after 5-17-2020.
All other terms and conditions remain unchanged.
Lance Davis Contracting Officer
NCO1616L2-5045
Amendment #2
1. Can you explain the price / cost schedule?
0. What does the “Quantity” represent for each item number? (example: 0001 has a 4 under quantity, what does the 4 represent) After conferring with Engineering, line items 0001-0007 are adjusted to “1 Job” (for each line item) and line item 0008 is hereby deleted. See new line item listing below, to be turned as pricing with your quote.
1. While reviewing the posted solicitation for the above-referenced project, we found a mention of a coordination study to be included in the report for this project as reference material (page 21, item E. 11). Is this referring to a previous coordination study that will be provided to us, or are we to perform a coordination study as part of this project? The coordination study would be part of the Arc Flash report available for review at the site.
Also, on page 16, item E.3.3.1(1), it mentions correcting the one-line diagram as necessary. Is this to be done by hand or on CAD. By hand.
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
Switchgear inspection and testing for building B64 in accordance with the PWS.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Switchgear inspection and testing for building B71 in accordance with the PWS.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Switchgear inspection and testing for building B71N in accordance with the PWS.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Switchgear inspection and testing for building B86 in accordance with the PWS.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Switchgear inspection and testing for building B87 in accordance with the PWS.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Switchgear inspection and testing for building B7 in accordance with the PWS.
| 1.00 |
| JB |
| __________________ |
| __________________ |
Switchgear inspection and testing for building B90 in accordance with the PWS.
| GRAND TOTAL |
| __________________ |
File details come from the government source that posted it. Updated .