36C25920Q0302-0003000.docx
DOCX document Posted
- Solicitation number
- 36C25920Q0302
About this file
36C25920Q0302 0003 36C25920Q0302 0003.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25920Q0302-0004000.docx | DOCX document | |
| 36C25920Q0302-0002000.docx | DOCX document | |
| 36C25920Q0302-0001000.docx | DOCX document | |
| 36C25920Q0302-001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25920Q0302 Amendment #3
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 04-23-2020 Amendment #3 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
1011 Honor Heights Drive Muskogee OK 74401 36C259 Department of Veterans Affairs Network Contracting Office
NCO 19
1011 Honor Heights Drive Muskogee OK 74401 To all Offerors/Bidders
36C25920Q0302 04-16-2020
X X X
Boiler Safety Testing & Inspection for VAMC Muskogee OK.
The purpose of this Amendment (Amendment #3) is to answer acompany's questions.
see next page for questions and VA's answers.
The closing date and time is still 4-24-20 at 16:00 (CST) No other solicitation questions will be accepted at this time.
All other Terms & Conditions remain unchanged
Lance Davis Contracting Officer
NCO1616L2-5045
Question from a potential bidder with VA’s response in Red:
· Appear to have contradictory statements about the preparation of the boilers for testing within the PWS section C. “ii” & “iv”.
The PWS, Section “C” “ii” & “iv” has been adjusted to read as follows (black is added verbiage to the PWS now and upon contract Award).
i. The contractor is required to prepare the boilers for internal inspection by opening, cleaning watersides and firesides, and preparing the boiler for inspection following National Board, ASME, Veterans Administration and industry requirements/guidelines. The contractor will also be required to restore the boiler for service.
ii. VA will have the boilers that are to have Combustion Analysis/Tuning and Safety Device Testing preformed, prepared for the test personnel upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.
File details come from the government source that posted it. Updated .