About this file

36C25919R0189 0001 36C25919R0189 0001.docx

View the file

Other files

File Type Posted
36C25919C0306-000.docx DOCX document
36C25919R0189-0001001.pdf PDF
36C25919R0189-0001002.pdf PDF
36C25919R0189-001.txt TXT text file
36C25919R0189-000.docx DOCX document
36C25919R0189-002.txt TXT text file
36C25919R0189-001.txt TXT text file
36C25919R0189-002.txt TXT text file
36C25919R0189-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25919R0189 0001

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 09-23-2019 36C259 Department of Veterans Affairs Network Contracting Office 19 (NCO 19) Rocky Mountain Acquisition Center 6162 South Willow Drive, Suite Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office 19 (NCO 19) Rocky Mountain Acquisition Center 6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25919R0189 09-23-2019

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 4:30 p.m. mountain time 09-25-2019 X one (1) The purpose of this amendment is to:

a. Provide answers to questions submitted about the requirement.

b. Provide FAR Provision 52.204-24 in full text, e ach offeror must complete this provision and submit with proposal.

c. Provide PVS and PSN as-builts. Any other files will be provided after contract award.

THE NEW DEADLINE FOR SUBMISSION OF PROPOSALS IS

4:30 P.M. MT, WEDNESDAY, SEPTEMBER 25, 2019.

Pamela Barnes Contracting Officer 52.204–24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

As prescribed in 4.2105(a), insert the following provision:

Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2019)

(a) Definitions. As used in this provision— Covered telecommunications equipment or services, Critical technology, and Substantial or essential component have the meanings provided in clause 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition. Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115–232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Contractors are not prohibited from providing—

(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Representation. The Offeror represents that—

It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.

(d) Disclosures. If the Offeror has responded affirmatively to the representation in paragraph (c) of this provision, the Offeror shall provide the following information as part of the offer—

(1) All covered telecommunications equipment and services offered (include brand; model number, such as original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable);

(2) Explanation of the proposed use of covered telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b) of this provision;

(3) For services, the entity providing the covered telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known); and

(4) For equipment, the entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known).

(End of provision)

CONTINUATION PAGE

QUESTION
ANSWER
1
Has any benchmark RF testing of the specified parking garages been conducted? If so, how recently and can that test information be provided?
No recent RF testing has been completed for the parking garages.
2
Was an anticipatory iBwave design created for the targeted expansion areas? If so, can that be provided?
Not yet. The current iBwave designed will be shared upon award.
3
Is the existing DAS a BDA-fed system?
Yes
4
Is the requirement to extend the existing DAS into the expansion area only – that is, into the specified garages?
Yes
5
Can as-built records and OEM information on the existing DAS system be provided?
This is still in discussion with CO. Upon award it will absolutely be shared.
6
Are drawings and square footage information for the expansion areas – the specified parking garages – available?
Yes.
7
Which of the specified parking garages have conduit (with available space) in place from the current DAS “footprint” for cable installation?
ECHCS anticipates additional conduit will need to be ran between the Telecom Rooms and the roof possibility.
8
What is the name of the incumbent DAS contractor?
There isn’t an incumbent for the expansion. The system was installed by Mountain Wireless.
9
Has the incumbent DAS contractor performance been acceptable?
Yes.
10
Is paging the only public safety service to require augmentation in the specified garages?
There is no public safety service on this particular DAS.
11
Is paging augmentation needed only for the specified garages?
Yes.
12
What are the paging frequencies which require augmentation in the specified garages?
-700 Mhz, 850 mhz, 1900Mhz, 2100Mhz, neg -85dBm/-95dBm RSRP and 2500Mhz,-98dBm RSRP(Spirit) 900Mhz paging -93dBm RSSI.
13
Does the current DAS provide paging signal augmentation for the current DAS “footprint”?
Yes.
14
What type of installation required as that was not mentioned? There are two main DAS types, passive and active. Passive DAS is less complicated and will often meet most cost requirements, especially for a project this size. Passive DAS also works with multiple WSP without needing to get providers involved. Active DAS is the other option, but is more costly to install considering the nature of the equipment that will be needed. Active DAS works per provider so you are going to need individual equipment for each provider. As well as fiber cables will be required compared to the coax for Passive DAS.

Both Active and passive parts will be added to the already existing components. Expectation of active components is to install remote amplifier units (RAU) with connection to AC power & grounding to a new or exiting CO Buss bar, installation of hybrid combiner, installation, termination and testing of the RF path between RAU and coupler, and installation of fiber between RAU and FTP.

Expectation of passive components being installation of conduit pathways, coax and connectors, passive enclosures, passive components, and antennas.

What are your plans with regards to boring? How do you want that priced?
VA doesn’t anticipate needing boring with this expansion. But it would be the responsibility of the contractor
16
Will there be a walk to clarify this scope of work?
Site visit was at 10:00 am on September 19, 2019, this information was in the solicitation. There will be no additional walkthroughs prior to award.
17
Have the carriers approved your plan of adding the remotes to the existing sectors? Would we need to lead that conversation?
Yes, the contractor is expected to lead any conversations with the carriers.
18
Will there be a bid walk?
See answer to question 16.
19
When will you be providing the original iBwave?
Yes, upon contract award.
20
Do you require any concealment of the equipment?
The remotes need to be located in the Telecom rooms, and any cable/coax needs to be in conduit.
21
Any zoning requirements that you are aware of?
No, VA doesn’t anticipate the need rezone anything, however, that is based on design from the contractor.
22
With regards to the light poles, have you identified specific poles that need to be used?
Must match existing light poles with color and articular appearance.
23
With regards to the due date of 9/24, would you consider an extension?
There will be no extension granted, this is a fiscal year 19 funded project.
24
It seems we missed the bid walk but may be able to price the expansion off the prior design CD, and AS built. Would it be possible for one of you to send those Docs my way via email as well as any walk notes from today?
But all iBwave forms and as-builts will be provided upon award.
25
Are the original iBwave / constructions drawings for the DAS available?
Yes.
26
Are the construction drawings / building layout for the VA facility available?
Yes.
27
How many additional zones are we adding?
No, VA doesn’t anticipate additional zones to be added. However, it is dependent on the contractor’s design proposal upon award.
28
Does the public safety repeater also have to feed these new extensions? If so, then where are these repeaters currently located?
There are no public safety repeaters with this DAS, purely cellular.
29
Are there chases from floor to floor in the parking garage?
No.
30
If we have to core drill will it require xrays?
Yes.
31
How tall is the ceiling in the parking garages?
Varies upon floor and is available on the as builds attached.
32
Will the coax / fiber need to be ran in pvc, emt, or rigid conduit.
Emt unless 152,153 please refer to solicitation, any location subject to vehicular impact.
33
What are the work times allowed? Will we need to complete this work on a 2nd or 3rd shift?
Ideally, mostly business hours. However, dependent on plan for the conduit runs in the parking garages, there may be a need for some work outside normal business hours.
34
Are we providing the circuits for the remotes? Who is providing power for the remotes?
VA electricians will be providing power 120V or 240V within the Telecom rooms.
35
Do all components in the exposed garage area need to be encased? (i.e. splitters, antennas, etc.)
Yes, antennas can be mounted into junction boxes.
36
How many strands of fiber will be provided and to what locations (point to point)?
See statement of work in solicitation, two strands of fiber will be provided for each remote.
37
Can you provide floor plans?
Yes.
38
Can you provide as-builts for the existing system we will be tying into? (BIM Model/REVIT)
PDF will be provided BIM model will be provided upon contract award.
39
Will you provide 2 to 4 business days once we receive the floor plans and as-builts to give you an accurate bid?
No.
40
Can you identify the number of floors in each garage?
(PVN, PSN each have 6 floors), PVS has 2 floors.
41
5 remote groups (1 in PVS, 2 in PVN, PSN), where is the additional remote group
You can’t add. 1 in PVS, 2 in PVN, 2 PSN (1+2+2=5).
42
Will the VA provide AC Power at the remote locations?
Yes, AC power will be provided to the Telecom Rooms.
43
Does the equipment provided for the project need to be BAA/TAA compliant?
Yes.
44
Provide Bonding requirements for project?
VA isn’t anticipating any need for bonding.
45
Does all active equipment need to be installed in TRs?
Yes.
46
Please provide required RF bands, Bandwidth, detailed signal Level requirements and per WSP power allocation?
700 Mhz, 850 mhz, 1900Mhz, 2100Mhz, neg -85dBm/-95dBm RSRP and 2500Mhz,-98dBm RSRP(Spirit) 900Mhz paging -93dBm RSSI.
47
Is the Loading dock (basement level of PVN) in the coverage area?
Yes.

See attached document: PSN as builts RMRVAMC.

See attached document: PVS as builts RMRVAMC.