36C25919R0092-0005000.docx

DOCX document 27 KB Posted

Attached to
(CON) Restore Cooling Capability - 575 Federal contract opportunity
Solicitation number
36C25919R0092
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

36C25919R0092 0005 36C25919R0092 0005.docx

View the file

Other files for this federal contract opportunity

Other files attached to (CON) Restore Cooling Capability - 575, newest first.
File Type Posted
36C25919C0251-000.docx DOCX document
36C25919R0092-0004000.docx DOCX document
36C25919R0092-0003007.zip ZIP file
36C25919R0092-0003008.pdf PDF
36C25919R0092-0003009.zip ZIP file
36C25919R0092-0003005.zip ZIP file
36C25919R0092-0003003.pdf PDF
36C25919R0092-0003006.zip ZIP file
36C25919R0092-0003001.zip ZIP file
36C25919R0092-0003004.zip ZIP file
36C25919R0092-0003000.docx DOCX document
36C25919R0092-0003010.pdf PDF
36C25919R0092-0003002.zip ZIP file
36C25919R0092-0002018.zip ZIP file
36C25919R0092-0002017.zip ZIP file
36C25919R0092-0002010.zip ZIP file
36C25919R0092-0002008.pdf PDF
36C25919R0092-0002009.docx DOCX document
36C25919R0092-0002013.zip ZIP file
36C25919R0092-0002019.zip ZIP file
36C25919R0092-0002016.zip ZIP file
36C25919R0092-0002011.zip ZIP file
36C25919R0092-0002006.docx DOCX document
36C25919R0092-0002015.zip ZIP file
36C25919R0092-0002007.xlsx XLSX spreadsheet
36C25919R0092-0002012.dwg DWG drawing
36C25919R0092-0002014.zip ZIP file
36C25919R0092-0001001.docx DOCX document
36C25919R0092-007.docx DOCX document
36C25919R0092-005.pdf PDF
36C25919R0092-003.pdf PDF
36C25919R0092-002.pdf PDF
36C25919R0092-001.docx DOCX document
36C25919R0092-006.docx DOCX document
36C25919R0092-004.pdf PDF
36C25919R0092-000.docx DOCX document
36C25919R0092-000.docx DOCX document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 07-30-2019 575-16-104&18-109 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 36C259 Department of Veterans Affairs Network Contracting Office

NCO 19

6162 South Willow Drive, Suite 300 Greenwood Village CO 80111 To all Offerors/Bidders

36C25919R0092

X x x x The purpose of this amendment is to clarify the bid schedule as per the attached.

All other terms and conditions remain the same.

Question We are in receipt of Amendment #4 for the subject project. The new Bid Schedule provided with Amendment #4 is a bit confusing. Option #1 appears to be the complete project with separate breakdowns in Part A & B. Bid Alternative Deduct 0001A States:

“All work in the Base Bid minus any work, labor, profit, and overhead related to Alternate 1 on sheet M000T for 2 EA 120-ton air cooled rented chiller units (NOTE: rented chillers are still required and should be included in the Chillers bid).”

Does this mean we should?

· Include the total cost for (2) 120-ton temporary chillers in Base Bid – Part A & B, so we can show a deduct for 0001A and still have the cost included to complete the “Restore Cooling Capability” project when you accept the deduct?

· Include the total cost for (2) 120-ton temporary chillers, splitting the cost between Base Bid – Part A & B and show $0 amount for deduct 0001A, since we need the temporary chillers to complete both projects?

· Include the total cost for (2) 120-ton temporary chillers in Base Bid – Part A only, show the total cost to deduct the chillers in 0001A and if the VA exercises the deduct, the VA will provide all temporary chillers as required to complete the projects.

Answer: Include the cost for the 2 EA rented chiller units as the base bid for the Cooling Capacity project and show it as a deduct on the towers project.

The VA is not supplying temporary chillers at all.

File details come from the government source that posted it.