36C25919R0092-0003008.pdf
PDF 6 MB Posted
- Attached to
- (CON) Restore Cooling Capability - 575
- Solicitation number
- 36C25919R0092
About this file
36C25919R0092 0003 Tower CAD 4.pdf
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9-CT-3
9-CT-2
9-CT-1
FS-1
9-P-4
9-P-5
C
S
R
23-11
23-13
23-12
23-12
23-20
23-14
23-22
23-21
23-26
EXISTING HEAT
EXCHANGER
EXISTING
SECONDAY
PUMPS
EXISTING
SCREW CHILLER
EXISTING
ABSORPTION
CHILLER
EXISTING
CENTRIFUGAL
CHILLER
EXISTING
PRIMARY
PUMPS
EXISTING
CENTRIFUGAL
FILTER
EXISTING STEAM
UNIT HEATER
EXISTING STEAM
UNIT HEATER
EXISTING AIR
SEPARATOR
14" CS
12" CS
E
12" CS
D
R
M
T
M
M
P
(E) 1 1/4"
W
TANK OVERFLOW
DRAIN PIPE
SUMP DRAIN PIPE
STRAINER BASKET
DRAIN PIPE
23-19
(E) 2 1/2"
A
E
M
M
P
1" CDR-M
23-27
23-30
" CDR-H
" STM-HP
EXISTING STEAM FLOW METER
EXISTING STEAM
CONTROL VALVE
D
R
M
R
S
APPROX.
FLOOR
LEVEL
(E) 8" CWR
(E)SUH
" CWR
" CWR" CWS
10" CR
10"CS
12" CS
14" CS
23-18
23-17
C
R
23-13
23-13
23-15
COOLING TOWER
OVERFLOW DRAIN
PIPE, TYP.
23-28
23-2323-23
23-16
DEDUCT ALTERNATE # 2
9-CT-1
9-CT-2
9-CT-3
23-10
23-1023-10
23-10
23-10
23-10
FS-1
23-10
23-10
23-16
23-26
23-27
EXISTING
SECONDARY PUMPS
(E) 2 1/2"
(E) 1 1/4"
(E) 1" CDR-M
(E) 1" STM-MP
EXISTING PLATE
HEAT EXCHANGER
EXISTING
ABSORPTION
CHILLER
EXISTING
CENTRIFUGAL
CHILLER
EXISTING
SCREW
CHILLER
EXISTING POT
FEEDERS
EXISTING
CENTRIFUGAL
FILTER
EXISTING STEAM
UNIT HEATER
EXISTING
CONDENSATE
PUMP
EXISTING AIR
SEPARATOR
EXISTING STEAM
UNIT HEATER
M
M
P
C
R
(E) 8"
(E) 3/4" CA
23-30
(E)SUH
R
S
(E)SUH
M
M
P
(E) 3/4" CA
(E) 1" CDR-M
Office of
Construction and Facilities
Management
Project Number
Building Number
Drawing Number
Dwg. of
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Department of
Veterans Affairs
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A o n e e i g h t i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t i n c h o n e f o o t o n e h a l f i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t
575-16-104
Replace Boiler Plant
Cooling Towers
2226.M08
A
M
2/14/2019
HYDRONIC RISER
DIAGRAMS
M901T
JBMK
Grand Junction, CO
CONSTRUCTION DOCUMENTS
M901T
2 CHILLED/CONDENSER WATER RISER DIAGRAM
M901T
1 CHILLED/CONDENSATE WATER RISER DIAGRAM
KEYNOTES
23-26 PROPOSED CHILLED WATER RETURN PIPING RENTAL CHILLER TIE IN POINT. COORDINATE WITH COR FOR SCHEDULING
AND EXACT TIE IN POINT. ASSUME TIE IN TO TAKE PLACE OFF HOURS. THIS SCOPE OF WORK SHALL BE DELETED AS A PART OF DEDUCT ALTERNATE # 1. THIS WORK SHALL TAKE PLACE BEFORE ANY WORK INSIDE THE CHILLER PLANT STARTS. SEE SCOPE AND SEQUENCE OF WORK SUMMARY ON SHEET M000T FOR FURTHER INFORMATION.
23-27 PROPOSED CHILLED WATER SUPPLY PIPING RENTAL CHILLER TIE IN POINT. COORDINATE WITH COR FOR SCHEDULING AND EXACT TIE IN POINT. ASSUME TIE IN TO TAKE PLACE OFF HOURS. THIS SCOPE OF WORK SHALL BE DELETED AS A PART OF DEDUCT ALTERNATE # 1. THIS WORK SHALL TAKE PLACE BEFORE ANY WORK INSIDE THE CHILLER PLANT STARTS. SEE SCOPE AND SEQUENCE OF WORK SUMMARY ON SHEET M000T FOR FURTHER INFORMATION.
23-28 RE-INSTALL 12 INCH BASKET STRAINERS AND ISOLATION VALVES. PROVIDE 1 INCH MANUAL ISOLATION VALVE AND DRAIN DOWN PIPING TO NEAREST FLOOR DRAIN. PROVIDE DP SENSORS ACROSS EACH STRAINER AND TIE TO
AUTOMATION SYSTEM GRAPHICS.
23-30 THE EXISTING BUILDING 9 COOLING PLANT IS KNOWN TO CONTAIN ASBESTOS. SEE MECHANICAL GENERAL NOTES ON
SHEET M000T AND SPECIFICATION 02 82 13.13 FOR ASBESTOS ABATEMENT REQUIREMENTS.
KEYNOTES
23-18 PROVIDE NEW 12 INCH CONDENSER WATER RETURN PIPING AND CAP AT EXTERIOR OF BUILDING AND AT
APPROXIMATELY 15 FEET AFF FOR TEMPORARY COOLING TOWER CONNECTION. PROVIDE MANUAL ISOLATION VALVE AT BRANCH CONNECTION AND SLOPE ALL EXTERIOR PIPING 1/4 INCH PER FOOT BACK TOWARD THE INTERIOR, MANUAL DRAIN VALVE INSIDE BUILDING 9 FOR GRAVITY DRAIN DOWN OF ALL EXTERIOR CONDENSER WATER RETURN PIPING.
23-19 RE-INSTALL EXISTING SUBMERSIBLE SUMP PUMP, PIPING, AND ALL ACCESSORIES FOR A COMPLETE AND OPERABLE SYSTEM FOR SUMP PIT DRAIN DOWN. ROUTE FORCED MAIN TO NEAREST FLOOR DRAIN AND PROPER AIR GAP PER
CODE.
23-20 RE-INSTALL EXISTING SWEEPER SYSTEM, INCLUDING TURBULATOR NOZZLES, PIPING, PUMP SUCTION CHECK VALVE, AND ALL ACCESSORIES FOR A COMPLETE AND OPERABLE SYSTEM. CONTRACTOR TO REPLACE ANY DEFECTIVE ITEMS
OF SYSTEM UPON REINSTALLATION WITHOUT ANY INCREASED COST TO THE VA.
23-21 PROVIDE NEW 4 INCH MANUAL BALANCING VALVE IN DISCHARGE LINE OF EXISTING CENTRIFUGAL SEPARATOR FILTRATION SYSTEM (CS-1/9-P-10). RE-ROUTE SUPPLY AND RETURN PIPING AROUND RELOCATED 12 INCH BASKET STRAINERS AS REQUIRED. TAB CONTRACTOR TO CHECK FLOW AND WORK WITH CONTROLS CONTRACTOR TO SET PRESET SPEED ON VFD TO PROVIDE A CONSTANT 200 GPM THROUGH THE LAKOS CENTRIFUGAL SEPARATOR WHENEVER THE SYSTEM IS ENERGIZED. CONTRACTOR TO ADJUST FLOW BY MEANS OF THE VFD SPEED AND NOT CHOKE DOWN THE BALANCING VALVE. BALANCING VALVE IS INSTALLED AS A MEANS TO MANUALLY MEASURE FLOW ONLY. CONTRACTOR TO ENSURE AUTOMATIC BLOW DOWN AND ENTIRE SYSTEM IS FULLY OPERATIONAL.
CONTRACTOR TO PROVE TO THE COR THAT THIS SYSTEM IS 100% OPERATIONAL BEFORE ANY UN-INSTALLATION WORK IS TO TAKE PLACE. SEE GENERAL MECHANICAL NOTE #11 ON SHEET M000T FOR REQUIREMENTS. ANY DEFECTIVE PORTION OF THE SYSTEM SHALL BE REPLACED BY THE CONTRACTOR WITHOUT INCREASED COST TO THE VA.
23-22 PROVIDE NEW DISC FILTER SKID AS SCHEDULED. PROVIDE NEW 6 INCH PUMP SUCTION PIPING AND TERMINATE ALONG THE BOTTOM OF THE NEW SUMP BASIN FLOOR. PROVIDE A 6 INCH CHECK VALVE AT THE BOTTOM OF THE SUCTION LINE LOCATED IN THE VERTICAL RISER. CONNECT A NEW 6 INCH CONDENSER WATER DISCHARGE LINE TO THE CONDENSER WATER SUPPLY LINE COMING FROM THE NEW VERTICAL TURBINE PUMPS AND FEEDING THE NEW CONDENSER WATER SYSTEM AND CHILLERS. CONTRACTOR TO PROGRAM SYSTEM CONTROLLER FOR OPTIMUM SYSTEM BLOW DOWN THAT KEEPS DISC FITLER ASSEMBLY CLEAN BUT MINIMIZES THE AMOUNT OF MAKE-UP WATER.
ROUTE 2 INCH AUTOMATIC BLOW DOWN DISCHARGE LINE TO NEAREST FLOOR DRAIN AND PROVIDE PROPER AIR GAP PER CODE. SEE PLUMBING PLANS FOR COMPRESSED AIR CONNECTION. IF THIS DEDUCT ALTERNATE IS TAKEN ALL PIPING AND ACCESSORIES FOR THE CONDENSER WATER SUPPLY, RETURN, AND COMPRESSED AIR SHALL BE INSTALLED AS A PART OF THE BASE BID TO ADD THIS FILTRATION SYSTEM IN THE FUTURE WITHOUT SHUTDOWN OF THE COOLING PLANT. SEE DEDUCT ALTERNATE #3 ON SHEET M000T FOR FURTHER CLARIFICATION AND DETAIL.
23-23 CONNECT NEW 12 INCH CONDENSER WATER SUPPLY AND RETURN PIPING TO PLATE AND FRAME HEAT EXCHANGER.
COORDINATE WITH COR WHETHER TO CONNECT TO THE EXISTING HEAT EXCHANGER OR A NEW HEAT EXCHANGER
WHICH IS OUT OF THE SCOPE OF THIS PROJECT.
KEYNOTES
23-10 EXISTING EQUIPMENT TO REMAIN.
23-11 REMOVE COOLING TOWER 9-CT-3 AND ALL ACCESSORIES FROM THE PROJECT AS A PART OF DEDUCT ALTERNATE #2.
BRANCH PIPING INCLUDING THE TEE, MOTORIZED CONTROL ISOLATION VALVE, BALANCING VALVE, AND DRAIN DOWN PIPING AND VALVING PER KEYNOTE 23-14 SHALL REMAIN AS A PART OF THE BASE BID. INSTALL THE 14 INCH SUPPLY AND 12 INCH RETURN CONDENSER WATER PIPING AND STUB THROUGH THE EXTERIOR WALL AND CAP. ISOLATION
VALVE SHALL REMAIN CLOSED UNTIL FUTURE COOLING TOWER CAN BE INSTALLED.
23-12 ALL NEW 14 INCH CONDENSER WATER SUPPLY PIPING EXITING EACH NEW COOLING TOWER AT APPROXIMATELY 8 FEET AFF SHALL BE SLOPED AT 1/4" PER FOOT TOWARD NEW CONDENSER WATER SUMP BASIN LOCATED 6.5 FEET AFF FOR GRAVITY DRAIN DOWN OF EXTERIOR PIPING. TERMINATE SUPPLY PIPE AT APPROXIMATELY 24 INCHES ABOVE NEW
FINISHED SUMP BASIN FLOOR HEIGHT.
23-13 ALL NEW 12 INCH CONDENSER WATER RETURN PIPING SUPPLYING EACH NEW COOLING TOWER AT APPROXIMATELY 15 FEET AFF INSIDE AND 22 FEET AFF OUTSIDE SHALL BE SLOPED 1/4" PER FOOT BACK TOWARD INTERIOR AUTOMATIC/MANUAL DRAIN DOWN VALVE ASSEMBLY FOR GRAVITY DRAIN DOWN OF EXTERIOR PIPING.
23-14 PROVIDE A 1 INCH SOLENOID VALVE AND A MANUAL DRAIN DOWN VALVE IN PARALLEL FOR AUTOMATIC DRAIN DOWN OF CONDENSER WATER RETURN PIPING ON EXTERIOR OF BUILDING 9 AND FEEDING EACH COOLING TOWER. CONNECT ALL (3) 1 INCH COOLING TOWER DRAIN DOWN PIPES AND ROUTE TO NEW CONDENSER WATER SUMP BASIN AT APPROXIMATELY 6.5 FEET AFF. MANUAL VALVE SHOULD BE CLOSED AT ALL TIMES AND IS ONLY INTENDED TO OPERATE
DURING A POWER OUTAGE FOR MANUAL EXTERIOR PIPING DRAIN DOWN.
23-15 PROVIDE NEW 1 INCH CONDENSER WATER SUPPLY PIPE AND CONNECT TO EXISTING CHEMICAL TREATMENT SYSTEM.
ALSO PROVIDE NEW 1 INCH CONDENSER WATER TREATMENT OR CHEMICAL FEED PIPE FROM WATER TREATMENT SYSTEM TO NEW CONDENSER WATER SUMP PIT OR REROUTE EXISTING PIPING AS REQUIRED FOR THE NEW INCREASED HEIGHT OF THE SUMP PIT BASIN AT THE 6.5 FEET AFF LEVEL. CONTRACTOR TO MAINTAIN EXISTING WATER TREATMENT PROGRAM OR PROVIDE NEW WATER TREATMENT PROGRAM AS A RESULT OF THE NEW AND INCREASED CONDENSER WATER SYSTEM SIZE FOR THE NEW PLANT. COORDINATE WITH COR AND/OR WATER TREATMENT CONTRACTOR FOR EXACT REQUIREMENTS. THE EXISTING OR NEW SYSTEM SHALL STILL BE TIED TO THE BAS AND BE ABLE TO ADJUST CONDUCTIVITY SETPOINT AND ANY OTHER CONTROL SETPOINT CURRENTLY SHOWN AND CONTROLLABLE AT THE FRONT END. REINSTALL AND ENSURE AUTOMATIC BLOW DOWN SYSTEM IS 100% OPERATIONAL AND REPROGRAM CONDUCTIVITY CONTROLLER TO AUTOMATICALLY BLOW DOWN AT PROPER INTERVALS OR CYCLES
OF CONCENTRATION FOR NEW CONDENSER WATER SYSTEM.
23-16 CONNECT NEW CONDENSER WATER SUPPLY AND RETURN TO CHILLER. COORDINATE WITH COR WHETHER TO CONNECT TO THE EXISTING CHILLER OR A NEW CHILLER WHICH IS OUT OF THE SCOPE OF THIS PROJECT.
23-17 PROVIDE NEW 14 INCH CONDENSER WATER SUPPLY PIPING AND CAP AT EXTERIOR OF BUILDING AND AT APPROXIMATELY 8 FEET AFF FOR TEMPORARY COOLING TOWER CONNECTION. TERMINATE AT APPROXIMATELY 24 INCHES ABOVE BOTTOM OF SUMP PIT FINISH FLOOR HEIGHT AND SLOPE ALL PIPING BACK TOWARD NEW INTERIOR SUMP BASIN PIT AT 1/4 INCH PER FOOT FOR GRAVITY DRAIN DOWN OF EXTERIOR CONDENSER WATER SUPPLY PIPING.
DEDUCT
ALTERNATE #3
AutoCAD SHX Text 517 7th street
AutoCAD SHX Text rapid city sd 57701
AutoCAD SHX Text p 605.342.9470
AutoCAD SHX Text f 605.342.2377
AutoCAD SHX Text www.4front.biz
AutoCAD SHX Text
FOUR
AutoCAD SHX Text
FRONT
AutoCAD SHX Text D E S I G N I N C.
| Sheets and Views |
| M901T-Layout1 |
File details come from the government source that posted it.