36C25919R0092-0003003.pdf

PDF 9 MB Posted

Attached to
(CON) Restore Cooling Capability - 575 Federal contract opportunity
Solicitation number
36C25919R0092
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

36C25919R0092 0003 Chiller CAD 5.pdf

View the file

Other files for this federal contract opportunity

Other files attached to (CON) Restore Cooling Capability - 575, newest first.
File Type Posted
36C25919C0251-000.docx DOCX document
36C25919R0092-0005000.docx DOCX document
36C25919R0092-0004000.docx DOCX document
36C25919R0092-0003001.zip ZIP file
36C25919R0092-0003004.zip ZIP file
36C25919R0092-0003000.docx DOCX document
36C25919R0092-0003010.pdf PDF
36C25919R0092-0003002.zip ZIP file
36C25919R0092-0003007.zip ZIP file
36C25919R0092-0003008.pdf PDF
36C25919R0092-0003009.zip ZIP file
36C25919R0092-0003005.zip ZIP file
36C25919R0092-0003006.zip ZIP file
36C25919R0092-0002006.docx DOCX document
36C25919R0092-0002015.zip ZIP file
36C25919R0092-0002007.xlsx XLSX spreadsheet
36C25919R0092-0002012.dwg DWG drawing
36C25919R0092-0002014.zip ZIP file
36C25919R0092-0002018.zip ZIP file
36C25919R0092-0002017.zip ZIP file
36C25919R0092-0002010.zip ZIP file
36C25919R0092-0002008.pdf PDF
36C25919R0092-0002009.docx DOCX document
36C25919R0092-0002013.zip ZIP file
36C25919R0092-0002019.zip ZIP file
36C25919R0092-0002016.zip ZIP file
36C25919R0092-0002011.zip ZIP file
36C25919R0092-0001001.docx DOCX document
36C25919R0092-004.pdf PDF
36C25919R0092-007.docx DOCX document
36C25919R0092-005.pdf PDF
36C25919R0092-003.pdf PDF
36C25919R0092-002.pdf PDF
36C25919R0092-001.docx DOCX document
36C25919R0092-006.docx DOCX document
36C25919R0092-000.docx DOCX document
36C25919R0092-000.docx DOCX document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9-P-7

FS-2

AS-1

9-ACU-1

9-P-1

9-P-2

C

W S

C

C

R

C

W

6" CWR 6" CWR

C

C

9-P-8

C

C

W S

DEDUCT

ALTERNATE #3

DEDUCT

ALTERNATE #4 DEDUCT

ALTERNATE #7 DEDUCT

ALTERNATE #2

23-58

23-57

DEDUCT

ALTERNATE #6

R

E

2" CDR-H

3" STM-HP

C

W S

9-CCU-2

9-CCU-1

(E)SUH

(E)SUH

S

(E)FS-1

(E)CS-1

E

P

E

P

E

C

S

E

C

S

(E)9-CT-1

(E)9-CT-2

(E)9-CT-3

9-CDP-1

C

C

C

W S

23-64

23-63

23-65

E

C

R

E

C

R

E

C

R

E

D

R N

(E) 3/4" CA

(E) 1" CDR-M

(E) 3/4" CA

T

M

M

P

R

23-59

23-57

23-58

10" CWR 10" CWR 10" CWR

C

W

12" CWS

C

C

W S

FS-2

9-P-7

9-P-8

M

M

P

D

R

M

9-ACU-1

AS-1

DEDUCT

ALTERNATE #4

E

C

W

DEDUCT

ALTERNATE #3

DEDUCT

ALTERNATE #7

DEDUCT

ALTERNATE #2

9-P-1

9-P-2

DEDUCT

ALTERNATE #6

9-CDP-1

6"

6"

C

W R

14"

9-CCU-1

(E)SUH

9-CCU-2

(E)SUH

STEAM TRAP

23-58

23-6523-65

23-64

23-63

E

C

S

E

C

S

E

C

R

M

M

P

E

D

R N

E

C

R

M

M

P

(E) 1" CDR-M

(E) 3/4" CA

E

C

R

EXISTING COOLING TOWERS

STEAM

CONDENSATE

PUMP

12" CS

12" CR

R

3-WAY

CONTROL

VALVE

2" CD

2" CDR-H

3" CDR-H

C

W R

Office of

Construction and Facilities

Management

Project Number

Building Number

Drawing Number

Dwg. of

DrawnCheckedDate

Location

Project TitleDrawing Title

Approved: Project Director

ARCHITECT/ENGINEERS:CONSULTANTS:

DateRevisions:

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

Department of

Veterans Affairs

1 2 3 4 5 6 7 8 9 10

F

E

D

C

B

A o n e e i g h t i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e e i g h t i n c h o n e f o o t o n e h a l f i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t t h r e e i n c h e s o n e f o o t

575-18-109

Restore Facility

Cooling Capability

2226.M09

A

M

2/14/2019

HYDRONIC RISER

DIAGRAMS

M901C

JBMK

Grand Junction, CO

CONSTRUCTION DOCUMENTS

M901C

2 CHILLED/CONDENSER WATER RISER DIAGRAM

M901C

1 CHILLED/CONDENSATE WATER RISER DIAGRAM

KEYNOTES

23-57 RE-INSTALL EXISTING AIR SEPARATOR AS-1 AND STAND IN NEW LOCATION. CONNECT TO NEW CHILLED

WATER RETURN MAIN PIPING. RE-INSTALL IN A LOCATION THAT ALLOWS FOR PROPER WALKING CLEARANCE BETWEEN STAND AND NEW ABSORPTION CHILLER PIPING. ALSO MAINTAIN PROPER CLEARANCE BETWEEN NEW ELECTRICAL PANEL MCC-2 AND NEW 12 INCH CHILLED WATER MAIN PER THE NEC. MAINTAIN EXISTING INSULATION OR PROVIDE NEW IF IT WAS DAMAGED IN MOVE. ENSURE SYSTEM IS 100% OPERATIONAL.

NOTIFY COR IMMEDIATELY OF ANY DEFICIENCIES.

23-58 ROUTE NEW 12 INCH CHILLED WATER SUPPLY AND RETURN PIPING UNDERGROUD AT A MINIMUM 6 FEET BELOW EXTERIOR FINISH GRADE AND TO WITHIN 5 FEET OF EAST EXTERIOR WALL OF BUILDING 9. PROVIDE UNDERGROUND INULATION INTO THE BUILDING, THEN SWITCH TO THE ABOVEGROUND INSULATION ON THE PIPING. COORDINATE WITH SITE UTILITY CONTRACTOR FOR TIE-IN AND EXACT LOCATION. ROUTE NEW MAINS FUTHER SOUTH TO WITHIN APPROXIMATELY 1 FOOT OF ENTRY DOOR. EXISTING MAINS LOCATED

UNDER EXTERIOR STORAGE BUILDING ARE TO BE ABANDONED. SEE SITE PLAN FOR DETAILS.

23-59 RE-CONNECT EXISTING CHEMICAL POT FEEDERS AND ALL ACCESSORIES TO THE NEW 12 INCH CHILLED

WATER SUPPLY AND RETURN MAINS. ENSURE SYSTEM IS 100% OPERATIONAL.

23-63 PROVIDE NEW 12 INCH CHILLED WATER SUPPLY PIPING AND CAP AT EXTERIOR OF BUILDING AND AT

APPROXIMATELY 3 FEET AFF FOR TEMPORARY CHILLER CONNECTION.

23-64 PROVIDE NEW 12 INCH CHILLED WATER RETURN PIPING AND CAP AT EXTERIOR OF BUILDING AND AT

APPROXIMATELY 6 FEET AFF FOR TEMPORARY CHILLER CONNECTION.

23-65 CAP AND ABANDON EXISTING 8 INCH CHILLED WATER SUPPLY AND RETURN PIPING BELOW GRADE. FIELD

VERIFY EXACT LOCATION OF 8 TO 12 INCH CHILLED WATER TRANSITION.

AutoCAD SHX Text 517 7th street

AutoCAD SHX Text rapid city sd 57701

AutoCAD SHX Text p 605.342.9470

AutoCAD SHX Text f 605.342.2377

AutoCAD SHX Text www.4front.biz

AutoCAD SHX Text

FOUR

AutoCAD SHX Text

FRONT

AutoCAD SHX Text D E S I G N I N C.

Sheets and Views
M901C-Layout1

File details come from the government source that posted it.