36C25919R0092 0003 Chillers CAD 2 - M401C 1.pdf
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
A A
C C
BB
M301C
M301C
M302C
M302C
9-ACU-1
9-P-29-P-1
9-HX-1
FS-2
9-P-8
9-P-7
AS-1
(E) 14" CS
(E) 14" CS
(E ) 1
2" C
R
10" CS
(E ) 6
" C S
(E ) 1
" C S
(E) 12" CR
10" CWR
2"
C W
R
12" CWR
12" CWR
12" CWS
10" CWS
0"
C W
S
10" CWS
2"
C W
S
14" CROSSOVER
PIPE AND FLOW
METER
(E) POT FEEDERS
(E) 1" STM-MP
(E ) 1
" S
TM
-M P
(E ) 1
" C D
R -M
DEDUCT
ALTERNATE #7
DEDUCT
ALTERNATE #3
DEDUCT
ALTERNATE #4
DEDUCT
ALTERNATE #6
DEDUCT
ALTERNATE #2
(E ) 1
" C D
R -M
(E) 1" STM-MP
(E) 14" CS
23-59
23-57
23-5823-58
23-62
23-61
23-62
23-6123-6123-61 9-CCU-2
9-CCU-1
(E) 10" CR
9-ACU-1
10" CWR
0"
C R
12" CWR
10" CS
10" CWR
6"
6"
10" CWS
10" CWS
3/4"
(E) 1" CDR-M (E)SUH
9-ACU-1
(E) 12" CR
(E ) 1
2" C
R (E) 14" CS
(E) 1" STM-MP
(E) 12" CR
10" CWR
(E ) 3
(E) 1" CDR-M
(E ) 1
4" C
R
10" CWS
(E ) 1
2" C
S
2" CDR-H
3" STM-HP
9-CDP-1
2" CDR-H
STEAM CONDENSATE PUMP
(E) 12" CS
(E) 12" CR
2"
C W
R
(E)SUH
(E)FS-1
(E)CS-1
(E)9-P-5 (E)9-P-4
10" CR
10" CWS
10" CWR
10" CR
10" CS
23-63
23-64
12" CWR
12" CWS
23-6523-65
3-WAY CONTROL
VALVE
12" CWR
(E ) 1
2" C
R
12" CR
(E) FD
(E) COLUMN
(E) COLUMN
HP STEAM
CONTROL VALVE
HP STEAM TRAP
3" CDR-H
HP STEAM FLOW METER
2"
C W
S
12" CWS
FLOW METER
FLOW METER
12" CWR
12" CWS
2"
C W
S
2"
C W
S
2"
C W
R
12" CWS
12" CWR
AS-1
(E ) 8
" C W
S
(E ) 8
" C W
R
23-6523-65
23-63
23-64
23-5823-58
23-5723-57
23-68
23-6823-6823-68
DN
A A
C C
BB
M301C
M301C
M302C
M302C
9-ACU-1
9-P-29-P-1
9-HX-1
FS-2
9-P-8
9-P-7
AS-1
(E) 14" CS
(E) 14" CS
(E ) 1
2" C
R
10" CS
(E ) 6
" C S
(E ) 1
" C S
(E) 12" CR
10" CWR
2"
C W
R
12" CWR
12" CWR
12" CWS
10" CWS
0"
C W
S
10" CWS
2" C
W S
14" CROSSOVER
PIPE AND FLOW
METER
(E) POT FEEDERS
(E) 1" STM-MP
(E ) 1
" S
TM
-M P
(E ) 1
" C D
R -M
DEDUCT
ALTERNATE #7
DEDUCT
ALTERNATE #3
DEDUCT
ALTERNATE #4
DEDUCT
ALTERNATE #6
DEDUCT
ALTERNATE #2
(E ) 1
" C D
R -M
(E) 1" STM-MP
(E) 14" CS
23-59
23-57
23-5823-58
23-62
23-61
23-62
23-6123-6123-61 9-CCU-2
9-CCU-1
(E) 10" CR
9-ACU-1
10" CWR
0"
C R
12" CWR
10" CS
10" CWR
6"
6"
10" CWS
10" CWS
3/4"
(E) 1" CDR-M (E)SUH
9-ACU-1
(E) 12" CR
(E ) 1
2" C
R (E) 14" CS
(E) 1" STM-MP
(E) 12" CR
10" CWR
(E ) 3
(E) 1" CDR-M
(E ) 1
4" C
R
10" CWS
(E ) 1
2" C
S
2" CDR-H
3" STM-HP
9-CDP-1
2" CDR-H
STEAM CONDENSATE PUMP
(E) 12" CS
(E) 12" CR
2"
C W
R
(E)SUH
(E)FS-1
(E)CS-1
(E)9-P-5 (E)9-P-4
10" CR
10" CWS
10" CWR
10" CR
10" CS
23-63
23-64
12" CWR
12" CWS
23-6523-65
3-WAY CONTROL
VALVE
12" CWR
(E ) 1
2" C
R
12" CR
(E) FD
(E) COLUMN
(E) COLUMN
HP STEAM
CONTROL VALVE
HP STEAM TRAP
3" CDR-H
HP STEAM FLOW METER
2"
C W
S
12" CWS
FLOW METER
FLOW METER
12" CWR
12" CWS
2"
C W
S
2"
C W
S
2"
C W
R
12" CWS
12" CWR
AS-1
(E ) 8
" C W
S
(E ) 8
" C W
R
23-6523-65
23-63
23-64
23-5823-58
23-5723-57
23-68
23-6823-6823-68
517 7th streetrapid city sd
57701p 605.342.9470f 605.342.2377www.4front.bizFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg. of
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEERS:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
Department of Veterans Affairs
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A o n e e ig h t in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h t in c h o n e fo o t o n e h a lf in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
575-18-109Restore Facility Cooling Capability
2226.M09
2/
/2
7:
:0
A
M
2/14/2019
ENLARGED HYDRONIC
PLANS
M401C
14JBMK
Grand Junction, CO
CONSTRUCTION DOCUMENTS
1/4" = 1'-0"M401C
1 LEVEL 1 OVERALL HYDRONIC PIPING PLAN PROJECT
NORTH
TRUE
NORTH
KEYNOTES
23-57 RE-INSTALL EXISTING AIR SEPARATOR AS-1 AND STAND IN NEW LOCATION. CONNECT TO NEW CHILLED
WATER RETURN MAIN PIPING. RE-INSTALL IN A LOCATION THAT ALLOWS FOR PROPER WALKING CLEARANCE BETWEEN STAND AND NEW ABSORPTION CHILLER PIPING. ALSO MAINTAIN PROPER CLEARANCE BETWEEN NEW ELECTRICAL PANEL MCC-2 AND NEW 12 INCH CHILLED WATER MAIN PER THE NEC. MAINTAIN EXISTING INSULATION OR PROVIDE NEW IF IT WAS DAMAGED IN MOVE. ENSURE SYSTEM IS 100% OPERATIONAL.
NOTIFY COR IMMEDIATELY OF ANY DEFICIENCIES.
23-58 ROUTE NEW 12 INCH CHILLED WATER SUPPLY AND RETURN PIPING UNDERGROUD AT A MINIMUM 6 FEET BELOW EXTERIOR FINISH GRADE AND TO WITHIN 5 FEET OF EAST EXTERIOR WALL OF BUILDING 9. PROVIDE UNDERGROUND INULATION INTO THE BUILDING, THEN SWITCH TO THE ABOVEGROUND INSULATION ON THE PIPING. COORDINATE WITH SITE UTILITY CONTRACTOR FOR TIE-IN AND EXACT LOCATION. ROUTE NEW MAINS FUTHER SOUTH TO WITHIN APPROXIMATELY 1 FOOT OF ENTRY DOOR. EXISTING MAINS LOCATED
UNDER EXTERIOR STORAGE BUILDING ARE TO BE ABANDONED. SEE SITE PLAN FOR DETAILS.
23-59 RE-CONNECT EXISTING CHEMICAL POT FEEDERS AND ALL ACCESSORIES TO THE NEW 12 INCH CHILLED
WATER SUPPLY AND RETURN MAINS. ENSURE SYSTEM IS 100% OPERATIONAL.
23-61 MAINTAIN APPROXIMATELY 8 FEET X 6.5 FEET CLEAR SPACE FOR REMOVAL OF CHILLER MOTOR, IMPELLER, AND ANY ACCESSORIES VIA EXISTING 2 TON OVERHEAD CRANE SYSTEM. PROVIDE FLANGED PIPING CONNECTIONS FOR ANY PIPING ENCROACHING IN THIS AREA FOR REMOVAL DURING MAINTENANCE OF
CHILLER EQUIPMENT.
23-62 MAINTAIN 24 INCHES TO 30 INCHES OF CLEAR SPACE UNDERNEATH EXISTING STRUCTURAL BEAM THAT SUPPORTS THE EXISTING 2 TON MOBILE CRANE SYSTEM IN THIS VICINITY. ALL PIPING MAINS THAT CROSS THROUGH THIS AREA INCLUDING THE CHILLED WATER SUPPLY AND RETURN, AND THE CONDENSOR WATER SUPPLY AND RETURN SHALL BE INSTALLED 12 FEET AFF OR LOW ENOUGH FOR THE EXISTING CRANE SYSTEM TO BE MOBILIZED OR MOVED ALONG THE BEAM LINE AND ABOVE ANY NEW CHILLERS INSTALLED IN
THIS VICINITY.
23-63 PROVIDE NEW 12 INCH CHILLED WATER SUPPLY PIPING AND CAP AT EXTERIOR OF BUILDING AND AT
APPROXIMATELY 3 FEET AFF FOR TEMPORARY CHILLER CONNECTION.
23-64 PROVIDE NEW 12 INCH CHILLED WATER RETURN PIPING AND CAP AT EXTERIOR OF BUILDING AND AT
APPROXIMATELY 6 FEET AFF FOR TEMPORARY CHILLER CONNECTION.
23-65 CAP AND ABANDON EXISTING 8 INCH CHILLED WATER SUPPLY AND RETURN PIPING BELOW GRADE. FIELD
VERIFY EXACT LOCATION OF 8 TO 12 INCH CHILLED WATER TRANSITION.
23-68 PROVIDE NEW ISOLATION VALVE
0 2' 4' 8'
SCALE :1/4" = 1'-0"
NOT TO SCALEM401C
2 TEMPORARY CHILLED WATER CONNECTION PIPING 3D VIEW