36C25919Q0566-004.doc

DOC document 657 KB Posted

Attached to
WTP SCADA Replacement adding specifications and questions/answers
Solicitation number
36C25919Q0566
Issued by

About this file

36C25919Q0566 Water Treatment Plant Specifications 2.doc

View the file

Other files

File Type Posted
36C25919Q0566-003.docx DOCX document
36C25919Q0566-002.docx DOCX document
36C25919Q0566-001.pdf PDF
36C25919Q0566-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01010

SUMMARY OF WORK

PART 1: GENERAL

1.1

DESCRIPTION

This project consists of, but not limited to, the installation of a temporary water system; the removal of existing water treatment equipment from an existing water treatment building; the furnishing and installation of new UF/MF filtration water treatment equipment into the existing water treatment building; The installation of Owner supplied feed pumps within the water treatment building; the up-dating of electrical and control systems within the water treatment building; the construction of a new chemical feed building including yard piping, valve vault, valves, fittings and surface restoration; improvements to the raw water transfer pump station including the installation of Owner supplied pumps and the re-piping; and the expansion of the existing backwash pond as presented in the Construction Drawings.

The Contract Documents are intended to provide the basis for proper completion of the work suitable for the intended use of the Owner. Specifications and Drawings included in these contract documents establish the performance, quality requirements, location and general arrangement of materials and equipment, and establish the minimum standards for quality of workmanship and appearance. Anything not expressly set forth but which is reasonably implied or necessary for proper performance of the project shall be included.

1.2

TEMPORARY WATER

The Contractor shall provide temporary water as shown in these contract documents and Section 01600. The Contractor shall disinfect and test the temporary system prior to putting the system into use. Once the temporary water system is placed into service, the Owner will be responsible for the operation of the system and the cost of the water used. Protection of the temporary water system from freezing shall be the responsibility of the Owner.

The Contractor shall not remove any equipment or interrupt the operations of the existing water plant until the temporary water system is installed, tested and placed into service.

1.3

REMOVED EQUIPMENT

All equipment removed from the treatment plant, except as noted here or on the Construction Plans shall become the property of the Contractor and shall be removed from the project site. The Contractor shall protect any and all facilities that are to be salvaged and/or remain as is as indicated on the Construction Plans. The Contractor shall repair or replace any facilities that the Contractor’s operations damages during this demolition project.

The existing air compressor and chlorinator system shall remain the property of the Owner. The removal of the chlorinator system shall be the responsibility of the Owner. The Contractor shall move the existing air compressor into the storage building. The existing 20-gpm chlorine system roto-meter shall be reinstalled, by the Contractor, into the proposed chlorine system as noted. All existing chemical feed pumps shall remain the property of the Owner and the Owner shall be the responsibility for their removal.

All other process equipment and piping, unless noted on the Construction Plans or in the Project Manual, shall be removed and become the property of the Contractor to salvage, scrap or sell.

The existing lighting system and heating system shall remain intact and functional at the completion of the project as it was at the start of the project. The plant water system pump and piping shall remain except the re-routing of some of the piping as noted on the Construction Plans. The emergency shower/eyewash shall be relocated as shown on the Construction Plans.

The electric panels not called out to be removed, shall remain and be incorporated into the work.

The Contractor shall not remove any equipment or interrupt the operations of the existing water plant until the temporary water system is installed, tested and placed into service.

1.4

CONTROL SYSTEM INTEGRATOR

The Contractor shall provide a competent and experienced Control System -Integrator to complete the requirements of Section 11900.

1.5

OWNER-FURNISHED ITEMS

Owner-furnished items are as follows:

Two feed water pumps and motors, and

Two transfer pumps and motors

Details of these items are provided at the end of this section. The Contractor shall provide manufacturer/supplier representative inspection of the pump installation as per Section 11920.

1.6

FIELD VERIFICATION

Field verify dimensions indicated on drawings before fabricating or ordering materials. Do not scale drawings.

Notify the Contracting Officer of existing conditions differing from those indicated on the drawings. Verify the existence and location of underground utilities along the route of the proposed work. Omission of an existing or previous abandoned utility location on the Drawings is not to be considered as its nonexistence. Inclusion of existing utility locations on the Drawings is not to be considered as its definite location. Do not remove or alter existing utilities without prior written approval.

1.7 SUBSURFACE CONDITIONS

The Contractor shall satisfy himself as to the ground water and subsurface conditions at the site of the work. The Contractor shall be aware that ground water and soil moisture contents can fluctuate seasonally.

Soil moisture contents and ground water levels will fluctuate due to seasonal changes, weather, irrigation, and other variations in conditions. The bidders shall make independent investigations as they believe are necessary to prepare their bid. The Contractor is responsible to determine construction methods and include these costs in the bid unit prices. Methods and procedures related to wet soils could include adjusting the moisture of the material or removal of the wet material and replacement with another suitable material.

Concrete

The soils in the project area could be corrosive in nature. All cement used in the project shall conform to the requirements of ASTM C 150 Type I/II.

Ductile Pipe and Fittings

The soils in the project area could be corrosive in nature. The trench for all ductile iron (DI) pipe and DI fittings shall be over excavated a minimum of one foot and replaced with imported clean, non-corrosive select bedding material. A minimum of one foot of this select bedding shall be placed under, beside and above all DI pipe and fittings. All DI pipe and fittings shall be provided with polyethylene encasement as recommended by the pipe manufacturer for corrosive soil conditions.

1.8

OPERATION AND MAINTENANCE MANUAL

Substantial Completion will not be granted until Operation and Maintenance Manuals have been submitted and approved as per Section 11930. The Contractor shall provide Operation and Maintenance Manuals that include valves that are incorporated into the work prior to Substantial Completion being granted.

1.9

EXISTING FACILITIES

Existing underground installations such as water mains, gas mains, telephone lines, power lines, and buried structures in the vicinity of the work to be done hereunder are indicated on the Drawings only to the extent such information has been made available to or discovered by the Design Engineer in preparing the Drawings. There is no guarantee as to the accuracy or completeness of such information, and all responsibility for the accuracy and completeness thereof is expressly disclaimed.

Where construction will be required adjacent to existing structures, the Contractor shall be solely responsible to maintain the structural integrity of the existing structures. The Contractor shall take whatever means necessary to ensure that the existing structure is not damaged and, if necessary, shall install shoring or sheet piling or change the size or type of construction equipment. The Contractor shall repair all damage to the existing structures at his own expense. Any fences destroyed during construction shall be repaired to the satisfaction of the Owner. Any delay, additional work, or extra cost to the Contractor caused by existing underground installations shall not constitute a claim for extra work, additional payment or damages.

The Contractor shall protect and not disturb any survey markers or monuments, such as lot or block corners, property pins, or section corners or section breakdown corners. Any survey marker or monument that is disturbed or destroyed by the Contractor shall be replaced at no cost to the Owner by a licensed land surveyor at the Contractor’s expense.

1.10

SUPERINTENDENT

The Contractor shall, at all times when work of any nature under this Contract is in progress, keep on the job site, a competent superintendent or crew foreman who shall be familiar with all phases of the work. The superintendent or crew foreman shall represent the Contractor in his absence and all directions given to him shall be as binding as if given to the Contractor.

The superintendent or crew foreman shall be responsible to perform initial quality control inspection of the crew’s workmanship for compliance with the specifications.

1.11

ENVIRONMENTAL CONTROLS

Contractor shall place straw bales around inlets and in drainage swales as required to control soil erosion until vegetation is restored.

Contractor shall dispose of all oil and petroleum products in an appropriate manner off-site. This requirement shall include any and all materials used for cleanup of such materials.

The Contractor shall provide and maintain a sanitary, self-contained portable toilet for use by all workmen at all times during the course of the work. The Contractor and all workmen employed by him shall conduct all operations in a clean and sanitary manner.

1.12

WARRANTY PERIOD

The Contractor shall provide a full two year warranty on all of the equipment, installation and construction included and provided under this work. This warranty period begins at Substantial Completion. Substantial Completion will not be granted until after all of the systems are installed and function; the O&M Manuals have been approved and delivered as per Section 11930; operator training as per Section 11940 is completed; and the plant is cleaned, disinfected and placed into full service producing potable water.

END OF SECTION 01010

SECTION 01050

FIELD ENGINEERING

PART 1

- GENERAL

WORK INCLUDED:

A. The Owner will provide three bench marks that will provide primary field control (horizontal and vertical) for the project. The Owner will also provide corner stakes for the proposed backwash pond floor and the end of the backwash discharge pipe.

B. From the information provided by the Owner, unless otherwise specified in the contract documents, the CONTRACTOR shall develop and make all detailed surveys needed for construction such as slope stakes, batter boards, grade stakes, and other working points, lines, and elevations.

C. Notify Contracting Officer of required survey work at least 96 hours before starting work.

D. Preserve all benchmarks, control points and stakes.

PRESERVATION OF REFERENCE POINTS:

A. Mark and protect existing property pins and/or street monuments.

B. The CONTRACTOR shall carefully preserve bench marks, reference points, lot corners, section corners and stakes and in case of destruction he shall be charged for the resetting of such points and shall be responsible for any mistakes that may be caused by their unnecessary loss or disturbance.

C. Use a licensed land surveyor to replace all property corners or other monuments marked or shown on the plans that are destroyed by the work.

SURVEY NOTES:

CONTRACTOR shall maintain survey notes in standard survey notebooks in a neat and legible format. CONTRACTOR shall provide a duplicate set of survey notes for all staking operations, which will be given to the Contracting Officer for record purposes no later than 24 hours after the stakes are set. The Contracting Officer reserves the right to monitor the work of survey crews as judged necessary to show conformance with this specification. However, such monitoring shall in no way relieve the CONTRACTOR of the responsibility for survey accuracy and adequacy to obtain a finished product fully conforming to the plans and specifications.

COMPENSATION:

All stakes, instruments, labor, and other items required for the CONTRACTOR’S layout shall be furnished by the CONTRACTOR. CONTRACTOR’S cost for equipment, materials, and personnel as specified herein shall be included in the prices bid for the various bid items listed on the bid sheets.

END OF SECTION 01050

SECTION 01060

PERMITS

PART 1 - GENERAL

1.1 GENERAL

The Contractor shall be responsible for obtaining all permits necessary for the completion of this project. The costs for all permits shall be considered incidental to construction and shall be included in the price bid for related items of work.

The Contractor shall, at his own expense, procure all permits, certificates and licenses required of him/her by law for the execution of his work. Contractor shall comply with all federal, state and local laws, ordinances and rules and regulations relating to the performance of the work. This includes but not limited to the determination of the need for the preparation, execution and submittal of a Storm Water Pollution Prevention Plan (SWPPP) permit.

END OF SECTION 01060

SECTION 01150

MEASUREMENT AND PAYMENT

PART 1

GENERAL

1.1 SCOPE:

This section of specifications supersedes the method of measurement and basis of payment that may be described in the various technical sections. The method of measurement and basis of payment for this project is described in 1.4 of this section.

1.2 GENERAL:

The total bid price for each item of the contract shall cover all work shown on the contract drawings and required by the specifications and other Contract Documents. All costs in connection with the work, including furnishing all materials, supplies, equipment, and appurtenances; providing all construction plant, equipment, and tools; and performing all necessary labor and supervision to fully complete the Work, shall be included in the unit and lump sum prices bid. No item that is required by the Contract Documents for the proper and successful completion of the Work will be paid for outside of or in addition to the prices submitted in the Bid. All work not specifically set forth as a pay item in the Bid Form shall be considered a subsidiary obligation of the CONTRACTOR and all costs in connection therewith shall be included in the prices bid.

1.3 MEASUREMENT AND PAYMENT ITEMS:

The progress payment for this Lump Sum project will be based on the percent completed by the Contractor of each category of work listed in the schedule of values prepared by the Contractor and approved by the Contracting Officer at the start of the project. The percent completed shall be as determined by the Contracting Officer.

The schedule of values shall include as a minimum the following tasks:

· Mobilization/demobilization

· Temporary Water Supply

· Raw water building

· Removal of existing process equipment

· Dry-well improvements

· Feed pump installation

· Feed water chemical system

· UF/MF filtration system

· Disinfection system

· Electrical system

· Control system

· Expansion of existing backwash pond

· Disinfection, testing and start-up

· Operation and Maintenance Manuals

· Operator training

Mobilization/demobilization

The total for mobilization/demobilization including taxes, bonds, and insurance shall not exceed 10% of the total bid price. Fifty percent of mobilization/demobilization will be paid on the first pay request after the work has started. The remaining 50% will be paid based on a percentage of the overall project completed.

Temporary Water Supply

The total for temporary water supply including installation, testing and removal shall not exceed 4% of the total bid price. Eighty percent of temporary water system will be paid when the system is placed into service. The remaining 20% will be paid based after the system is disassembled and removed from the project site.

Raw Water Building

The raw water building shall include the earthwork; driveway: concrete work; piping, meter and valves; building construction; electrical work; and chemical feed system. Raw Water Building will be paid based on a percentage of the item completed.

Removal of existing process equipment

The total for removal of existing process equipment as indicated in the construction plans and specifications shall not exceed 5% of the total bid price. Removal of existing process equipment will be paid based on a percentage of the item completed.

Dry-well improvements This item include the removal of existing pumps and piping, the installation of the new transfer pumps; fabrication and installation of the discharge piping and valves: and other improvements to the dry-well as indicated in the construction plans and specifications. Dry-well improvements will be paid based on a percentage of the item completed.

Feed pump installation

This item includes the removal of existing pumps, sole plates and piping, the installation of the feed pumps and sole plates; fabrication and installation of the discharge piping, strainers and valves: and other improvements to the feed water pump system indicated in the construction plans and specifications. Feed pump installation will be paid based on a percentage of the item completed.

Feed water chemical system

The feed water chemical system includes the drum pump, day tank, metering pump, chemical feed line, manhole and injector. Feed water chemical system will be paid based on a percentage of the item completed.

UF/MF filtration system

The UF/MF filtration system includes the UF/MF skid assemblies, clean-in-place system, neutralization system, compressed air system, process control system and related piping. UF/MF filtration system will be paid based on a percentage of the item completed.

Disinfection system

The disinfection system includes the calcium hypochlorite feed equipment, pumping and feed line and injector. Disinfection system will be paid based on a percentage of the item completed.

Electrical system

The electrical system modifications includes the process wiring, conduit, panels, motor starters, VFDs, connections to equipment, and related items as indicated in the construction plans and specifications. Electrical system modifications will be paid based on a percentage of the item completed.

Control system

The control system includes the control wiring; conduits; panels; sensors and elements; supervisory control system, operator interface panels, system integrator, software and programming; and related items as indicated in the construction plans and specifications. Control system will be paid based on a percentage of the item completed.

Expansion of existing backwash pond

The expansion of existing backwash pond includes the earthwork and concrete work indicated in the construction plans. Expansion of existing backwash pond will be paid based on a percentage of the item completed.

Disinfection, testing and start-up

The total for disinfection, testing and start-up including the disinfection, testing and start-up of all systems and sub-systems and related tasks described in the specifications shall not be less than 1% of the total bid price. Disinfection, testing and start-up will be paid based on a percentage of the item completed.

Operation and Maintenance Manuals The total for the Operation and Maintenance Manuals described in the specifications shall not be less than 1% of the total bid price. Operation and Maintenance Manuals will be paid when the manuals are approved by the Contracting Officer.

Operator training

The total for the operator training described in the specifications shall not be less than 1% of the total bid price. Operator training will be paid when the training is completed and approved by the Contracting Officer.

The lump sum contract price shall include all equipment, materials, labor and performance of all work necessary and/or incidental for the completion of all improvements shown on the Construction Plans and described in the Specifications.

END OF SECTION 01150

SECTION 01300

SHOP DRAWINGS AND SUBMITTALS

PART 1- GENERAL

1.1 SECTION INCLUDES:

A. Submittal procedures, schedules, lists and instructions for proper and prompt review of construction related documents.

1.2 SCOPE:

A. Contractor to submit on all items to be incorporated into the work. The Design Engineer reserves the right to require submittals in addition to those called for in the individual sections.

1.3 SUBMITTAL PROCEDURES:

A. In accordance with Article 2.05 and 2.07 of the General Conditions, Contractor shall submit and receive approval of a schedule of shop drawings and sample submittals which will list each required submittal and the times for submitting, reviewing and processing such submittal.

B. In accordance with the approved submittal schedule and at least 15 days prior to his need for approval, Contractor shall forward to Design Engineer all items required by the individual sections of the specifications and for all items incorporated into the work. Unless a different number is called for in the individual sections, submit six copies of each shop drawing, all operation and maintenance instructions, and specimens of each sample requested. Three copies will be retained by Design Engineer and one copy will be retained by the Owner. The remaining copies shall be returned to the Contractor along with the Design Engineer’s comments. If the Contractor wants more than two copies sent to him he shall submit whatever additional copies he desires.

C. Transmit each submittal in accordance with Design Engineer’s accepted format, by completing the transmittal form included at the end of this section, in its entirety.

D. Apply Contractor’s stamp, sign stamp certifying that the Contractor has reviewed the submittal, verified the products meet the requirements of the Contract Documents, verified field dimensions, adjacent construction work, coordination all information, and certifies that the items in the submittal are in accordance with the requirements of the Work and Contract Documents.

E. Schedule submittals to expedite the Project, and deliver to Design Engineer at business address.

F. Coordinate the submission of related items. Uncoordinated submittals will be rejected.

G. For each submittal, allow 15 days for review, excluding delivery time to and from the Contractor.

H. Identify any variations from Contract Documents and product or system limitations that may be detrimental to successful performance of the completed Work.

I. Provide space for Contractor and Design Engineer review stamps.

J. If directed to revise and resubmit, identify all changes made since previous submission.

K. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with provisions.

1.4 SUMMARY OF REQUIRED SUBMITTALS:

All submittals requested in individual specification sections, including this Section, are to be submitted and approved prior to incorporating those materials and/or processes into the work. The listing below highlights the major submittals required for this project:

A. Permits: Submit to the Design Engineer or Contracting Officer at the preconstruction conference a copy of all permits required by the governing authorities.

B. Subcontractors: At the preconstruction conference, the Contractor shall supply a list of all suppliers and subcontractors to be used on the project.

C. Equipment List and Rental Rates: At the preconstruction conference, the Contractor shall supply a list of all equipment owned or rented that will be used on this project. The equipment list shall include the make, model, year, horsepower and capacity of each piece of equipment. The list shall also include rental rates and operating rates for each piece of equipment determined per the requirements of these contract documents.

D.

Construction Progress Schedule and Schedule of Values: The Contractor shall submit to the Owner with the completed Agreement a Progress Schedule, Schedule of Values, and an estimated Progress Payment Schedule. The Progress Schedule shall be in bar chart or CPM form and show estimated starting and completion dates for each part of the Work. The Progress Payment Schedule shall show starting and completion dates for each part of the Work. The Progress Payment Schedule shall show the monthly progress payment requests that are estimated to be made through the duration of the Contract. Both the Progress Schedule and Payment Schedule shall be revised monthly to show project progress revisions to the schedules. The revised schedules shall be submitted with the monthly progress payment request. No monthly progress payment request shall be accepted from the Contractor and processed for payment unless accompanied by the revised schedules.

E.

Product Data: Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers’ standard data to provide information unique to this project.

F.

Shop Drawings: Submit for review the number of opaque copies that Contractor requires, plus four copies that will be retained by Design Engineer.

G.

Manufacturer Installation Instructions: Where required, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Design Engineer in quantities referenced or specified herein.

H.

Manufacturer Certificates: When specified in individual specification sections, submit certification by manufacturer to Design Engineer, in quantities specified for product data. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.

I.

Operation and Maintenance Instructions: Manufacturer’s printed instructions shall include operating instructions, maintenance literature, lubrication requirements, and parts lists.

J. Contractor’s Quality Control Plan: The Contractor shall prepare a Quality Control Plan in accordance with Section 01400 of these specifications for approval by the Engineer. The Contractor’s Quality Control Plan shall be submitted and approved by the Engineer prior to any payment being made for mobilization/demobilization.

PART 2 – PRODUCTS

NOT APPLICABLE

PART 3 – EXECUTION

PART 4

MEASUREMENT AND PAYMENT

A. All work described herein is incidental to other related items of work and no measurement and additional payment for submittals will be considered.

END OF SECTION 01300

SECTION 01400

QUALITY CONTROL AND QUALITY ASSURANCE

PART 1 - GENERAL

1.1 DESCRIPTION:

This Section describes the quality control and quality assurance aspects of the project. This is a Quality Control / Quality Assurance (QC/QA) project.

The Contractor is solely responsible for quality control of all aspects of the project. The Contractor shall develop and implement a Quality Control Plan to ensure compliance with the Contract Documents.

The Owner reserves the right to perform construction observation and quality assurance testing on any portion of the work and to the extent they deem necessary to confirm compliance with the Contract Documents.

1.2 DEFINITIONS:

1.2.1 Quality Control – Planned and specific actions or operations necessary to produce a product that complies with the Contract Documents. Quality Control consists of actions, inspections, sampling and testing necessary to ensure the Work is in compliance with the Contract Documents and to control production and construction processes. Quality Control is keyed to the construction sequence to quickly determine when the Work is out of compliance with the Contract Documents and to respond to correct the situation and bring the Work into compliance. Quality Control is the responsibility of the Contractor and is at their expense.

1.2.2 Quality Assurance – Construction observation, testing and any other actions deemed necessary to verify that the Work complies with the Contract Documents as determined by the Owner. Quality assurance includes observation of the Contractor’s Quality Control, verifying the results of the Contractor’s testing and additional Quality Assurance sampling and testing. Quality Assurance will not be adequate for the Contractor’s production and placement needs. The Owner and/or Contracting Officer will provide Quality Assurance as deemed necessary. The expense of Quality Assurance is the responsibility of the Owner.

1.2.3 Verification/Compliance Testing – Sampling and testing which is carried out independent of the Contractor’s Quality Control testing to confirm/verify that the Work complies with the Contract Documents. The frequency of verification/compliance testing will be determined by the Owner and may not be adequate for the Contractor’s production and placement needs. Verification/compliance testing will not be used to determine construction procedures or operations (i.e. rolling patterns, lift thickness, etc.). Verification/compliance testing will be provided by the Owner and/or Contracting Officer. The expense of Verification/Compliance Testing is the responsibility of the Owner.

1.3 SUBMITTALS:

1.3.1 Prior to mobilizing, submit a Quality Control Plan defining the program and the documentation proposed to ensure that all materials and work conform to the Contract Documents. The plan shall identify personnel, procedures, control, tests, frequency of tests, and records and forms to be used. Quality control testing frequency is at the Contractor’s discretion.

1.3.2 Submit records of all tests to the Contracting Officer within 24 hours of the testing. The Quality Control laboratory shall notify the Contractor and Contracting Officer promptly of irregularities or deficiencies observed in the Work during performance of the Quality Control Testing.

PART 2 – PRODUCT

NOT APPLICABLE

PART 3 – EXECUTION

3.1 General – Be responsible for quality control tests and inspections to control Contractor production and construction processes. Include in the Contractor quality control system an internal organization, plans, and procedures to produce the specified end product. Assure the system covers all construction operations, both on-site and off-site, and is keyed to the construction sequence.

3.2

Contractor Cooperation with Quality Assurance Agency – Assure the Contracting Officer and Owner’s representatives has access to all work areas at all times work is in progress. Provide any special facilities or equipment to access work areas at Contractor expense. Notify the Contracting Officer when the work is ready for Quality Assurance testing. Establish and update the construction schedule to provide the Contracting Officer estimated sampling/testing dates and times.

3.3

Payment for Testing and Re-Testing – Contractor shall pay for all Quality Control testing identified above. Mix Designs for Portland Cement Concrete and Flowable Fill, mix designs for Asphalt Concrete, and all initial aggregate quality tests are quality control tests and are at Contractor’s expense. Testing costs are incidental to the work and are to be included in the lump sum or unit cost bid.

Owner will pay the Quality Assurance testing costs.

Quality Assurance re-testing, due to failing initial tests, will by performed by the Owner or their quality assurance testing agency, and the re-testing costs deducted from the Contractor’s progress estimates.

PART 4 - MEASUREMENT AND PAYMENT

END OF SECTION 01400

SECTION 01600

TEMPORARY WATER SUPPLY

PART 1

GENERAL

1.5 Description:

Provide temporary water supply from the City of Sheridan water plant to the existing water treatment plant on the project site as shown on the Construction Drawings. The system shall have a capacity of at least 120-gpm.

1.6 Submittals:

CONTRACTOR shall submit a shop drawing including all materials proposed to be used for temporary water supply.

1.7 Applicable Laws and Regulations:

CONTRACTOR shall comply with all applicable laws and regulations.

1.4 The Contractor shall not remove any equipment or interrupt the operations of the existing water plant until the temporary water system is installed, tested and placed into service.

PART 2

PRODUCTS

2.1 Temporary Water Piping

The water piping shall be constructed using glued schedule 80 PVC pipe or a fully restrained joint, C-900 PVC piping system. All materials used shall be NSF approved for water system use. All pipe used for the temporary water system must have a visible National Sanitation Foundation (NSF) approval stamp by the manufacturer. The temporary system shall be constructed leak-free.

2.2 Backflow Prevention

The temporary water supply shall be equipped with a backflow prevention device approved by the City of Sheridan. The Contractor shall supply the backflow device, installation and all testing required to connect to the City’s water system.

2.3 Shut-off Valve

The temporary water supply shall be equipped with a minimum of two shut-off valves that are approved by the City of Sheridan.

2.4 Flow Meter

The temporary water supply shall be equipped with a flow meter showing both current flow rate and total flow through the meter that is approved by the City of Sheridan. The meter is available through the City for a refundable deposit. The Contractor shall be responsible for the deposit and after the project is completed, the Contractor shall return the meter to re-claim their deposit.

PART 3

EXECUTION

3.1 Temporary Water System Sizing

All pipe sizes shall be adequate to meet a minimum flow of 120-gpm water supply demands of the Owner.

3.2 Temporary Water System Disinfection

All temporary water systems shall be assembled, flushed, and disinfected in place and approved by the City of Sheridan before being placed into service. The disinfection procedures shall be equal to the procedures required for the new water main. This will require minimum 48-hours laboratory time for the Bac-T sample to determine acceptability.

Temporary hoses, piping, fittings, etc., to be flushed and disinfected in accordance with the State of Wyoming Department of Environmental Quality, and the standards of this specification prior to being placed into service.

3.3 Connection to Owner’s System

Once the temporary water system has been assembled, pressure tested and disinfected, the CONTRACTOR shall make the connection the Owner’s system as shown in the Construction Drawings

3.4 Operation of the Temporary Water System

Once the temporary water system has been assembled, pressure tested, disinfected, and connected to the Owner’s system, the Owner will operate the system and be responsible to protect the system against freezing. The Owner will also be responsible for the cost of the water used in the temporary water system. The Contractor shall be responsible for the maintenance of the system including any damage to the system, other than that caused from freezing.

3.5 Removal of the Temporary Water Supply System

After the project is completed and the Owner’s water treatment plant is producing water, the Contractor shall disassemble and remove the temporary water supply system. The Contractor shall retain ownership of the piping material used for the water system.

3.6 Where the temporary water system cuts cross county, the Owner will locate the existing raw water line and provide alignment staking every 100 feet. The Contractor shall follow the existing line with the temporary water line.

3.7 The Contractor shall provide adequate support as needed when crossing any ditches.

PART 4

NOT USED

END OF SECTION 01600

SECTION 01700

CONTRACT CLOSEOUT

PART 1 - GENERAL

1.1 Cleanup

At Substantial Completion and prior to the Final Inspection, as outlined in Division 1, execute the following:

A. Remove debris, waste, surplus materials, and rubbish from right-of-way, easements (construction or permanent) and private property impacted by the Work.

B. Remove debris, dirt, and silt from water valve boxes installed during the Work or impacted by the Work.

C. Rake landscaped surfaces clean of debris.

D. Sweep dirt and debris from all paved areas affected by the Work.

E. Adjust operating products and equipment to ensure smooth and unhindered operation.

1.2 Record Documents

Submit record documents to Contracting Officer as outlined in Division 1. Final payment will not be processed until the record documents are submitted to and approved by the Contracting Officer.

1.3 Operation and Maintenance Manual Submit Operation and Maintenance Manual as per Section 11930.

1.4 Warranties and Bonds

Submit, with final payment request, all warranty certificates, lien releases, and Consent of Surety documents as per Division 1.

1.5 Substantial Completion and Final Inspection

Submit written certification that project is substantially complete and request, in writing, a final inspection. Substantial and final completion will only be considered for the entire Project. The Contracting Officer will make an inspection within 10 days of receipt of request. Substantial Completion shall be defined as a fully functioning water tank which has been tested according to this specification; all backfill, compaction, and surface restoration completed.

Should the Contracting Officer determine that the Work is substantially complete, he will prepare a punch list of deficiencies that need to be corrected before final acceptance, and issue a Notice of Substantial Completion with the deficiencies noted.

Should the Contracting Officer determine that the Work is not substantially complete, he will immediately notify the Contractor, in writing, stating reasons. After the Contractor completes the Work, he shall submit Certification and Request for Final Inspection.

1.6 Acceptance of the Work

After all deficiencies have been corrected, a Letter of Final Acceptance will be issued. If only designated portions of the project have been inspected, a Letter of Partial Acceptance will be issued for that portion corrected.

Acceptance may be given prior to correction of deficiencies which do not preclude operation and use of the facility; however, final payment will be withheld until all deficiencies are corrected.

Until receipt of the Letter of Final Acceptance, the Contractor shall be responsible for the Work of this Contract.

1.7 Scheduling and Coordination

Coordinate with Contracting Officer on how project is taken over and operated during transition. Protect all finished work until Owner accepts responsibility.

1.8 Post-Construction Inspection

Prior to expiration of one year from date of final acceptance, the Contracting Officer and Owner will inspect the project to determine whether corrective work is required. The Contractor will be notified in writing of all deficiencies. Corrective work must start on noted deficiencies within 10 days of receipt of notification to Contractor.

PART 2 – PRODUCT

PART 3 - EXECUTION

PART 4 - MEASUREMENT AND PAYMENT

END OF SECTION 01700

SECTION 02315

EXCAVATION

PART 1 GENERAL

1.01

SECTION INCLUDES

A.

Excavating for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building.

B.

Trenching for utilities outside the building, see Civil Sheets.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01

PREPARATION

A.

Identify required lines, levels, contours, and datum locations.

B.

Locate, identify, and protect utilities that remain and protect from damage.

3.02

EXCAVATING

A.

Excavate to accommodate new structures and construction operations.

B.

Notify Contracting Officer of unexpected subsurface conditions and discontinue affected Work in area until notified to resume work.

C.

Slope banks of excavations deeper than 4 feet to angle of repose or less until shored.

D.

Do not interfere with 45 degree bearing splay of foundations.

E.

Cut utility trenches wide enough to allow inspection of installed utilities.

F.

Hand trim excavations. Remove loose matter.

G.

Correct areas that are over-excavated and load-bearing surfaces that are disturbed; See Section 02316.

H.

Grade top perimeter of excavation to prevent surface water from draining into excavation.

I.

Remove excavated material that is unsuitable for re-use from site.

J.

Remove excess excavated material from site.

3.03

PROTECTION

A.

Prevent displacement of banks and keep loose soil from falling into excavation; maintain soil stability.

B.

Protect bottom of excavations and soil adjacent to and beneath foundation from freezing.

END OF SECTION

SECTION 02316

FILL AND BACKFILL

PART 1 GENERAL

1.01

SECTION INCLUDES

A.

Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, site structures, and utilities within the building.

B.

Backfilling and compacting for utilities outside the building to utility main connections.

1.02

RELATED SECTIONS

A.

Section 02315 - Excavation: Removal and handling of soil to be re-used.

B.

Section 03300 - Cast-in-Place Concrete.

1.03

REFERENCES

A.

AASHTO T 180 - Standard Specification for Moisture-Density Relations of Soils Using a 4.54 kg (10-lb) Rammer and a 457 mm (18 in.) Drop; American Association of State Highway and Transportation Officials; 2001 (2004).

B.

ASTM D 698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)); 2000a.

C.

ASTM D 1556 - Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method; 2000.

D.

ASTM D 1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN m/m3)); 2002.

E.

ASTM D 2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method; 1994(R 2001).

F.

ASTM D 2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth); 2005.

G.

ASTM D 3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth); 2005.

1.04

DEFINITIONS

A.

Finish Grade Elevations: Indicated on drawings.

B.

Subgrade Elevations: Indicated on drawings.

1.05

SUBMITTALS

A.

See Division 1 - Administrative Requirements, for submittal procedures.

B.

Compaction Density Test Reports.

PART 2 PRODUCTS

2.01

FILL MATERIALS

A.

General Fill: Subsoil excavated on-site.

B.

Granular Fill - Gravel: Pit run washed stone; free of shale, clay, friable material and debris.

2.02

ACCESSORIES

A.

Geotextile Fabric: Non-biodegradable, woven,.

B.

Vapor Retarder: 10 mil thick, polyethylene.

PART 3 EXECUTION

3.01

EXAMINATION

A.

Identify required lines, levels, contours, and datum locations.

3.02

PREPARATION

A.

Scarify subgrade surface to a depth of 6 inches to identify soft spots.

B.

Cut out soft areas of subgrade not capable of compaction in place. Backfill with general fill.

C.

Compact sub grade to density equal to or greater than requirements for subsequent fill material.

D.

Until ready to fill, maintain excavations and prevent loose soil from falling into excavation.

3.03

FILLING

A.

Fill to contours and elevations indicated using unfrozen materials.

B.

Fill up to sub grade elevations unless otherwise indicated.

C.

Employ a placement method that does not disturb or damage other work.

D.

Systematically fill to allow maximum time for natural settlement. Do not fill over porous, wet, frozen or spongy sub grade surfaces.

E.

Maintain optimum moisture content of fill materials to attain required compaction density.

F.

Slope grade away from building minimum 2 inches in 10 ft, unless noted otherwise. Make gradual grade changes. Blend slope into level areas.

G.

Correct areas that are over-excavated.

1.

Load-bearing foundation surfaces: Use structural fill, flush to required elevation, compacted to 95 percent of maximum dry density.

2.

Other areas: Use general fill, flush to required elevation, compacted to minimum 97 percent of maximum dry density.

H.

Compaction Density Unless Otherwise Specified or Indicated:

1.

Under paving, slabs-on-grade, and similar construction: 97 percent of maximum dry density.

I.

Reshape and re-compact fills subjected to vehicular traffic.

3.04

FILL AT SPECIFIC LOCATIONS

A.

Use general fill unless otherwise specified or indicated.

B.

Structural Fill:

1.

Maximum depth per lift: 6 inches, compacted.

2.

Compact to minimum 95 percent of maximum dry density.

C.

Under Interior Slabs-On-Grade:

1.

Use granular fill.

2.

Depth: 4 inches deep.

3.

Compact to 95 percent of maximum dry density.

D.

At Foundation Walls and Footings:

1.

Do not backfill against unsupported foundation walls.

3.05

TOLERANCES

A.

Top Surface of General Filling: Plus or minus 1 inch from required elevations.

B.

Top Surface of Filling Under Paved Areas: Plus or minus 1 inch from required elevations.

3.06

FIELD QUALITY CONTROL

A.

See Division 1 - Quality Requirements, for general requirements for field inspection and testing.

B.

Perform compaction density testing on compacted fill in accordance with ASTM D1556, ASTM D2167, ASTM D2922, or ASTM D3017.

C.

Evaluate results in relation to compaction curve determined by testing uncompacted material in accordance with ASTM D 698 ("standard Proctor"), ASTM D 1557 ("modified Proctor"), or AASHTO T 180.

D.

If tests indicate work does not meet specified requirements, remove work, replace and retest.

E.

Frequency of Tests: min 4.

3.07

CLEAN-UP

A.

Leave unused materials in a neat, compact stockpile.

B.

Remove unused stockpiled materials, leave area in a clean and neat condition. Grade stockpile area to prevent standing surface water.

END OF SECTION

SECTION 02721

AGGREGATE BASE COURSE

PART 1 GENERAL

1.01

SECTION INCLUDES

A.

Aggregate base course.

1.02

RELATED REQUIREMENTS

A.

Section 02751 - Portland Cement Concrete Paving: Finish concrete surface course.

B.

Section 02316 - Fill and Backfill: Topsoil fill at areas adjacent to aggregate base course.

1.03

REFERENCE STANDARDS

A.

ASTM D 698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)); 2007.

B.

ASTM D 1556 - Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method; 2007.

C.

ASTM D 2487 - Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System); 2006.

1.04

SUBMITTALS

A.

See Division 1 - Administrative Requirements, for submittal procedures.

B.

Aggregate Composition Test Reports: Results of laboratory tests on proposed and actual materials used.

C.

Compaction Density Test Reports.

1.05

DELIVERY, STORAGE, AND HANDLING

A.

When necessary, store materials on site in advance of need.

B.

When aggregate materials need to be stored on site, locate stockpiles where designated.

1.

Separate differing materials with dividers or stockpile separately to prevent intermixing.

2.

Prevent contamination.

3.

Protect stockpiles from erosion and deterioration of materials.

PART 2 PRODUCTS

2.01

MATERIALS

A.

Coarse Aggregate: Pit run washed stone; free of shale, clay, friable material and debris.

1.

Graded in accordance with ASTM D 2487 Group Symbol GW.

2.

Graded in accordance with ASTM C 136, within the following limits:

a.

2 inch sieve: 100 percent passing.

b.

1 inch sieve: 95 percent passing.

c.

3/4 inch sieve: 95 to 100 percent passing.

2.02

SOURCE QUALITY CONTROL

A.

See Division 1 - Quality Requirements, for general requirements for testing and analysis of aggregate materials.

B.

Where aggregate materials are specified using ASTM D 2487 classification, test and analyze samples for compliance before delivery to site.

PART 3 EXECUTION

3.01

EXAMINATION

A.

Verify that survey bench marks and intended elevations for the work are as indicated.

B.

Verify substrate has been inspected, gradients and elevations are correct, and are dry.

3.02

PREPARATION

A.

Correct irregularities in substrate gradient and elevation by scarifying, reshaping, and re-compacting.

B.

Do not place aggregate on soft, muddy, or frozen surfaces.

3.03

INSTALLATION

A.

Spread aggregate over prepared substrate to a total compacted thickness of 6 inches.

B.

Place aggregate in maximum 4 inch layers and roller compact to specified density.

C.

Level and contour surfaces to elevations and gradients indicated.

D.

Add small quantities of fine aggregate to coarse aggregate as appropriate to assist compaction.

E.

Add water to assist compaction. If excess water is apparent, remove aggregate and aerate to reduce moisture content.

F.

Use mechanical tamping equipment in areas inaccessible to compaction equipment.

3.04

TOLERANCES

A.

Flatness: Maximum variation of 1/4 inch measured with 10 foot straight edge.

B.

Scheduled Compacted Thickness: Within 1/4 inch.

3.05

FIELD QUALITY CONTROL

A.

See Division 1 - Quality Requirements, for general requirements for field inspection and testing.

B.

Compaction density testing will be performed on compacted aggregate base course in accordance with ASTM D1556.

C.

Results will be evaluated in relation to compaction curve determined by testing uncompacted material in accordance with ASTM D 698 ("standard Proctor").

D.

If tests indicate work does not meet specified requirements, remove work, replace and retest.

E.

Proof roll compacted aggregate at surfaces that will be under slabs-on-grade.

3.06

CLEANING

A.

Remove unused stockpiled materials, leave area in a clean and neat condition. Grade stockpile area to prevent standing surface water.

B.

Leave borrow areas in a clean and neat condition. Grade to prevent standing surface water.

END OF SECTION

SECTION 02751

PORTLAND CEMENT CONCRETE PAVING

PART 1 GENERAL

1.01

SECTION INCLUDES

A.

Concrete sidewalks and parking areas.

1.02

RELATED SECTIONS

A.

Section 03200 - Concrete Reinforcement.

B.

Section 03300 - Cast-in-Place Concrete.

C.

Section 07900 - Joint Sealers: Sealant for joints.

1.03

REFERENCES

A.

ACI 301 - Specifications for Structural Concrete for Buildings; American Concrete Institute International; 2005.

B.

ACI 304R - Guide for Measuring, Mixing, Transporting, and Placing Concrete; American Concrete Institute International; 2000.

C.

ACI 305R - Hot Weather Concreting; American Concrete Institute International; 1999.

D.

ACI 306R - Cold Weather Concreting; American Concrete Institute International; 1988 (Reapproved 2002).

E.

ASTM C 94/C 94M - Standard Specification for Ready-Mixed Concrete; 2007.

F.

ASTM D 1751 - Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (nonextruding and Resilient Bituminous Types); 2004.

G.

ASTM D 1752 - Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion Joint Fillers for Concrete Paving and Structural Construction; 2004a.

PART 2 PRODUCTS

2.01

PAVING ASSEMBLIES

A.

Comply with applicable requirements of ACI 301.

B.

Concrete Sidewalks and Median…