36C25918Q0237 36C25918Q0237 QASP 20180404.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25918Q0237-00002000.docx | DOCX document | |
| 36C25918Q0237-00001000.docx | DOCX document | |
| 36C25918Q0237-005.docx | DOCX document | |
| 36C25918Q0237-001.docx | DOCX document | |
| 36C25918Q0237-004.docx | DOCX document | |
| 36C25918Q0237-002.docx | DOCX document | |
| 36C25918Q0237-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 36C25918Q0237
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) – Investigative Services
INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS). This plan sets forth the procedures and guidelines the VA will use in ensuring the required performance standards or services levels are achieved by the contractor.
Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by VA to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
Performance Management Strategy The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives/disincentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
ROLES AND RESPONSIBILITIES
The project team consists of the contracting officer (CO) and the Contracting Officer’s Representative (COR).
The Contracting Officer The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and for resolving any differences between the observations documented by the contracting officer's representative (COR) and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
The Contracting Officer’s Representative The Contracting Officer’s Representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.”
Incentives or Disincentives in Relation to Standards and Quality Levels Contractor performance on this contract, be it less than, greater than, or equal to satisfactory performance on this contract, will be subject to the Incentives/Disincentives identified in the Performance Requirements Summary. The results will also be documented by the COR and CO, for use as past performance indicators to support any interest or bids the contractor makes in future government requirements and solicitations. Failure to meet the required service or performance level will result in a delinquency notice to the contractor.
METHODOLOGIES TO MONITOR PERFORMANCE
Surveillance Techniques In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
· Random monitoring - which shall be performed by the COR/COR designated inspector. An example of a sampled week could be the COR sampling four successive waiting times for each of five days in one week.
· 100% Inspection – Each month, the COR, shall review the generated documentation and enter summary results into the Surveillance Activity Checklist.
· Periodic Inspection – COR typically performs the periodic inspection which should align with the frequency of required services per the PWS, such as weekly or monthly, depending on the required task.
· Customer Feedback The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the CO and COR, as opposed to the contractor. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Report, identified in Attachment 4.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
Acceptable Quality Levels The acceptable quality levels (AQLs) included in Attachment 1, Performance Requirements Summary, for contractor performance are structured to allow the contractor to manage how the work is performed while providing disincentives for performance shortfalls. For certain critical activities such as those involving maintaining safety during operations, the desired performance level is established at 100 percent. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at the VA Medical Center in this PWS.
QUALITY ASSURANCE DOCUMENTATION
The Performance Management Feedback Loop The performance management feedback loop begins with the communication of expected outcomes.
Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.
Monitoring Forms The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2, 3 and 4. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results satisfy the Purpose of the Performance Work Statement. The COR will retain a copy of all completed QA surveillance forms and forward electronic copies to the CO.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in disincentives, as shown in Attachment 1 of this document.
Reporting The COR will prepare a written report for the CO summarizing the overall results of the quality assurance surveillance of the contractor’s performance, as needed. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2, 3 or 4), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
Reviews and Resolution The COR may require the contractor’s project manager, or a designated alternate, to meet with the CO and other government personnel as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the COR as often as required or per the contractor’s request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
· Recommendations for improved efficiency and/or effectiveness
The COR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO/ACO.
QASP ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
| Task |
| Standard |
| Acceptable Quality Level (AQL) |
| Surveillance Method |
| Incentives (Negative and Positive) |
Rework/Remedy
| 1. Case Action Plan (CAP) |
| CAP includes a minimum of the items identified in the PWS. |
CAP must be received by the COR within 48 hours following Case Orientation and Review.
| 90% of all CAP submittals must be within the 48 hours listed by the standard. |
| Direct Observation -Receipt and review of Case Action Plan |
| Remedy / Rework |
Refer to Incentive/Disincentive table below
CPARS documentation.
| 2. Case Action Plan Update |
| Contractor provides COR with work log, weekly status updates, and obtains approval before implementing any changes to the original CAP. |
Approved changes to the CAP are annotated or updated and provided to the COR within 48 hours of approval.
| 90% of all changes to the CAP, must be provided to the COR within the 48 hours listed by the standard. |
| Direct Observation -Receipt and review of Case Action Update |
| Remedy / Rework |
Refer to Incentive/Disincentive table below
CPARS documentation.
| 3. Final Case Report (FCR) |
| FCR includes a minimum of the items identified in the PWS |
FSP is provided to the COR within two (5 business days) of conclusion of investigations.
| The FCR must be provided within the 5 business days, listed in the standard, 90% of the time. |
| Direct Observation -Receipt and review of Final Service Report |
| Remedy / Rework |
Refer to Incentive/Disincentive table below
CPARS documentation.
| 5. Contracting Staffing Requirements |
| Contractor provides Qualified Investigators and required documentation in accordance with PWS |
Contractor notifies COR at least three (3) days prior of changes to staff, along with a written explanation of the circumstances necessitating the change.
Must apply the standard 99% of the time.
Desired quality level is 100% application of this requirement, including within frequency and due dates
| Direct Observation -Receipt and review of Contracting Staffing Documentation |
| Remedy immediately. |
Refer to Incentive/Disincentive table below
CPARS documentation.
| 6. Contractor Conduct |
| Contractor personnel conduct themselves in accordance with section V of the PWS. |
| Must follow the standard 99% of the time. |
| Direct Observation |
Receipt of Reports Remedy immediately. Rework, as necessary.
Refer to Incentive/Disincentive table below
CPARS documentation.
| 7. Contractor POC |
| POC is available to COR per PWS |
POC Contact information is current and updated.
Respond to at least 95% of incoming telephone calls or voice messages left by COR with the month (calendar) to be Rated Satisfactory.
During each month, no more than 3 of returned phone calls to COR may be later than the specified time period with the month (calendar) to be Rated Satisfactory.
Direct Observation - Receipt of POC contact details
Direct Observation - of POC contact details and accessibility Remedy immediately. Rework, as necessary.
Refer to Incentive/Disincentive table below
CPARS documentation.
| 8. Tasks and Requirements in accordance with PWS |
| Satisfying the PWS Tasks and Requirements within the Constraints as well as satisfying the Purpose of the PWS. |
| Minimum acceptable quality level is 90% completion of requirement, including within frequency and due dates |
Desired quality level is 100% completion of requirement, including within frequency and due dates Direct Observation
Random Inspection
Remedy immediately. Rework, as necessary.
Refer to Incentive/Disincentive table below
CPARS documentation.
| 9. Rework or Remedy |
| Rework or Remedy accomplished before the following services are due. |
For example, must be accomplished before the following investigation phase begins or are due before Rework or Remedy 95% with response time meeting required standards 90%
Rework or Remedy must not be left unresolved for more than 5 days during the month.
No more than 3 of Remedy resolution requests made by the COR may be later than the specified time period.
Direct Observation
Random Inspection
Remedy immediately. Rework, as necessary.
Refer to Incentive/Disincentive table below
CPARS documentation.52.249-8(a)(2) will be actioned.
Refer to “QASP (continued) – Past Performance Documentation”
INCENTIVE / DISINCENTIVE TABLE
| Incentives/Disincentive Ratings used in Base Period and Option Period 1 |
| Incentives/Disincentive Ratings used in Option Periods 2-4 |
| Evaluation Ratings |
| Evaluation Rating Definition |
(+) Meet the acceptable performance definition as a condition for positive ratings in CPARS assessment.
Minimum SATISFACTORY rating for ALL TASKS.
(+) Meet the acceptable performance definition as a condition for positive ratings in CPARS assessment. Minimum THREE (3) or more TASKS with at least VERY GOOD or EXCEPTIONAL rating.
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
(+) Meet the acceptable performance definition as a condition for positive ratings in CPARS assessment. Minimum SATISFACTORY rating for ALL TASKS to include Exceptional and Very Good rating requirements described above.
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
(-) Does not meet the acceptable performance definition as a condition for positive ratings in CPARS assessment.
(-) Does not meet the acceptable performance definition as a condition for positive ratings in CPARS assessment.
| Marginal |
| Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective. |
QASP ATTACHMENT 2: SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD: ____________________________________________________________________
SURVEY PERIOD: __________________________________________________________________________ SURVEILLANCE METHOD (Check):
□ Random Sampling □ 100% Inspection □ Periodic Inspection □ Customer Complaint LEVEL OF SURVEILLANCE (Check):
□ Monthly □ Quarterly □ As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______% Service Provider’s Performance (Check): Meets Standards Does Not Meet Standards
Narrative of Performance During Survey Period: __________________________________________________
PREPARED BY: ___________________________________ DATE: _________________
QASP ATTACHMENT 3: Performance Report
1. CONTRACT NUMBER: <insert number>
2. Prepared by: (Name of COR) <insert name>
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations.>
Prepared by: <Enter COR’s name>
| _______________________________________ | ________________ |
| Signature – Contracting Officer’s Representative | Date |
QASP ATTACHMENT 4: Customer Complaint Report (CCR)
1. Contract Number: <insert number>
2. TO: (Contractor Task Manager or on-site representative) <insert name>
3. FROM: <insert name>
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
<Describe in detail. Identify any attachments. IMPORTANT NOTE: A customer’s objective feedback, as it pertains to the required tasks of the PWS, should only be considered instead of subjective feedback.>
6. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this CCR. >
Prepared by: <Enter name>
| _______________________________________ | ________________ | |
| Signature – COR | Date |
Received by:
| _______________________________________ | ________________ | |
| Signature – CO | Date |