5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

None

Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014

Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders

36C25820R0041 06-24-2020

X

See SF-30-Block 14 Continuation Page

CONTINUATION PAGE

RFP Questions and Answers:

Questions:

· My plan is to address each task/subtask individually, indicating what I have done in relationship to the task and, where appropriate, providing attachments (i.e., copies of various tools, email templates, etc. that I have developed for SMART, which also demonstrates proficiency with Excel, Word, etc.). Is that correct? Since the IDIQ specifies that proficiency should be on the CV or resume, would it be appropriate to instead have all the attachments with the CV? I have numerous forms that have been developed for SMART that are pertinent to the tasks/subtasks and just want to assure that the placement of these attachments is acceptable.

· The B.3 Price Schedule has a place for the “grand total” on the last page. Is that the total of items 0001, 1001, 2001, 3001, and 4001?

· There is a section 11 “Quality Assurance” which indicates a plan for overseeing contractors working for me. Since I’m a one-person shop, that is not relevant. Is this something that I should address?

Answers:

1. Please refer to 52.212-1 Section J Paragraph 2 and Section 10 Contractor Qualifications of the PWS. The contractor, contractor’s employees, sub-contractor and individuals who will perform work under this contractor must meet all the qualifications listed below and submit copies of degree, training certificates, professional certifications, resume, CV, etc. to meet contractor qualifications. Computer knowledge - Skilled in Microsoft Office Programs (e.g., Outlook Email, Word, PowerPoint, Excel and SharePoint), and Adobe Acrobat. Resume or CV must demonstrate experience.

1. Solicitation states, “ Offers must submit their proposed pricing using the Table Below. Offers submitted which do not use this table may be considered for award. Please provide pricing in Section B.3 Price/Cost Schedule Item Information Section.

1. Please refer to 52.212-1 Section J Paragraph 5 and Section 11 of the PWS. Submit their management and quality assurance approach documentation outlined in Section 11-Quality Assurance of the Performance Work Statement.