S02-36C25820Q0376 0003 Amendment 20200901.docx
DOCX document 24 KB Posted
- Solicitation number
- 36C25820Q0376
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02-36C25820Q0376 Amendment 0002 20200901.docx | DOCX document | |
| S02-36C25820Q0376 Amendment 0001 20200831.docx | DOCX document | |
| S02-36C25820Q0376 RFQ 20200827.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 09-01-2020 None Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders
36C25820Q0376 08-27-2020
X X X
CONTINUATION PAGE
Questions and Answers:
3. The requirement requests “updates” to the CCURE software. That may require a full system upgrade. Should we include the necessary costs to upgrade CCURE to new versions each year?
Answer: The system should be updated with the latest software version each year.
4. The requirement calls for on-site repairs within (8) hours of a VA call, however the CLINs do not allow us to respond with the costs to meet this requirement. Please verify if on-site support is a requirement.
Answer: Upgrades should be installed at the beginning of the period of performance. One time annually within 30 days after of receipt of award. A separate CLIN for services outside the scope of the contract will be added. Refer to Solicitation Amendment 002 Question 2.
5. Please clarify the requirement in Section 8: Over and Above Repairs. Will the contractor be responsible for fixing hardware such as control panels, readers, door devices, etc.? Should the necessary costs be included in this response?
Answer: The contractor is not responsible for fixing hardware and any hardware repairs will be performed inhouse. The contractor is responsible for software only. Refer to Solicitation Amendment 002 Question 2.
6. The requirement calls for inspections. Please clarify what the expectation of the inspection is for this scope of work.
Answer: Sentence will be removed from Statement of Work. The contractor does not perform inspections.
7. The CLINs note a total of (8) hours per year for the system updates and upgrades. This amount of time is inconsistent with the overall requirement and level of effort needed to respond to the solicitation. Please clarify the CLINs.
Answer: It should only take 8 hours to perform annual software upgrades and updates.