36C25819R0077-003.pdf
PDF Posted
- Attached to
- 36C25819R0077 l 605-19-4-6012-0120 l Procedure Rm Led & HVAC l 605-19-100 l Loma Linda (605)
- Solicitation number
- 36C25819R0077
About this file
36C25819R0077 S02_Attachment 02_Specifications_36C25819R0077.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25819R0077-001.docx | DOCX document | |
| 36C25819R0077-002.pdf | ||
| 36C25819R0077-004.pdf | ||
| 36C25819R0077-003.pdf | ||
| 36C25819R0077-001.docx | DOCX document | |
| 36C25819R0077-004.pdf | ||
| 36C25819R0077-002.pdf | ||
| 36C25819R0077-000.docx | DOCX document | |
| 36C25819R0077-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 02
SPECIFICATIONS
605-19-100
13 pages
13 July 2018
Loma Linda, California VA Health Care System (605)
Upgrade HVAC & Led Lining
CONSTRUCTION
Radiation Protection Shielding Design
Facility: VA Loma Linda - Procedure Room Address: 11201 Benton St, Loma Linda, CA 92357
Contact: Timothy J. LaFave, PM/COR, Loma Linda VAMC, Timothy.Lafave@va.gov Signature:
Room ID: SSV Procedure Room 3D-72 Date: July 13, 2018
Calculation Method: NCRP 147
Installation Type: Fluoroscopic
Fluoroscopic Patients / Week: 30
Barrier Requirements Summary
Existing Structural Recommended P/T Shielded Air Kerma Protected Location Material Additional Barrier (mGy/wk) (mGy/wk)
North Wall - Balcony 1.75 in gypsum 0.1 0.0594
North Wall - Glass 0.50 in plate glass 0.1 0.0843
North West Corner - Corridor 1.75 in gypsum 0.1 0.0873
East Wall - Sleep Room 1.25 in gypsum 2 / 64ths inch lead 0.02 0.0123
South Wall - Handwash Station Glass 0.25 in plate glass 1.50 in plate glass 0.1 0.0781
South Wall - Ante Room 1.25 in gypsum 2 / 64ths inch lead 0.1 0.0123
West Wall - Corridor 1.25 in gypsum 2 / 64ths inch lead 0.1 0.0112
Ceiling 3.0 in concrete 0.02 0.0096
Floor 3.0 in concrete 0.02 0.0096
Physicist:
Steven M. LaFontaine, M.S., DABR Certified Medical Physicist Therapy Physics, Inc.
2501 Cherry Ave., #270, Signal Hill, CA 90755 562-317-0650 Fax: 562-317-0661 Email: steven@therapyphysics.com
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Therapy Physics, Inc.
562-317-0650
Comments and Recommendations
1. This is a shielding report for a mobile c-arm procedure room located on the third floor of this multi-story building. A minimum floor-to-floor distance of 12 feet was assumed; a minimum of 2 inches concrete is required in the floor and ceiling. The C-Arm is assumed to expose within a 5 ft by 5 ft box area, centered in the room with a straight line of access to the double doors (marked on diagram). Distance measurements are made from the closest point of the barrier to this box area.
2. All shielding requirements are based on NCRP Report #147 (2005): “Structural Shielding Design and Evaluation for Medical Use of X- Rays.” Calculations for each barrier are made using the computer software program based on data and assumptions are from NCRP Report # 147.
3. The following assumptions were used in the shielding calculations:
Workload: 30 patients per week (240 minutes Fluoro beam on) each room. Assumes 8 minutes fluoro time per patient.
4. Assuming all walls will have the standard 2 layers of 5/8" gypsum board and doors are solid-core.
5. The shielding recommendations are designed to meet Radiation Protection Standards as defined by the VA Code of Radiation Control Regulations. Future changes in either assumed information, equipment, workload, or room design will necessitate a re-evaluation of these shielding requirements
6. This report has been updated as of July 13, 2018, to reflect updated in shielding material thickness for North Wall - Balcony; all previous reports should be disregarded. As confirmed by architectural drawings, the exterior contains a total of 1.75 inches gypsum, among other additional materials; the window is solid plate glass with one inch spandrel insulating panel (estimated equivalent thickness is 0.5 inches).
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Protected Location: North Wall - Balcony Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 0.2 P/T (mGy/wk): 0.100 Barrier Type:
Primary or Secondary:
Use Factor:
Workload Distribution:
Number of Patients / Week:
Scatter Direction:
Use Table / Bucky Preshielding? :
Under-Table Fluoro Tube
Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter
Distance to Protected Location: 20.0 ft 20.0 ft Unshielded Air Kerma (mGy/wk): 9.69E-03 2.50E-01
Other Material Tranmission: 1.00E+00 1.00E+00 Remaining Air Kerma (mGy/wk): 9.69E-03 2.50E-01
Transmission Model: Secondary Secondary Preshielding Credit: N/A
Existing Material Tranmission: 2.29E-01 2.29E-01 Shielded Air Kerma (mGy/wk): 0.0022 0.0572
Other Existing Material: Material:
Structual Material Required: 0.96 in Material:
Existing Structural Materal: 1.75 in Material: Shielded Air Kerma (mGy/wk): 0.0594
Side
Gypsum Gypsum
N/A
N/A Secondary
Fluoro (R&F)
Secondary Wall
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Protected Location: North Wall - Glass
Primary or Secondary:
Use Factor:
Workload Distribution:
Number of Patients / Week:
Scatter Direction:
Use Table / Bucky Preshielding? :
Under-Table Fluoro Tube
Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter
Distance to Protected Location: 20.0 ft 20.0 ft Unshielded Air Kerma (mGy/wk): 9.69E-03 2.50E-01
Other Material Tranmission: 1.00E+00 1.00E+00 Remaining Air Kerma (mGy/wk): 9.69E-03 2.50E-01
Transmission Model: Secondary Secondary Preshielding Credit: N/A
Existing Material Tranmission: 3.24E-01 3.24E-01 Shielded Air Kerma (mGy/wk): 0.0031 0.0811
Other Existing Material: Material:
Structual Material Required: 0.41 in Material:
Existing Structural Materal: 0.50 in Material: Shielded Air Kerma (mGy/wk): 0.0843Plate Glass
N/A
Fluoro (R&F)
Side
Plate Glass
Secondary Wall
Secondary N/A
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Protected Location: North West Corner - Corridor
Primary or Secondary:
Use Factor:
Workload Distribution:
Number of Patients / Week:
Scatter Direction:
Use Table / Bucky Preshielding? :
Under-Table Fluoro Tube
Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter
Distance to Protected Location: 16.5 ft 16.5 ft Unshielded Air Kerma (mGy/wk): 1.42E-02 3.68E-01
Other Material Tranmission: 1.00E+00 1.00E+00 Remaining Air Kerma (mGy/wk): 1.42E-02 3.68E-01
Transmission Model: Secondary Secondary Preshielding Credit: N/A
Existing Material Tranmission: 2.29E-01 2.29E-01 Shielded Air Kerma (mGy/wk): 0.0033 0.0840
Other Existing Material: Material:
Structual Material Required: 1.53 in Material:
Existing Structural Materal: 1.75 in Material: Shielded Air Kerma (mGy/wk): 0.0873Gypsum
N/A
Fluoro (R&F)
Side
Gypsum
Secondary Wall
Secondary N/A
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Protected Location: East Wall - Sleep Room Design Goal (P) (mGy/wk): 0.02 Occupancy (T): 1 P/T (mGy/wk): 0.020 Barrier Type:
Primary or Secondary:
Use Factor:
Workload Distribution:
Number of Patients / Week:
Scatter Direction:
Use Table / Bucky Preshielding? :
Under-Table Fluoro Tube
Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter
Distance to Protected Location: 10.0 ft 10.0 ft Unshielded Air Kerma (mGy/wk): 3.88E-02 1.00E+00 Structural Material Tranmission: 6.56E-01 6.56E-01 Remaining Air Kerma (mGy/wk): 2.54E-02 6.56E-01
Transmission Model: Secondary Secondary Preshielding Credit: N/A
Rec + Preshield Transmission: 1.80E-02 1.80E-02 Shielded Air Kerma (mGy/wk): 0.0005 0.0118
Existing Structural Material: 1.25 in Material:
Additional Barrier Required: 0.64 mm Material:
Recommended Additional Barrier: 0.79 mm Material: ( 2 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0123
Lead
N/A
Fluoro (R&F)
Gypsum
Side
Lead
Secondary Wall
Secondary N/A
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Protected Location: South Wall - Handwash Station Glass
Primary or Secondary:
Use Factor:
Workload Distribution:
Number of Patients / Week:
Scatter Direction:
Use Table / Bucky Preshielding? :
Under-Table Fluoro Tube
Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter
Distance to Protected Location: 9.0 ft 9.0 ft Unshielded Air Kerma (mGy/wk): 4.78E-02 1.24E+00 Structural Material Tranmission: 7.81E-01 7.81E-01 Remaining Air Kerma (mGy/wk): 3.74E-02 9.66E-01
Transmission Model: Secondary Secondary Preshielding Credit: N/A
Rec + Preshield Transmission: 7.79E-02 7.79E-02 Shielded Air Kerma (mGy/wk): 0.0029 0.0752
Existing Structural Material: 0.25 in Material:
Additional Barrier Required: 1.30 in Material:
Recommended Additional Barrier: 1.50 in Material: Shielded Air Kerma (mGy/wk): 0.0781
Plate Glass
Fluoro (R&F)
Plate Glass
Side
Plate Glass
Secondary Wall
Secondary N/A
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Protected Location: South Wall - Ante Room
Primary or Secondary:
Use Factor:
Workload Distribution:
Number of Patients / Week:
Scatter Direction:
Use Table / Bucky Preshielding? :
Under-Table Fluoro Tube
Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter
Distance to Protected Location: 10.0 ft 10.0 ft Unshielded Air Kerma (mGy/wk): 3.88E-02 1.00E+00 Structural Material Tranmission: 6.56E-01 6.56E-01 Remaining Air Kerma (mGy/wk): 2.54E-02 6.56E-01
Transmission Model: Secondary Secondary Preshielding Credit: N/A
Rec + Preshield Transmission: 1.80E-02 1.80E-02 Shielded Air Kerma (mGy/wk): 0.0005 0.0118
Existing Structural Material: 1.25 in Material:
Additional Barrier Required: 0.24 mm Material:
Recommended Additional Barrier: 0.79 mm Material: ( 2 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0123
Fluoro (R&F)
Gypsum
Side
Lead
Secondary Wall
Secondary N/A
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Protected Location: West Wall - Corridor
Primary or Secondary:
Use Factor:
Workload Distribution:
Number of Patients / Week:
Scatter Direction:
Use Table / Bucky Preshielding? :
Under-Table Fluoro Tube
Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter
Distance to Protected Location: 10.5 ft 10.5 ft Unshielded Air Kerma (mGy/wk): 3.51E-02 9.08E-01 Structural Material Tranmission: 6.56E-01 6.56E-01 Remaining Air Kerma (mGy/wk): 2.30E-02 5.95E-01
Transmission Model: Secondary Secondary Preshielding Credit: N/A
Rec + Preshield Transmission: 1.80E-02 1.80E-02 Shielded Air Kerma (mGy/wk): 0.0004 0.0107
Existing Structural Material: 1.25 in Material:
Additional Barrier Required: 0.22 mm Material:
Recommended Additional Barrier: 0.79 mm Material: ( 2 / 64ths inch ) Shielded Air Kerma (mGy/wk): 0.0112
Fluoro (R&F)
Gypsum
Side
Lead
Secondary Wall
Secondary N/A
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Protected Location: Ceiling
Primary or Secondary:
Use Factor:
Workload Distribution:
Number of Patients / Week:
Scatter Direction:
Use Table / Bucky Preshielding? :
Under-Table Fluoro Tube
Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter
Distance to Protected Location: 12.0 ft 12.0 ft Unshielded Air Kerma (mGy/wk): 2.69E-02 9.87E-01
Other Material Tranmission: 1.00E+00 1.00E+00 Remaining Air Kerma (mGy/wk): 2.69E-02 9.87E-01
Transmission Model: Secondary Secondary Preshielding Credit: N/A
Existing Material Tranmission: 9.50E-03 9.50E-03 Shielded Air Kerma (mGy/wk): 0.0003 0.0094
Other Existing Material: Material:
Structual Material Required: 2.34 in Material:
Existing Structural Materal: 3.00 in Material: Shielded Air Kerma (mGy/wk): 0.0096Concrete
N/A
Fluoro (R&F)
Fwd/Back
Concrete
Ceiling
Secondary N/A
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
Protected Location: Floor
Primary or Secondary:
Use Factor:
Workload Distribution:
Number of Patients / Week:
Scatter Direction:
Use Table / Bucky Preshielding? :
Under-Table Fluoro Tube
Leakage Scatter Leakage Scatter Leakage Scatter Leakage Scatter
Distance to Protected Location: 12.0 ft 12.0 ft Unshielded Air Kerma (mGy/wk): 2.69E-02 9.87E-01
Other Material Tranmission: 1.00E+00 1.00E+00 Remaining Air Kerma (mGy/wk): 2.69E-02 9.87E-01
Transmission Model: Secondary Secondary Preshielding Credit: N/A
Existing Material Tranmission: 9.50E-03 9.50E-03 Shielded Air Kerma (mGy/wk): 0.0003 0.0094
Other Existing Material: Material:
Structual Material Required: 2.34 in Material:
Existing Structural Materal: 3.00 in Material: Shielded Air Kerma (mGy/wk): 0.0096Concrete
N/A
Fluoro (R&F)
Fwd/Back
Concrete
Secondary Floor
Secondary N/A
7/13/2018 VA Loma Linda Procedure 3D-72 C-Arm-18.xlsm
StevenLappy Typewritten Text Sleep Room
StevenLappy Typewritten Text Corridor
StevenLappy Typewritten Text Holding Ante-Room
StevenLappy Typewritten Text Balcony - No Occupants within 20 ft
StevenLappy Rectangle
StevenLappy Typewritten Text Northwest Corner
StevenLappy Typewritten Text Wash Station
StevenLappy Typewritten Text Assumed:
5 ft x 5 ft Area C-Arm Exposure
StevenLappy Line
StevenLappy Line
StevenLappy Line
StevenLappy Line
StevenLappy Line
StevenLappy Line
StevenLappy Line
StevenLappy Line
StevenLappy Line
StevenLappy Line
StevenLappy Text Box 2# Lead
StevenLappy Text Box 2# Lead
StevenLappy Text Box 2# Lead
StevenLappy Text Box 2# Lead
StevenLappy Text Box 2# Lead
StevenLappy Text Box 2# Lead -Doors
StevenLappy Text Box Project: VA Loma Linda Procedure Room 3D-72, Mobile C-Arm Date: July 13, 2018 Version 2.0 Assumes:
-2 hours per week fluoro-on time -Mobile C-Arm used within 5x5 ft box centered in room -At least 12 ft floor-to-floor height, at least 2 inches concrete in floor and ceiling -North Wall contains at least 1.75 inch Gypsum and 0.5 inch plate glass 2# / sq ft lead = 1/32 inch lead
StevenLappy Text Box No additional shielding required; existing plate glass window and gypsum wallboard is sufficient
StevenLappy Line
StevenLappy Line
StevenLappy Line
StevenLappy Text Box Additional Glass or 2# equivalent Leaded Glass required