36C25819Q0309-003.pdf
PDF 152 KB Posted
- Solicitation number
- 36C25819Q0309
About this file
36C25819Q0309 S02_Attachment 02_Schedule LLVA SOW Duration.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25819Q0309-0001001.pdf | ||
| 36C25819Q0309-0001000.docx | DOCX document | |
| 36C25819Q0309-0002000.docx | DOCX document | |
| 36C25819Q0309-004.pdf | ||
| 36C25819Q0309-001.docx | DOCX document | |
| 36C25819Q0309-002.pdf | ||
| 36C25819Q0309-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 02
ATTACHMENT 02
SCHEDULE
LLVA Pipe Replacement SOW Durations
Project # 605-19-420
1 pages
26 June 2019
Loma Linda, California VA Health Care System (605)
Urgent Repair Water Main
CONSTRUCTION
LLVA City Water Pipe Replacement Proposal
Scope of Work Durations
STEPS PROCEDURE DURATION
PHASE I - CITY WATER MAIN 6" DIA
1 Confirm positive shutoff of valves prior to air separator tank. 2 HRS
2 Build pipe assemblies onsite. 5 DAYS
3 Perform city water shutdown, drain, demo existing piping and install new assemblies, test and re-establish service.
8 HRS
4 Connect soft water supply to new city water main 6" pipe.
No City Water shutdown is required for this operation.
Only the soft water system will be affected and will require to be shutdown.
8 HRS
PHASE II - CITY WATER LOOP
1 Build pipe assemblies onsite. 5 DAYS
2 Perform city water shutdown, drain, demo existing piping and install new assemblies, test and re-establish service.
8 HRS
| S02_Attachment 02_Scheduled LLVA Pipe Replacement SOW Durations |
| S02_Attachment 02 Scheduled LLVA Pipe Replacement SOW Durations |