36C25819B0037-002.pdf
PDF 20 MB Posted
- Attached to
- 36C262-19-AP-3843 / 605-19-3-6012-0119 - 605-17-322 Pharmacy USP 797 & 800 (VA-19-00053133)
- Solicitation number
- 36C25819B0037
About this file
36C25819B0037 S02 Pharmacy USP 797 and 800 Compliance 100_ Drawings PDF.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25819B0037-0002000.docx | DOCX document | |
| 36C25819B0037-0001004.pdf | ||
| 36C25819B0037-0001003.pdf | ||
| 36C25819B0037-0001000.docx | DOCX document | |
| 36C25819B0037-0001001.pdf | ||
| 36C25819B0037-0001002.pdf | ||
| 36C25819B0037-001.docx | DOCX document | |
| 36C25819B0037-003.pdf | ||
| 36C25819B0037-004.pdf | ||
| 36C25819B0037-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHARMACY USP 797 AND 800
PROJECT NO. :605-17-322
JERRY L. PETTIS MEMORIAL
VETERANS MEDICAL CENTER
11201 BENTON STREET
LOMA LINDA, CALIFORNIA
COVER SHEET
L I C
E N S E D A R C H I T EC
T
S T
A T
E O F C A L I F O
R N
I A
JO
RGE E . A L FARO
REN._______
C-22051
03/21
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
C U s e rs \I v a ld o v in o s \D o c u m e n ts
\L O
M A
L
IN
D A
P
H A
R M
A C
Y U
S P
A
R C
H
IG
N A
C
IO
.V A
L D
O V
IN
O
S .r v t
/1
/2
:1
:2
A
M
GI100
TITLE SHEET
D. DIMATJ. ALFARO
PHARMACY USP 797 & 800
FULLY SPRINKLERED
605-17-322
04/08/2019
VA MEDICAL CENTER, LOMA LINDA
N.T.S.GI100
4 VICINITY MAP TRUE
NORTH
N.T.S.GI100
3 SITE PLAN
TRUE
NORTH
SHEET INDEX
DWG # SHEET # SHEET NAME
1 GI100 TITLE SHEET
2 GI200 GENERAL NOTES
3 GC001 EXIT PLAN, CODE DATA AND DETAIL KEY PLAN
4 GC002 PHASING AND STAGING PLAN
5 ASB1 ASBESTOS ABATEMENT FLOOR PLAN
6 S101 GENERAL NOTES
7 S102 TYPICAL DETAILS
8 S201 FLOOR PLAN
9 A001 ARCHITECTURAL GENERAL NOTES, LEGEND AND ABBREVIATIONS
10 AE101 ARCHITECTURAL DEMOLITION PLAN AND FLOOR PLAN
11 AE102 ARCHITECTURAL REFLECTED CEILING PLAN
12 AE301 ARCHITECTURAL WALL SECTIONS
13 AE401 ARCHITECTURAL INTERIOR ELEVATIONS
14 AE402 ARCHITECTURAL SIGNAGE AND FINISH PLAN
15 AE403 ARCHITECTURAL CEILING DETAILS
16 AE501 ARCHITECTURAL OPENING DETAILS
17 AE601 ARCHITECTURAL SCHEDULES
18 AE701 ARCHITECTURAL DETAILS
19 AC101 PHARMACY ACCESS CONTROL PLAN
20 FA101 PHARMACY FIRE ALARM PLAN
21 FP101 PHARMACY SPRINKLER PLAN
22 P001 GENERAL NOTES, LEGEND AND ABBREVIATIONS
23 PD101 PLUMBING DEMOLITION PLAN
24 PL101 PLUMBING FLOOR PLAN
25 PL501 PLUMBING DETAILS
26 M001 MECHANICAL GENERAL NOTES LEGEND AND ABBREVIATIONS
27 M002 MECHANICAL SCHEDULES
28 MD101 MECHANICAL FIRST/SECOND FLOOR INTERSTITIAL DEMOLITION PLAN
- AREA A
29 MD102 MECHANICAL FIRST/SECOND FLOOR INTERSTITIAL DEMOLITION PLAN
- AREA B
30 MD103 MECHANICAL SECOND FLOOR/LOW ROOF INTERSTITIAL DEMOLITION
PLAN - AREA B
31 MD104 MECHANICHAL PENTHOUSE #6 FLOOR AND ROOF DEMOLITION
PLANS
32 MH101 MECHANICAL FIRST/SECOND FLOOR INTERSTITIAL NEW WORK -
AREA A
33 MH102 MECHANICAL FIRST/SECOND FLOOR INTERSTITIAL NEW WORK -
AREA B
34 MH103 MECHANICAL SECOND FLOOR/LOW ROOF INTERSTITIAL NEW WORK -
AREA B
35 MH201 MECHANICAL FIRST FLOOR PHARMACY PLAN - NEW WORK
36 MH202 MECHANICAL FIRST/SECOND FLOOR INTERSTITIAL ABOVE
PHARMACY - NEW WORK
37 MH203 MECHANICAL FIRST FLOOR MECHANICAL ROOM SERVICE BAY #5 -
NEW WORK
38 MH204 MECHANICHAL PENTHOUSE #6 FLOOR AND ROOF PLANS - NEW
WORK
39 MH500 MECHANICAL AIR AND WATER FLOW DIAGRAM
40 MH501 MECHANICAL CONTROLS DIAGRAM
41 MH601 MECHANICAL DETAILS
42 MH602 MECHANICAL DETAILS
43 MH603 MECHANICAL DETAILS
44 E101 GENERAL NOTES, LEGEND AND ABBREVIATIONS
45 ED102 PHARMACY ELECTRICAL DEMOLITION PLAN
46 ED103 PHARMACY LIGHTING AND CEILING DEVICES DEMOLITION PLAN
47 ED104 MECHANICAL EQUIPMENT ELECTRICAL DEMOLITION PLANS
48 ED105 MECHANICAL EQUIPMENT ELECTRIC DEMOLITION PLAN
49 EL111 PHARMACY ELECTRICAL LIGHTING PLAN
50 EP112 PHARMACY ELECTRICAL POWER PLAN
51 EP113 MECHANICAL EQUIPMENT - ELECTRICAL PLAN
52 EP114 MECHANICAL EQUIPMENT - ELECTRICAL PLAN
53 EP115 ELECTRICAL POWER PLAN AT PENTHOUSE #6 FLOOR AND ROOF
54 EP120 ELECTRICAL SITE PLAN
55 EP201 PANEL SCHEDULES
56 EP202 PANEL SCHEDULES
57 EP203 PANEL SCHEDULES
58 EP204 PANEL SCHEDULES
59 EP301 ELECTRICAL DETAILS
60 EP302 ELECTRICAL DETAILS
GI100
1 ISOMETRIC VIEW NORTHEAST
GI100
2 ISOMETRIC VIEW SOUTHWEST
GI100
5 AERIAL VIEW
VA
Revisions: Date:
FINAL STAMPED
SUBMITTAL
GENERAL NOTES
ABBREVIATIONS/DEFINITION
CO CONTRACTING OFFICER
COR/COTR CONTRACTING OFFICER'S (TECHNICAL) REPRESENTATIVE
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
GOVERNMENT THE TERM GOVERNMENT SHALL MEAN DEPARTMENT OF VETERANS AFFAIRS
EXISTING HAZARDOUS MATERIALS
IF THE CONTRACTOR ENCOUNTERS ANY UNKNOWN OR SUSPECTED HAZARDOUS MATERIAL, NOT SPECIFICALLY ADDRESSED IN
SAID DOCUMENTS, HE SHALL IMMEDIATELY STOP WORK AND ADVISE THE C.O. FOR ACTION.
THE ARCHITECT/ENGINEER AND HIS/HER CONSULTANTS SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY, PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY FORM AT THE PROJECT SITE. THIS INCLUDES BUT IS NOT LIMITED TO, ASBESTOS, ASBESTOS PRODUCTS, POLYCHLORINATED BIPHENYL (PCB) OR
OTHER TOXIC SUBSTANCES.
CONTRACTOR SHALL, AT THE TIME OF BID, PROVIDE A LINE ITEM FOR THE COST OF HAZARDOUS MATERIALS ABATEMENT
SHOWN ON THE PLANS.
1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY APPROVALS AND PERMITS REQUIRED FROM
REGULATING AGENCIES BEFORE STARTING ANY WORK.
2. SUBJECT TO MINOR EXCEPTIONS, GENERALLY THE ITEMS SHOWN IN BOLD LINES ARE NEW AND ITEMS SHOWN IN
GRAYSCALE ARE EXISTING.
3. THE WORK ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO CONVEY THE SCOPE OF WORK, INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT AND FINAL LAYOUT. THE DRAWINGS ARE GENERIC IN NATURE AND ARE INTENDED TO BE SUPPORTED BY SPECIFIC MANUFACTURER AND/OR FABRICATORS SHOP DRAWINGS AND
SIMILAR DETAILS TO DETERMINE EXACT SPACING AND/OR INSTALLATION REQUIREMENTS.
4. IF ANY PART OF THE DRAWINGS OR SPECIFICATIONS CONTRADICT THE MANUFACTURER'S RECOMMENDATIONS, APPLICATION OR INSTALLATION INSTRUCTIONS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK, ADVISE THE
CONTRACTING OFFICER AND RECEIVE CLEAR, WRITTEN, DIRECTION BEFORE PROCEEDING.
5. DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. IF ANY DISCREPANCIES OR OMISSIONS IN THE DIMENSIONS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY. ANY WORK DONE WITHOUT PROPER NOTIFICATION BEING GIVEN TO THE
CONTRACTING OFFICER IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
6. PRIOR TO DEMOLITION, CONTRACTOR SHALL VERIFY ALL DIMENSIONS, EXISTING CONDITIONS AND LOCATION OF NEW CONSTRUCTION WITH EXISTING WALLS, FLOORS, CEILINGS, COLUMNS, FURRING, MECHANICAL AND ELECTRICAL
EQUIPMENT AND EXISTING CONSTRUCTION.
7. FIELD INVESTIGATION PERFORMED DURING THE DESIGN STAGE IS LIMITED TO WHAT CAN BE REASONABLY SEEN AND DOCUMENTED WHILE THE SPACE IS OPERATIONAL AND OCCUPIED BY PERSONNEL, EQUIPMENT AND FURNITURE. AS SUCH, THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING A THOROUGH REVIEW AND VALIDATING ALL FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR SHALL REPORT ANY PROBLEMS/CONFLICTS TO THE CONTRACTING OFFICER WITHIN TWO (2) DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH ARE NOT BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER ARE TO BE MADE
BY THE CONTRACTOR AT NO ADDITIONAL COST TO GOVERNMENT.
8. DRAWINGS SHOWN ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND ENSURE SHOP DRAWINGS ARE PROVIDED BEFORE DETAILING COMPLETE UTILITY LAYOUT AND INSTALLATION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ROUTE NEW CONDUITS, DUCTS, PIPING AND SIMILAR LINES TO AVOID POTENTIAL INTERFERENCES, AND WHERE THIS CANNOT BE ACCOMPLISHED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE, REROUTE, ADJUST REINSTALL THE INTERFERENCE SUCH THAT IT NO LONGER POSES A PROBLEM. THESE
ITEMS ARE TO BE ADDRESSED AND CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
9. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES TO AVOID POTENTIAL CONFLICTS.
10. FINAL LOCATION OF MECHANICAL AND ELECTRICAL EQUIPMENT SUCH AS PANELBOARD, METERS, FLUES, VENTS, ETC., SHALL BE APPROVED BY THE GOVERNMENT.
11. EACH SUBCONTRACTOR IS CONSIDERED TO BE A SPECIALIST IN HIS RESPECTIVE FIELD AND SHALL, PRIOR TO SUBMISSION OF BID OR PERFORMANCE OF WORK, NOTIFY THE CONTRACTOR AND THE CONTRACTING OFFICER, IN WRITING, OF ANY WORK CALLED FOR IN THE DRAWINGS OR SPECIFICATIONS THAT CANNOT BE FULLY GUARANTEED.
12. THE CONTRACTOR WARRANTS ALL WORK TO BE PERFORMED AND ALL MATERIALS TO BE FURNISHED UNDER THIS CONTRACT AGAINST DEFECTS IN WORKMANSHIP FOR A PERIOD OF NOT LESS THAN 1 YEAR FROM THE DATE OF FINAL ACCEPTANCE. UPON WRITTEN NOTICE OF ANY DEFECT IN MATERIALS OR WORKMANSHIP, THE CONTRACTOR SHALL, AT THE OPTION OF THE GOVERNMENT, REPAIR OR REPLACE SAID DEFECT WITHOUT COST TO THE GOVERNMENT.
13. ALL MATERIALS SHALL CONFORM TO THE "BUY AMERICAN ACT".
14. ALL CONSTRUCTION WORK, ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION, ETC. SHALL CONFORM TO THE MOST CURRENT ISSUE OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), THE INTERNATIONAL BUILDING CODE, VA CRITERIA AND ANY APPLICABLE LOCAL, STATE AND FEDERAL CODES AND GUIDELINES. SHOULD THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE CONFLICT WITH THE REQUIREMENTS OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), THEN THE MORE STRINGENT BETWEEN THE TWO SHALL GOVERN.
15. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR WORKING CONDITIONS AT THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO WORK HOURS. CONTRACTOR SHALL CONFORM TO ALL SAFETY REGULATIONS ENFORCED AT THE TIME OF CONSTRUCTION. JOB SITE SAFETY IS STRICTLY THE RESPONSIBILITY OF THE CONTRACTOR, AND NOT THE
ARCHITECT/ENGINEER OR THE GOVERNMENT.
16. THE CONTRACTOR SHALL PROVIDE U.L. RATED PORTABLE FIRE EXTINGUISHERS, TYPE 24.10.B.C ON SITE AND IN A
LOCATION APPROVED BY THE GOVERNMENT.
17. THE CONTRACTOR SHALL MAINTAIN THE CONSTRUCTION AREA AND ALL ADJACENT AFFECTED AREAS, IN A CLEAN AND ORDERLY MANNER THROUGHOUT THE COURSE OF CONSTRUCTION. DO NOT BLOCK ENTRANCES, EXITS, LOBBIES, CORRIDORS, ETC.
18. THE CONTRACTOR SHALL REMOVE ALL DEBRIS ON A DAILY BASIS IN ACCORDANCE WITH VA AND EPA REGULATIONS.
DEBRIS SHALL BE TRANSPORTED ON COVERED CARTS TO THE APPROVED DISPOSAL AREA AS DIRECTED BY THE CONTRACTING OFFICER. THE CONSTRUCTION AREA, AND ALL ADJACENT AREAS, SHALL BE CLEAN AND FREE OF
DEBRIS AT THE END OF EACH DAY.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL LEFT-OVER MATERIALS, DEBRIS, TOOLS AND EQUIPMENT INVOLVED IN HIS OPERATIONS AT THE CONCLUSION OF THE PROJECT. ALL PROJECT AREAS AND SURROUNDING AREAS AFFECTED BY CONSTRUCTION SHALL BE LEFT CLEAN AND IN PERFECT CONDITION.
20. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO ENSURE THAT ALL PROPERTIES, EQUIPMENT AND DEVICES AT THE PROJECT SITE ARE PROTECTED DURING THE CONSTRUCTION PERIOD. ANY DAMAGES TO EXISTING CONSTRUCTION, LANDSCAPING, EQUIPMENT AND DEVICES SHALL BE REPAIRED AND RESTORED TO A CONDITION EQUAL TO THAT EXISTING AT THE COMMENCEMENT OF THE WORK. THE CONTRACTOR SHALL RESTORE ANY DAMAGE AT HIS OWN EXPENSE. THE CONTRACTOR SHALL SUBMIT THE PROCEDURE FOR CONSTRUCTION AND DEMOLITION
PRIOR TO COMMENCING WORK.
21. ALL FINISH WORK, EITHER NEW OR EXISTING, WHICH IS DAMAGED OR STAINED AS A RESULT OF CONSTRUCTION ACTIVITIES, SHALL BE REPAIRED OR REPLACED AS NECESSARY AT NO ADDITIONAL COST TO GOVERNMENT.
22. ALL SURFACES SHALL BE SMOOTH, CONTINUOUSLY FREE OF IMPERFECTIONS AND IN PROPER CONDITION TO RECEIVE THE FINISH AS SPECIFIED. IN AREAS WHERE A FINISH IS NOT SPECIFIED, THEY SHALL MATCH ADJACENT MATERIAL IN
CONSTRUCTION, COLOR, TEXTURE AND MANUFACTURER.
23. WORK SHALL NOT BE PERFORMED WHEN WEATHER CONDITIONS MAY CREATE HAZARDOUS WORKING CONDITIONS OR
LEAD TO FAILURE IN WORKMANSHIP.
24. ANY ROOF, WALL OR OTHER OPENINGS MADE DURING CONSTRUCTION SHALL BE SEALED AND PROTECTED FROM RAIN, MOISTURE, WIND, DUST AND OTHER OUTSIDE ELEMENTS.
25. AN APPROPRIATELY QUALIFIED REPRESENTATIVE OF THE CONTRACTOR SHALL BE ON SITE TO SUPERVISE AND COORDINATE CONSTRUCTION AT ALL TIMES WHILE WORK IS IN PROGRESS. SUCH PERSON SHALL BE RESPONSIBLE FOR OSHA COMPLIANCE AND JOB SITE SAFETY. JOB SITE SAFETY IS STRICTLY THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE GOVERNMENT, ARCHITECTS AND ENGINEERS ARE NOT RESPONSIBLE FOR ANY ASPECT OF JOB
SITE SAFETY.
26. QUALITY CONTROL, INSPECTIONS AND WORKMANSHIP IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ANY OBSERVATIONS MADE BY THE GOVERNMENT OR ARCHITECT/ENGINEER DURING THE COURSE OF CONSTRUCTION ARE FOR THE BENEFIT OF THE GOVERNMENT AND DO NOT ALLEVIATE THE CONTRACTOR OF THIS RESPONSIBILITY.
27. THE CONTRACTOR SHALL NOT STORE ANY CHEMICALS ON THE SITE OR WITHIN THE CONFINES OF THE BUILDING
28. IF THE CONTRACTOR ENCOUNTERS ANY UNKNOWN SUBSTANCE OR MATERIAL THAT MAY BE SUSPECTED HAZARDOUS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK AND NOTIFY THE CONTRACTING OFFICER.
ASBESTOS CONTAINING MATERIALS ARE NOT PERMITTED.
29. ASBESTOS CONTAINING MATERIALS ARE NOT PERMITTED.
30. CONTRACTOR SHALL MAINTAIN AND KEEP THE EXISTING FIRE ACCESS LANE AND PEDESTRIAN ACCESS AND EXIT
PATHS CLEAR AT ALL TIMES.
31. SOME WORK MAY BE REQUIRED AFTER NORMAL WORKING HOURS, ON HOLIDAYS AND/OR WEEKENDS. THIS INCLUDES ANY WORK WHICH COULD POTENTIALLY BLOCK ACCESS TO THE FACILITY OR CAUSE DISRUPTION TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THE WORK WILL HAVE TO BE CAREFULLY PLANNED AND PHASED FOR MINIMAL DISRUPTION TO MEDICAL CENTER ACTIVITIES. ANY WORK AFTER HOURS MUST BE CAREFULLY COORDINATED WITH, AND APPROVED BY THE GOVERNMENT, A MINIMUM OF TWO WEEKS IN ADVANCE.
32. CONTRACTOR SHALL DEVELOP AND SUBMIT A DETAILED PHASING PLAN INDICATING THE SEQUENCE OF WORK, THE POTENTIAL UTILITY CUTOVERS OR OUTAGES, AND SPECIFICALLY LIST ANY POTENTIAL DISRUPTIONS TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THIS PLAN SHALL BE SUBMITTED AND APPROVED PRIOR TO MOBILIZING ON
THE SITE.
33. UNDER NO CIRCUMSTANCES CAN THERE BE UTILITY OUTAGES, INCLUDING BRIEF CUTOVERS, ANYWHERE ON THE CAMPUS WITHOUT THE EXPRESS WRITTEN CONSENT OF THE GOVERNMENT. THE CONTRACTOR SHALL PLAN AND FORECAST UPCOMING WORK WHICH MAY DISRUPT NORMAL OPERATIONS OR INTERFERE WITH STAFF OR PATIENTS AND IDENTIFY THESE IN THE PHASING PLAN, AS WELL AS REPORT THESE IN THE WEEKLY MEETINGS. IT MAY BE NECESSARY TO POSTPONE OR RESCHEDULE WORK TO ACCOMMODATE THE NEEDS OF THE MEDICAL CENTER. ALL SUCH TIME SHALL BE INCLUDED IN THE BASE BID AND WILL NOT BE BILLABLE TO THE GOVERNMENT.
34. CONTRACTOR SHALL SUBMIT TO THE GOVERNMENT, FOR APPROVAL, THE LOCATION FOR LOADING AND UNLOADING MATERIALS. CONTRACTOR IS ADVISED THAT THERE WILL BE TIME RESTRICTIONS ASSOCIATED WITH SUCH ACTIVITIES AND SHALL TAKE THIS INTO CONSIDERATION WHEN PREPARING THE PHASING PLAN.
35. CONTRACTOR SHALL PROVIDE SEISMIC ANCHORING AND/OR BRACING OF ALL CONSTRUCTION, WHETHER OR NOT SPECIFICALLY STATED ON THE DRAWINGS OR SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, WALLS, PARTITIONS, CASEWORK, FIXTURES, CEILING SUSPENDED ITEMS, OVERHEAD DUCTWORK, EQUIPMENT, PLUMBING AND ELECTRICAL PIPES AND RACEWAYS, AND FIRE PROTECTION SYSTEMS PER SPECIFICATION SECTION 130541 AND
AS SHOWN ON THE PLANS AND/OR SPECIFIED BY EACH RESPECTIVE DISCIPLINE.
36. WHERE EXTERIOR WORK OCCURS, THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE CONTRACTING OFFICER THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE.
37. CONTRACTOR SHALL PROVIDE ALL SAFETY AND CAUTION SIGNAGE TO REDIRECT PEDESTRIAN TRAFFIC AND/OR ALERT THEM TO POTENTIAL CONSTRUCTION ACTIVITIES AND HAZARDS. SAFE AND ACCESSIBLE PEDESTRIAN ROUTES SHALL BE MAINTAINED AT ALL TIMES. PROVIDE SIGNAGE IN ACCORDANCE WITH OSHA STANDARD
SPECIFICATION FOR ACCIDENT PREVENTION SIGNS AND TAGS 1910.145.
38. FOR VA-PROVIDED EQUIPMENT TO BE INSTALLED BY THE CONTRACTOR (SHOWN AS "VC" ON THE PLANS OR SCHEDULES), CONTRACTOR SHALL DISCONNECT, REMOVE AND RELOCATE SUCH EQUIPMENT AND SHALL BE RESPONSIBLE FOR RE-CONNECTING AND TESTING PROPER OPERATION (PER MANUFACTURER'S INSTRUCTIONS) OF
SUCH EQUIPMENT PRIOR TO TURNING OVER SUCH EQUIPMENT TO THE VA.
39. FOR UTILITY INTERRUPTIONS OF LESS THAN 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, FIVE (5) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. FOR UTILITY INTERRUPTIONS EXCEEDING 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, TEN (10) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE
DURATION OF SUCH INTERRUPTION.
40. CONSTRUCTION IS TAKING PLACE IN AN EXISTING OCCUPIED FACILITY. AS SUCH, DEMOLITION OR CONSTRUCTION THAT PRODUCES EXCESSIVE (60 DB OR GREATER) NOISE OR VIBRATION SHALL BE PERFORMED AT TIMES COORDINATED AND APPROVED BY THE COTR. CONTRACTOR IS ADVISED THAT WORK MAY BE STOPPED OR DELAYED AT ANY TIME AT THE DISCRETION OF THE COTR SHOULD CONSTRUCTION ACTIVITIES CAUSE ANY DISTURBANCE OR
INTERFERENCE WITH PATIENT CARE.
41. THE CEILING ACCESS PANELS SHOWN ON DRAWINGS ARE FOR MAJOR MECHANICAL EQUIPMENT ACCESS ONLY.
ADDITIONAL ACCESS PANELS (NOT SHOWN) WILL BE REQUIRED FOR MAINTENANCE, PLUMBING, ELECTRICAL AND FIRE PROTECTION. CONTRACTOR SHALL PROVIDE ADDITIONAL ACCESS PANELS REQUIRED FOR THE ABOVE SPECIALTIES AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTOR SHALL COORDINATE WITH EACH SPECIALTY TRADE AND LOCATE ADDITIONAL ACCESS PANELS FOR REVIEW AND APPROVAL BY THE VA PRIOR TO
FRAMING THE CEILING.
42. SHORING, BRACING AND PROTECTION OF EXISTING STRUCTURE AND EARTHWORK IS THE CONTRACTORS RESPONSIBILITY. PROVIDE ADEQUATE SHORING OF ANY EXISTING CONDITIONS OR CONDITIONS CAUSED BY CONSTRUCTION RELATED ACTIVITIES, AS NECESSARY TO PROTECT PERSONS AND STRUCTURE FROM POTENTIAL FALLING STRUCTURE, EQUIPMENT OR COLLAPSE OF EARTHWORK. AS A MINIMUM, FOR ANY EARTHWORK RESULTING IN TRENCHES OR EXCAVATIONS EXCEEDING THREE FEET (3') IN DEPTH, THE CONTRACTOR SHALL RETAIN THE SERVICES OF A LICENSED STRUCTURAL ENGINEER TO PROVIDE INSTRUCTIONS, FOR VA APPROVAL, ON THE METHODS TO BE USED FOR SHORING. ANY OVERHEAD STRUCTURE, EQUIPMENT OR SIMILARLY HEAVY CONDITION TO REMAIN, SHALL BE PROPERLY SHORED WITH INPUT FROM A LICENSED STRUCTURAL ENGINEER, AS
REQUIRED, TO ENSURE THE PERSONAL SAFETY AND PROTECTION OF REMAINING STRUCTURE.
43. PROVIDE TEMPORARY CONSTRUCTION BARRIERS AS NECESSARY TO SEPARATE DEMOLITION AREAS FROM ADJACENT OCCUPIED SPACES. WHEN BARRIERS CROSS A REQUIRED EXIT PATH, PROVIDE EXIT DOORS WITHIN
BARRIER WALL.
44. THESE DOCUMENTS ARE NOT INTENDED TO SHOW EVERY EXISTING CONDITION OR ITEM. CONTRACTOR SHALL NOTIFY VA OF MISCELLANEOUS ITEMS FOUND. COORDINATE WITH THE VA REGARDING THE DISPOSITION OF SUCH
ITEMS, AND HANDLE ACCORDINGLY AT NO COST TO THE GOVERNMENT.
45. NOTIFY VA OF MISCELLANEOUS ITEMS FOUND. COORDINATE WITH THE VA REGARDING THE DISPOSITION OF SUCH
ITEMS, AND HANDLE ACCORDINGLY AT NO COST TO THE GOVERNMENT.
46. ALL STRUCTURAL ELEMENTS INCLUDING THEIR FIRE PROTECTION MATERIALS ARE TO REMAIN EXCEPT WHERE
FURRING IS INDICATED TO BE REMOVED.
47. BEFORE LAYING OUT DUCTWORK, PIPING, CONDUITS, FIXTURES, REGISTERS AND/OR OTHER UTILITIES ABOVE CEILING, COORDINATE CEILING SUSPENSION SYSTEM SUPPORT LOCATIONS TO AVOID CONFLICTS WITH EXISTING OR NEW CONSTRUCTION. WHERE INTERFERENCE WITH CEILING SUPPORTS CANNOT BE AVOIDED, CONTRACTOR SHALL PROVIDE ALTERNATE CODE-COMPLIANT SUSPENSION SYSTEM AND LAYOUT AT NO EXTRA COST TO THE VA.
FIRE PROOFING
CONTRACTOR SHALL PROVIDE FIRE PROOFING WHERE MISSING, DAMAGED, OR IMPACTED BY NEW CONSTRUCTION AND AS
REQUIRED IN ACCORDANCE WITH SPECIFICATIONS.
L I C
E N S E D A R C H I T EC
T
S T
A T
E O F C A L I F O
R N
I A
JO
RGE E . A L FARO
REN._______
C-22051
03/21
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
C U s e rs \I v a ld o v in o s \D o c u m e n ts
\L O
M A
L
IN
D A
P
H A
R M
A C
Y U
S P
A
R C
H
IG
N A
C
IO
.V A
L D
O V
IN
O
S .r v t
/1
/2
:1
:2
A
M
GI200
GENERAL NOTES
D. DIMATJ. ALFARO
PHARMACY USP 797 & 800
FULLY SPRINKLERED
605-17-322
04/08/2019
VA MEDICAL CENTER, LOMA LINDA
Revisions: Date:
T
R
F.E.C.
R
T
R
B S
C B
S C
B S
C
BSC
T
F.E.C.
1 32'-0" MAX. COMMON PATH OF TRAVEL (100'-0" ALLOWED)
238'-0" TRAVEL DISTANCE TO BUILDING EXIT (300'-0"
ALLOWED)
118-0" TRAVEL DISTANCE TO SMOKE COMPARTMENT 1-2
(300'-0" ALLOWED)
66'-0" TRAVEL DISTANCE TO SMOKE COMPARTMENT 1-11
(300'-0" ALLOWED)
(N) 1 HR FIRE RATED WALL OPENING INFILL
SHEET NOTES
BUILDING CODE DATA
OCCUPANCY IBC: B
NFPA: (E) BUSINESS
CONSTRUCTION TYPE IB / II (II) **
PROJECT AREA 691
PROJECT OCCUPANT LOAD * 17
FIRE SPRINKLER THROUGHOUT YES
ACCESSIBLE ENTRY ROUTE YES
ACCESSIBLE MEANS OF EGRESS YES
CODE REFERENCES
LEGEND
EXIT SIGN
EGRESS ROUTE
OCCUPANT LOAD
EXIT LOAD
FIRE EXTINGUISHER
CABINET
1 HR FIRE RATED PARTITION
(N) FULL HT PARTITION
(E) PARTITION
FEC
THE FOLLOWING CODES ARE USED FOR THE
BASIS OF DESIGN FOR THIS PROJECT BUT ARE
NOT LIMITED TO:
· IBC
· NFPA 101
· NEC
· NFPA 80
· NFPA 110
· IMC
· IPC
· VA MANUAL H-18-8
· ASCE-7
NOTE: THE CONTRACTOR IS RESPONSIBLE FOR
VERIFYING AND USING THE MOST CURRENT
APPLICABLE CODE EDITION.
* INCLUDING RM 1C-27
** TWO HOUR
19 18 17
H
G
VAULT
1C-27A
CART
CL
CL
CLCL
HD STORAGE
1C-27FHD BUFFER
ROOM
1C-27E
ANTE ROOM
1C-27D
NON HD
BUFFER RM
1C-27C
NON HD
STORAGE
1C-27B
PHARMACY
1C-27
STORAGE
CORRIDOR
CORRIDOR
PHARMACY
19 18 17
H
G
19 18 17
H
G
19 18 17
H
G
AE401 24
AE401
AE401
AE401 14
AE401
AE501
AE501
AE501
AE501
AE501
AE301
AE301
AE301
AE301
AE301
AE301
AE301
AE301
AE301
AE301
AE501
AE501
AE501
SIM
AE501
STORAGE
CORRIDOR
CORRIDOR
PHARMACY
PT1
PT2
PT3
PT4
4A
AE701
4A
AE701
AE301 SIM
PHARMACY
1C-27
VAULT
1C-27A
NON HD
STORAGE
1C-27B
NON HD
BUFFER RM
1C-27C
ANTE ROOM
1C-27D
HD BUFFER
ROOM
1C-27E
HD STORAGE
1C-27F
19 18 17
H
G
19 18 17
H
G
L I C
E N S E D A R C H I T EC
T
S T
A T
E O F C A L I F O
R N
I A
JO
RGE E . A L FARO
REN._______
C-22051
03/21
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
C U s e rs \I v a ld o v in o s \D o c u m e n ts
\L O
M A
L
IN
D A
P
H A
R M
A C
Y U
S P
A
R C
H
IG
N A
C
IO
.V A
L D
O V
IN
O
S .r v t
/1
/2
:1
:5
A
M
GC001
EXIT PLAN, CODE DATA AND DETAIL KEY
PLAN
D. DIMATJ. ALFARO
PHARMACY USP 797 & 800
FULLY SPRINKLERED
605-17-322
04/08/2019
VA MEDICAL CENTER, LOMA LINDA
TRUE
NORTH
1/4" = 1'-0"GC001
2 PHARMACY EXIT PLAN & CODE DATA
1/4" = 1'-0"GC001
1 DETAIL KEY PLAN
TRUE
NORTH
W
8X28
W 8X28 W 8X28
W 8X28
W
8X28
W
8X31
W
8X31
W
8X31
W
8X31
W
8X31
W
8X31
W
8X31
W
8X31
W
8X31
W
8X31
W
8X31
W
8X31
W
8X40
W
10X45
W
10X45
W
10X45
W
10X4
W
10X4
W
10X45
W
10X45
W 10X45
W 10X45
W
10X4
W
10X45
W
10X45
K-2209CA
XTO N
LAVATORYVITR
EOU S CH
IN A
K-2209CA
XTON
LAVATORYVITR
EOUS CH
INA
K-2209CA XTO
N
LAVATORYVITR EOU
S CH IN
A
K-2209CAXTO
N
LAVATORYVITREOU
S CHIN
A
K-2209CA XTO
N
LAVATORYVITR EOU
S CH
IN
A
K-2209CA
XTON
LAVATORYVITR
EOUS CH
IN
A
K-2209CA
XTO N
LAV
ATO RY
VITREOU
S CHINA
K-2209CA
XTON
LAV
ATORY
VITREOU
S CHINA
K-2209CAXTO
N
LAVATO
RY
VITREO
US CHINA
K-2209CAXTO
N
LAVATO
RY
VITREO
US CHINA
K-2209CA
XTO
N
LAVATORYVITR
EOU
S CHIN
A
K-2209CA
XTO
N
LAVATORYVITR
EOU
S CHIN
A
K-2209CA
XTON
LAV
ATORY
VITREOU
S CHINA
K-2209CA
XTO N
LAV
ATO RY
VITREOU
S CHINA
K-2209CA
XTO
N
LAV
ATO
RY
VITR
EOU
S CHIN
A
K-2209CA
XTO N
LAV
ATO RY
VITR
EOU S CH
IN
A
K-2005KING
STON
C_
LAVATOR
Y
VITR
EOUS CH
IN
A
K-2005KINGSTO
N
C_LAVATOR
Y
VITREOUS CHINA
K-2005KINGSTO
N
C_LAVATOR
Y
VITREOUS CHINA
K-2005KING
STO
N
C_
LAVA
TORY
VITR
EOU
S CHIN
A
FIRST FLOOR
1SB6
1SB1
1SB4
1SB3
1SB5
1SB8
1SB7
1SB2
1B-37
BEDDING
CY01-2
COURT
WE S T
EL EV A TOR S
ELECTRICAL PANEL
CANOPY 1
C1-12
1B-50D
C1-123
1A-124
1A-125 1A-126 1A-130 1A-131
1A-128
1A-129
1A-113
1A-107
1A-109
1A-1161A-117 1A-1181A-1191A-120
1A-121
1A-122
1A-106
1A-110
1A-111
1B-27A
1B-29A
1B-29B 1B-28E
1B-28G
1B-28B
1B-28
1B-43
1B-411B-48
1B-50
1B-50B
1B-50
1B-50C 1B-51D1B-51E
1B-51
1B-49
1B-51C
1B-50A 1B-51A
1B-51F
1B-51K
1B-51H
1B-51I
1A-132 1A-133
1A-138
C1-115
1A-139 1A-137 1A-136 1A-135 1A-134
1A-556A 1A-556B
1F-10F1F-10D1F-10C
1C-27A
1B-12B
1C-32
C1-73
1A-302A
1A-302B
1A-302D
1A-301 1A-303 1A-303A 1A-304
1A-305
1A-310
1A-311
1A-312
1A-313 1A-314 1A-315 1A-316 1A-317
1A-318
1A-3061A-307
1A-319
1A-308
1A-320
1A-309
1A-321
1A-302C
C107
C1-56
C1-77
C1-75
C1-37
C1-25
C1-81
1F-35
C1-42
1E-63
1E-64B
1D-04
1D-04A 1D-06A
1D-06
1C-15A
1C-04
1C-27
1A-621
1A-615
1A-617
1A-619
1A-625
1A-627
1A-6291A-631
1A-612
1A-614
1A-614B
1A-624
1A-626
1A-628
1A-632
1A-634
1A-610
1B-04A
1B-06
1B-04D
1B-04
1B-04C1B-04B
1A-5581A-5211A-512
1A-502
1A-400
1A-400A
1A-5111A-412
1A-411 1A-421
1A-402
1A-4031A-404
1A-4231A-425 C1-10C
C1-18A C1-18B C1-18C
C1-10B
1A-434
1A-453A
1A-434A
1A-453
1A-4571A-4221A-4241A-426
1A-542
1A-532
1A-544
1A-526
1A-546
1A-524
1A-548
1A-522 1A-556
1A-554
1A-552
1A-443
1A-444
1A-439
1A-437
1A-435
1A-433
1A-431
1A-547
1A-549
1A-5451A-543
1A-4521A-451
C1-17A
C1-16
C1-17C
C1-15
C1-09
1A-02A
1A-02B
1A-02C
1A-02D
C1-38D
1A-68A
1A-70A
SB01-1
1C-29
C1-44
1C-22
1F-21
1F-23
C1-85
1E-100
1F-20
1C-25C
1C-33G
1E-621E-61
C1-47
1C-27C
1C-25D
1C-25E
1C-25
1C-25F
1C-25G
C1-43
1C-24
1C-24A
SB01-3
C1-67
1C-06
1C-05
1C-11
1C-12
C1-63
1C-14A
1C-14C EL01-S4 EL01-S5
1C-03
1D-19
1D-01
1D-09A
SH01-5
1D-01B
1D-17
1D-16A
1D-16
1D-10
1D-11
1D-12 1D-13
1D-08A
1D-08
1D-05A
1D-05
1D-03
1D-14
1C-26E
1C-26A
1C-32A
1C-26C
1C-26D
1C-26
1C-18 1C-17 1C-16 1C-15
C1-45
SB01-2
SB01-2A
1B-45
1B-44
1B-42
1B-40
1C-20
1B-16A
1B-16B
1B-031B-02
1B-16
1B-14
1B-13
1B-12A
1B-11
C1-30
1B-321B-17
1B-18
1B-19
1B-31 1B-30
C1-33
C1-29
1B-25
1B-24
1B-231B-221B-21
1B-10
1B-08
C1-21
C1-17
C1-08
1A-72C
ST01-3
1C-23
C1-06
C1-02
1A-56
1A-55
1A-54
1A-53
1A-52
1A-562
1A-49
SB01-1A
1A-76
1A-74
1A-76A
C1-41
1A-84G
1A-84H
1A-84N
1A-84I
1A-84D 1A-84F1A-84E
C1-54
1A-84B
SH01-4
EL01-P1
1F-03A
1F-04
1F-03
1F-03B 1F-01
C1-49
1A-84M 1A-84L
1A-84O1A-84P1A-84Q
1A-84K
1A-84R1A-84S1A-84U
C1-53
C1-50
1F-09
1F-08
1F-071F-08C 1F-08B
1F-08A
1F-06
1F-19
1F-10
1F-10A
1C-28
1C-30B 1C-32C
1C-04B
1C-04C
C1-40
1C-04A
1C-33A
1C-28A
1C-28C
1C-33
C1-62
1F-22
C1-60
C1-58
1F-38
1F-38C
1F-10G1F-10E1F-10B
C1-59
C1-57
C1-48
1F-09A
1F-05
1F-36
1C-07
1C-07B1C-07C1C-07A
1C-33E 1E-33F
1C-33M 1C-33L 1C-33K 1C-33J 1C-33H 1C-09
1E-109A
1C-37E1C-37B
1C-37A
1E-06
1C-37
1C-38
1F-261F-25
1F-24
1E-301E-32 1E-34
1F-28
1F-29C
1F-30 1F-30A
1F-42 1F-41
1F-39C
1F-37
1F-35B
1F-311F-32
C1-68
1E-56 1E-55 1E-54 1E-53 1E-52
1E-51
1E-50
1E-48
C1-91
1E-36
1E-35
C1-69
C1-92
C1-66
C1-74
C1-86
1E-29
1E-27
1E-25
1E-23
1E-21
1E-26
1E-24
1E-22
1E-20
1E-18
1E-17
1E-15
1E-16
1E-14
1E-19
1E-43A
1E-37
1E-38
1E-40
1E-42
1E-44
1E-64
1E-65
1E-79 1E-80
1E-77 1E-78
1E-96
1E-97
1E-98
1E-101
1E-103
1E-104
1E-108
1E-109 1E-110
1E-112
1E-113
1E-115
1E-116
1E-118
1E-119
1E-121
1E-124
1A-84
C1-52
1A-84T
1A-88
1A-82D 1A-82E 1A-82F 1A-82G
C1-41A
1A-82B
1A-82A
1A-82H
1A-82I
1A-82J 1A-77
1E-41
1E-05B
1E-07 1E-08
C1-79
1E-09 1E-10
1E-11
1E-12
1E-148 1E-146
C1-87
1E-145
1E-84
1E-143
1E-85
1E-142
1E-87
1E-140 1E-139
1E-88 1E-90
1E-137 1E-136
1E-91
C1-88
1E-93
1E-134
1C-14A
1A-72
1A-560
C1-05
C1-07
1E-66
1E-67
1E-68
1E-69 1E-70 1E-70A
1E-149A
ST01-87
1E-149 1E-148A 1E-145A 1E-142A 1E-139A 1E-136A
1E-133
1E-132
1E-131
1E-130
1E-125
1E-128
C1-90
1E-73
1E-74
1E-75 1E-76
1E-81
1E-82
1E-83 1E-86 1E-89 1E-92
C1-89
1E-95
1E-45A
1E-45
1E-44A
1E-42A
1E-40A
1E-38A
1E-37A
C1-72
C1-71
1E-43
1E-31
1E-57A
1E-57
1E-58
1E-59 1E-60
CY01-1
1E-64C
1E-64A
1E-28
1E-13
1E-01
1E-29A
1E-27A
1E-25A
1E-23A
1E-21A
1E-19A
1E-05A
1E-06A
1E-07A 1E-08A 1E-10A
1E-12A
SH01-11
ST01-8
1E-107
1E-106
1E-105
1E-102
1E-99
1E-123 1E-122
1E-120
1E-117
1E-114
1E-111
1E-48A
1E-50A1E-51A
1E-52A1E-54A 1E-56A
SH01-10
ST01-7
SB01-7A
SB01-7
1F-33
1F-34 1F-34A
C1-57A
1F-35A
1F-37A
1F-37B
1F-39
1F-39A
1F-39B
1F-40
C1-65
1F-29A
1F-29
1F-29B
1E-46
1E-33
1F-27
1E-47
1E-49
1F-38A
1F-38B
1F-21A
1F-22A
1C-36
ST01-6
EL01-S8
EL01-S7
EL01-S6
1C-34
C1-61
EL01-T2
C1-51
1C-37D
1E-02
1E-03
1E-04
1C-33F
1C-33O
1C-33R
1C-08
SB01-8A
SB01-8
SH01-9
C1-65A
C1-64
1F-43 1F-02
C1-55
C1-28
EL01-P2
1C-31
1C-30
EL01-B2
SH01-6
1C-26F
1C-32B
DW01-2
1C-28B
1C-32D
1C-04D
1C-04F
1C-04G
C1-46
SB01-6
SB01-6A
SH01-8
1D-18
1C-03
1C-02
1C-03A
1C-01
ST01-5
C1-18
1C-14B
1D-16B
1D-16C
C1-83
ST01-9
C1-82
1D-15
1D-07
1D-09
C1-80
1D-20
1D-20A
EL01-A1
1D-02
1D-02A
SH01-3
SB01-4
SB01-4A
1C-15B
1C-27B
1C-25B
C1-38
1A-88A
1A-84W
1A-84X
1A-84V
1A-83B
1A-83A
1A-92
1A-84C
1A-84J
ST01-4
C1-11
1A-82C
1A-302F
1A-72B
1A-72A
1A-71
1A-70
1A-69
1A-68
EL01-S3
EL01-S2
EL01-S1
C1-26
EL01-T1
1C-22A
1C-21 1B-51
1B-51B
1B-54
1B-52
1B-46
1B-46B
C1-34 1B-42A
1B-40A
SH01-2
ST01-2
C1-22
1B-28C
1B-28F 1B-28A
1B-28H
1B-28D
1B-27
1B-26D
1B-26D
1B-26B
1B-26A
1B-26
1B-25A
1B-29
1B-29C
1B-29D
1B-20
1B-09
C1-20
MA01-1
C1-191B-04E
1B-05 1B-07
1A-613
1A-627A 1A-627B
1A-629A
1A-611
1A-447A 1A-445 1A-447
1A-436
1A-551
1A-438
SH01-1
ST01-1
1C-26B
1A-04
1A-05 1A-06 1A-08 1A-09
1A-101A-11
1A-84Y
1A-02
1A-02E
1A-02F1A-02H1A-02J 1A-02G1A-02I
1A-02K
1A-07
1A-03
1A-01
1A-102
1A-101A
1A-101B
SB01-5
SB01-5A
C1-35
SB01-3A
1A-112
1A-101
1A-108
1B-16A. 1
1A-82K
1C-24B
1B-51J
1B-51G
1C-04A
1C-06A
1G-101
1G-103
1G-105
1G-107
1G-109
1G-111
1G-113
1G-117
1G-119
1G-121
1G-123
1G-126
1G-129
1G-143
1G-120
1G-141
1G-118
1G-116
1G-114
1G-112
1G-135
1G-110
1G-131
1G-102
1G-130
1G-132
1G-134
1G-136
1G-138
1G-140
1G-144
1G-146
1G-148
C1-100
C1-142
C1-140 C1-141
C1-143
1G-102A
1G-127
1G-148A
1G-146A
1G-144A
1G-140A
1G-103A 1G-101A
1G-107A
1G-105A
1G-111A
1G-109A
1G-117A
1G-113A
1G-121A
1G-119A
1G-127A
1G-123A
1F-09B
1A-114
1A-547B 1A-547A
1C-15C
1C-10
CORR
LAB
WORK RM
OFFICE
EXAM RM EXAM RM EXAM RM PHARMACIST
CLEAN UTIL
TOILET
EXAM
EXAM
WAITING RMEXAM RM
EXAM RMEXAM RMEXAM RM
EXAM RM
EXAM
EXAM
EXAM
BEDDING
ANIMAL WRD
ANIMAL WRD
PROCEDURE
PROCEDURE
ANIMAL WRD
ANTE ROOM
RADIATION SAFETY
OFFICESTORAGE
WORK RM
REFRI GERA
WORK RM
OFFICE
OFFICEPOST DOCS
WORK RM
LAB
OFFICE
LABCHEMICAL
OFFICE
LAB
BIOCHEM
LAB
CORR CORR
EXAM RM
CORR
SOCIAL WORK EXAM RM EXAM RM EXAM RM EXAM RM
ANTEROOM
TOILET
OFFICEOFFICEOFFICE
ANTEROOM
REFUGE RM
DECON RM
CORR
CORR
CORR
CORR
WAITING RM
RECEPTION SCHD RM EXAM RM
EXAM RM
PHARMACY
OFFICE
OFFICE
EXAM RM EXAM RM EXAM RM EXAM RM EXAM RM
EXAM RM
EXAM RMEXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
WORK RM
CORR
CORR
CORR
CORR
CORR
CORR
CORR
OFFICE
CORR
OFFICE
RECREATION
ELEC
OFFICE OFFICE
PLUMBING
STORAGE
WAREHOUSE
PHARMACY
RESTROOM
EXAM-TREAT
EXAM-TREAT
EXAM-TREAT
EXAM-TREAT
CORR
SLEEP RMNURSE OFF
MED RM
WORK RM
WORK RM
EXAM-TREAT
EXAM-TREAT
EXAM-TREAT
CLEAN LIN
SOIL LINEN
SECLUSION
TRAINING
WORK RM
POL-SECUR
ARMORYNCIC
HOLDINGTRIAGEPHARMACY
WAITING RM
CHECK-IN
RECEPTION
TRIAGE RMTRIAGE RM
PHARMACY
EXAM RM
WAITING RM
PUB TOILETPUB TOILET
EXAM RMOFFICE
CORR
CORR CORR CORR
CORR
EXAM RM
PRI TOI
PAT TOIL
EXAM RM
RN RM.NURSINGEXAM RMEXAM RM
EXAM RM
PHARMACY
EXAM RM
NURSING
EXAM RM
EXAM RM
EXAM RM
EXAM RM HOLDING
RESTROOM
RESTROOM
CHIEFING
SOILED UTI
EXAM RM
EXAM RM
EXAM RM
EXAM RM
EXAM RM
WAITING RM
TRIAGE
EXAM RMEXAM RM
EXAM RMEXAM RM
CORR
CORR
CORR
CORR
CORR
OFFICE
OFFICE
OFFICE
OFFICE
CORR
STAFF TOI
STAFF TOI
SERVBAY
LOCKERS
CORR
CORR
STAFF LCKR
STAFF LCKR
CORR
PAT RM 2B
STORAGE
SUBSTANCE
FREEZER
PRI TOIOFFICE
CORR
VAULT
WAITING RM
OFFICE
MAIL RM
OFFICE
OFFICE
CORR
EMS OFFICE
EMS ADMIN OFFICE
SERVBAY
CORR
CHIEF OFF
WAREHOUSE
OFFICE
STORAGE
CORR
STORAGE
TRANSPORTATION ELEV ELEV
VEST
GENERATOR
EQUIP RM
ELEC
SHAFT
FIRE PUMP
BOILERS/CHILLERS RM
GRAPH CTRL
BOILER RM
COMPACTOR
PAINT SHOP
STORAGE PAINT SHOP
OFFICE
AC UNIT
OFFICE
STRL UNIT
ELEC
MAINT
WASHING RM
PREP RM
WIPE DN RM
STORAGE
MECH
SUPPLY RM
OFFICE CONTROL RM RECEIVING TECH OFF
CORR
SERVBAY
EQUIP RM
LAB
EMS
RSRCH LAB
HSKPG
ANIMAL SUR
O.R.
SUPV OFFCHIEF OFF
DRESSING
ANIMAL PRE
STORAGE
REFUGE RM
RECOVERY
CORR
LAUNDRYCOLD RM
KITCHEN
EXPERIMENT
WARD ANIMAL WRD
CORR
CORR
NECROPSY
ANIMAL WRD
ANIMAL WRDANIMAL WRDANIMAL WRD
PROCEDURE
COLD RM
CORR
CORR
CORR
STORAGE
STAIR
BREAK RM
CORR
CORR
PATIENT EFFECTS
EXAM RM
EXAM RM
EXAM
EMS
SHOWER
EQUIP RM
ANTER OOM
PHARMACY
AGENT CASHIER
CORR
EXAM RM
EXAM
EXAM
EXAM
OFFICE EXAMEXAM
CORR
RECEPTION
SHAFT
ELEV
OFFICE
PRPL HRT
PAT ADVOC
OFFICE DCNDT AFF
CORR
EXAM
EXAM
EXAM RMEXAMEXAM
WORK AREA
EXAM RMCAST RM-1
CORR
CORR
OFFICE
OFFICE
PROGRAM MGRAGENT ORG
WOMEN VETERANS
OFFICE
AMER. LGN
LAUNDRY
WAITING RM
OFFICE
LINEN
SUPPLY RM
EYE WASH
MTRL MGMNT
CHIEF OFF
CORR
PHRM CACHE
DISH
SEW
LINEN
KITCHEN
CORR
OFFICE
CORR
CORR
AUDITORIUM
OFFICE
EXAMOFFICEOFFICE
CORR
CORR
CORR
CAREGIVER
REHAB
STAFF TOI
CORR
REFRIGERAREFRIGERASTORAGE
CONTROL RM STORAGE
REFRIGERA FREEZER REFRIGERA FREEZER REFRIGERA
SUPV OFFOFFICE
CHIEF
PAT RM 1B
INFO CTR
EMS
STAFF LCKRSTAFF LCKR
PAT EFFECT
CONF RMLAUNDRY
NURSE STAT
BREAK RM
SACRISTY
MEDIT-CHPL NAVE
OFFICE OFFICE
CORR
STORAGE
OFFICEOFFICE
CORR
PAT RM 4B PAT RM 2B PAT RM 2B PAT RM 2B PAT RM 2B
PAT RM 1B
PAT RM 1B
PAT RM 4B
CORR
SOILED UTI
CLEAN UTIL
CORR
WAITING RM
NURSE STAT
CORR
CORR
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
SHARED OFFICE
SOCIAL WRK
DIR OFF
MNGR OFF
MNGR OFF
MED RM
SOILED UTI
CLEAN UTIL
PAT RM 2B
SHARED OFFICE
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
DINING
MECH
STORAGE
EMS
SOCIAL WRK MNGR OFF
RESTROOM
CONG BATH
PAT RM 2B
PAT RM 1B
PAT RM 1B
PAT RM 1B
MECH
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
SOILED UTI
WAIT AREA
CORR
WORK RM
OPERATORS
OFFICE OFFICE OFFICE OFFICE
CORR
OFFICE
OFFICE
FELLOW
OFFICE
OFFICE
OFFICE
RECREATION
RECREATION
WORK RM
PAT RM 1B
PAT RM 2B
CORR
PAT RM 2B PAT RM 2B
PAT RM 2B
PAT RM 4B
PAT RM 2B PAT RM 2B
CORR
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B
PAT RM 2B PAT RM 2B
PAT RM 2B PAT RM 2B
PAT RM 2B PAT RM 2B
PAT RM 2B
CORR
PAT RM 2B
REPORT RM
TRANSPORTATION
AMB CARE
SOCIAL WORK
ENTRANCE
MECH
EMS
EMS
DIETITIAN PAT TOIL
PAT LGE
PRI TOI
STAIR
BREAK RM PAT TOIL PAT TOIL PAT TOIL PAT TOIL RESTROOM
STORAGE
MED RM
MECH
NOURISH ST
EMS
RESTROOM
FAMILY DINING
RESTROOM
RESTROOM
OFFICE
LAUNDRY
BEH MED OFFICE
PAT RM 2B
PAT TOIL PAT TOIL PAT TOIL PAT TOIL
WAITING RM
STORA GE
PAT TOIL
PAT RM 2B
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
CORR
CORR
OFFICE
STORAGE
OFFICE
OFFICE
THERAPY RM
OFFICE
OFFICE
COURT
STORAGE
OFFICE
WORK RM
RES TR OOM
MED RM
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
PAT TOIL
STAFF OFF
PAT TOIL
PAT TOIL PAT TOIL HOPTL BATH
HOPTL BATH
SHAFT
STAIR
PAT RM 1B
RESTROOM
RESTROOM
RESTROOM
RESTROOM
STORAGE
RESTROOM
RESTROOM
RESTROOM
RESTROOM
RESTROOM
PAT TOIL
PAT TOILPAT TOIL
PAT TOILPAT TOIL
PAT TOIL
SHAFT
STAIR
EQUIP RM
SERVBAY
CHIEF OFF
OFFICE
SECRETARY
CORR
UTIL RM
CHIEF OFF
SECRETARY
CORR
STAFF TOI
CORR
EMS
CORR
MEDIT-CHPL
RESTROOM
KITCHEN
MED RM
CONG BATH
RESTROOM
STORAGE
RESTROOM
STAFF TOI
STAFF TOI
SIGNAGE RM
STAIR
ELEV
ELEV
ELEV
MECH RM
ELEV LOB
ELEV
CORR
CORR
KITCHEN
CONG BATH
EMS
EMS
CHEMICAL
STORAGE
STORAGE
EQUIP RM
SERVBAY
SHAFT
CORR
CORR
HAS
REHAB COUNSELOR
CORR
ELEV LOB
ELEV
DMBWTR ACC
STAFF TOI
ELEV
SHAFT
TRANSITION
EMS
DUMBWAITER
STERILIZER
NOURISH ST
ASSIST OFF
SHOP
MAIL RM
CORR
SERVBAY
EQUIP RM
SHAFT
BOOS PUMP
PUB TOILET
PUB TOILET
REPRODUCT
EMS CLOSET
STAIR
ELEV LOB
LOCKSMITH
PRI TOI
SUPV OFF
CORR
STAIR
OP PLANT
LOCKERS
TRANSPORTATION
CORR
STORAGE
EQUIP RM
ELEV
MAINT
MAINT
SHAFT
SERVBAY
EQUIP RM
COMPUTER
CLEAN
RESTROOM
LOBBY
PRI TOI
EMS CLOSET
REST RM
LOCKER
MALE TOILET
WOMENS
CORR
EXAM
EXAM
STAIR
CORR
OFFICE
VEST
INPATIENT PHARMACY
PHARMACY
EMS CLOSET
STAFF LCKR
DIR OFF
STAFF LCKR
ELEV
ELEV
ELEV
ELEV LOB
ELEV
ELEVATOR LOBBY
STORAGE
LAB
DARK RM
RESEARCH LAB
WASHING RM
MECH
CORR
MECH RM
CHIEF OFF
SHAFT
STAIR
CORR
ANIMAL WRD
ANIMAL SUR
CLEAN
AUTOCLAVE
DECON RM
FEED
STORAGE
CGWSH-DRTY
CAGEWASH
EQUIP RM
CGWSH-CLN
COLD RM
CIR
ANIMAL WRD
ANIMAL WRD
EQUIP RM
COLD RM
CORR
EMS
CORRSTORAGE
SHOWE R SHOWE R
INTERVIEW
ISOL RM
PRI TOI
TOILET
EXAM-TREAT
RESTROOM
CLEAN UTIL RESTROOM
EXAM RM
FAST TRACK
STORAGE
SHAFT
STAIR
STORAGE
MY HEALTH
PATIENT
EDUCATION
INTAKE INTAKE
OFFICEINTAKE
WAITING
TOILET
OFFICE
ELIGIBILITY
WAITING
CHECK-IN
ELIGIBILITY
OFFICE
ELIGIBILITY
OFFICE
ELIGIBILITY
OFFICE
ELIGIBILITY
OFFICE
ELIGIBILITY
OFFICE
INFORMATION
WOMENS
PUBLIC
RESTRM
MENS
PUBLIC
RESTRM
MAIN
ENTRANCE
VET SUPPORT
OFFICE
EXAM RM
STORAGE
STORAGE
CANTEEN
LOBBY
STORAGE
OFFICE
MECH RM
OFFICE
REHAB CARE
CO - ORDER OFFICE
ELECTRICAL
HALL
EXAM
CONF RM
MECH
ANIMAL SUR
VESTIBULE
EXAM
OFFICE
OFFICE EMS CHIEF
OFFICE
OFFICE
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
BARIATRIC
ROOM
BARIATRIC
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
ROOM
RESIDENT
RESIDENT ROOM
ADA/ABA
MEDITATION
KITCHEN
FAMILY
LAUNDRY
HOUSEKEEPING
WOMEN'S
MEN'S
MEDS
UTILITY
CLEAN
UTILITY
SOILED
ELEC.
COMM.
MECHANICAL
LOCKER/LOUNGE
STAFF
TV/LIVING
OFFICE
DIRECTORS
OFFICE
CLINIC
ROOM
CONFERENCE
ROOM
EQUIPMENT
ROOM
RESIDENT
ROOM
RESIDENT
RESIDENT ROOM
ADA/ABA
RESIDENT ROOM
ADA/ABA
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
RESTROOM
STAFF
RESIDENT ROOM
ADA/ABA
HAC
CORRIDOR
OFFICE
CO-ORDINATOR
OFFICE
CAREGIVER
CO-ORDINATOR
OFFICE
PROGRAM MGR
OFFICE
EXAM
WORK RM
SOCIAL WORKER
OFFICE
EXAM
EXAM
SUPERVISOR OFFICE
AMBULANCE
ENTRANCE
OFFICE OFFICE
ELEC RM
SOUND
BOOTH
SOUND
BOOTH
SOUND
BOOTH
/ HAC
OFFICEVTS PROGRAM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
RM
WAREHOUSE
DOCK
OFFICE
CHIEF OFFICE
WASHER
DRYER
SECURITY GATE
SECURITY GATE
OVER HEAD DOOR
OVER HEAD DOOR
OVER HEAD DOOR
UP
DN
UP
UP
UP
UP
DN
UP
DN
UP
UP
DN
UP
UP
U P
U P
DN
UP
UP
UP
UP
UP
UP
UP
U P
U P
UP
UP
UP
RAMP UP
DN
UP
DN
RAMP
UP
UP
RAMP UP
EXISTING WALKWAY
SLOPE
LANDING
19 18 17
H
G
CLEAN
1C-27B
ANTE ROOM
1C-27A
VAULT
1C-27C
PHARMACY
1C-27
19 18 17
H
G
19 18 17
H
G
GENERAL NOTES
1. THE VA WILL RELOCATE SOME PHARMACY OPERATIONS TO
A TEMPORARY TRAILER AND TO ADJACENT ROOM (SEE
SHEET NOTES AND .)
2. THE PHARMACY FUNCTIONS THAT REMAIN WILL BE IN
OPERATION DURING CONSTRUCTION.
3. ANY WORK ON THE CORRIDOR MUST BE DONE AFTER
HOURS OR ON WEEKENDS. SEE NOTE
4. THE CONSTRUCTION BARRIERS SHOWN ARE ONLY A GUIDE
AND DO NOT RELIEVE THE CONTRACTOR FROM HIS
RESPONSIBILITY TO LAYOUT AND PROVIDE BARRIERS AS
DIRECTED IN COORDINATION WITH THE VA. CONSTRUCTION
BARRIES SHALL BE SEALED AND SHALL COMPLY WITH THE
VA INFECTION CONTROL REQUIREMENTS.
5. CONTRACTOR SHALL DEVELOP AND SUBMIT A PHASING
AND STAGING PLAN FOR VA APPROVAL.
2 9
SHEET NOTES
1 PROJECT AREA.
2 GENERAL AREA OF PHARMACY TEMPORARY RELOCATION
TRAILER.
3 GENERAL LOCATION OF CONTRACTOR'S TEMPORARY 1 HR
FIRE RATED CONSTRUCTION BARRIERS. PROVIDE ACCESS
DOOR AS REQUIRED.
4 MAINTAIN A 6'-0" MINIMUM CLEARANCE IN FRONT OF
PNEUMATIC TUBE STATION. CONTRACTOR SHALL PROVIDE
PHARMACY ACCESS TO THIS STATION AT ALL TIMES.
5 CONTRACTOR ACCESS.
6 WORK IN THIS AREA TO OCCUR AFTER HOURS OR ON
WEEKENDS.
7 (E) SMOKE COMPARTMENT PARTITION. CONTRACTOR SHALL
MAINTAIN THE INTEGRITY OF SMOKE BARRIES AT ALL TIMES
8 (E) PNEUMATIC TUBE STATION TO REMAIN IN SERVICE AND
OPERATIONAL DURING CONSTRUCTION.
LEGEND
EXISTING CONSTRUCTION TO REMAIN. (U.O.N.)
DEMOLISH OR REMOVE EXISTING
CONSTRUCTION.
(E) OR (N) 1HR FIRE RATED CONSTRUCTION.
PHARMACY RELOCATION AREAS
PROJECT AREA
L I C
E N S E D A R C H I T EC
T
S T
A T
E O F C A L I F O
R N
I A
JO
RGE E . A L FARO
REN._______
C-22051
03/21
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
C U s e rs \I v a ld o v in o s \D o c u m e n ts
\L O
M A
L
IN
D A
P
H A
R M
A C
Y U
S P
A
R C
H
IG
N A
C
IO
.V A
L D
O V
IN
O
S .r v t
/1
/2
:1
:5
A
M
GC002
PHASING AND STAGING PLAN
D. DIMATJ. ALFARO
PHARMACY USP 797 & 800
FULLY SPRINKLERED
605-17-322
04/08/2019
VA MEDICAL CENTER, LOMA LINDA
1/4" = 1'-0"GC002
2 STAGING PLAN TRUE
NORTH
N.T.S.GC002
1 PHASING KEY PLAN TRUE
19 18 17
H
G
CLEAN
1C-27B
ANTE ROOM
1C-27A
VAULT
1C-27C
PHARMACY
1C-27D
CPT
4412 SW Corbett Avenue
Portland, OR 97239
503.248.1939
PBS Engineering and
Environmental Inc.
pbsusa.com
SCOPE OF WORK
ASBESTOS ABATEMENT NOTES:
1. REMOVE ASBESTOS-CONTAINING MATERIALS IN
ACCORDANCE WITH SPECIFICATION SECTION 02 82 13.
2. THE ABATEMENT CONTRACTOR SHALL WORK CLOSELY
WITH THE CONTRACTING OFFICER; THEIR FIELD
REPRESENTATIVE; OR THE VPIH TO COORDINATE
REMOVAL OF ASBESTOS CONTAINING MATERIALS.
3. ASBESTOS-CONTAINING BUILDING MATERIALS ARE
PRESENT IN AREAS IMMEDIATELY ADJACENT TO WORK
AREAS. ASBESTOS-CONTAINING MATERIALS THAT ARE TO
REMAIN SHALL NOT BE DISTURBED DURING
CONSTRUCTION ACTIVITIES. IF ASBESTOS-CONTAINING
MATERIALS ARE IMPACTED, STOP WORK, AND CONTACT
THE CONTRACTING OFFICER; THEIR FIELD
REPRESENTATIVE; OR THE INDUSTRIAL HYGIENIST.
4. IF ADDITIONAL SUSPECT ASBESTOS-CONTAINING
MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION
OR DEMOLITION ACTIVITIES THAT ARE NOT IDENTIFIED ON
THIS ABATEMENT DRAWING OR THE HAZARDOUS BUILDING
MATERIALS SURVEY REPORT, STOP WORK AND CONTACT
THE CONTRACTING OFFICER THEIR FIELD
REPRESENTATIVE; OR THE INDUSTRIAL HYGIENIST.
ASBESTOS-CONTAINING FLOOR TILE AND MASTIC TO BE
REMOVED
LEGEND:
GENERAL NOTES:
1. THIS DRAWING IS DIAGRAMMATIC. IT IS FOR GENERAL
MATERIAL LOCATION INFORMATION. CONTRACTOR SHALL
VERIFY ALL MATERIAL LOCATIONS AND QUANTITIES TO BE
REMOVED.
2. THE BUILDING WAS SURVEYED FOR SUSPECT
ASBESTOS-CONTAINING MATERIALS.
ASBESTOS-CONTAINING MATERIALS ARE KNOWN TO EXIST
IN OTHER PORTIONS OF THE BUILDING.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H R
E V
I T
U
S E
R
F
I L E
S L O
M A
L I N
D
P
H A
R M
A C
Y
U
S P
A
R C
H C e n t r a l d a n n y d i m a t u l a c r v t
P
M
ASB1
ASBESTOS ABATEMENT FLOOR PLAN PHARMACY USP 797 & 800
FULLY SPRINKLERED
605-17-322
04/08/2019
VA MEDICAL CENTER, LOMA LINDA
Revisions: Date: JABRD
KEY PLAN
ASBESTOS-CONTAINING FLOORING TO BE REMOVED IS
OVERLAID WITH CARPETCPT
AutoCAD SHX Text
ASBESTOS ABATEMENT FLOOR PLAN
AutoCAD SHX Text
SCALE: 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
ASB1
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
INTERPRETATION OF DRAWINGS & SPECIFICATIONS
IN GENERAL, THE WORKING DETAILS WILL INDICATE DIMENSIONS, POSITION AND KIND OF
CONSTRUCTION, AND THE SPECIFICATIONS, QUALITIES AND METHODS. ANY WORK INDICATED ON THE WORKING DETAILS AND NOT MENTIONED IN THE SPECIFICATIONS, OR VICE VERSA, SHALL BE
FURNISHED AS THOUGH FULLY SET FORTH IN BOTH. WORK NOT PARTICULARLY DETAILED,
MARKED OR SPECIFIED, SHALL BE IDENTICAL OR SIMILAR TO LIKE CASES OF CONSTRUCTION
THAT ARE DETAILED, MARKED OR SPECIFIED. IF CONFLICTS OCCUR ON DRAWINGS AND/OR
SPECIFICATIONS, THE MOST EXPENSIVE MATERIALS OR METHODS WILL PREVAIL.
SHOULD AN ERROR APPEAR IN THE WORKING DETAILS OR SPECIFICATIONS OR IN WORK DONE
BY OTHERS AFFECTING THIS WORK, THE CONTRACTOR SHALL NOTIFY THE VA AT ONCE AND IN
WRITING. IF THE CONTRACTOR PROCEEDS WITH THE WORK SO AFFECTED WITHOUT HAVING
GIVEN SUCH WRITTEN NOTICE AND WITHOUT RECEIVING THE NECESSARY APPROVAL,
DECISION OR INSTRUCTIONS IN WRITING FROM THE VA, THEN HE SHALL HAVE NO VALID CLAIM
AGAINST THE VA, FOR THE COST OF SO PROCEEDING AND SHALL MAKE GOOD ANY RESULTING
DAMAGE OR DEFECT. NO VERBAL APPROVAL, DECISION, OR INSTRUCTION SHALL BE VALID OR
BE THE BASIS FOR ANY CLAIM AGAINST THE VA, ITS OFFICERS, EMPLOYEES OR AGENTS. THE
FOREGOING INCLUDES TYPICAL ERRORS IN THE SPECIFICATIONS OR NOTATIONAL ERRORS IN
THE WORKING DETAILS WHERE THE INTERPRETATION IS DOUBTFUL OR WHERE THE ERROR IS
SUFFICIENTLY APPARENT AS TO PLACE A REASONABLY PRUDENT CONTRACTOR ON NOTICE
THAT, SHOULD HE ELECT TO PROCEED, HE IS DOING SO AT HIS OWN RISK.
CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE CODES AND REGULATIONS.
SHOP DRAWING NOTE:
WHEN NOT ADDRESSED BY DIVISION 1 OF THE SPECIFICATIONS, PAPER FORMAT STRUCTURAL
SHOP DRAWINGS SHALL BE SUBMITTED IN THE FORM OF THREE COPIES MINIMUM OF EACH
SHEET. WHERE SUBMITTALS ARE ELECTRONIC, FORMAT SHALL BE PDF.
THE PURPOSE OF SHOP DRAWING SUBMITTALS BY THE CONTRACTOR IS TO DEMONSTRATE TO
THE STRUCTURAL ENGINEER THAT HE UNDERSTANDS THE DESIGN CONCEPT BY INDICATING
WHICH MATERIAL HE INTENDS TO FURNISH AND INSTALL, AND BY DETAILING THE FABRICATION
AND INSTALLATION METHODS HE INTENDS TO USE ON A STAND ALONE SET OF DOCUMENTS.
DUPLICATION OF DESIGN DOCUMENTS FOR THE PURPOSE OF SHOP DRAWINGS IS NOT
ACCEPTABLE.
PRIOR TO FABRICATION, SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW BY THE
STRUCTURAL ENGINEER. SHOP DRAWING SUBMITTALS SHALL INCLUDE, BUT ARE NOT
NECESSARILY LIMITED TO, STRUCTURAL STEEL, REINFORCING STEEL, & GLUE-LAMINATED
BEAMS.
PRIOR TO SUBMISSION THE CONTRACTOR SHALL REVIEW ALL SUBMITTALS FOR
CONFORMANCE WITH THE CONTRACT DOCUMENTS AND SHALL STAMP SUBMITTALS AS BEING
"REVIEWED FOR CONFORMANCE".
SHOP DRAWING SUBMITTALS PROCESSED BY THE STRUCTURAL ENGINEER ARE NOT CHANGE
ORDERS.
ANY DETAIL ON THE SHOP DRAWINGS THAT DEVIATES FROM THE CONTRACT DOCUMENTS
SHALL CLEARLY BE MARKED WITH THE NOTE "THIS IS A CHANGE".
SHOP DRAWINGS OR CALCULATIONS SUBMITTED FOR REVIEW THAT REQUIRE RESUBMITTAL
FOR RE-REVIEW SHALL BE BILLED HOURLY FOR SUCH TIME TO THE GENERAL CONTRACTOR.
RE-REVIEW WILL NOT PROCEED WITHOUT WRITTEN APPROVAL FROM THE GENERAL
CONTRACTOR FOR ADDITIONAL ENGINEERING REVIEW SERVICES.
SAFETY NOTE:
THE CONTRACTOR SHALL NOTIFY THE VA WHERE A CONFLICT OR DISCREPANCY OCCURS BETWEEN
THE STRUCTURAL DRAWINGS AND ANY OTHER PORTION OF THE CONTRACT DOCUMENTS OR
EXISTING FIELD CONDITIONS. SUCH NOTIFICATION SHALL BE GIVEN IN DUE TIME SO AS NOT TO
AFFECT THE CONSTRUCTION SCHEDULE. IN CASE OF A CONFLICT BETWEEN STRUCTURAL
DRAWINGS AND SPECIFICATIONS THE MORE RESTRICTIVE CONDITION SHALL TAKE PRECEDENCE
UNLESS WRITTEN APPROVAL HAS BEEN GIVEN FOR THE LEAST RESTRICTIVE. CONTRACTOR SHALL
VERIFY ALL DIMENSIONS WITH ARCHITECTURAL PRIOR TO COMMENCING ANY WORK.
WHEN CONSTRUCTION ATTACHES TO OR IS WITHIN AN EXISTING BUILDING, A COMPLETE SET OF DRAWINGS OF THE EXISTING BUILDING SHALL BE KEPT ON THE JOB SITE. CONTRACTOR TO OBTAIN
THESE DRAWINGS FROM THE VA (IF THEY ARE AVAILABLE).
CONTRACTOR SHALL PROVIDE AN ALLOWANCE EQUAL TO 2% OF THE BID FOR STRUCTURAL STEEL, MISC. IRON AND REINFORCING STEEL TO BE USED AT THE DISCRETION OF THE STRUCTURAL
ENGINEER. UNUSED AMOUNT TO REVERT TO THE VA UPON COMPLETION OF THE JOB.
ANY SUBSTITUTIONS FOR STRUCTURAL MEMBERS, HARDWARE OR DETAILS SHALL BE REVIEWED BY
THE ARCHITECT AND STRUCTURAL ENGINEER. SUCH REVIEW WILL BE BILLED ON A TIME AND
MATERIALS BASIS TO THE GENERAL CONTRACTOR WITH NO GUARANTEE THAT THE SUBSTITUTION
WILL BE ALLOWED.
DO NOT SCALE DRAWINGS. CONTACT THE ARCHITECT OR STRUCTURAL ENGINEER FOR ANY
DIMENSIONS NOT SHOWN.
THESE DRAWINGS ARE NOT COMPLETE UNTIL REVIEWED AND ACCEPTED BY THE VA AND SIGNED BY
THE STRUCTURAL ENGINEER.
GENERAL NOTES
100SN001-1
IT IS THE CONTRACTORS RESPONSIBILITY TO COMPLY WITH THE PERTINENT SECTIONS, AS
THEY APPLY TO THIS PROJECT, OF THE "CONSTRUCTION SAFETY ORDERS" ISSUED BY THE
STATE OF CALIFORNIA LATEST EDITION, AND ALL OSHA REQUIREMENTS.
THE VA AND THE STRUCTURAL ENGINEER DO NOT ACCEPT ANY RESPONSIBILITY FOR THE
CONTRACTOR'S FAILURE TO COMPLY WITH THESE REQUIREMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATE DESIGN AND CONSTRUCTION OF
ALL FORMS AND SHORING REQUIRED. SHORING INDICATIONS (LOCATION, DIRECTION,
DURATION, ETC.) ARE ONLY SHOWN ON THE STRUCTURAL DRWGS WHEN REQUIRED TO
IMPLEMENT THE DESIGN INTENT OF THE FINAL WORK PRODUCT. DETERMINATION WHETHER
SHORING IS REQUIRED FOR TEMPORARY OR INTERMEDIATE CONDITIONS DURING
CONSTRUCTION IS WHOLLY THE RESPONSIBILITY OF THE CONTRACTOR.
WHERE SPECIFICATIONS HAVE BEEN PREPARED FOR THIS PROJECT, THEY ARE ARRANGED IN
SEVERAL SECTIONS, BUT SUCH SEPARATION SHALL NOT BE CONSIDERED AS THE LIMITS OF
THE WORK REQUIRED OF ANY SEPARATE TRADE. THE TERMS AND CONDITIONS OF SUCH
LIMITATIONS ARE WHOLLY BETWEEN THE CONTRACTOR AND HIS SUBCONTRACTORS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
A.
B.
C.
A.
B.
C.
D.
E.
F.
G.
A.
B.
C.
AB
(A)
ABV
ADD'L
AHU
ALT
APPROX
ARCH'L
(B)
BLKG
BLDG
BLW
BM
BMS
B.O.
BOF
BOT
BRCG
BRG
BTWN
CC
CG
CJ
CL
CLR
CMU
COL
COORD
CONC
CONN
COND
CONT
CONTR
CJP
CSK
DBL
DF
DL
DWG
(E)
EA
EF
EJ
ELEV
EN
EOS
EQ
EW
FB
FC
FDN
FF
FRMG
FS
FT
FTG
GA
GALV
GLB
GR
GYP
HDG
HD
HDR
HGR
HORIZ
HSB
HSS
HT
INFO
JH
K
LBS
LL
LLH
LLV
LOC
ANCHOR BOLT
"MEMBER" ABOVE
ABOVE
ADDITIONAL
AIR HANDLING UNIT
ALTERNATE
APPROXIMATE
ARCHITECTURAL
"MEMBER" BELOW
BLOCKING
BUILDING
BELOW
BEAM
BEAMS
BOTTOM OF
BOTTOM OF FOOTING
BOTTOM
BRACING
BEARING
BETWEEN
CENTER TO CENTER
CENTER OF GRAVITY
CONSTRUCTION JOINT
CENTERLINE
CLEAR
CONCRETE MASONRY UNIT
COLUMN
COORDINATE
CONCRETE
CONNECTION
CONDITION
CONTINUOUS
CONTRACTOR
COMPLETE JOINT PENETRATION
COUNTERSINK
DOUBLE
DOUGLAS FIR
DEAD LOAD
DRAWING
EXISTING
EACH
EACH FACE OR EDGE FASTENER
EXPANSION JOINT
ELEVATION
EDGE NAILING
EDGE OF SLAB
EQUAL
EACH WAY
FACE OF BLOCK(OR BRICK) OR FLAT BAR
FACE OF CONCRETE OR FRAMING
CLIP (SIMPSON A35 UNO)
FOUNDATION
FINISH FLOOR
FRAMING
FACE OF STUD OR FAR SIDE
FIRE TREATED
FOOTING
GAUGE OR GAGE
GALVANIZED
GLUED LAMINATED BEAM
GRADE
GYPSUM
HOT DIPPED GALVANIZED
HOLDOWN
HEADER
HANGER
HORIZONTAL
HIGH STRENGTH BOLT
HOLLOW STRUCTURAL SECTION
HEIGHT
INFORMATION
JOIST HANGER
KIPS (1000 LBS)
POUNDS
LIVE LOAD
LONG LEG HORIZONTAL
LONG LEG VERTICAL
LOCATION
LONG
LS
LWC
LWIC
MAX
MB
MECH'L
MFR
MI
MIN
MISC
MTL
MK
(N)
NIC
NS
NTS
NWC
O/
OH
OPNG
OSB
PC
PERP
PJP
PL
PT
REINF
REQ'D
REV
RWD
SC
SCH
SDS
SHTG
SIM
SEOR
SJ
SMS
SOG
SP
SQ
STD
STFNR
STGRD
STL
STR
SW
TBD
T&B T&G
THRD
TN
T.O.
TOC
TOF
TOS
TOW
TRANS
TYP
UNO
VERT
VIF
W/
W/O
WF
WP
WS
WWF
XS
XXS
Ø
LONGITUDINAL
LAG SCREW
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
MAXIMUM
MACHINE BOLT
MECHANICAL
MANUFACTURER
MALLEABLE IRON
MINIMUM
MISCELLANEOUS
METAL
MARK
NEW
NOT IN CONTRACT
NEAR SIDE
NOT TO SCALE
NORMAL WEIGHT CONCRETE
OVER
OPPOSITE HAND
OPENING
ORIENTED STRAND BOARD
PIECE
PERPENDICULAR
PARTIAL JOINT PENETRATION
PLATE
PRESSURE TREATED
REINFORCING OR REINFORCEMENT
REQUIRED
REVISION
REDWOOD
SLIP CRITICAL
SCHEDULE
SELF-DRILLING SCREW
SHEATHING
SIMILAR
STRUCTURAL ENGINEER OF RECORD
SLAB CONTROL JOINT
SHEET METAL SCREW
SLAB-ON-GRADE
STRUCTURAL PANEL
SQUARE
STANDARD
STIFFENER
STAGGERED
STEEL
STRUCTURAL
SHEAR WALL
TO BE DETERMINED
TOP & BOTTOM
TONGUE & GROOVE
THREADED
TOE NAIL
TOP OF
TOP OF CONCRETE (SLAB UNO)
TOP OF FOOTING OR TOP OF FRAMING
TOP OF STEEL
TOP OF WALL
TRANSVERSE
TYPICAL
UNLESS NOTED OTHERWISE
VERTICAL
VERIFY IN FIELD
WITH
WITHOUT
WIDE FLANGE
WORK POINT
WOOD SCREW
WELDED WIRE FABRIC
EXTRA STRONG
DOUBLE EXTRA STRONG
AT
ROUND OR DIAMETER
AND
NUMBER OR POUNDS
PLUS OR MINUS
100SN003-1
ABBREVIATIONS
DESIGN CRITERIA
100SN002-1
CODES AND STANDARDS
2015 INTERNATIONAL BUILDING CODE
(IBC)
ASCE 7-10
ACI 318-14
AISC 360-10, 341-10, 358-10
TMS 402-13/ACI 530-13/ASCE 5-13
TMS 602-13/ACI 530.1-13/ASCE 6-13
2015 NDS, 2015 SDPWS
VA H-18-8 SEISMIC DESIGN
REQUIREMENTS
LATERAL LOADS
SEISMIC:
SITE CLASS D
Ss = 2.392; S =1.595 S = 1.095 ; S = 1.095
I = 1.0 TYPICAL
RISK CATEGORY: III
SEISMIC DESIGN CATEGORY: D
WIND:
V = 110 MPH,
RISK CATEGORY: III
EXPOSURE CATEGORY:C
GCPI =±0.18
2.
P
DS
1 D1
ULT
1.
TYPE
CONCRETE CONSTRUCTION - REQUIRED SPECIAL INSPECTIONS AND TESTS
110SN301-1
CONTINUOUS REFERENCED STANDARDPERIODIC
1. INSPECT REINFORCEMENT, INCLUDING
PRESTRESSING TENDONS, AND VERIFY
PLACEMENT.
ACI 318 CH. 20, 25.2, 25.3,
26.5.1-26.5.3
- X
2. REINFORCING BAR WELDING: AWS D.14
ACI 318: 26.5.4
A. VERIFY WELDABILITY OF REINFORCING
BARS OTHER THAN ASTM A706
B. INSPECT SINGLE-PASS FILLET WELDS,
MAXIMUM 5/16"
C. INSPECT ALL OTHER WELDS
- X
- X
X -
3. INSPECT ANCHORS CAST IN CONCRETE. X - ACI 318: 17.8.2
4. INSPECT ANCHORS POST-INSTALLED IN
HARDENED CONCRETE MEMBERS.
ACI 318: 17.8.2.4, 17.8.2
A. ADHESIVE ANCHORS INSTALLED IN
HORIZONTALLY OR UPWARDLY INCLINED
ORIENTATIONS TO RESIST SUSTAINED
TENSION LOADS.
- X
B. MECHANICAL ANCHORS AND ADHESIVE
ANCHORS NOT DEFINED IN 4.A.
- X
5. VERIFY USE OF REQUIRED DESIGN MIX. ACI 318: CH. 19, 26.4.3,
26.4.4
- X
6. PRIOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.