36C25819B0013-0001002.docx

DOCX document 14 KB Posted

Attached to
Upgrade Cancer Cntr Exhaust System LOCATION OF PERFORMANCE Loma Linda
Solicitation number
36C25819B0013
Issued by

About this file

36C25819B0013 0001 S02_ATTACHMENT J_605-19-407 Cancer Center Exhaust Fan Replacement RFI Log for Solicitation 36C25819B0013.docx

View the file

Other files

File Type Posted
36C25819B0013-0001004.pdf PDF
36C25819B0013-0001001.pdf PDF
36C25819B0013-0001000.docx DOCX document
36C25819B0013-0001003.jpg JPG image
36C25819B0013-005.pdf PDF
36C25819B0013-003.docx DOCX document
36C25819B0013-007.docx DOCX document
36C25819B0013-004.pdf PDF
36C25819B0013-002.pdf PDF
36C25819B0013-008.pdf PDF
36C25819B0013-006.pdf PDF
36C25819B0013-000.docx DOCX document
36C25819B0013-001.pdf PDF
36C25819B0013.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Log for Solicitation 36C25819B0013

1. Will Testing and Balancing only need to be done for the Isolation Rooms or the entire building? Only for Isolation Rooms.

1. Please verify the scope of work does not include adding or modifying direct digital controls. Correct

1. Paragraph 1.7 of Specification 01 35 26 Safety Requirements allows the superintendent to also be Quality Control Manager and Competent Person. Due to the size of the project can the superintendent also be the SSHO? Yes

1. Please verify the Keynotes, Floor Plan Notes and Floor Plan Sheet Notes on the drawings do not pertain to this project. Correct

1. Please verify that only the hi-lighted Detail F6 on AS-515 pertains to this project. Detail D6 applies also, for duct penetration.

1. POP is it 90 days or 45 days? 90 days

1. Provide mechanical as-built drawings that shows ductwork distribution for EF-2 and design airflow parameters for CAV-219S (Rooms 2A105A and 2A105). Attached

1. Does the project require a stamped design by a registered mechanical engineer? No, shop drawings are acceptable.

1. Is work to be performed either after hours or on weekends? Plan on working during normal duty hours. Some after duty hours work may be required.

1. Does the existing galvanized exhaust air distribution ductwork needs to be changed to stainless steel? If so, please indicate exactly where on the VA Design Guideline is stainless steel ductwork is called for. Yes, please reference Specification 23 31 00, page 4, specified corrosion resistant systems: stainless steel sheet.