36C25819B0013-0001002.docx
DOCX document 14 KB Posted
- Solicitation number
- 36C25819B0013
About this file
36C25819B0013 0001 S02_ATTACHMENT J_605-19-407 Cancer Center Exhaust Fan Replacement RFI Log for Solicitation 36C25819B0013.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25819B0013-0001004.pdf | ||
| 36C25819B0013-0001001.pdf | ||
| 36C25819B0013-0001000.docx | DOCX document | |
| 36C25819B0013-0001003.jpg | JPG image | |
| 36C25819B0013-005.pdf | ||
| 36C25819B0013-003.docx | DOCX document | |
| 36C25819B0013-007.docx | DOCX document | |
| 36C25819B0013-004.pdf | ||
| 36C25819B0013-002.pdf | ||
| 36C25819B0013-008.pdf | ||
| 36C25819B0013-006.pdf | ||
| 36C25819B0013-000.docx | DOCX document | |
| 36C25819B0013-001.pdf | ||
| 36C25819B0013.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Log for Solicitation 36C25819B0013
1. Will Testing and Balancing only need to be done for the Isolation Rooms or the entire building? Only for Isolation Rooms.
1. Please verify the scope of work does not include adding or modifying direct digital controls. Correct
1. Paragraph 1.7 of Specification 01 35 26 Safety Requirements allows the superintendent to also be Quality Control Manager and Competent Person. Due to the size of the project can the superintendent also be the SSHO? Yes
1. Please verify the Keynotes, Floor Plan Notes and Floor Plan Sheet Notes on the drawings do not pertain to this project. Correct
1. Please verify that only the hi-lighted Detail F6 on AS-515 pertains to this project. Detail D6 applies also, for duct penetration.
1. POP is it 90 days or 45 days? 90 days
1. Provide mechanical as-built drawings that shows ductwork distribution for EF-2 and design airflow parameters for CAV-219S (Rooms 2A105A and 2A105). Attached
1. Does the project require a stamped design by a registered mechanical engineer? No, shop drawings are acceptable.
1. Is work to be performed either after hours or on weekends? Plan on working during normal duty hours. Some after duty hours work may be required.
1. Does the existing galvanized exhaust air distribution ductwork needs to be changed to stainless steel? If so, please indicate exactly where on the VA Design Guideline is stainless steel ductwork is called for. Yes, please reference Specification 23 31 00, page 4, specified corrosion resistant systems: stainless steel sheet.