Request for Information (RFI) Log (Pre-Award) Project: Secondary Electrical Distribution Loma Linda, California VA Health Care System (605) Solicitation No: 36C258-19-B-0005

RFI Number
Date
Question
Answer
001
12/13/2018
In the solicitation the government is requiring a general contracting license not an electrical contracting license. My question is will the government accept a California C10 license for this scope of work? As a C10 we only perform electrical work or work incidental to electrical work for example wall repair.
A C-10 license is acceptable for this scope of work.
002
12/19/2018
Please verify there are no plans or specifications associated with this project. Paragraph 6 on page 15 of the solicitation states the project includes a package of drawings with specifications. None are provided with the solicitation.
Specifications are referenced on page 9 of the solicitation. The specification sections can be downloaded at the website listed in paragraph B on that page. There are no drawings for this project.
003
12/19/2018
Please verify Contractor is not responsible for “design” of the electrical distribution system and work is limited to the “Specific Requirements” beginning on page 9 of the solicitation.

“Design” is not required. This is a construction project. Refer to Master Construction Spec PG-18-1 Division 26

004
12/19/2018
The Price Cost Schedule has one line item for lump sum pricing. Paragraph D “Construction Bid” on page 10 of solicitation requests bid pricing to be itemized. Please provide instruction on how bid pricing is to be submitted.
Please send us the cost for the one line item. If you wish to break out further, please do so.
005
12/19/2018
Paragraph E “Endstate Performance” states “Completed work will be inspected by a licensed installer in the appropriate trade.” Can the work be inspected by the same electrical company that performed the installation? Does the inspector need to be an independent third party?
The VA will inspect all completed work.
006
12/19/2018
Will the VA set-up a conference call for contractors to call into the public bid opening to hear results?
The VA will not set up a conference call. You will need to be present at the Phoenix office to witness the bid opening.