36C25818R0351-0002002.pdf
PDF 157 KB Posted
- Solicitation number
- 36C25818R0351
About this file
36C25818R0351 0002 S05_Request for Information Log1.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25818C0165-000.docx | DOCX document | |
| 36C25818R0351-0002001.pdf | ||
| 36C25818R0351-0002000.docx | DOCX document | |
| 36C25818R0351-0001002.pdf | ||
| 36C25818R0351-0001001.pdf | ||
| 36C25818R0351-0001000.docx | DOCX document | |
| 36C25818R0351-003.pdf | ||
| 36C25818R0351-001.docx | DOCX document | |
| 36C25818R0351-002.pdf | ||
| 36C25818R0351-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
664-18-3-5046-0026 VA258-18-AP-1269
Request for Information (RFI) Log Pharmacy Remodeling
Construction Project: 664-18-323 18 July 2018
San Diego, California VA Health Care System (664)
RFI
Number Date Question Answer
001 8/29/2018
Will further demolition of existing doors & frames, walls, ceiling or flooring be required or will VA San Diego continue to manage all demolition activities?
If demolition will be required and part of this contract, will VA San Diego provide a lay-down are to accommodate a 40 yard debris box?
Will vibratory tools be permitted and if so, during what hours?
Demolition of existing doors & frames, walls, ceiling or flooring is not in scope of this project: however, contractor is required to perform all required works in order to install all ceiling air devices and wall-mounted registers to meet with industry standards and USP requirements.
These required works include but not limited to do some minor ceiling demolition and wall demolition.
Demolition work IS REQUIRED for MEP. Lay-down yard will be provided. Size of the lay-down yard shall be finalized at the start of the construction. Permission of vibration tool shall be discussed with VA project manager at the start of the construction.
002 8/29/2018
Will the anteroom be equipped with a hand washing basin?
Will the anteroom be equipped with an eye washing station hard piped with a drain?
No as per Statement of Work
664-18-3-5046-0026 VA258-18-AP-1269
Will the pharmacy have med gas or compressed air?
Will any water distribution or drainage be added to this project?
003 7/6/2018
Will the pharmacy by a class 5 throughout?
Does the existing 3 east pharmacy have humidity controls? If not, will humidity controls be added to the design?
Will plans show which rooms are positive negative and air exchanges required for each room?
Will any HVAC controls be required or added in this space or interstitial controlling this space?
Are there any outstanding mechanically related work orders for this space which need to be corrected during this project?
Does the attached design criteria coincide with this project's mechanical intent?
Scope of work refers to USP-797 and USP-800 for all requirements for all specified room in the project.
Existing Pharmacy don't have humidity controls. Humidity controls is required per USP-797 and USP- 800.
Follow USP standards and requirements for space pressurization and air exchange for each individual room.
Follow Scope of Work for all requirements for controls.
See scope of work and provide proposal in which the contractor must clearly address and include all related works to complete this project successfully.
The attached design criteria is driving the project's mechanical intent;
however, it does not completely identify all specific design requirements for this project.
Contractor must address ALL requirements for this particular project in their proposal.