About this file

36C25818R0314 S02_ATTACHMENT 08_ Drawings 600-14-130 - PS100-1.pdf

View the file

Other files

File Type Posted
36C25818R0314-0001002.pdf PDF
36C25818R0314-0001000.docx DOCX document
36C25818R0314-0001001.pdf PDF
36C25818R0314-003.pdf PDF
36C25818R0314-004.pdf PDF
36C25818R0314-002.pdf PDF
36C25818R0314-006.pdf PDF
36C25818R0314-001.docx DOCX document
36C25818R0314-007.pdf PDF
36C25818R0314-005.pdf PDF
36C25818R0314-008.pdf PDF
36C25818R0314-000.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 08

DRAWINGS

(Schwab Engineering)

600-14-130

PS100-1

1 page

28 February 2017

Long Beach, California VA Health Care System (600)

Natural Gas Piping Correction

CONSTRUCTION

F

IN

A L

C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

1000 E. Walnut Street, Suite 227, Pasadena, CA 91106 t: 888.900.3823 f: 626.463.2739 www.schwabeng.com Project No.: 0214.767.00

NATURAL GAS SITE PIPING INSTALLATION

SCALE: 1" = 70'-0"

S02_ATTACHMENT 08_ COVER
S02_ATTACHMENT 08_ Drawings 600-14-130 - PS100-1
PS100-1
Layout1

File details come from the government source that posted it.