36C25818R0312-0001000.docx
DOCX document 28 KB Posted
- Attached to
- VA258-18-AP-0394 | 605-16-1-6012-0006 | 605-16-601 Replace Main Stormwater Piping Loma Linda CA (605)
- Solicitation number
- 36C25818R0312
About this file
36C25818R0312 0001 36C25818B0312 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25818R0312-0001003.pdf | ||
| 36C25818R0312-0001001.pdf | ||
| 36C25818R0312-0001002.pdf | ||
| 36C25818R0312-0001004.pdf | ||
| 36C25818R0312-0001005.pdf | ||
| 36C25818R0312-010.pdf | ||
| 36C25818R0312-008.pdf | ||
| 36C25818R0312-004.pdf | ||
| 36C25818R0312-007.pdf | ||
| 36C25818R0312-005.pdf | ||
| 36C25818R0312-003.pdf | ||
| 36C25818R0312-006.pdf | ||
| 36C25818R0312-002.pdf | ||
| 36C25818R0312-009.pdf | ||
| 36C25818R0312-001.docx | DOCX document | |
| 36C25818R0312-000.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-09-2018 605-16-601 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 To all Offerors/Bidders
36C25818B 07-09-2018
X x x The purpose of this amendment is to incorporate the following clauses and attachments:
1.) FAR 52.219-14 - Limitation on Subcontracting 2.) IL 001AL-11-15-A Limitations on Subcontracting Monitoring and Complian ce 3.) S02_ATTACHMENT 10_ Site Walk Sign In Sheet_Storm Water Drain_605-16-601 4.) S02_ATTACHMENT 11_ Request for Information Log _ Replace Storm Water 605-16-601 5.) S02_ATTACHMENT 12_ Response to RFI 001 - 605-16-601 Specs 6.) S02_ATTACHMENT 13_ Drain Line Repair pg.2-3 7.) S02_ATTACHMENT 14_ (UPDATED) Davis Bacon Wage Determinations All other terms and conditions remain unchanged at this time.
A.1 52.219-14 LIMITATIONS ON SUBCONTRACTING (JAN 2017)
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Applicability. This clause applies only to—
(1) Contracts that have been set aside or reserved for small business concerns or 8(a) participants;
(2) Part or parts of a multiple-award contract that have been set aside for small business concerns or 8(a) participants; and
(3) Orders set aside for small business or 8(a) participants under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract in the case of a contract for—
(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The concern shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials.
(3) General construction. The concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees.
(4) Construction by special trade contractors. The concern will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees.
(End of Clause)
A.2 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)
This solicitation includes . Accordingly, any contract resulting from this solicitation will include this clause. The contractor is advised in performing contract administration functions, the CO may use the services of a support contractor(s) retained by VA to assist in assessing the contractor's compliance with the limitations on subcontracting or percentage of work performance requirements specified in the clause. To that end, the support contractor(s) may require access to contractor's offices where the contractor's business records or other proprietary data are retained and to review such business records regarding the contractor's compliance with this requirement. All support contractors conducting this review on behalf of VA will be required to sign an “Information Protection and Non-Disclosure and Disclosure of Conflicts of Interest Agreement” to ensure the contractor's business records or other proprietary data reviewed or obtained in the course of assisting the CO in assessing the contractor for compliance are protected to ensure information or data is not improperly disclosed or other impropriety occurs. Furthermore, if VA determines any services the support contractor(s) will perform in assessing compliance are advisory and assistance services as defined in FAR 2.101, Definitions, the support contractor(s) must also enter into an agreement with the contractor to protect proprietary information as required by FAR 9.505-4, obtaining access to proprietary information, paragraph (b). The contractor is required to cooperate fully and make available any records as may be required to enable the CO to assess the contractor's compliance with the limitations on subcontracting or percentage of work performance requirement.
A.3 ADDITIONAL ATTACHMENTS
| Attachment # |
| Title |
| Date |
| # Pages |
| 10 |
| Site Walk Sign-in-Sheet |
Storm Water Drain_605-16-601
| 06-18-2018 |
| 1 |
| 11 |
| Request for Information Log |
Storm Water Drain_605-16-601
| 06-25-2017 |
| 2 |
| 12 |
| Response to RFI 001 - Specs |
Storm Water Drain_605-16-601
| 01-20-2017 |
| 209 |
| 13 |
| Drain Line Repair pg.2-3 |
Storm Water Drain_605-16-601
| 05-12-2016 |
| 4 |
| 14 |
| (UPDATED) DBA Wage Determinations |
Storm Water Drain_605-16-601
| 06-06-2018 |
| 61 |
See attached document: S02_ATTACHMENT 10_ Site Walk Sign In Sheet_Storm Water Drain_605-16-601.
See attached document: S02_ATTACHMENT 11_ Request for Information Log _ Replace Storm Water 605-16-601.
See attached document: S02_ATTACHMENT 12_ Response to RFI 001 - 605-16-601 Specs.
See attached document: S02_ATTACHMENT 13_ Drain Line Repair pg.2-3.
See attached document: S02_ATTACHMENT 14_ (UPDATED) Davis Bacon Wage Determinations.