36C25818R0311 S02_ATTACHMENT 02_ SPECIFICATIONS_ AC26 Replacement_Specifications.pdf

View the file

Other files

File Type Posted
36C25818R0311-0002005.pdf PDF
36C25818R0311-0002003.pdf PDF
36C25818R0311-0002000.docx DOCX document
36C25818R0311-0002004.pdf PDF
36C25818R0311-0002002.pdf PDF
36C25818R0311-0002006.pdf PDF
36C25818R0311-0002001.pdf PDF
36C25818R0311-0001008.pdf PDF
36C25818R0311-0001006.docx DOCX document
36C25818R0311-0001007.pdf PDF
36C25818R0311-005.pdf PDF
36C25818R0311-002.pdf PDF
36C25818R0311-001.docx DOCX document
36C25818R0311-004.pdf PDF
36C25818R0311-006.pdf PDF
36C25818R0311-000.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 02

Specifications

(95% Construction Documents)

SRD

664-14-517

831 pages

16 June 2016

San-Diego, California VA Health Care System (664)

AC26 Replacement

CONSTRUCTION

3920 E Coronado Street, Suite #201, Anaheim, CA 92807 I Phone 714 688 0212 www.srdarchitectsinc.com

SPECIFICATIONS

PROJECT # 644-14-517

PROJECT:

5TH FLOOR WEST - AC26 REPLACEMENT

AT DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

3350 LA JOLLA VILLAGE DRIVE

SAN DIEGO, CA 92161

95% CONSTRUCTION DOCUMENTS

JUNE 16th, 2016 http://www.srdarchitectsinc.com/

5TH FLOOR WEST - AC26 REPLACEMENT

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

09-01-15

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00_VASD General Requirements 06-15

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13

01 33 23 Shop Drawings, Product Data, and Samples 07-15

01 35 26 Safety Requirements 10-14

01 42 19 Reference Standards 07-15

01 57 19 Temporary Environmental Controls 01-11

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 09-13

01 91 00 General Commissioning Requirements 06-13

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 02-15

02 82 11_VASD Traditional Asbestos Abatement 09-15

02 83 33.13 Lead-Based Paint Removal and Disposal 08-11

DIVISION 03 – CONCRETE

03 81 27 Coring of Concrete 06-13

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-12

05 50 00 Metal Fabrications 07-14

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 22 00 Roof and Deck Insulation 10-10

07 54 23 Thermoplastic Polyolefin (TPO) Roofing 05-15

07 60 00 Flashing and Sheet Metal 07-14

07 72 00 Rooftop Support Systems 06-16

07 81 00 Applied Fireproofing 05-15

07 84 00 Firestopping 05-15

07 92 00 Joint Sealants 05-15

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-13

08 71 00 Door Hardware 02-15

08 71 13 Automatic Door Operators 06-12

DEPARTMENT OF VETERANS AFFAIRS

09-01-15

00 01 10-2

DIVISION 09 – FINISHES

09 22 16 Non-Structural Metal Framing 10-14

09 29 00 Gypsum Board 11-14

09 91 00 Painting 09-15

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-15

22 07 11 Plumbing Insulation 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-15

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

11-10

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

23 07 11 HVAC and Boiler Plant Insulation 02-15

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 09-12

23 22 13 Steam and Condensate Heating Piping 02-15

23 23 00 Refrigerant Piping 02-15

23 31 00 HVAC Ducts and Casings 03-13

23 34 00 HVAC Fans 02-15

23 37 00 Air Outlets and Inlets 02-15

23 40 00 HVAC Air Cleaning Devices 02-12

23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11

23 82 16 Air Coils 04-11

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 07-15

26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13

26 05 26 Grounding and Bonding for Electrical Systems 12-12

26 05 33 Raceway and Boxes for Electrical Systems 05-14

26 24 16 Panelboards 05-14

26 27 26 Wiring Devices 08-14

26 29 11 Motor Controllers 08-14

26 29 21 Enclosed Switches and Circuit Breakers 12-12

APPENDIX - A Hazardous Material Report by ENCORP dated March

2015. (available in PDF copy)

APPENDIX – B Product Data ( Basis of Design and or Approved

Equal)

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

07-01-15

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

1 G 000 COVER SHEET

2 GI 001 ARCHITECTURAL ABBREVIATIONS, SYMBOLS AND NOTES

3 GC 001 GENERAL REQUIREMENTS NOTES

4 GC 002 GENERAL REQUIREMENTS NOTES

5 GC 101 STAGING PLAN

6 GC 102 EGRESS PLAN - 5TH FLOOR WEST

7 GC 103 EGRESS PLAN - 5TH FLOOR WEST INTERSTITIAL

8 GC 104 EGRESS PLAN - ROOF

9 GC 105 STATEMENT OF CONDITIONS

ARCHITECTURAL

10 AE 101 FLOOR PLAN - 5TH FLOOR WEST

11 AE 102 INTERSTITIAL FLOOR PLAN - 5TH FLOOR WEST

12 AE 105 REFLECTED CEILING PLAN - 5TH FLOOR WEST

13 AE 106 PARTIAL ROOF PLAN

14 AE 301 BUILDING SECTION

15 AE 401 ENLARGED FLOOR AND REFLECTED CEILING PLAN

16 AE 402 ENLARGED ROOF PLAN

17 AE 501 ROOFING DETAILS

18 AE 502 ROOFING DETAILS

19 AE 508 PENETRATION DETAILS

20 AE-601 DOOR SCHEDULE AND DETAILS

21 AE 901 EXISTING SITE PHOTOGRAPHS

22 AE 902 EXISTING SITE PHOTOGRAPHS

23 AR-101 REFERENCE DRAWING

24 AR-102 REFERENCE DRAWING

STRUCTURAL

25 S 1.01 GENERAL NOTES

26 S 2.01 ENLARGED ROOF FRAMING PLAN

27 S 3.01 SECTIONS AND DETAILS

28 S 3.02 SECTIONS AND DETAILS

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

07-01-15

00 01 15 - 2

MECHANICAL

29 MH-001 GENERAL NOTES AND SHEET INDEX

30 MH-002 LEGENDS, ABBREVIATIONS AND SYMBOLS

31 MH-003 MECHANICAL EQUIPMENT SCHEDULES

32 MH-004 MECHANICAL EQUIPMENT SCHEDULES

33 MH-005 ROOF FLOOR OVERALL PLAN WEST

34 MH-105 5TH FLOOR OVERALL HVAC PLAN

35 MH-105I 5TH FLOOR OVERALL INTERSTITIAL HVAC PLAN

36 MH-205 5TH FLOOR ENLARGED HVAC PLAN

37 MD-205I 5TH FLOOR ENLARGED INTERSTITIAL DEMOLITION PLAN

38 MH-205I 5TH FLOOR ENLARGED INTERSTITIAL REMODEL HVAC PLAN

39 MH-205IP 5TH FLOOR ENLARGED INTERSTITIAL REMODEL PIPING PLAN

40 MD-206 ENLARGED DEMOLITION ROOF PLAN

41 MH-206 ENLARGED ROOF PLAN

42 MH-206P ENLARGED ROOF PLAN - PIPING

43 MH-301 MECHANICAL DETAILS

44 MH-302 MECHANICAL DETAILS

45 MH-303 MECHANICAL DETAILS

46 MH-401 MECHANICAL CONTROLS

47 MH-402 MECHANICAL CONTROLS

48 MH-501 MECHANICAL EXISTING CONDITIONS

49 MH-502 MECHANICAL EXISTING CONDITIONS

50 MH-503 MECHANICAL EXISTING CONDITIONS

51 MH-SKM-1

SCHEMATIC DIAGRAM OF PROPOSED HVAC SYSTEM – DUCT

LAYOUT (SOUTH)

52 MH-SKM-2

SCHEMATIC DIAGRAM OF PROPOSED HVAC SYSTEM – DUCT

LAYOUT (NORTH)

53 MH-SKM-3 SCHEMATIC DIAGRAM OF PROPOSED HVAC SYSTEM – ROOF

PLUMBING

54 P-001 GENERAL NOTES AND SHEET INDEX

55 P-002 PLUMBING SCHEDULES

56 P-105 5 TH FLOOR OVERALL PLUMBING PLAN

57 P-105I 5 TH FLOOR OVERALL INTERSTITIAL PLUMBING PLAN

58 P-205 5 TH FLOOR ENLARGED REMODEL PLUMBING PLAN

59 P- 205I 5 TH FLOOR ENLARGED INTERSTITIAL REMODEL PLUMBING PLAN

60 P-206 ENLARGED PLUMBING ROOF PLAN

61 P-301 PLUMBING DETAILS

ELECTRICAL

62 EP-001 GENERAL NOTES, APPLICABLE CODES, SHEET INDEX

63 EP-002 SYMBOLS LISTS AND ABBREVIATIONS

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

07-01-15

00 01 15 - 3

64 EP-003 SINGLE LINE DIAGRAM

65 EP-004 PANEL SCHEDULE AND LOAD SUMMARY

66 EP-107R ROOF FLOOR OVERALL PLAN WEST

67 EP-205 5TH FLOOR ENLARGED ELECTRICAL PLAN

68 EP-205I 5TH FLOOR ENLARGED INTERSTITIAL REMODEL PLAN

69 EP-206I 6TH FLOOR ENLARGED INTERSTITIAL REMODEL PLAN

70 EP-207 ENLARGED ROOF POWER PLAN WEST

71 EP-301 ELECTRICAL DETAILS

72 EP-301 ELECTRICAL DETAILS

- - - END - - -

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 GENERAL INTENTION

1.2 STATEMENT OF BID ITEM(S)

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.4 CONSTRUCTION SECURITY REQUIREMENTS

1.5 FIRE SAFETY

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 INFECTION PREVENTION MEASURES

1.9 DISPOSAL AND RETENTION

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.11 RESTORATION

1.12 PHYSICAL DATA

1.13 AS-BUILT DRAWINGS

1.14 USE OF ROADWAYS

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.16 TEMPORARY TOILETS

1.17 AVAILABILITY AND USE OF UTILITY SERVICES

1.18 NEW TELEPHONE EQUIPMENT

1.19 TESTS

1.20 INSTRUCTIONS

1.21 GOVERNMENT-FURNISHED PROPERTY

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -2

1.22 RELOCATED ITEMS

1.23 “SUBMITTAL EXCHANGE” Software

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 GENERAL INTENTION

1.2 STATEMENT OF BID ITEM(S)

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.4 CONSTRUCTION SECURITY REQUIREMENTS

1.5 FIRE SAFETY

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 INFECTION PREVENTION MEASURES

1.9 DISPOSAL AND RETENTION

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.11 RESTORATION

1.12 PHYSICAL DATA

1.13 AS-BUILT DRAWINGS

1.14 USE OF ROADWAYS

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.16 TEMPORARY TOILETS

1.17 AVAILABILITY AND USE OF UTILITY SERVICES

1.18 NEW TELEPHONE EQUIPMENT

1.19 TESTS

1.20 INSTRUCTIONS

1.21 GOVERNMENT-FURNISHED PROPERTY

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -2

1.22 RELOCATED ITEMS

1.23 “SUBMITTAL EXCHANGE” Software

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -3

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 GENERAL INTENTION

A. Contractor shall completely prepare for building operations, including demolition and removal of existing structures, furnish labor and materials and perform work for the Bldg. 1, First Floor, Northeast

(1NE) Remodel – Prosthetics Expansion project as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Network Contracting Office (NCO) Contracting Officer.

C. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the VA Project Manager in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the Resident Engineer.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

E. Prior to commencing work, general contractor shall provide proof that a

OSHA designated “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subcontractors are present.

F. Training:

1. All employees of general contractor or subcontractors shall have the

10-hour or 30-hour OSHA Construction Safety course and other relevant competency training, as determined by RE/COR acting as the

Construction Safety Officer with input from the facility

Construction Safety Committee.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -4

2. Submit training records of all such employees for approval before the start of work.

G. VHA Directive 2011-36, Safety and Health during Construction, dated

9/22/2011 in its entirety is made a part of this section

1.2 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION of the AC 26 REPLACEMENT PROJECT WITH NEW

100% OUTSIDE AIR UNIT AC-74A, AC -74B, CHILLED WATER COOLING, PRE-HEAT

COILS, PRE AND FINAL FILTERS, TWO (2) NEW EXHAUST SYSTEMS EF-74A AND EF-

74B DEDICATED TO SERVE THE SEVEN OPERATING ROOMS AT THE ROOF, OPERATING

ROOM 7 AND HOLDING ROOM ARE ISLATION ROOMS WITH DEDICATED EXHUAST

SYSTEM, REPLACE ALL VENTURI VALVES FOR SEVEN OPERATING ROOMS AND

INCLUDING OTHER NEW WORK AS SHOWN ON DRAWINGS AND SPECIFICATIONS. Work shall include general construction, alterations, mechanical and electrical work, necessary removal of existing structures and construction and certain other items.

1.3 SPECIFICATIONS AND DRAWINGS

A. AFTER AWARD OF CONTRACT, Contractor shall print sufficient sets of specifications and drawings for their own use and keep a full size set at the site for noting As-Built information on daily and weekly basis.

Provide a minimum of one full size and three half size sets of drawings and one set of specifications in a three ring binder for use by VA COR.

B. Additional sets of drawings may be made by the Contractor, at

Contractor's expense.

1.4 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -5

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 days’ notice to the Contracting

Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the VA Project Manager for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -6 information shall be shared only with those with a specific need to accomplish the project.

3. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

4. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

6. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. Separate permits shall be issued for General Contractor and its employees for parking in designated areas only.

3. Contractors should be advised that the existing VAMC San Diego site is severely impacted and that on-site parking for contractor personnel, vehicles and other forms of transportation may be unavailable. Contractors may have to plan and obtain off-site parking and staging as required.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -7

1.5 FIRE SAFETY

A. Applicable Publications: Publications listed below form part of this

Article to extent referenced. Publications are referenced in text by basic designations only.

1. American Society for Testing and Materials (ASTM):

E84-2009 ............ Surface Burning Characteristics of Building

Materials

2. National Fire Protection Association (NFPA):

10-2010 ............. Standard for Portable Fire Extinguishers

30-2008 ............. Flammable and Combustible Liquids Code

51B-2009 ............ Standard for Fire Prevention During Welding, Cutting and Other Hot Work

70-2011 ............. National Electrical Code

101-2012 ............ Life Safety Code

241-2009 ............ Standard for Safeguarding Construction, Alteration, and Demolition Operations

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926 ......... Safety and Health Regulations for Construction

4. VHA Directive 2005-007

B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to Resident Project Engineer and Facility

Safety Manager for review for compliance with VHA Directive 2005-007, NFPA 101 and NFPA 241.Prior to beginning work, all employees of the contractor and/or any subcontractors shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -8 construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc.

Provide documentation to the VA Project Manager that all construction workers have undergone contractor’s safety briefing.

C. Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet).

E. Temporary Construction Partitions:

1. Install and maintain temporary construction partitions to provide smoke-tight separations between construction areas and adjoining areas. Construct partitions of gypsum board or treated plywood

(flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire retardant treated wood or metal steel studs.

Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. At door openings, install

Class C, ¾ hour fire/smoke rated doors with self-closing devices.

2. Install fire-rated temporary construction partitions as shown on drawings to maintain integrity of existing exit stair enclosures, exit passageways, fire-rated enclosures of hazardous areas, horizontal exits, smoke barriers, vertical shafts and openings enclosures.

3. Close openings in smoke barriers and fire-rated construction to maintain fire ratings. Seal penetrations with listed through-penetration fire stop materials in accordance with Section 07 84 00, FIRESTOPPING.

F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -9

G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with

Project Manager

H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily Report findings and corrective actions weekly to

Project Manager.

I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA

241 and NFPA 10.

J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.

K. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with Project Manager. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center.

Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the Resident

Engineer.

L. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with Project Manager.

M. Hot Work: Perform and safeguard hot work operations in accordance with

NFPA 241 and NFPA 51B. Coordinate with Project Manager Obtain permits from facility Safety Manager at least 24 hours in advance.

N. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to Project Manager.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -10

O. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.

P. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.

Q. Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926.

R. If required, submit documentation to the VA Project Managerthat personnel have been trained in the fire safety aspects of working in areas with impaired structural or compartmentalization features.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -11 local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the VA Project Manager. Contractors should be advised that the existing VAMC San Diego site is severely impacted and that on-site parking for contractor personnel, vehicles and other forms of transportation may be unavailable. Contractors may have to plan and obtain off-site parking and staging as required.

E. Workmen are subject to rules of Medical Center applicable to their conduct.

F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by VA Project Manager where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -12

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by Project Manager. All such actions shall be coordinated with the Utility Company involved:

I.Building No.1 (one) will be occupied during performance of work but immediate areas of alterations will be vacated.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veteran’s Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by

Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

J. When a building area is turned over to Contractor, Contractor shall accept entire responsibility therefore.

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -13

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by Project Manager.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of Project Manager. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval.

Refer to specification Sections 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS

INSTALLATIONS and 28 05 11, REQUIREMENTS FOR ELECTRONIC SAFETY AND

SECURITY INSTALLATIONS for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

Resident Engineer, in writing, 48 hours in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the Resident Engineer.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -14

5. In case of a contract construction emergency, service will be interrupted on approval of Resident Engineer. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads; walks and entrances must be approved by the Resident

Engineer.

N. Coordinate the work for this contract with other construction operations as directed by Project Manager. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the Project Manager areas of buildings in which alterations occur and areas which are anticipated routes of access, and

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -15 furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and Project Manager?

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of

Project Manager and to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE

CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR

852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and VA Project Manager together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -16 will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 INFECTION PREVENTION MEASURES

A. Implement the requirements of VAMC’s Infection Control Risk Assessment

(ICRA) team. ICRA Group may monitor dust in the vicinity of the construction work and require the Contractor to take corrective action immediately if the safe levels are exceeded.

B. Establish and maintain a dust control program as part of the contractor’s infection preventive measures in accordance with the guidelines provided by ICRA Group. Prior to start of work, prepare a plan detailing project-specific dust protection measures, including periodic status reports, and submit to Project Manager and Facility

ICRA team for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND

SAMPLES.

1. All personnel involved in the construction or renovation activity shall be educated and trained in infection prevention measures established by the medical center.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -17

C. Medical center Infection Control personnel shall monitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the medical center prior to the start of work and periodically during the construction stage to determine impact of construction activities on indoor air quality. In addition:

1. The RE and VAMC Infection Control personnel shall review pressure differential monitoring documentation to verify that pressure differentials in the construction zone and in the patient-care rooms are appropriate for their settings. The requirement for negative air pressure in the construction zone shall depend on the location and type of activity. Upon notification, the contractor shall implement corrective measures to restore proper pressure differentials as needed.

2. In case of any problem, the medical center, along with assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.

D. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold.

1. Dampen debris to keep down dust and provide temporary construction partitions in existing structures where directed by Resident

Engineer. Block off ducts and diffusers to prevent circulation of dust into occupied areas during construction.

2. Do not perform dust producing tasks within occupied areas without the approval of the Project Manager. For construction in any areas that will remain jointly occupied by the medical Center and

Contractor’s workers, the Contractor shall:

a. Provide dust proof temporary drywall construction barriers to completely separate construction from the operational areas of the hospital in order to contain dirt debris and dust. Barriers shall be sealed and made presentable on hospital occupied side.

Install a self-closing rated door in a metal frame, commensurate with the partition, to allow worker access. Maintain negative air

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -18 at all times. A fire retardant polystyrene, 6-mil thick or greater plastic barrier meeting local fire codes may be used where dust control is the only hazard, and an agreement is reached with the Project Manager and Medical Center shall provide fire rated where required

b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that construction exhaust to exterior is not reintroduced to the medical center through intake vents, or building openings. Install HEPA (High

Efficiency Particulate Accumulator) filter vacuum system rated at

95% capture of 0.3 microns including pollen, mold spores and dust particles. Insure continuous negative air pressures occurring within the work area. HEPA filters should have ASHRAE 85 or other pre filter to extend the useful life of the HEPA. Provide both primary and secondary filtrations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintroduced to the medical center.

c. Adhesive Walk-off/Carpet Walk-off Mats, minimum 600mm x 900mm

(24” x 36”), shall be used at all interior transitions from the construction area to occupied medical center area. These mats shall be changed as often as required to maintain clean work areas directly outside construction area at all times.

d. Vacuum and wet mop all transition areas from construction to the occupied medical center at the end of each workday. Vacuum shall utilize HEPA filtration. Maintain surrounding area frequently.

Remove debris as they are created. Transport these outside the construction area in containers with tightly fitting lids.

e. The contractor shall not haul debris through patient-care areas without prior approval of the VA Project Managerand the Medical

Center. When, approved, debris shall be hauled in enclosed dust proof containers or wrapped in plastic and sealed with duct tape.

No sharp objects should be allowed to cut through the plastic.

Wipe down the exterior of the containers with a damp rag to remove dust. All equipment, tools, material, etc. transported

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -19 through occupied areas shall be made free from dust and moisture by vacuuming and wipe down.

f. Using a HEPA vacuum, clean inside the barrier and vacuum ceiling tile prior to replacement. Any ceiling access panels opened for investigation beyond sealed areas shall be sealed immediately when unattended.

g. There shall be no standing water during construction. This includes water in equipment drip pans and open containers within the construction areas. All accidental spills must be cleaned up and dried within 12 hours. Remove and dispose of porous materials that remain damp for more than 72 hours.

h. At completion, remove construction barriers and ceiling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the removal.

E. Final Cleanup:

1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical shafts and utility chases that have been part of the construction.

2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, furniture (built-in or free standing), partitions, flooring, etc.

3. All new air ducts shall be cleaned prior to final inspection.

1.9 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -20 that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by Resident Engineer.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center Cemetery.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -21

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.11 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

Resident Engineer. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the VA Project

Managerbefore it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -22 contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.12 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

B. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

(FAR 52.236-17)

1.13 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the Resident Engineer's review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings to the VA Project Managerwithin 15 calendar days after each completed phase and after the acceptance of the project by the Resident

Engineer.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -23

1.14 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the Project Manager, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed by the Contractor at

Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

1.15 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to compliance with the following provisions:

1. Permission to use each unit or system must be given by Resident

Engineer. If the equipment is not installed and maintained in accordance with the following provisions, the Project Manager will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded.

The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

DEPARTMENT OF VETERANS AFFAIRS

SAN DIEGO MEDICAL CENTER

01-15-VASD

01 00 00 -24

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

1.16 TEMPORARY TOILETS

A. Contractor may have for use of Contractor's workmen, such toilet accommodations as may be assigned to Contractor by Medical Center.

Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workmen. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.

1.17 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract.