36C25818R0209-001.docx

DOCX document 14 KB Posted

Attached to
REPAIR EXISTING ROOF AREA BLDG 133 VA262-18-AP-3479
Solicitation number
36C25818R0209
Issued by

About this file

36C25818R0209 36C25818R0209_1.docx

View the file

Other files

File Type Posted
36C25818R0209-00004000.docx DOCX document
36C25818R0209-00003000.docx DOCX document
36C25818R0209-00002002.docx DOCX document
36C25818R0209-00002003.pdf PDF
36C25818R0209-00001001.docx DOCX document
36C25818R0209-00001000.docx DOCX document
36C25818R0209-002.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FedBizOpps Presolicitation Notice

CLASSIFICATION CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

RESPONSE DATE (MM-DD-YYYY)

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

SET-ASIDE

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

ADDRESS

POSTAL CODE

COUNTRY

ADDITIONAL INFORMATION

GENERAL INFORMATION

PLACE OF PERFORMANCE

* = Required Field FedBizOpps Presolicitation Notice Rev. March 2010 Y

REPAIR EXISTING ROOF AREA BLDG 133

VA262-18-AP-3479

85014 36C25818R0209 04-06-2018 N 236220 Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 Roman Cardenas Roman.Cardenas@va.gov Long Beach VAMC

1. Title. Remove and Replace Existing Roof and HVAC Duct on building 133

2. Background.

Due to the age of building 133, VA need to remove and replace approximately 860 Square Feet of roof materials and HVAC duct work because when it rains in this connecting corridor it leaks on patients and staff.

3. Scope.

The contractor will remove and replace approximately 860 Square Feet of existing 4” X 3” HVAC duct work to allow access to existing roof. Run temporary 30” duct work to maintain airflow from main mechanical room in the corridor to main Bldg. 133. Remove and replace approximately 860 square feet of roof. After the roofing is completed the contractor shall replace existing duct and reseal all joints.

PERIOD PERFORMANCE: Performance period for this contract will be no more than 45 days.

DEMO

1. Fence-off all working areas that are in pedestrian traffic.

2. Stage work vehicles in approved locations.

3. Secure AC units, exhaust fans, & other equipment during the demo.

4. Remove all debris from roof.

5. Remove existing membrane and felt from roof to expose decking

6. Clean entire surface of roof.

7. Walk roof with COR to ascertain any areas of faulty sub materials that show deflection.