36C25818Q9667-0001000.docx
DOCX document 19 KB Posted
- Attached to
- SAVAHCS B40 Replace Cooling Tower Fill Federal contract opportunity
- Solicitation number
- 36C25818Q9667
About this file
36C25818Q9667 0001 36C25818Q9667 0001.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25818Q9667-0002000.docx | DOCX document | |
| 36C25818Q9667-001.docx | DOCX document | |
| 36C25818Q9667-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) None Department of Veterans Affairs NCO22-Gilbert Network Contracting 3601 S. 6th Avenue Tucson
AZ
85723 Department of Veterans Affairs NCO22-Gilbert Network Contracting 3601 S. 6th Avenue Tucson
AZ
85723 To all Offerors/Bidders
36C25818Q9667
X X X
SEE CONTINUATION PAGE FOR DETAILS.
Thomas H. Robinson Contracting Officer
CONTINUATION PAGE
The purpose of this amendment is as follows:
1. Provide responses to submitted questions below.
This amendment DOES NOT change the quote due date for this solicitation.
Q&A Building 40 Replace Cooling Tower Fill
Q: Are there any rust issues in the chilling towers?
A: There aren’t any visible issues but it is possible that you may encounter some.
Q: Will the contractor be responsible for replacing the Fan Motor Adjustment Rods?
A: Yes
Q: What type of material should the Fan Motor Adjustment Rods be made of Galvanized or Stainless?
A: Since two of the units are galvanized and two are stainless the replacement rods should be galvanized for the galvanized units, and stainless for the stainless units.
Q: Will the Government supply a dumpster?
A: Per the Statement of Work the contractor will be responsible for supplying a dumpster to dispose waste.
Q: Will there be space made available for a dumpster near the location of work?
A: Yes, space will be made available.
Q: Will the Government supply a forklift if needed?
A: No
Q: What types of back-up replacement fill are required?
A: Per the SOW the Government requires one of each type of fill as replacements. For a total of two back-ups total.
Q: Will the contractor be allowed to drop off materials ahead of time?
A: Yes, we will be able to ensure there is an area where material can be pre-staged.
Q: Does the Government require OEM Fill?
A: The contractor will be responsible for supplying OEM or equivalent fill, as long as it meets the required specifications.