36C25818B0354-001.docx

DOCX document 173 KB Posted

Attached to
691-18-2-5090-1010 - DEEP WELL PUMP REMOVAL Federal contract opportunity
Solicitation number
36C25818B0354
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

36C25818B0354 36C25818B0354.docx

View the file

Other files for this federal contract opportunity

Other files attached to 691-18-2-5090-1010 - DEEP WELL PUMP REMOVAL, newest first.
File Type Posted
36C25818B0354-002.docx DOCX document
36C25818B0354-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25818B0354

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT

NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV.

8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that t ime. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government accepta nce after the date offers are due will not be considered and will be rejected.

36C25818B0354 X 691-18-2-5090-1010 none 00262 Department of Veterans Affairs Network Contracting Office 22- Gilbert 777 E. Missouri Ave Suite 300 Phoenix AZ 85014 Department of Veterans Affairs Network Contracting Office 22- Gilbert 777 E. Missouri Ave Suite 300 Phoenix AZ 85014 Vannell Berrien 602-798-4427

SOLICITAION FOR: to obtain construction services to repair the emergency back-up well water pump at the West Los Angeles Healthcare System (WLAVAHCS), Los Angeles, California.

NAICS code: 237110 Bid bonds are to be submitted on form SF24.

All awards are subject to availability of funds.

Cost range: $25,000 - $100,000

This procurement is 100% set aside for Service Disabled Veteran Owned Business (SDVOSB) in accordance with Public Law (PL) 109-461, 38 United States Code (USC) Section 8127. To be eligible to participate in this procurement, the Contractor shall be registered/enrolled in the following databases at the time of bid submission and award:

System for Award Management (SAM): www.sam.gov VetBiz: https://vip.vetbiz.gov - verification is also required.

VETS 4212 (DoL): www.dol.gov/vets/ vets4212

One time organized site visit will be held Friday, August 31, 2018 at 9:00 a.m. local time @ Long Beach VA Heatlh Care System, in front of BLDG 63 at WLAVAMC 11301 Wilshire Boulevard, Los Angeles, CA 90822

All Requests f or Information (RFI) for this solicitation must be received no later than 9:00 am (local time), Monday, September 3, 2018. All questions shall be in writing to the Contract Specialist with the subject line as follows:

RFI | 36C25818B0354| Deep Well Pump Repair. RFI's will be recieved by email to vannell.berrien@va.gov

The Contractor shall be responsible for the correct title classification of workers and compliance with all applicable wage and hour laws.

Contractors shall include their company's DUNS number in section 14 on page 2 of this Standard Form (SF) 1442.

Contractor shall perform work in strict accordance with the General Specifications, Statement of Work, schedule, and all other supporting documents for this contract.

X X 52.211-10 X one

1:00 PM

09-07-2018 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT

OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS

SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Govern ment on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE O

F CONTRACTOR OR PERSON AUTHORIZED

31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return ______ _ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Enter pricing for all bid items in bid schedule on following page as indicated.

Include the bid schedule with this SF 1442.

00262 Department of Veterans Affairs Network Contracting Office 22-Gilbert 777 E. Missouri Ave.

Suite 300 Phoenix AZ 85014 Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin TX 78714-9971

1.2 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Provide all labor, equipment, certification, supervision, and materials necessary to remove the existing pump bowl assembly from the well and replace it with a new pump bowl assembly at the VAGLAHS. Work included is provided in the statement of work.

Construction – 30 calendar days.

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.1 PRICE/COST SCHEDULE6
ITEM INFORMATION6
A.2 DELIVERY SCHEDULE6
STATEMENT OF WORK7
INTRODUCTION:7
BACKGROUND / DESCRIPTION OF WORK:7
CONSTRUCTION DOCUMENTS AND SPECIFICATIONS:7
SPECIFIC REQUIREMENTS7
CONFORMANCE STANDARDS:8
HOURS OF COVERAGE:9
IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:9
INFORMATION SECURITY:10
OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS:10
PERIOD OF PERFORMANCE:10
SUBMITTALS:10
COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:10
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS14
REPRESENTATIONS AND CERTIFICATIONS20
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018)20
CLAUSE in FULL TEXT24
M.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)24
M.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)24
M.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)24
M.4 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995)25
M.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)27
M.6 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)28
M.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)31
M.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)31
M.9 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (JAN 2008)31
M.10 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)32
M.11 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)32
M.12 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)32
M.13 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)33
M.14 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ALTERNATE II (APR 1984)34
M.15 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)35
CLAUSE INCORPORATED BY REFERENCE36
VAAR Clause in Full Text38
M.16 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)38
M.17 VAAR 852.211-73 BRAND NAME OR EQUAL (JAN 2008)38
M.18 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION)39
M.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)40
M.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002)41
M.21 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (JUL 2002)41
M.22 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002)42
M.23 VAAR 852.236-76 CORRESPONDENCE (APR 1984)42
M.24 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002)42
M.25 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984)43
M.26 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984)43
M.27 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984)43
M.28 VAAR 852.236-82 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS) (APR 1984) ALTERNATE I (JULY 2002)43
M.29 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984)47
M.30 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984)47
M.31 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008)47
M.32 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002)48
M.33 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008)50
M.34 VAAR 852.236-91 SPECIAL NOTES (JUL 2002)50
M.35 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008)51
M.36 VAAR 852.246-75 WARRANTY FOR CONSTRUCTION--GUARANTEE PERIOD SERVICES (JAN 2008)51
M.37 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011)52
DAVIS BACON WAGE DETERMINATION53

A.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

Provide all labor, equipment, certification, supervision, and materials necessary to remove the non functioning deep well pump from well and replace it with a new pump bowl assembly at the VAGLAHS.

GRAND TOTAL
__________________

A.2 DELIVERY SCHEDULE

ITEM NUMBER
QUANTITY
DELIVERY DATE
0001
SHIP TO:
Department of Veteran Affairs

West Los Angeles VA HealthCare System 11301 Wilshire Boulevard Los Angeles, CA 90822

USA

1.00
30 Days After NTP
MARK FOR:
Stephen Tourrette

310-268-3743 stephen.tourrette@va.gov

Page 1 of

STATEMENT OF WORK

36C25818B0354

Page 1 of

Statement of Work Repair Well Water Pump

Greater Los Angeles, California VA Health Care System (691)

691-18-2-5090-1010

INTRODUCTION:

This requirement is for the repair/replacement of the emergency back up well water pump that provides emergency back up well water to the facilities boilers. This project is referred to as the Well Water Pump in the Los Angeles, California VA Greater Los Angeles Health Care System (VAGLAHS)

BACKGROUND / DESCRIPTION OF WORK:

The Veterans Affairs Healthcare System located in Los Angeles, California (691) requires repair of the emergency back up well water pump.

CONSTRUCTION DOCUMENTS AND SPECIFICATIONS:

Contractor shall furnish all labor, equipment, certification, supervision, and materials necessary to perform all operations in connections with this order. Contractor shall perform work in strict accordance with the General Specifications, Statement of Work, schedule, and all other supporting documents for this contract to include, but not limited to the following documents:

SPECIFIC REQUIREMENTS

A. General Requirements

a. The existing pump is to be turned over to the facility for possible future repair as spare.

B. Scope of work A. Disconnect and remove the well pump metal framed building roof and associated roof beams to allow for removal of the well pump components.

B. Disconnect well pump motor electrical connections and flanged pump connections.

C. Disconnect and remove well pump motor and frame.

D. Use stinger crane to remove 126’ well pump piping/shaft sections. Extract, label and disconnect each of the 26 pump piping/shaft connections. Disconnect and remove defective pump bowl assembly.

E. Sound well for total depth after the well pump has been removed.

F. Video log well casing using color side scan video equipment.

G. Provide and install new pump bowl assembly.

H. Clean and inspect the 13 each 10’ pump suction line shafts.

I. Replace associated 13 stainless steel line shaft couplings.

J. Replace 13 each 1” 304 stainless steel shaft couplings and associated neoprene line shaft bearings.

K. Provide and install new 4” Flowmatic bronze foot valve to ensure pump is always primed.

L. Install new well pump bowl assembly into the suction line shaft adjusting the pump impellers for proper clearance as required.

M. Connect the pump motor and frame assembly.

N. Inspect existing piping and valves internals for any blockages.

O. Connect well pump flanged piping connections.

P. Connect well pump motor electrical connections and verify rotation.

Q. Startup pump and test for proper operation. Take new well level reading when pump is operational.

R. Reinstall and seal well pump metal framed building roof beams and metal roofing material.

CONFORMANCE STANDARDS:

A. All design and construction accomplished pursuant to this contract shall comply with the latest edition of the following documents unless the contractor is directed otherwise by the Contracting Officer. Any exceptions must be approved in writing by the Contracting Officer prior to construction startup.

a. VA Master Construction Specifications

b. VA Construction Standards

c. VA Seismic Design Handbook

d. VA Space Planning Criteria

e. VA Design Manuals

f. VA CADD Standards

g. NFPA 101, Life Safety Code

h. NFPA 70, National Electric Code

i. NFPA 99, Health Care Facilities

j. NFPA 12, Installation of Sprinkler Systems

k. Accessibility Standards (ADAAG, ABAAS, Barrier Free Design Guide)

l. AIA Guidelines for Construction and Equipment of Hospital and Medical Facilities

m. International Building Codes

n. State and Local codes and guidelines (as applicable)

HOURS OF COVERAGE:

A. Normal hours of operation are Monday through Friday from 8:00 am to 4:00 pm PDT time. All work is expected to be performed during normal hours of coverage unless requested or approved by the COTR or his/her designee.

B. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel.

C. Work performed outside the normal hours of coverage must be approved by the COTR or his/her designee.

D. Federal Holidays observed by VAGLAHS are:

New Years' DayLabor Day
Martin Luther King DayColumbus Day
Presidents' DayVeterans' Day
Memorial DayThanksgiving Day
Independence DayChristmas Day

IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:

A. The Contractor's FSEs shall wear visible identification issued by VAGLAHS Police Section at all times while on the premises of VAGLAHS. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. VAGLAHS will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited inside any buildings at VAGLAHS. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.

INFORMATION SECURITY:

A. In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements do not apply to this requirement, and Security Accreditation Package is not required. The nature of this requirement is technical; however, there is no information to be protected.

OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS:

PERIOD OF PERFORMANCE:

A. Commencement of work shall begin within 10 days after receipt of written Notice to Proceed (NTP), and should last no longer than a duration of 1 months after date NTP is issued.

SUBMITTALS:

B. Contractor shall submit all required material/shop drawing submittals to the Contracting Officer within 10 calendar days of award, or as agreed to by the Contracting Officer for approval. No materials shall be installed prior to approval.

C. All material submittals and shop drawings shall contain, and have the Project Title, Project Number, and Contract number clearly indicated.

D. Material submittals and shop drawings shall be checked and signed by the Contractors Quality Control Manager prior to submission to the Government.

E. Submittals shall be legible, and shall include all technical data needed to verify that the item meets requirements of listed specifications, and applicable codes.

COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:

A. The Contractor shall be required to commence work required at the time specified on the Notice to Proceed (NTP), execute the work, and complete the entire work not later than the completion time specified on the NTP. The time stated for completion shall include final cleanup of the premises. At the government’s option, it may choose to specify a two-stage performance period. For example, separating material lead-time from construction days can considerably decrease the length of time occupied buildings are inconvenienced by construction.

B. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; location of partitions, eating spaces, and restrooms for the Contractor employees; and the like. Delivery of materials and equipment shall be made with minimal interference to Government operations and personnel.

C. The Contractor will be paid monthly upon submission of proper invoices for work completed. If the performance period exceeds 30 days and a progress schedule (approved by the Government) has been submitted, partial payment(s) may be authorized. Final payment will be withheld until all discrepancies are corrected and as-built drawings are approved by the Government.

SPECIAL NOTICE

AVAILABILITY OF FUNDS

The Government’s obligation under this solicitation is contingent upon the availability of congressionally appropriated funds from which contract award may be made. No legal liability on the part of the Government for contract award may arise until funds are made available, with notice issued in writing, by the Contracting Officer.

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

Bidding materials consisting of drawings, specifications and contract forms may be obtained by qualified General (Prime) Contractors interested in submitting proposals directly to the Department of Veterans Affairs through FedBizOpps.gov.

A bid guarantee (on standard form SF 24) is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the response due date, will require rejection of the bid in all cases except those listed in Federal Acquisition Regulation (FAR) Part 28.101-4, and may be cause for rejection even then.

If the contract will exceed $150,000 (see FAR Part 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two (2) bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Specification.

If the contract will not exceed $150,000, the bidder to whom award is made will be required to furnish a payment protection in the penal sum and type as noted in the General Conditions of the Specification.

PAST PERFORMANCE

During contract administration, the Government shall prepare and submit assessments on contractor performance for contracts and orders in excess of the simplified acquisition threshold ($700,000 or more for construction; $35,000 or more for architect-engineer (A/E) service contracts) (see FAR Subpart 42.1502) by electronic submission to Contractor Performance Assessment Reporting System (CPARS), which automatically transmits the information to Past Performance Information Retrieval System (PPIRS).

VA ACQUISITION REGULATION (VAAR) 804.1102

VENDOR INFORMATION PAGES (VIP) DATABASE

Prior to January 1, 2012, all VOSBs and SDVOSBs must be listed in the VIP database, available at http://www.VetBiz.gov, and also must be registered in the Central Contractor Registration (CCR) (see 48 CFR subpart 4.11) to receive contract awards under VA’s Veteran-owned Small Business prime contracting and subcontracting opportunities program. After December 31, 2011, all VOSBs, including SDVOSBs, must be listed as verified in the VIP database, and also must be registered in the System for Award Management (SAM) to be eligible to participate in order to receive new contract awards under this program.

VAAR 819.7003 ELIGIBILITY

(a) Eligibility of SDVOSBs and VOSBs continues to be governed by the Small Business Administration regulations, 13 CFR subparts 125.8 through 125.13, as well as the FAR, except where expressly directed otherwise by the VAAR, and 38 CFR verification regulations for SDVOSBs and VOSBs.

(b) At the time of submission of offer, the offeror must represent to the contracting officer that it is a—

(1) SDVOSB concern or VOSB concern;

(2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and

(3) Verified for eligibility in the VIP database.

(c) A joint venture may be considered an SDVOSB or VOSB concern if

(1) At least one member of the joint venture is an SDVOSB or VOSB concern, and makes the representations in paragraph (b) of this section;

(2) Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement;

(3) The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in FAR 19.101; and

(4) The joint venture meets the requirements of 13 CFR 125.15(b), modified to include veteran-owned small businesses where this CFR section refers to SDVOSB concerns.

(d) Any SDVOSB or VOSB concern (nonmanufacturer) must meet the requirements in FAR 19.102(f) to receive a benefit under this program.

691-18-2-5090-1010 VA262-18-AP-5608

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

Page 1 of Page 1 of

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

1. PROJECT DESCRIPTION:

Contractor shall provide all labor, equipment, certification, supervision, and materials necessary to remove the existing deep well pump from the well and replace it with a new Deep well pump at the VAGLAHS and shall perform work in strict accordance with the General Specifications, Statement of Work, schedule, and all other supporting documents for this contract for the Deep Well Pump Replacement in the West Los Angeles, California, VA Health Care System (GLAVAHCS) located at 11301 Wilshire Boulevard, Los Angeles, California 90822 as required by drawings and specifications.

2. PROJECT LOCATION:

West Los Angeles VA Healthcare System 11301 Wilshire Boulevard Los Angeles, CA 90822

3. CONTRACT SPECIALIST:

Vannell L. Berrien Email – Vannell.Berrien@va.gov

4. TYPE OF CONTRACT:

Firm Fixed Price

5. ESTIMATED COST RANGE:

Between $25,000 and $100,000. (In accordance with (IAW) VAAR 836.204(f))

6. DESIGN:

This project does not include a package of drawings with specifications.

7. ESTIMATED COMPLETION TIME:

30 (Thirty) Calendar Days

8. PRE-BID CONFERENCE AND SITE VISIT:

An organized pre-bid conference and site visit will be conducted on: Friday, August 31, 2018, 9:00 a.m. (local time), at the West Los Angeles, California, VA Health Care System (GLAVAHCS) located at 11301 Wilshire Boulevard, Los Angeles, California 90822 in front of BLDG 63. Attendance is not mandatory, however all interested bidders are strongly encouraged to attend. No other site visits shall be scheduled.

9. BID CONTENTS:

a. Standard Form 1442. (Box 14-20 completed and signed acknowledging all amendments; do not fill in anything in “Award” section, from box 21 down).

b. Bid Guarantee/Bond (using SF24).

c. Contractor’s License - All Bidders shall submit, issued to the SDVOSB Prime, a current copy of their General Contractor’s License, or for those States that do not issue a General Contractor’s License, a State issued construction license that pertains to HVAC repair, maintenance, and alteration of structures and facilities.

d. Safety or Environmental violations and Experience Modification Rate (EMR) - All Bidders shall include with their Bid, past Safety and Environment record and current Experience Modification Rate. See paragraph 23.

e. VETS-4212, Federal Contractor Veterans’ Employment Report. See paragraph 21.

10. BID DUE DATE:

Submit One (1) original hardcopy of Bid Contents no later than Friday, September 7, 2018, 1:00 p.m. (local time).

Location:Department of Veteran Affairs
ATTN: Vannell L. Berrien

777 E. Missouri Ave Suite 300, 3rd Floor Conference Room Phoenix, AZ 85014

*All bids must be received in a sealed package.

** Bids may be received by e-mail no later than Tuesday, September 4,2018, 1:00 p.m. (local time). Send to vannell.berrien@va.gov

***Bids received after the time and date specified above, shall be rejected as late.

11. PUBLIC BID OPENING:

Will be held on Friday, September 7, 2018, 1:00 p.m. (local time).

Location: Department of Veteran Affairs 777 E. Missouri Ave Suite 300, 3rd Floor Conference Room Phoenix, AZ 85014

12. OFFER GUARANTEE (BID BOND):

An offer guarantee is required. Per FAR Clause 52.228-1 – Bid Guarantee – paragraph (c), the amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

13. PAYMENT AND PERFORMANCE BONDS:

If the contract will exceed $150,000 (see FAR 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the solicitation.

If the contract will not exceed $150,000, the bidder to whom award is made will be required to furnish a payment protection in the penal sum and type as noted in the General Conditions of the Specification.

14. DAVIS BACON WAGE RATE

Compliance to Labor Standards Provisions and Bid Davis Bacon Wage Rate Determinations for Los Angeles County is required.

15. NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS)

The North American Industry Classification System (NAICS) Code for this procurement is 237110.

16. BUY AMERICAN ACT:

VA does not anticipate accepting an offer that includes foreign construction material. More info about this can be found under the following provisions and clauses: FAR 52.225-9, 52.225-10; VAAR 852.236-89.

17. REQUEST FOR INFORMATION:

All Requests for Information (RFIs) regarding this IFB must be received no later than Monday, September 3, 2018, 9:00a.m. (local time) via e-mail to vannell.berrien@va.gov, to allow a reply to reach all prospective bidders before the submission of their bids. Responses to questions will be posted as an amendment to the solicitation and the government reserves the right to consolidate questions and responses.

18. Amendments to the solicitation must be acknowledged in the space provided in Block 19 of the SF1442 or by returning a signed copy of the amendment with the bid on the bid due date.

19. Bidders are strongly cautioned to check the Federal Business Opportunities http://www.fbo.gov website frequently and to “refresh” their web page to ensure they have the latest information.

20. This solicitation requires registration with the System for Award Management (SAM) pursuant to applicable regulations and guidelines. All must also complete an electronic annual representations and certifications (formerly ORCA). Registration information can be found at www.sam.gov.

21. Bidders are required to provide confirmation of their submission of the annual form VETS-4212, Federal Contractor Veterans’ Employment Report. http://www.dol.gov/vets/vets100verification.htm).

22. This solicitation is 100% Set-Aside for Service Disabled Veteran Owned Small Business (SDVOSB). Public Law 109-461, 38 USC Sec. 8127 provides SDVOSB and VOSB Set Aside authority to the VA. Businesses must be registered and verified in the VIP database at Vendor Information Pages (VetBiz) (https://www.vip.vetbiz.va.gov/).

23. SAFETY OR ENVIRONMENTAL VIOLATIONS AND EMR

a. All Bidders shall submit information pertaining to their past Safety and Environmental record. The information will be reviewed such that the bidder has no more than three (3) serious, or one (1) repeat or one (1) willful Occupational Safety and Health Administration (OSHA) or any Environmental Protection Agency (EPA) violation(s) in the past three (3) years.

b. All Bidders/Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.

c. All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Bidder’s/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, Bidder/Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the elevated EMR and the anticipated date the EMR may be reduced to 1.0 or below.

d. Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state’s worker’s compensation insurance rating bureau.

e. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. The above information, along with other information obtained from Government systems, such as the Occupational safety and Health Association (OSHA) and Environmental Protection Agency (EPA) online inspection history databases will be used, in part, to make the Determination of Responsibility. Failure to affirm being within the guidelines above will result in a determination of “Non-Responsibility” for the bidder. Failure to submit this information will result in a determination of “Non-Responsive” for the bidder. Note: Any information received by the Government that would cause for a negative Determination of Responsibility will make the bidder ineligible for award.

f. This requirement is applicable to all subcontracting tiers, and prospective prime Contractors are responsible for determining the responsibility of their prospective subcontractors.

- - END OF SECTION - -

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237110.

(2) The small business size standard is $36.5 Million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.

(vii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(viii) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(ix) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(x) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xi) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiii) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xiv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xvi) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xvii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xviii) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xix) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xx) 52.225-4, Buy American—Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $80,317, the provision with its Alternate II applies.

(D) If the acquisition value is $80,317 or more but is less than $100,000, the provision with its Alternate III applies.

(xxi) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan—Certification. This provision applies to all solicitations.

(xxiii) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications. This provision applies to all solicitations.

(xxiv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[X](i) 52.204-17, Ownership or Control of Offeror.

[X](ii) 52.204-20, Predecessor of Offeror.

[](iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

[](iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Certification.

[](v) 52.222-52, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Certification.

[](vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).

[](vii) 52.227-6, Royalty Information.

[](A) Basic.

[](B) Alternate I.

[](viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the SAM Web site accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR Clause #
Title
Date
Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.

(End of Provision)

CLAUSE in FULL TEXT

M.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after receipt of notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of Clause) M.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision) M.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
23.8 %
6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is State of California, County of Los Angeles, City of Long Beach.

(End of Provision) M.4 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997) ALTERNATE I (JUL 1995)

(a) "Hazardous material," as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).

(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety Data Sheet submitted under this contract.

Material (If none, insert “None”)
Identification No.

(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.

(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items. Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.

(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.

(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.

(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.

(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:

(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to—

(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;

(ii) Obtain medical treatment for those affected by the material; and

(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.

(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.

(3) The Government is not precluded from using similar or identical data acquired from other sources.

(i) Except as provided in paragraph (i)(2) the Contractor shall prepare and submit a sufficient number of Material Safety Data Sheets (MSDS's), meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No.