36C25818B0346-003.pdf

PDF 37 KB Posted

Attached to
691-18-2-5105-0009 Maintenance & Repair Landscape
Solicitation number
36C25818B0346
Issued by

About this file

36C25818B0346 SOW.pdf

View the file

Other files

File Type Posted
36C25818B0346-0005001.pdf PDF
36C25818B0346-0005000.docx DOCX document
36C25818B0346-0004000.docx DOCX document
36C25818B0346-0003000.docx DOCX document
36C25818B0346-0002000.docx DOCX document
36C25818B0346-0001002.pdf PDF
36C25818B0346-0001000.docx DOCX document
36C25818B0346-0001001.pdf PDF
36C25818B0346-002.pdf PDF
36C25818B0346-001.docx DOCX document
36C25818B0346-004.pdf PDF
36C25818B0346-000.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

7/30/2018

The contractor will be responsible to perform all work specified below. All material will be provided by contractor to accomplish complete landscaping, walkways and driveway. The contractor will provide all tools, machinery and any other equipment to successfully complete the project in hand. All work shall be performed in a good and workmanlike manner per industry standards. Please insure COR is contacted for all inspections that are indicated in red and bold.

Sidewalks & driveway are not to be placed directly on top of existing buried propane tanks exact location of sidewalks & the end of the driveway inside the gates to be determined on site once work begins. If any existing equipment, water lines and electrical lines/conduit are damaged when digging the contractor will be responsible to repair the damage on the contractors expense.

1. Contractor will remove weeds from entire enclosed area along with a two-foot-wide perimeter outside the fence line of the tank farm enclosure.

2. Excavate & remove 12” of top soil, (1st 4” of soil, 2nd 8” of soil) from entire enclosed area along with a two-foot-wide perimeter outside the fence line of the tank farm enclosure.

3. Place preventive gopher wire mesh at bottom of entire excavation. Inspection are gopher wire mesh is laid in place.

4. Replace 8” of soil on top of preventive gopher wire mesh.

5. Place weed prevention barrier on top of soil. Inspection of weed prevention barrier when laid in place.

6. Place 4” s of 1” rock on top of weed barrier

7. Concrete sidewalks & driveway. At a PSI, no, less than 3000. Receipt from concrete company showing 3000 PSI.

8. All walkways and driveway will be inspected before concrete pour.

9. Install concrete form for a new driveway from existing gates to extend out 17’ to existing

10. Asphalt road in front of the tank farm, and is to also extend in from the gates 30’.

New driveway to be same width as gates 11’ 6” wide and to flare out at approx. 45 degrees on each side at asphalt end of driveway. Driveway to be 4” thick.

11. Compact soil within the forms and place concrete base and compact once again, place #4 rebar.

12. Install concrete forms for a 3’ wide sidewalk connecting new driveway and all existing cement Pads forming a 3’ wide path along the inside perimeter of the fence line.

13. Compact base inside of forms and place appropriate wire inside the sidewalk forms.

14. Place cement throughout entire forms. Cement to be 3000psi. Finish to be broom finish.

After all, finished work the site will be washed down and cleaned from all debris produced from the construction site. The contractor is responsible to dispose of all construction debris, trash, access dirt and excess gravel produced from the project. A final inspection will be commenced for completion.