36C25818B0337-001.docx
DOCX document 202 KB Posted
- Solicitation number
- 36C25818B0337
About this file
36C25818B0337 36C25818B0337_1.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25818B0337-0001000.docx | DOCX document | |
| 36C25818B0337-0001003.pdf | ||
| 36C25818B0337-0001001.pdf | ||
| 36C25818B0337-0001002.pdf | ||
| 36C25818B0337-002.pdf | ||
| 36C25818B0337-003.pdf | ||
| 36C25818B0337-005.doc | DOC document | |
| 36C25818B0337-004.pdf | ||
| 36C25818B0337-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4.
CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK
DESCRIBED IN THESE
DOCUMENTS (
Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS 13.
ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
1. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than ____ ___________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25818B0337 X 07-06-2018 none Bid Opening: Dept of Veterans Affairs VA Long Beach Health Care System 5901 E. Seventh St Bldg 5 room 100F Long Beach, Ca. 90822 Ca 90822 Department of Veterans Affairs Phoenix VA Healthcare System 777 E. Missouri, Suite 300 Phoenix AZ 85014 Jeff Gray 858-642-6296 Remove/Replace B126/128 Emergency Generator Fuel Lines
This solicitation calls for the construction to Remove/Replace B126/128 Emergency Generator Fuel lines at Long Beach VA Health Care Center located in Long Beach, California. 5901 E Seventh St., Long Beach Ca.
Contract or shall furnish all labor, equipment, certification, supervision, and materials necessary to perform operation in connection with this order.
Awardee shall perform work in strict accordance with general specifications, Statement of Work, Attachments, Schedule, and terms and conditions set forth in the contract.
This requirement is 100% set aside for SDVOSB concerns.
Magnitude of this project is between $250,000 and $500,000.
Applicable NAICS code and size standard for this application is 541620/$15 million.
Please provide a reference number for any additional documents provided in response to this solicitation, as well as current DUNS or CAGE code Wage determination applicable to the solicitation is General Decision Number: CA180033180629 CA33
All bids shall be submitted hard copy to CO Jeff Gray at the address listed in block 7 of this solicitation.
Public bid opening will pake place on Friday, 12:00 PM PST (local time) August 24, 2018, Bldg 5, room 100F.
of the address listed in block 7 of this solicitation.
RFIs due: 3 August 2018 @ 2:00 pm pst ( submit to CO jeffery.gray@va.gov and COR keith.didrickson@va.gov.
email header title to be RFI for Solicitation 36C25818B0337.
RFI response due :
10 August 2018 (posted).
X X 52.211-10 X 08-24-2018 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DA
TE
31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs NCO22-Gilbert Network Contracting 777 E. Missouri, Suite 300 Phoenix AZ 85014 This is accomplished through the Tungsten Network located at:
http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.
Jeff Gray
Table of Contents
| PART I - THE SCHEDULE | 2 |
| SECTION A - SOLICITATION/CONTRACT FORM | 2 |
| SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 2 |
| SECTION B - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK | 7 |
| B.1 INTRODUCTION: | 7 |
| B.2 BACKGROUND / DESCRIPTION OF WORK: | 7 |
| B.3 CONSTRUCTION DOCUMENT: | 7 |
| B.4 SPECIFICATIONS | 8 |
| B.5 SPECIFIC REQUIREMENTS | 8 |
| 7. Security Requirements | 12 |
| Vendor will not have access to patient records, data or VA computer systems | 12 |
| 12. Period of Performance. | 13 |
| The period of performance will begin immediately due to the extreme nature of this emergency. | 13 |
| B.6 CONFORMANCE STANDARDS: | 13 |
| B.7 HOURS OF COVERAGE: | 14 |
| B.8 IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS: | 14 |
| B.9 INFORMATION SECURITY: | 14 |
| B.10 OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS: | 14 |
| B.11 PERIOD OF PERFORMANCE: | 15 |
| B.12 SUBMITTALS: | 15 |
| B.13 MODIFICATIONS: | 16 |
| SECTION C - CONTRACT CLAUSES | 17 |
| C.1 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 17 |
| GENERAL CONDITIONS | 18 |
| 4.1 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) | 18 |
| 4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 19 |
| 4.3 52.214-26 AUDIT AND RECORDS—SEALED BIDDING (OCT 2010) | 19 |
| 4.4 52.214-27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA—MODIFICATIONS—SEALED BIDDING (AUG 2011) | 20 |
| 4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) | 21 |
| 4.6 52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA—MODIFICATIONS—SEALED BIDDING (OCT 2010) | 23 |
| 4.7 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015) | 23 |
| 4.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 24 |
| 4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014) | 25 |
| 4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS | 28 |
| 4.11 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 28 |
| 4.12 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 31 |
| 4.13 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 31 |
| 4.14 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 32 |
| 4.15 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) | 32 |
| 4.16 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002) | 34 |
| 4.17 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (JUL 2002) ALTERNATE I | 34 |
| 4.18 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002) | 35 |
| 4.19 VAAR 852.236-76 CORRESPONDENCE (APR 1984) | 35 |
| 4.20 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002) | 35 |
| 4.21 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984) | 35 |
| 4.22 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984) | 35 |
| 4.23 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984) | 36 |
| 4.24 VAAR 852.236-83 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS) (JUL 2002) | 36 |
| ADDITIONAL REQUIREMENTS FOR BAR CHART SCHEDULE | 39 |
| 4.25 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984) | 40 |
| 4.26 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008) | 40 |
| 4.27 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993) | 40 |
| 4.28 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002) | 40 |
| 4.29 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008) | 42 |
| 4.30 VAAR 852.236-91 SPECIAL NOTES (JUL 2002) | 43 |
| 4.31 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008) | 44 |
| 4.32 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011) | 44 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 45 |
| SECTION E - SOLICITATION PROVISIONS | 46 |
| E.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 46 |
| E.2 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 46 |
| E.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 47 |
| E.4 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 48 |
| E.5 52.233-2 SERVICE OF PROTEST (SEP 2006) | 48 |
| E.6 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 49 |
| E.7 52.228-1 BID GUARANTEE (SEP 1996) | 49 |
| E.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 49 |
| E.9 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008) | 50 |
| E.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998) | 50 |
| E.11 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 51 |
| REPRESENTATIONS AND CERTIFICATIONS | 52 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018) | 52 |
| 3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) | 55 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 56 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 57 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 58 |
SECTION B - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
36C25818B0337
Page 1 of Page 1 of
Statement of Work Remove/Replace B126/128 Emergency Generator Fuel Lines July 2018 Long Beach, California VA Health Care System (600)
600-18-3-5667-0801
B.1 INTRODUCTION:
This requirement is for construction services Remove & Replace existing Underground Fuel Lines for Emergency Generators at Bldg-126 & 128, and move overfill alarm system, and Re-Route vent line. This project is referred to as the AC-26 Replacement in the VA Long Beach Healthcare System. This requirement is classified under construction as it calls for the alteration of real property.
B.2 BACKGROUND / DESCRIPTION OF WORK:
In July of 2017, VA Long Beach had the Three (3) year SB/989 testing performed, it was found in this testing that we had several leaks in our Fuel Lines for the Underground Fuel Storage Tanks that supply fuel to the Emergency Generators for Bldg-126 & 128. These deficiencies were noted by the City of Long Beach Fire Department, and we have been cited and fined since then. These repairs will bring us back into compliance with the Regulatory Agencies. Also, we are relocating the Veeder Root Alarm System, as it is over 200 feet away from the fill port for the Underground Fuel Storage Tank at Bldg-126. The alarm system is so far away from the fill port that if it were to be overfilled while the operator is dispensing fuel, he/she will not be able to hear the alarm, alarm needs to be relocated to bring it up to current codes. 120 calendar days duration.
B.3 CONSTRUCTION DOCUMENT:
Contractor shall furnish all labor, equipment, certification, supervision, and materials necessary to perform all operations in connections with this order. Contractor shall perform work in strict accordance with the General Specifications, Statement of Work, schedule, and all other supporting documents for this contract to include, but not limited to the following documents:
B.4 SPECIFICATIONS
A. The VA Master Construction Specifications contain work procedures and material requirements designed to meet regulatory compliance requirements. Whenever possible, the Master Construction Specifications must be used as the basis for project designs.
B. A complete list of these specifications can be viewed at the following website: http://www.cfm.va.gov. Specifications which address EOSH requirements include, but are not limited to, the following:
a. SECTION 01 00 00 – General Requirements
b. SECTION 23 10 00 FACILITY FUEL OIL SYSTEMS
B.5 SPECIFIC REQUIREMENTS
View following applicable Specifications at VHA web site , https://www.cfm.va.gov/TIL/’.
· Section 02 41 00 Demolition.
· Section 03 30 53, Short Form CAST-IN-PLACE CONCRETE.
· Section 26 05 11 Requirements for Electrical Installation.
· Section 26 05 19 Low Voltage Electrical Power Conductors & Cables.
· Section 26 27 26 Wiring Devices
· Section 26 05 41, UNDERGROUND ELECTRICAL CONSTRUCTION.
· Section 28 31 00 Fire Detection & Alarm
· Section 31 20 00, EARTHWORK.
California Design & Specifications are described in :
Title 23 , California Code of Regulations , Chapter 16 , California water Boards ‘ Underground storage Tank Regulations’ July 2011.
Web site ‘https://www.waterboards.ca.gov/ust/regulatory/’ Contractor shall submit State of California Mechanical, Plumbing, Safety Engineer approved shop drawings for each component of the new system and construction schedule for VA-COR and City of Long Beach Fire Department approval. All work under this contract shall be in accordance with industry standards, OSHA, California State Water Resources Board, and all applicable State/Federal Regulations. Contractor shall ensure that all required coordination and notification is conducted with the regulatory agency, City of Long Beach Fire Department and VALBHS. All work shall be performed by an approved and valid State of California Contractor. Contractor shall ensure (if required) all permits, plans and certifications are in place prior to commencing work.
Applicable VHA Specification are:
SECTION 23 10 00 FACILITY FUEL OIL SYSTEMS (attached)
1.1 Section 01 00 00, GENERAL REQUIREMENTS(ATTACHED)
1.2 Section 02 41 00, DEMOLITION.
1.3 Section 03 30 53, SHORT FORM, CAST-IN-PLACE CONCRETE.
1.4 Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATION.
1.5 Section 26 05 19, LOW VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES.
1.6 Section 26 27 26, WIRING DEVICES
1.7 Section 26 05 41, UNDERGROUND ELECTRICAL CONSTRUCTION.
1.8 Section 28 31 00, FIRE DETECTION & ALARM.
1.9 Section 31 20 00, EARTHWORK
2. Contractor shall check in with Keith Didrickson, Bldg-5C, upon arrival at the VA Long Beach Healthcare System.
3. Contractor and Employees shall be issued Temporary ID Badges from the VA Police Department that are to be worn at all times while on VA Property.
4. Supervisor: 30 Hour OSHA Construction Safety Training.
5. Personnel: 10 Hour OSHA Construction Safety Training.
6. Contractor and Employees to attend a 30 minute VA Safety briefing provided by the Safety Department.
7. A site visit is required for this Construction.
5. Specific Tasks. EAST SIDE OF BLDG-126, NEW FUEL LINES:
1. Contractor shall provide one (1) 1-MEG/1000 KW Mobile Generator and install on-site at the temporary generator hookup located at the front driveway of Bldg-126, for Back up Emergency Power for the Main Hospital, Bldg-126. Generator shall be maintained 24 Hours by Contractor during duration of Construction. Load bank hook up box has cam-lock cables, a 120/V outlet for battery charger, auto start wires and a phase rotation meter. Generator hookup will require 13 4/0 cables for hookup at 50 feet
2. Contractor shall remove two (2) existing sidewalks that cross over existing trench for underground fuel lines, and hand excavate to expose existing underground fuel lines. (A) 25” x 90” x 4”. (B) 5’ x 6’ x 4”. Contractor shall secure the area once the existing sections of the sidewalks have been removed with construction stakes/posts and plastic mesh, provided by the VA.
3. Contractor shall flush out three (3) fiberglass lined pipes (FRP) to remove any oil residue. Residue shall be disposed of per California Codes at an approved site for disposal. Contractor shall provide a Manifest of the disposal of any residue that was removed and disposed of at the approved site for disposal.
4. Contractor shall remove three (3) FRP lines (one supply, one return & one vent line) and dispose of at an approved site for disposal, and provide a Manifest of the disposal of the pipes.
5. Contractor shall hand excavate the base of the existing trench so that the installation of two (2) FRP lines (supply & return) will be installed as follows: (A) Base shall be 20” wide. (B) Base shall be hand excavated so that there will be 10” thick of rounded 3/8” pea stone. (C) Return line shall be slightly sloped to match existing line. All soil that is removed is to be disposed of at an approved site for disposal and Contractor is to provide a Manifest for all soil that is disposed of, as the soil will be contaminated with fuel residue. All Manifests are to be provided to the COR within 14 calendar days of disposal.
6. Contractor shall submit sketch of excavated trench with dimensions for approval.
7. Contractor shall install two (2) new FRP lines (one supply & one return), , 2” Primary with 3” Secondary containment on a 10” base of 3/8” rounded pea stone, each line will be approximately 220 feet long. Primary 2” line shall be tested at 10/PSI. Secondary containment line shall be tested at 5/PSI. Return line shall be slightly sloped to match existing line at Underground Storage Tank (UST).
8. Contractor shall install 10” of 3/8” rounded pea stone the entire length of the trench.
9. Contractor shall install Filter Fabric, Model: Woven 150, as Manufactured by Granite Environmental on top of the 3/8” rounded pea stone. Backfill entire trench to grade with a minimum of four (4) inches of top soil. Install grass seed on top soil, keep top soil moist until germinated.
10. Two (2) FRP lines at Bldg-126 shall enter via a transition pump, manufactured by APT, Model: AST-2922. Cover shall have 4” inspection port with lockable cap and adaptor, Model: OPW634TTM7087/OPW633T8075.
11. Pipes shall exit using entry boots, Model: DEB-200-SC.
12. Contractor shall make all electrical & plumbing connections between new lines and existing lines for detection of fuel overflow at Veeder Root Panel.
13. Sump shall have one (1) Veeder Root sump sensor, Model: 330513-001 and shall be tied into existing TLS-300 Console.
14. Contractor shall replace two (2) sections of sidewalk that were removed with 3000/psi concrete with steel mesh, (A) 25” x 90” x 4”. (B) 6’ x 5’ x 4”, and finish concrete to match existing.
15. Contractor shall repair/replace any irrigation (Sprinkler) piping and sprinkler heads that may be damaged during excavation to match existing.
16. Contractor shall remove and dispose of all dirt and gravel left from the original excavation, as well as current excavation, and dispose of at an approved site for disposal.
RE-ROUTING OF VENT LINE AT BLDG-126.
1. Contractor shall excavate approximately 15’ of existing soil toward Bldg-126, with a 20“ wide base to re-route Vent line towards Bldg-126.
2. Contractor shall install one set of FRP’s (2” primary & 3” secondary), approximately 15’ in existing trench, with a 10” base of 3/8” rounded pea stone.
3. Contractor shall install one (1), 90 degree elbow and run an additional 15’ of FRP toward Bldg-126, with a 10” base of 3/8” rounded pea stone.
4. Contractor shall install one (1), 90 degree elbow up to existing grade, with FRP, and install another 90 degree elbow running toward Bldg-126, with 14’ of 2” diameter stainless steel flex pipe, Model: FSMM0200x18.
5. Contractor shall install stainless steel flex pipe to 90 degree elbow mounted to Bldg-126, per California codes.
6. Contractor shall install, 30’ of 2” Galvanized pipe vertically up the wall of Bldg-126, and attach per California Codes.
7. Vent lines underground will all be FRP’s and run from the UST to the transition sump Manufactured by APT, Model AST-2922, cover shall have 4” inspection port with lockable cap and adaptor, Model: OPW634TTM7087/OPW633T8075.
8. Vent lines in trench shall be connected to transition sump using entry boots, Model: DEB-200-5C. Sump shall have one (1) Veeder Root sump sensor, Model: 330513-001 and shall be tied into existing TLS-300 console. Vent line shall be connected to UST, transition sump and Veeder Root sensor per California Codes.
RELOCATING EXISTING VEEDER ROOT OVERFILL ALARM SYSTEM FROM BLDG-151, SUB-STATION 13, WHICH HOUSES EMERGENCY GENERATOR FOR BLDG-126, TO TANK FILL PORT, LOCATED AT BLDG-126.
1. Contractor shall turn off all power to Veeder Root alarm system, and do LO/TO (lock out/tag out).
2. Contractor shall remove L/B (left bend) on outside of cinder block wall to include all conduit, boxes, fittings and straps that come before L/B (left bend).
3. Contractor shall remove all electrical wiring and low voltage wiring to 4S junction box inside Bldg-151.
4. Contractor shall seal penetration on outside of Bldg-151.
5. Contractor shall remove existing Veeder Root alarm system and reinstall at new location near fill port station next to Bldg-126.
6. Contractor shall run new ¾” EMT (electrical metallic tubing) from existing 4S box inside to adjacent wall and install new 4S box, with compression couplings & connectors.
7. Contractor shall drill through wall at new 4S box through cinder block wall.
8. Contractor shall run ¾” EMT (electrical magnetic tubing) through cinder block wall. Install on outside of cinder block wall a new weather rated junction box & connect new 4S box to new weather rated junction box.
9. Contractor shall install new ¾” EMT for low voltage wiring from Veeder Root to newly installed 4S box.
10. Contractor shall install new ¾” EMT for electrical wiring from Veeder Root to newly installed 4S junction box.
11. Contractor shall install ¾” RMC for low voltage wiring from newly installed weather rated junction box down to existing trench, 8” to 10” below grade, with 8” to 10” of 20/ML PVC pipe tape on RMC & SCH/80 PVC pipe.
12. Contractor shall install approximately 220’ of SCH/80 PVC electrical conduit in existing trench for low voltage wiring, with 8” to 10” inches of 20/ML PVC pipe tape from connection of newly installed RMC.
13. Contractor shall install approximately 220’ of SCH/80 PVC electrical conduit in existing trench for electrical wiring, with 8” to 10” of 20/ML PVC pipe tape from connection of newly installed RMC.
14. Contractor shall run all wiring to match existing wire type and adjust to account for voltage drop of newly install electrical wiring and newly installed low voltage wiring.
15. Contractor shall install new concrete pad, 3’ x 3’ x 18” near fill port station next to Bldg-126, to include 2 ea. 7’ X 2” galvanized steel pipe, with galvanized caps, set approximately 20” apart, with 6’ above finished concrete.
16. Contractor shall install ¾” RMC for low voltage wiring up to desired height, with 8” to 10” of 20/ML PVC pipe tape above finished concrete and 8” to 10” of 20/ML PVC pipe tape on SCH/80 PVC electrical conduit in existing trench.
17. Contractor shall install ¾” RMC for electrical wiring up to desired height, with 8” to 10” of 20/ML PVC pipe tape above finished concrete and 8” to 10” of 20/ML on SCH/80 PVC electrical conduit in existing trench.
18. Contractor shall install 2 ea. 24” long unistruts, with U-Bolts and Unistrut spring nuts.
19. Contractor shall install new weather rated junction box to unistruts, and tie all RMC into newly installed weather rated junction box.
20. Contractor shall run all wiring to match existing wire type and adjust to account for voltage drop of newly installed electrical wiring and newly installed low voltage wiring, through all newly installed junction boxes, weather rated junction boxes, all RMC and all SCH/80 PVC electrical conduit and tie into newly installed Veeder Root alarm location.
21. Once Contractor is finished with the new installation, Contractor will remove LO/TO (lock out/tag out) and test system for proper operation.
22. Contractor shall remove and dispose all debris and leave area clean.
BLDG-128, FUEL LINES:
1. Contractor shall flush out existing Fiberglass Reinforced Plastic (FRP) line to remove any oil residue. Residue shall be disposed of per California Codes at an approved site for disposal. Contractor shall provide a Manifest of the disposal of any residue that was removed and disposed of at the approved disposal site.
2. Contractor shall remove one (1) FRP line (approximately 180’ long) and dispose of at an approved site for disposal. Contractor to provide a Manifest for the disposal of the RFP.
3. Contractor shall hand excavate the base of the existing trench so that the installation of one (1) RFP line will be installed as follows: Base shall be 12” wide so that there will be 10” of 3/8” rounded pea stone. All soil that is excavated will be disposed of at an approved site for disposal, as soil will be contaminated with fuel/oil residue. Contractor shall provide a Manifest of all soil that was disposed of at the approved site for disposal.
4. Contractor shall remove existing irrigation lines in the trench, and replace to match existing to include sprinkler heads.
5. Contractor shall install approximately 180” of new FRP. Primary 2” with 3” secondary containment, per California Codes.
6. Contractor shall install Filter Fabric, Model: Woven 150, as Manufactured by Granite Environmental on top of 10” of 3/8” rounded pea stone.
7. Contractor shall backfill entire trench to grade with a minimum of four (4) inches of top soil. Install new grass seed on top soil, keep top soil moist until germinated.
6. Performance Monitoring - Routine inspections by Facilities Personnel
7. Security Requirements Vendor will not have access to patient records, data or VA computer systems
8. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).
No Government equipment will be used by the Vendor
9. Other Pertinent Information or Special Considerations.
None
10. Risk Control Submit an (ICRA). “Infection Prevention Construction Risk Assessment” permits.
11. Place of Performance.
Bldg. 126 & 128,6 VAMCLB.
12. Period of Performance.
The period of performance will begin immediately due to the extreme nature of this emergency.
13. Delivery Schedule.
N/A:
B.6 CONFORMANCE STANDARDS:
A. All design and construction accomplished pursuant to this contract shall comply with the latest edition of the following documents unless the contractor is directed otherwise by the Contracting Officer. Any exceptions must be approved in writing by the Contracting Officer prior to construction startup.
a. VA Master Construction Specifications
· https://www.cfm.va.gov/til/spec.asp#01
b. VA Construction Standards
c. VA Seismic Design Handbook
d. VA Space Planning Criteria
e. VA Design Manuals
f. VA CADD Standards
g. NFPA 101, Life Safety Code
h. NFPA 70, National Electric Code
i. NFPA 99, Health Care Facilities
j. NFPA 12, Installation of Sprinkler Systems
k. Accessibility Standards (ADAAG, ABAAS, Barrier Free Design Guide)
l. AIA Guidelines for Construction and Equipment of Hospital and Medical Facilities
m. International Building Codes
n. State and Local codes and guidelines (as applicable)
B.7 HOURS OF COVERAGE:
A. Normal hours of operation are Monday through Friday from 7:30 am to 4:00 pm California time (no daylight savings). All work is expected to be performed generally during/outside normal hours of coverage unless requested or approved by the COTR or his/her designee.
B. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel.
C. Work performed outside the normal hours of coverage must be approved by the COTR or his/her designee.
D. Federal Holidays observed by NAVAHCS are:
| New Years' Day | Labor Day | ||
| Martin Luther King Day | Columbus Day | ||
| Presidents' Day | Veterans' Day | ||
| Memorial Day | Thanksgiving Day | ||
| Independence Day | Christmas Day |
B.8 IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:
A. The Contractor's FSEs shall wear visible identification issued by NAVAHCS Police Section at all times while on the premises of NAVAHCS. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. NAVAHCS will not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is prohibited inside any buildings at NAVAHCS. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
B.9 INFORMATION SECURITY:
A. In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements do not apply to this requirement, and Security Accreditation Package is not required. The nature of this requirement is technical; however, there is no information to be protected.
B.10 OTHER PERTINENT INFORMATION OR SPECIAL CONSIDERATIONS:
A. Access to worksite shall be coordinated through the Engineering Department located at:
VA Long Beach Healthcare System
5901 East Seventh St.
Long Beach, Ca., 90822-5201
Contracting Officer’s Representative (COR).
| Name: |
| KEITH DIDRICKSON |
| Section: |
| Facilities |
| Address: |
| 138C3 |
| Phone Number: |
| 562-826-8000, ext: 22469. |
| Fax Number: |
| 562-826-5981 |
| E-Mail Address: |
| Keith.Didrickson@va.gov |
B.11 PERIOD OF PERFORMANCE:
A. Commencement of work shall begin within 10 days after receipt of written Notice to Proceed (NTP), and should last no longer than a duration of 120 calendar days after date NTP is issued.
B.12 SUBMITTALS:
B. Contractor shall submit all required material/shop drawing submittals to the Contracting Officer within 10 calendar days of award, or as agreed to by the Contracting Officer for approval. No materials shall be installed prior to approval.
C. All material submittals and shop drawings shall contain, and have the Project Title, Project Number, and Contract number clearly indicated.
D. Material submittals and shop drawings shall be checked and signed by the Contractors Quality Control Manager prior to submission to the Government.
E. Submittals shall be legible, and shall include all technical data needed to verify that the item meets requirements of listed specifications, and applicable codes.
B.13 MODIFICATIONS:
A. Modifications for this project after award will utilize the modification table and will be filled out when submitting a request. All requests must be submitted to the assigned COR who will then submit a formal request to the Contracting Officer (CO). New work is not allowed to commence unless it is signed by both parties via a Standard Form (SF) 30 modification.
600-18-3-5667-0801 36C262-18-AP-0749
Page 1 of Page 1 of
SECTION C - CONTRACT CLAUSES
C.1 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.
(End of Clause)
GENERAL CONDITIONS
4.1 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management database via https://www.acquisition.gov.
(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments—
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by—
(i) Government personnel and authorized users performing business on behalf of the Government; or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIS is automatically transferred after a waiting period of 14 calendar days, except for—
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the Contractor's record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the nonpublic segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
(End of Clause)
4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after receipt of award. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
4.3 52.214-26 AUDIT AND RECORDS—SEALED BIDDING (OCT 2010)
(a) As used in this clause, "records" includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.
(b) Certified cost or pricing data. If the Contractor has been required to submit certified cost or pricing data in connection with the pricing of any modification to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the certified cost or pricing data, shall have the right to examine and audit all of the Contractor's records, including computations and projections, related to—
(1) The proposal for the modification;
(2) The discussions conducted on the proposal(s), including those related to negotiating;
(3) Pricing of the modification; or
(4) Performance of the modification.
(c) Comptroller General. In the case of pricing any modification, the Comptroller General of the United States, or an authorized representative, shall have the same rights as specified in paragraph (b) of this clause and also the right to interview any current employee regarding such transactions.
(d) Availability. The Contractor shall make available at its office at all reasonable times the materials described in paragraph (b) of this clause, for examination, audit, or reproduction, until 3 years after final payment under this contract, or for any other period specified in Subpart 4.7 of the Federal Acquisition Regulation (FAR). FAR Subpart 4.7, Contractor Records Retention, in effect on the date of this contract, is incorporated by reference in its entirety and made a part of this contract.
(1) If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement.
(2) Records pertaining to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to the performance of this contract shall be made available until disposition of such appeals, litigation, or claims.
(e) The Contractor shall insert a clause containing all the provisions of this clause, including this paragraph (e), in all subcontracts expected to exceed the threshold in FAR 15.403-4(a)(1) for submission of certified cost or pricing data.
(End of Clause)
4.4 52.214-27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA—MODIFICATIONS—SEALED BIDDING (AUG 2011)
(a) This clause shall become operative only for any modification to this contract involving aggregate increases and/or decreases in costs, plus applicable profits, expected to exceed the threshold for the submission of certified cost or pricing data at FAR 15.403-4(a)(1), except that this clause does not apply to a modification if an exception under FAR 15.403-1(b) applies.
(b) If any price, including profit, negotiated in connection with any modification under this clause, was increased by any significant amount because (1) the Contractor or a subcontractor furnished certified cost or pricing data that were not complete, accurate, and current as certified in its Certificate of Current Cost or Pricing Data, (2) a subcontractor or prospective subcontractor furnished the Contractor certified cost or pricing data that were not complete, accurate, and current as certified in the Contractor's Certificate of Current Cost or Pricing Data, or (3) any of these parties furnished data of any description that were not accurate, the price shall be reduced accordingly and the contract shall be modified to reflect the reduction. This right to a price reduction is limited to that resulting from defects in data relating to modifications for which this clause becomes operative under paragraph (a) of this clause.
(c) Any reduction in the contract price under paragraph (b) of this clause due to defective data from a prospective subcontractor that was not subsequently awarded the subcontract shall be limited to the amount, plus applicable overhead and profit markup, by which (1) the actual subcontract or (2) the actual cost to the Contractor, if there was no subcontract, was less than the prospective subcontract cost estimate submitted by the Contractor; provided, that the actual subcontract price was not itself affected by defective certified cost or pricing data.
(d)(1) If the Contracting Officer determines under paragraph (b) of this clause that a price or cost reduction should be made, the Contractor agrees not to raise the following matters as a defense:
(i) The Contractor or subcontractor was a sole source supplier or otherwise was in a superior bargaining position and thus the price of the contract would not have been modified even if accurate, complete, and current certified cost or pricing data had been submitted.
(ii) The Contracting Officer should have known that the certified cost or pricing data in issue were defective even though the Contractor or subcontractor took no affirmative action to bring the character of the data to the attention of the Contracting Officer.
(iii) The contract was based on an agreement about the total cost of the contract and there was no agreement about the cost of each item procured under the contract.
(iv) The Contractor or subcontractor did not submit a Certificate of Current Cost or Pricing Data.
(2)(i) Except as prohibited by subdivision (d)(2)(ii) of this clause, an offset in an amount determined appropriate by the Contracting Officer based upon the facts shall be allowed against the amount of a contract price reduction if—
(A) The Contractor certifies to the Contracting Officer that, to the best of the Contractor's knowledge and belief, the Contractor is entitled to the offset in the amount requested; and
(B) The Contractor proves that the certified cost or pricing data were available before the date of agreement on the price of the contract (or price of the modification) and that the data were not submitted before such date.
(ii) An offset shall not be allowed if—
(A) The understated data was known by the Contractor to be understated when the Certificate of Current Cost or Pricing Data was signed; or
(B) The Government proves that the facts demonstrate that the contract price would not have increased in the amount to be offset even if the available data had been submitted before the date of agreement on price.
(e) If any reduction in the contract price under this clause reduces the price of items for which payment was made prior to the date of the modification reflecting the price reduction, the Contractor shall be liable to and shall pay the United States at the time such overpayment is repaid—
(1) Interest compounded daily, as required by 26 U.S.C. 6622, on the amount of such overpayment to be computed from the date(s) of overpayment to the Contractor to the date the Government is repaid by the Contractor at the applicable underpayment rate effective for each quarter prescribed by the Secretary of the Treasury under 26 U.S.C. 6621(a)(2); and
(2) A penalty equal to the amount of the overpayment, if the Contractor or subcontractor knowingly submitted certified cost or pricing data which were incomplete, inaccurate, or noncurrent.
(End of Clause)
4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
(a) Definitions. As used in this clause— Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is "not dominant in its field of operation" when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code 541620 assigned to contract number .
[Contractor to sign and date and insert authorized signer's name and title].
(End of Clause)
4.6 52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA—MODIFICATIONS—SEALED BIDDING (OCT 2010)
(a) The requirements of paragraphs (b) and (c) of this clause shall—
(1) Become operative only for any modification to this contract involving aggregate increases and/or decreases in costs, plus applicable profits, expected to exceed the threshold for submission of certified cost or pricing data at FAR 15.403-4(a)(1); and
(2) Be limited to such modifications.
(b) Before awarding any subcontract expected to exceed the threshold for submission of certified cost or pricing data at FAR 15.403-4(a)(1), on the date of agreement on price or the date of award, whichever is later, or before pricing any subcontract modifications involving aggregate increases and/or decreases in costs, plus applicable profits, expected to exceed the threshold for submission of certified cost or pricing data at FAR 15.403-4(a)(1), the Contractor shall require the subcontractor to submit certified cost or pricing data (actually or by specific identification in writing), as part of the subcontractor's proposal in accordance with FAR 15.408, Table 15-2 (to include any information reasonably required to explain the subcontractor's estimating process such as the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data, and the nature and amount of any contingencies included in the price), unless an exception under FAR 15.403-1(b) applies.
(c) The Contractor shall require the subcontractor to certify in substantially the form prescribed in FAR subsection 15.406-2 that, to the best of its knowledge and belief, the data submitted under paragraph (b) of this clause were accurate, complete, and current as of the date of agreement on the negotiated price of the subcontract or subcontract modification.
(d) The Contractor shall insert the substance of this clause, including this paragraph (d), in each subcontract that, when entered into, exceeds the threshold for submission of certified cost or pricing data at FAR 15.403-4(a)(1).
(End of Clause)
4.7 52.222-35 EQUAL OPPORTUNITY…