S02 36C25727Q0099.pdf

PDF 227 KB Posted

Attached to
Annual Chiller Maintenance & Remote 24/7 Monitoring
Solicitation number
36C25727Q0099
Issued by

About this file

This is a Notice of Intent to Sole Source solicitation for annual chiller maintenance and remote 24/7 monitoring services. The Department of Veterans Affairs, Network Contracting Office 17, is seeking a sole-source contractor (Solicitation Number 36C25727Q0099) to provide comprehensive chiller, cooling tower, and associated pump system services for VA Medical Centers in Temple and Waco, Texas. The contract includes a base year (April 1, 2027 – March 31, 2028) plus four one-year option periods through March 31, 2032. Response and award dates are not specified in the document. Invoicing will be conducted monthly through the Tungsten System following satisfactory performance, with itemized invoices required to include time period, service descriptions, unit costs, extended amounts, and contract/obligation numbers.

The scope of work requires 24/7 remote monitoring integration with Johnson Controls Building Automation System (Metasys) for 21 total chillers (16 currently equipped with Johnson Controls panels), immediate real-time alarming and diagnostics, preventive maintenance on high and low-pressure centrifugal chillers and air-cooled screw chillers, quarterly operational checks, and annual shutdowns. The contractor must provide an onsite Johnson Controls Factory Authorized Service Technician at Temple campus (36 hours/week) and scheduled support for Waco campus (4–8 hours/week before weekends), 32 hours of annual technician training, telephone support 24/7, and mechanical HVAC repairs as needed. Part replacement is covered up to $5,000 per part at no government cost. Required staffing includes an onsite Journeyman Technician with minimum 5 years' experience in YORK, Carrier, and Trane water chillers and Johnson Controls systems, plus a supporting Chiller Journeyman Technician with minimum 15 years' experience for preventive maintenance. The contractor must submit detailed monthly, quarterly, semi-annual, and annual preventative maintenance reports within five business days, respond to service calls within four hours, comply with all federal safety regulations and OSHA requirements, and provide comprehensive safety plans prior to work commencement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT* Notice of Intent to Sole Source Annual Chiller Maintenance & Remote 24/7 Monitoring

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE* 78240

SOLICITATION NUMBER* 36C25727Q0099

RESPONSE DATE/TIME/ZONE

ARCHIVE 60 DAYS AFTER THE RESPONSE DATE

SET-ASIDE

PRODUCT SERVICE CODE* J041

NAICS CODE* 238220

PLACE OF PERFORMANCE Olin E. Teague Veterans' Center

1901 Memorial Drive

Temple TX

POSTAL CODE 76504

COUNTRY

CONTACT INFORMATION

CONTRACTING OFFICE ADDRESS Department Of Veterans Affairs

Network Contracting Office 17

5441 Babcock Road Ste. 302

San Antonio TX 78240

POINT OF CONTACT*

Contract Specialist

Melanie Williams melanie.williams5@va.gov

210-694-6378

ADDITIONAL INFORMATION

AGENCY’S URL www.va.gov

URL DESCRIPTION Department of Veterans Affairs Homepage

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

STATEMENT OF WORK

24/7 Remote Chiller Monitoring and Chiller Maintenance

The contractor shall be responsible for providing supervision, labor, and materials for the services required to provide 24/7 remote monitoring and specified maintenance on Chillers, Cooling Towers and associated Chilled/Condenser Water Pump Systems for the VA Medical Centers located in Temple, TX and Waco, TX.

The Contractor shall be responsible for providing all labor, supervision, materials, equipment, tools, and any other supplies to perform 24/7 remote monitoring and specified maintenance on Chillers, Cooling Towers and associated Chilled/Condenser Water Pump Systems for the Temple and Waco VA Medical Center facilities.

The contractor shall provide all personnel, services, vehicles, transportation, tools, equipment, materials, supplies, facility supervision, administration supervision, and any other item(s) necessary to perform and accomplish this service. The contractor shall be familiar with all the terms, conditions, and requirements herein contained. All work must comply with federal regulations.

Working Conditions: The buildings and all surrounding areas will be occupied. The Contractor shall take all precautions to ensure that operations are conducted in a manner so as not to interfere with normal operation of surrounding facilities. The Contractor shall execute work in a safe manner and shall not subject personnel to unsafe conditions. The Contractor shall provide safety barricades, devices, and equipment to protect personnel and property.

Workmanship and Experience Requirements: On Site Journeyman Technician must have working knowledge of YORK, Carrier and Trane Water Chillers with a minimum of 5 years’ experience. Additionally, this technician must have a working knowledge of Cooling Towers, Condenser and Chilled Water Pumps, and the existing Johnson Controls Building

Automation System. (Metasys)

Supporting Chiller Journeyman Technician – In addition to the onsite Journeyman Technician, a Chiller Journeyman with minimum 15 years’ experience shall perform all chiller preventative maintenance for quarterly operational checks and annual shutdowns. This will apply to all Air Cooled and Water-Cooled Chillers currently on site at the Waco and Temple VA Campuses. To include VISIN 17 owned mobile chiller.

Chiller Journeyman Technician must have demonstrated proficiency in YORK, Carrier, and Trane manufactures.

The Contractor shall provide written documentation of the mechanics work experience and references to the Contracting Officer Representative (COR) within five (5) days if verification is requested. After the Notice to Proceed and prior to any work being started on this contract.

All work shall be done according to the Infection Control Risk Assessment (ICRA) specified for the respective areas where work is performed.

Documentation: Contractor shall, within f i v e ( 5) business days, provide a detailed report and analysis, both electronic and hard copy of all work performed and results to the COR. Report shall contain, at a minimum, company logo, date of service, amount of time spent on service, reason and results, technician’s name(s). At a minimum, the Contractor shall provide the following reports: Monthly, Quarterly, Semi-Annual, and Annual Preventative Maintenance (PM).

Note 1: Response Time: Contractor shall respond to routine and emergency service calls within four (4) hours of notification.

Hours of Coverage: Normal hours of coverage are seven (7) days per week, twenty-four (24) hours per day. Emergency service shall be performed on an “as needed” on call basis.

Note 2: Training: The Contractor shall provide thirty-two (32) hours of onsite training to the operating engineers, maintenance, and supervisory personnel each year. This training is to take place for eight (8) hours each quarter. Training shall enable the recipients to understand the importance and complexity of the mechanical equipment and their associated Johnson Controls control applications, calibration, and proper maintenance of the mechanical system.

Note 3: A dedicated Johnson Controls Factory Authorized Service Technician will provide onsite Technical Support for the Temple VA Campus totaling 36 Hours each Week and provide scheduled onsite Technical Support 4-8 hours or as needed per week prior to the beginning of each weekend for the Waco Campus. To exclude the following 8 observed holidays.

• New Years Day (January 1)

• MLK Day (Third Monday of January)

• Memorial Day (Last Monday in May)

• Independence Day (July 4)

• Labor Day (First Monday in September)

• Veterans Day (November 11)

• Thanksgiving Day (Fourth Thursday of November)

• Christmas Day (December 25)

Project Requirements:

Period of Performance:

Base Year: 4/1/2027 – 3/31/2028 Option Year 1: 4/1/2028 – 3/31/2029 Option Year 2. 4/1/2029 – 3/31/2030 Option Year 3: 4/1/2030 – 3/31/2031 Option Year 4: 4/1/2031 – 3/31/2032

Place(s) of Performance:

Olin E. Teague Veterans’ Center 1901 Memorial Drive Temple, TX 76504

Doris Miller VA Medical Center 4800 Memorial Dr.

Waco, TX 76711

Remote Monitoring:

Provide 24/7 remote monitoring of all chillers equipped with a Johnson Controls Control Panel. When combining both the Waco and Temple VA Campuses, 16 of the total 21 chillers are currently controlled and operated with a Johnson Controls Control Panel.

The contractor shall alert VA personnel to the alarms as they occur in real time as well as identify the potential causes and solutions for these problems.

As technology becomes available Contractor will provide remote monitoring to all 21 chillers covered under this contract at no additional charge to the Government.

Johnson Control technicians shall be equipped with mobile devices which can view every chiller’s Johnson Control Panel and current operating condition in real time from any location. For weekend or nighttime emergencies when the Contractor’s technician is away, he will have the ability to view the chillers operating condition via his mobile device and assist VA personnel in solving issues immediately.

The 24/7 remote monitoring shall fully integrate with the current Johnson Controls Metasys BAS providing trending and recording of all chiller control points. This information shall provide both the Service Technicians and VA staff the ability to pinpoint and accurately diagnose equipment alarms and prevent future equipment failures before they occur.

Telephone Assistance: Telephone assistance will be provided 24 hours per day, 7 days per week.

General Scope:

Parts: Contractor shall furnish and replace parts to meet up-time requirements.

The contractor shall have ready access to unique and/or high mortality parts. All parts supplied shall be compatible with existing equipment. The contractor shall provide only new parts. If new parts are not available, refurbished, or manufactured parts shall be used only with approval of VA Project Manager (VAPM). All parts supplied shall be compatible with existing equipment. The contractor shall provide all parts except as noted in Special Provisions.

Repair: Individual parts that require replacement shall be furnished by Contractor at no cost to the Government up to a maximum of $5,000 per part.

Inadequate or improper repairs performed by Contractor will be correctly repaired at a time convenient to the VA at no additional expense to the VA.

Provide preventative maintenance and premium full-service maintenance on existing Chillers, Cooling Towers and associated Chilled/Condenser Water Pump Systems for both the Waco and Temple VA Medical Centers.

Provide preventative maintenance and premium full-service maintenance to include associated VFD’s for all chillers, Cooling Towers and associated Chilled/Condenser Water Pump Systems FOR TEMPLE ONLY.

A Johnson Controls technician will assist and train VA personnel as a dedicated full-time resource to perform preventative measures and all associated repairs for the equipment listed under this contract.

Validate system integrity through physical checks of point data and command responses, system function tests, assessment of standard report logs, and analysis of special systems activity log files.

Contractor shall provide telephone assistance to the CTVHCS Point of Contact to enable communication with the Contractor’s representative for assistance in identifying and verifying operational needs and resolving problems.

All technicians will have the ability to view each chillers control panel and its current operating condition in real time from any location.

The contractor shall monitor the equipment performance and service history, and shall consult with the CTVHCS on application strategies, which will optimize the system’s ability to help meet present and future operational needs.

Scheduling of Preventative Maintenance inspections shall be coordinated between the

Contractor and COR. Preventative Maintenance inspections will be performed in a manner which clearly demonstrates that the equipment meets or exceeds all manufacturers’ technical performing specifications.

Perform mechanical HVAC repairs as needed.

Onsite technician’s time will be shared with both the Temple and Waco Campuses. Engineering & Market Research for Project Development: Identify and develop turnkey solutions for mechanical upgrades and repairs.

The Contractor shall service and verify make, model and serial numbers the following equipment and Locations: Temple ICF, Buildings 063, 99, 163, 171, 202, 203, IT Building, Cath Lab, CLC Building, Waco Bldg. 225, Waco Energy Center. To include associated VFD’s for all chillers, Cooling Towers and associated Chilled/Condenser Water Pump Systems FOR TEMPLE ONLY.

Building 163 - Temple

Equipment Model # HP TAG

JCI Controlled Trane Chiller

- 1

CVHE500 CH1

JCI Controlled YORK Chiller

- 2

YTK9J4FI-CTG CH2

Cooling Tower

Aurora Pump 93-14586-2 50 P1

Aurora Pump 93-14586-1 50 P2

Aurora Pump 60 S1

Aurora Pump 93-14910-1 60 S2

Aurora Pump 93-14907 60 S3

Aurora Pump 93-14910-2 30 S4

Peerless Pump SAE12 75 CWP1

Peerless Pump SAE12 75 CWP2

Peerless Pump SAE12 75 CWP3

CLC Building 221 - Temple

Cooling Towers and associated pumps and motors.

Building 163 Surgery Roof - Temple

Equipment Model # HP TAG

York Chiller -1 CH1

Chilled Water Pump 10 CWP1

Building 063 – Temple

Equipment Model # HP TAG

JCI Controlled YORK Chiller

- 1

YKFRFTQ7 CH3

Aurora Pump 08-

1748011

20 P3

Aurora Pump 08-

1747689

30 P4

Building 99 Chapel - Temple

JCI Controlled YORK Chiller

- 1

YCAL040 CH1

Chilled Water Pump CHWP

Building 203 - Temple

Equipment Model # HP TAG

JCI Controlled Trane Chiller

- 1

CVHF650 CH1

JCI Controlled Trane Chiller

- 2

CVHF650 CH2

JCI Controlled York Chiller

- 3

YMC2-S2550ABS CH3

Marley Cooling Tower NC9032GM CT1/2

Marley Cooling Tower NC228427-A1 CT3

TACO Pump EE600 20 P1

TACO Pump FE6008 20 P2

TACO Pump FE6008 20 P3

TACO Pump TA2030B 75 P4

TACO Pump TA2030B 75 P5

TACO Pump FI6011-

S003

40 P13

TACO Pump FI5009-

S002

20 P14

TACO Pump F5010

E2M1

40 CWP6

TACO Pump FF5010

E21M1

40 CWP7

TACO Pump FI6009 40 CWP8

Building 171 – Temple

Equipment Model # HP TAG

Trane Chiller - 1 RTHB130 CH1

Trane Chiller - 2 RTRB130 CH2

Cooling Tower CT1

Cooling Tower 2 (Future) CT2

Condenser Water Pump CWP1

Condenser Water Pump CWP2

CHW Primary FI3007 5 P1

CHW Primary FI3007 5 P2

CHW Secondary FI5011 40 P3

CHW Secondary FI5011 40 P4

Building 202 – Temple

Equipment Model # HP TAG

JCI Controlled Trane

Chiller - 1

CVHF450 CH1

JCI Controlled Trane

Chiller - 2

CVHF450 CH2

Marley Cooling Tower NC8304EL2GS CT1

MUELLER Pump 5G4A 10 CHP1

MUELLER Pump 5G4A 10 CHP2

MUELLER Pump 5G4A 10 CHP3

Weinman Pump 50 CHP4

Weinman Pump 50 CHP5

AMERICAN TURBINE

Pump

12M100 20 CWP1

AMERICAN TURBINE

Pump

12M100 20 CWP2

IT Building – Temple

Equipment Model # HP TAG

JCI Controlled YORK

Chiller - 1

YVAA CH1

JCI Controlled YORK

Chiller - 2

YVAA CH2

Bell & Gossett CHW Pump 1 CHWP1

Bell & Gossett CHW Pump 2 CHWP2

CATH Lab – Temple

Equipment Model # HP TAG

JCI Controller YORK Chiller

- 1

YCAL050 CH1

CHWP Aurora 11-

2162082

5 CHP3

Waco Energy Center

Equipment Model # HP TAG

JCI Controlled YORK Chiller

- 1

YKQSQRK1 CH1

JCI Controlled YORK Chiller

- 2

YKQSQRK1 CH2

JCI Controlled YORK Chiller – 3

YKQSQRK1 CH3

JCI Controlled YORK Chiller

- 4

YKQSQRK1 CH4

Marley Cooling Tower 124-11 CT1

Marley Cooling Tower 124-11 CT2

Marley Cooling Tower 124-11 CT3

Marley Cooling Tower 124-11 CT4

Paco Primary Chilled Water Pump PCW1

Paco Primary Chilled Water Pump PCW2

Paco Primary Chilled Water Pump PCW3

Paco Primary Chilled Water Pump PCW4

Condenser Water Pump 29-10153 CWP1

Condenser Water Pump 29-10153 CWP2

Condenser Water Pump 29-10153 CWP3

Condenser Water Pump 29-10153 CWP4

Portable Chiller

Equipment Model # HP TAG

JCI Controlled YORK Chiller

- 1

YCAV CH1

HIGH PRESSURE CENTRIFUGAL CHILLERS

Operating Season Inspections

• Inspecting chillers and adjusting safety controls

• Checking operation of controls

• Checking oil and refrigerant levels

• Checking operation of lube system

• Checking the oil return system

• Checking operation of motor and starter

• Recording operating conditions

• Checking log and reviewing chiller and system operation with operator

• Conducting routine maintenance as recommended and required

• Logging and reporting repairs and parts that are required

The Annual Equipment Shutdown Inspection and PM - Checking the Compressor-Motor Assembly for the following items and performing PM Tasks as indicated:

• Recording voltages

• Meging and recording motor winding resistance

• Lubricating open motor

• Checking the alignment on open drive units

• Checking the coupling

• Checking seals

• Checking inlet vane operator and linkage; lubricating where required Checking the Compressor Oil System for the following items:

• Changing oil filter, and dryer

• Conducting analysis on oil and oil filter at an independent laboratory

• Checking oil pump, seal and motor

• Cleaning the dirt leg

• Checking heater and thermostat

• Checking all other oil system components including cooler, strainer and solenoid valve where applicable

Checking Motor Starter (VSD) and performing the following tasks:

• Running diagnostic check

• Cleaning contacts or recommending replacement

• Checking linkage

• Meging motor

• Checking all terminals and tightening connections

• Replace VSD Coolant

• Checking overloads, dash pot oil and calibrating Cleaning or replacing air filters where required

• Dry running starter (or before start-up); checking status lights Review the Control Panel for the following items:

• Running diagnostic check of Micro Control Panel

• Checking safety shutdown operation

• Checking all terminals and tightening connections

• Checking Display Data accuracy and set points Checking the Condenser for the following items:

• Checking the water flow

• Checking flow switch operation

• Removing condenser head and inspecting end sheets

• Mechanically brush cleaning condenser water tubes Checking the Cooler for the following items:

• Checking the water flow

• Checking flow switch operation

• Checking refrigerant level Checking the System for the following items:

• Conducting a leak check and identifying leak sources for repairs

• Adding refrigerant as required

• Recording condition of sight glasses

• Checking the refrigerant cycle to verify the proper operating balance

• Checking condenser water and chilled water heat transfer General items included:

• Repairing insulation removed for inspection and maintenance procedures

• Cleaning equipment and surrounding area upon completion of work

• Consulting with the operator

• Reporting deficiencies and repairs required

LOW PRESSURE CENTRIFUGAL CHILLERS

Operating Season Inspections

• Inspecting chillers and adjusting safety controls

• Checking purge operation

• Checking operation of controls

• Checking oil and refrigerant levels

• Checking operation of lube system

• Checking the oil return system

• Checking operation of motor and starter

• Recording operating conditions

• Checking log and reviewing chiller and system operation with operator

• Check condenser and cooler water flows

• Checking the refrigerant cycle to verify the proper operating balance

• Checking condenser water and chilled water heat transfer

Logging and reporting repairs and parts that are required The Annual Equipment Shutdown Inspection and PM

Checking the Compressor-Motor Assembly for the following items and performing PM Tasks as indicated:

• Recording voltages

• Meging and recording motor winding resistance

• Lubricating open motor

• Checking the alignment on open drive units

• Checking the coupling

• Checking seals

• Checking inlet vane operator and linkage; lubricating where required Checking the Compressor Oil System for the

Changing oil, oil filter and dryer

• Conducting analysis on oil and oil filter at an independent laboratory

• Checking oil pump, seal and motor

• Cleaning the dirt leg

• Checking heater and thermostat

• Checking all other oil system components including cooler, strainer and solenoid valve where applicable

Checking Motor Starter and performing the following tasks:

Running diagnostic check

• Cleaning and inspecting heat exchanger

• Checking starter coolant pump and motor

• Meging motor

• Checking all terminals and tightening connections

• Cleaning or replacing air filter or starter fluid

• Checking overloads and calibrating

• Checking status lights

Review the Control Panel for the following items:

Running diagnostic check of Micro Control Panel

• Checking safety shutdown operation

• Checking all terminals and tightening connections

• Checking Display Data accuracy and set points Reviewing the Purge Unit for the following items:

• Inspecting the operation of the unit

• Changing filter drier

• Checking all other components for proper condition and operation;

recording pressure control set point

Checking the Condenser for the following items:

• Checking flow switch operation

• Removing condenser head and inspecting end sheets

• Mechanically brush cleaning condenser water tubes Checking the Cooler for the following items:

• Checking flow switch operation

• Checking refrigerant level Checking the System for the

• Conducting a leak check and identifying leak sources for repairs

• Adding refrigerant as required

• Recording condition of sight glasses

• Checking the refrigerant cycle to verify the proper operating balance

• Checking condenser water and chilled water heat transfer General items included:

• Repairing insulation removed for inspection and maintenance procedures

• Cleaning equipment and surrounding area upon completion of work

• Consulting with the operator

• Reporting deficiencies and repairs required

AIR COOLED SCREW CHILLERS

Operating Season Inspections

• Checking for general condition and operation

• Logging operating conditions and identifying inconsistencies

• Adjusting operating controls if required

• Checking for proper oil level and refrigerant charge

• Checking the oil temperature and compressor heater

• Inspecting starter, relays and controls

• Inspecting the air-cooled condenser fans, and motor operation

• Removing debris from inside and around the unit

• Reviewing operating procedures and the owner's log with the operator The annual equipment shutdown inspection and PM

• Meging and recording motor winding resistance

• Changing the oil filter

• Checking the oil level in the lube system; adding oil as required; & conducting an oil acidity test

• Conducting a leak check

• Changing the filter-dryer

• Checking the crankcase heater for proper operation

• Tightening the power wiring on contactors and in the motor terminal box

• Cleaning all contactors and recommending replacement if required

• Checking all relays, operating controls and safeties

• Checking and calibrating all controls, safeties, unloaders, and external interlocks

Checking for general condition and operation

• Logging operating conditions and identifying inconsistencies

• Adjusting operating controls if required

• Checking for proper oil level and refrigerant charge

• Checking the oil temperature and crankcase heater

• Inspecting starter, relays and controls

• Inspecting the air-cooled condenser fans, and motor operation

• Removing debris from inside and around the unit

• Reviewing operating procedures and the owner's log with the operator

• Download operating fault history

• Download operating data

• Load Calc, Heat Balance, and Water Balance

• Provide feedback to customer regarding recommendations and equipment’s operational concerns

The annual equipment shutdown inspection and PM

• Conduct all items listed above for operating season inspections

• Checking the oil level in the compressor and conducting an oil acidity test

• Conducting a leak check

• Checking the crankcase heater for proper operation

• Tightening the power wiring on contactors and in the motor terminal box

• Cleaning all contactors and recommending replacement if required

• Checking all relays, operating controls and safeties

• Checking and calibrating all controls, safeties, unloaders, and external interlocks

• Wash the condenser coils with water

• Check super heat and sub cooling

• Provide feedback to customer regarding recommendations and equipment’s operational concerns

COOLING TOWERS

Annual Maintenance Inspection

• Check volt / amps of fan motor (s)

• Check / tighten all electrical connections

• Check all starters / contactors for wear

• Check all operating / safety controls

• Check belts / replace per contract

• Check sheaves wear / alignment

• Check / clean fan schrolls and blade assembly

• Check / lubricate motor bearings

• Check / lubricate blower / fan bearings

• Check / lubricate couplings

• Check / lubricate gear boxes

• Check / clean strainers and screens

• Check / clean distribution pans / spray nozzles

• Check / clean sump

• Check / adjust float valve

• Check / adjust bleed-off rate

• Check / lube damper assembly if applicable

• Check economizer / controls if applicable

• Check / fill and baffles if applicable

• Check sump heaters operation if applicable

• Check overall condition of unit

Operational Inspection

• Check volt / amps of fan motor (s)

• Check / adjust belt tension

• Check sheaves wear / alignment

• Check / flush sump

• Check / adjust float valve

• Check / adjust bleed-off rate

• Check / clean strainers and screens

• Check / clean debris from unit

• Check / distribution pans / spray nozzles

• Check blower / fan bearings

• Check motor bearings

• Check overall condition of unit

PUMPS

Annual Inspection

• Check volt / amps motor

• Check / tighten all electrical connections

• Check all starters / contactors for wear

• Check all operating / safety controls

• Check / lubricate motor bearings

• Check / lubricate pump bearings

• Check pump / motor alignment

• Check coupling

• Check mechanical seals

• Check packing

• Check strainers

• Check hand valves

• Check gauges for accuracy

• Check suction / discharge pressures

• Check mounts / vibration pads

• Check overall condition of unit

Operational Inspection

• Check motors operation

• Check all starters / contactors for wear

• Check all operating / safety controls

• Check motor bearings

• Check pump bearings

• Check pump / motor alignment

• Check coupling

• Check mechanical seals

• Check packing

• Check strainers

• Check hand valves

• Check gauges for accuracy

• Check suction / discharge pressures

• Check mounts / vibration pads

• Check overall condition of unit

Other Considerations

• The contractor shall be responsible for the verification of all requirements for this project. All measurements and conditions must be verified by the contractor. Any discrepancies between field conditions, project documents, and this SOW shall be immediately brought to the Contracting Officer’s attention.

• The contractor will be required to submit a safety plan for VA review and approval prior to the performing work.

• It is the contractor’s responsibility to provide adequate documentation verifying that any equipment and/or materials proposed will meet or exceed all federal government requirements.

• Majority of the work shall be performed during normal working hours unless other wised noted by the COR. Normal working hours are 7:00 am – 1800, Monday – Friday. Some equipment may require after hours or weekend servicing at no extra cost to the VA.

• The contractor’s supervisor shall always be available to address any needs the COR may have during the period of performance.

• The contractor may be required to coordinate work activities and shutdowns with the COR and Maintenance and Operations (M&O) Supervisors.

• The contractor shall thoroughly clean inside and outside of project site daily with contractor’s own equipment, including vacuums, mops, buckets, wash rags, dust mops, etc.

• The contractor shall be responsible for the removal and disposal of all batteries, used coolant, used oil, used fuel, etc.

The contractor shall dispose of all materials off-site, and all materials shall be recycled to the maximum extent possible.

Codes and Standards

The services provided shall be conducted in accordance with the latest Uniform Building Code (UBC), National Fire Protection Associate (NFPA) standard, Uniform Federal Accessibility Standard (UFAS), VA Specifications and Standards, and local facility requirements. In the event there is a conflict between any of the standards/codes, the more stringent standard/code shall apply.

The contractor shall provide all applicable safety signage and barricades applicable to OSHA, VHA and DOD regulations. Contractor shall comply with VHA DIRECTIVE 2004-012 and all VA Center Policy Memorandums, including but not limited to the following:

(a) Protection of patients, visitors, and employees from traumatic injury, as well as occupational and facility–associated infections.

(b) Compliance with OSHA construction safety regulations.

(c) Compliance with EPA environmental regulations.

SAFETY PLAN REQUIREMENTS

Prior to performing any work, the contractor will be required to submit a safety plan in accordance with OSHA and VA Regulations.

The safety plan shall include, but not limited to the following:

A. Safety and Health Policy (i.e. company policy) B. Safety and Health Objectives (i.e. company goals, procedures, etc.)

C. Job Site Inspections (i.e. safety inspection/potential hazards/prevention, etc.)

D. Contractor Safety Administrator (i.e. competent person/safety officer) E. Personal Protective Equipment (i.e. head, hearing, and eye protection, footwear, clothing, gloves, etc.)

F. Safety Rules (i.e. rules applicable to the work/task being performed, equipment, ladders, confined spaces, open flame, etc.)

G. Job Safety Training (i.e. OSHA, safety meetings, etc.)

• 30 Hour OSHA Construction Safety Course – competent person

• 10 Hour OSHA Construction Safety Course – all others

H. Safety Discipline (i.e. correction of violations, etc.)

I. Hot Work Permit (i.e. responsibilities, procedures, etc.)

J. Emergency Procedures (i.e. responsibilities, procedures, etc.)

K. Written Hazard Communication Program (i.e.

responsibilities, procedures, list of hazards, MSDS, etc.)

SAFETY INSPECTIONS

On a weekly basis, the VA will conduct a safety inspection of the work area. This inspection includes, but is not limited to the following:

A. Means of Egress

• Fire/Smoke Doors unlocked, free of obstructions

• Means of Egress (including Exits) free of obstructions and clearly marked

B. Fire Alarm, Fire Detection, and Fire Suppression Systems.

• Fire Alarm Pull Stations are unobstructed

• Smoke Detector smoke caps in use, or removed at end of the day

• Hot Work Permits are current, in use

• Sprinkler Heads are unobstructed

C. Housekeeping and Traffic Control

• Trash and debris are removed promptly and transported outside the construction area

• Floor mats and dust tack mats are located at the entrance to construction area

• Tools and equipment are properly stored

• Signs installed to restrict patient access (doors locked as needed)

• Dust control measures are in place

• Barriers are in place and properly sealed

D. Hazardous Chemicals/Conditions

• Appropriate storage of hazardous chemicals

• MSDS sheets are readily available on-site

• Lock out/tag out procedures are in place

• Hot work permit is current and posted

E. Clothing

• PPE is available and properly worn

• Clothing is relatively dust free with the construction area and patient areas

1. Submit the proper documentation and reports to receive payment on this service. See information below:

Invoices and Payment

a. Payment to be made monthly, in arrears, following satisfactory performance by Contractor’s personnel and upon receipt of a properly prepared invoice.

Contractor shall be required to invoice through the Tungsten System athttp://www.tungsten-network.com/us/en/veterans-affairs/.

The invoice shall be itemized to include the following information. Any information listed below, and not provided on an invoice, will render that invoice incomplete and the invoice will be returned for immediate correction.

http://www.tungsten-network.com/us/en/veterans-affairs/

i. Time period being invoiced for.

ii. Description of services performed.

iii. Unit Cost billed.

iv. Extended amount due.

v. Invoice number, date, and;

vi. Contract and obligation numbers.

2. Coordinate with COR before the start of this service. See information below:

Government Holidays:

(a) The Government hereby provides notice, and Contractor hereby acknowledges receipt that Government personnel observe the listed days as holidays:

Date Holiday

• January 1st New Year's Day

• 3rd Monday January Birthday of Martin Luther King, Jr.

• 3rd Monday February Washington’s Birthday

• Last Monday May Memorial Day

• June 19th Juneteenth National Independence Day

• July 4th Independence Day

• 1st Monday September Labor Day

• 2nd Monday October Columbus Day

• November 11th Veterans Day

• Last Thursday November Thanksgiving Day

• December 25th Christmas Day

(b) In addition to the days designated as holidays, the Government observes the following days:

a. Any other day designated by Federal Statute

b. Any other day designated by

Executive Order Any other day designated by the

President’s Proclamation

It is understood and agreed between the Government and the Contractor that observance of such days by Government personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation. In the event the Contractor's personnel work during the holiday, they may be reimbursed by the Contractor, however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked.

NOTE: The COR cannot approve any changes in scope or approve any change resulting in change in cost to the government under this contract.

File details come from the government source that posted it. Updated .