This is a Solicitation/Contract/Order (SF 1449) for commercial products and services issued by the Department of Veterans Affairs, Central Texas Veterans Health Care System.

The solicitation seeks contractor services for maintenance, calibration, inspection, and testing of electrical power distribution systems and components, plus dissolved gas analysis and testing at two VA Medical Center locations in Temple and Waco, Texas. The contract is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with a $12.5 million estimated value and an 180-day period of performance after receipt of order. The principal NAICS code is 811310 (Commercial and Industrial Machinery and Equipment Repair and Maintenance). The solicitation incorporates RFO FAR Part 12 streamlined procedures for commercial acquisitions. Offerors must submit proposals in two volumes by January 13, 2027, at 10:00 AM CST via email to shawn.reinhart@va.gov. Volume I includes the signed SF 1449, Section B.1, Section B.2 pricing (using firm fixed unit prices for nine line items including oil sample testing, transformer testing, medium/high voltage testing, switch gear testing/torque, senior engineer report preparation, engineer admin work, after-hours work, and lead-acid batteries for both locations), technical approach (maximum 25 pages), and past performance information. Volume II must contain a redacted version of the technical approach. The evaluation will use comparative analysis based on technical approach/methodology, price, and past performance, without numerical scores or adjectival ratings. Award will be made to the offeror whose proposal represents best value to the Government. All pricing must be valid for 90 days from solicitation close. Site visits are encouraged and scheduled for December 7, 2026 (Waco) and December 11, 2026 (Temple). Questions are due by December 16, 2026, at 10:00 AM CST.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. UEI: EFT:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

36C25727Q0089 11-18-2026

Mr. Shawn R. Reinhart 254-421-6661 01-13-2027

10:00 AM CST

36C257

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple, TX 76504

X 100

X

811310

$12.5 Million

NET 30

N/A

X

36C674

Department of Veterans Affairs Central Texas Veterans HCS (See SOW Paragraph 8.1)

Temple & Waco, TX

36C257

Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171

This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

(877) 353-9791 (512) 460-5540

See CONTINUATION Page

NEW: Contractor shall provide Maintenance, Calibration, Inspection, and Testing of the Electrical Power Distribution System and components and Dissolved Gas Analysis and Testing IAW the Statement of Work (SOW).

This acquisition is being conducted IAW RFO FAR Part 12.

THE FAR IS CURRENTLY BEING REVISED. DO NOT ADD ANY CLAUSES

OR PROVISIONS THAT ARE NOT INCLUDED IN THIS SOLICITATION.

https://www.acquisition.gov/far-overhaul

PERIOD OF PERFORMANCE: 180 Days After Receipt of Order (ARO)

Refer to Addendum to RFO FAR 52.212-1, Instructions to Offerors on pages 27 to 31.

Refer to Addendum to RFO FAR 52.212-2, Evaluation Commercial Products and Commercial Services on pages 32 to 34.

Site Visit Time, Date, and POC listed in Addendum FAR 52.212-1

See CONTINUATION Page

X X

X 1

Mr. Shawn R. Reinhart Contracting Officer

36C25727Q0089

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

B.3 DELIVERY SCHEDULE

B.4 STATEMENT OF WORK

SECTION C - CONTRACT CLAUSES

C.1 ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS –

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

C.2 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.3 SUPPLEMENTAL INSURANCE REQUIREMENTS

C.4 FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

C.5 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES

(MAY 2014)

C.6 FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL

CONTRACTORS (APR 2026)

C.7 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

C.8 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-

DISABLED VETERAN-OWNED SMALL BUSINESSES (NOV 2022)

C.9 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN

2023) (DEVIATION)

C.10 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED

BY REFERENCE (JAN 2008)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

SECTION E - SOLICITATION PROVISIONS

E.1 ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES

E.2 52.212-2 EVALUATION - COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (OCT 2025) (DEVIATION)

E.3 52.212-2 ADDENDUM to EVALUATION - COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C257 Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually []

c. Other [X] Upon completion, inspection, and acceptance

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT

UNIT

PRICE AMOUNT

57.00 EA __________ __________

Oil Sample Testing

PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment Components

57.00 EA __________ __________

Transformer Testing

Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and

104.00 EA __________ __________

Medium / High Voltage Testing

Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and

104.00 EA __________ __________

Switch Gear Testing / Torque

Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and

100.00 EA __________ __________

Senior Engineer - Report Preparation NTE 10 hours total over

10 days.

The Government will enter a Not-To-Exceed amount upon award. The Contractor shall not perform any work that exceeds an NTE amount unless a formal modification has been issued by the CO. Any work performed above the NTE amount without written CO approval shall be treated as an unauthorized commitment, and the Government is under no obligation to pay for such work. The CO is the only official with authority to approve adjustments, authorize additional funding, or modify the contract.

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT

UNIT

PRICE AMOUNT

Invoice Requirements. All invoices tied to NTE line items must clearly detail the work performed, dates of performance, and cumulative cost amounts. Invoices shall not reflect costs beyond the NTE ceiling unless a CO approved modification has been issued.

PRINCIPAL NAICS CODE: 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and Rebuilding of Equipment - Electrical and Electronic Equipment

50.00 EA __________ __________

Engineer Admin - Report and Field Work

Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and

1.00 JB __________ __________

After Hours Work

Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and

40.00 EA __________ __________

20 Lead-Acid replacement batteries and 20 coils - Temple

Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and

40.00 EA __________ __________________

20 Lead-Acid replacement batteries and 20 coils - Waco

Electronic) Repair and Maintenance PRODUCT/SERVICE CODE: J059 - Maintenance, Repair, and

GRAND

TOTAL

B.3 DELIVERY SCHEDULE

ITEM

NUMBER SHIPPING INFORMATION QUANTITY

DELIVERY

DATE

0001 -

SHIP TO: Department of Veterans Affairs Central Texas Veterans HCS 4800 Memorial Drive, Bldg 225 Waco, TX 76711

USA

SEE

SCHEDULE

B.2

180 days ARO

MARK FOR: Tracy Semmel

(254) 297-3456 tracy.semmel@va.gov

FOB: DESTINATION

0001 -

SHIP TO: Department of Veterans Affairs Central Texas Veterans HCS 1901 Veterans Memorial Dr.

USA

SEE

SCHEDULE

B.2

180 days ARO

MARK FOR: Michael Stanley

(254) 743-2976 michael.stanley5 @va.gov

FOB: DESTINATION

B.4 STATEMENT OF WORK

Maintenance, Calibration, Inspection, and Testing of the Electrical Power Distribution System & all components and Dissolved Gas Analysis and Testing

Temple & Waco

1. Purpose. This SOW establishes the requirements for maintenance, calibration, inspection, testing, grounding resistance measurement, dissolved gas analysis (DGA), labeling, and reporting for the Electrical Power Distribution Systems and components at the Central Texas Veterans Health Care System (CTVHCS) in Temple, TX and Waco, TX.

1.1 Background. These services are necessary to maintain safe, reliable, and code‑compliant operation of switchgear, breakers, transformers, and associated equipment across two VA campuses.

2. Scope of Services. The Contractor shall furnish all labor, materials, tools, equipment, transportation, supervision, and management to perform: (a) maintenance, calibration, inspection, and functional testing of switchgear, breakers, and transformers; (b) DGA sampling and dielectric strength testing; (c) grounding resistance measurements; (d) outage planning and coordination; (e) labeling; and (f) comprehensive reporting.

2.2 Exclusions. The Government will not provide materials, equipment, labor, trades, or staging facilities for this project. The Government will provide access and information only.

3. Applicable Regulations and Standards. The Contractor shall comply with all of the following regulations and standards. Where conflicts exist among standards/codes, the more stringent requirement shall apply.

• OSHA: 29 CFR 1910 (Subparts I & S); Lockout/Tagout per 29 CFR 1910.147.

• NFPA: NFPA 70 (NEC), NFPA 70B (Recommended Practice for Electrical Equipment

Maintenance), NFPA 70E (Electrical Safety in the Workplace), NFPA 110 (Emergency & Standby Power Systems).

• NETA: Maintenance Testing Specifications (MTS) and Acceptance Testing Specifications (ATS)—latest editions.

• ASTM: ASTM D3612 (DGA) and ASTM D300‑00 (dielectric strength) for transformer oil sampling/testing.

• VA Requirements: VA Technical Information Library (TIL) Division 26 specifications governing electrical systems; VHA Directive 2004‑012; other VA center policies and memoranda as applicable.

• Codes: IBC, IEC, ICC Codes; Uniform Federal Accessibility Standards (UFAS).

• Compliance with EPA and State environmental regulations.

3.1 Although this is not a construction contract the general contractor’s on-site “competent person” shall have completed the OSHA 30-hour construction worker course and that all other general and sub-contractor’s workers have completed the OSHA 10-hour construction worker course or other relevant competency training. The determination for training is based on the project hazards and complexity, State and Federal regulations and VA requirements. Verification of completion of training will be required prior to performing work.

3.2 Codes and Standards. The project shall be in accordance with the latest International Building Code (IBC), International Electrical Code (IEC), International Code Council (ICC), National Fire Protection Associate (NFPA) standard, Uniform Federal Accessibility Standard (UFAS), Inspectors Manual, VA Specifications and Standards, and local facility requirements.

4. Definitions

• COR - Contracting Officer’s Representative.

• PM - VA Project Manager.

• Critical Deficiency - A deficiency posing immediate risk to personnel or equipment.

• Catastrophic Deficiency - A deficiency likely to result in imminent equipment failure, fire, or severe safety hazard.

• Contractor - Qualified Electrical Contract Professional(s) performing services under this SOW.

5. Requirements

5.1 Pre‑Work Coordination.

5.1.1 Notify COR/PM 15 calendar days prior to starting work.

5.1.2 Submit a detailed work schedule/progress chart showing tasks by date, outage windows, weekend/after‑hours work, and sequencing.

5.1.3 Identify off‑hours and overtime requirements; obtain COR/PM approval for after‑hours/weekend work.

5.2 Testing & Maintenance Tasks.

5.2.1 Perform testing, removal/reinstallation of breakers and switches; calibrate, adjust, and lubricate switchgear and circuit breakers.

5.2.2 Torque all reinstalled conductors to manufacturer specifications; record values in final reports.

5.2.3 Draw transformer oil samples and perform DGA and dielectric strength testing per ASTM D3612 and ASTM D300‑00; include gases (e.g., H₂, O₂, N₂, CH₄, CO, CO₂, C₂H₆, C₂H₄) in DGA reports.

5.2.4 Measure ground resistance at listed transformers and building MSB cabinets; report values exceeding NFPA 70 requirements; recommend corrective measures to meet standards.

5.2.5 Immediately report critical/catastrophic deficiencies to COR/PM.

5.3 Labeling. Affix labels at each breaker/switchgear post‑inspection with: company name, address, telephone; date tested; printed name & signature of testing technician.

5.4 Reporting. Submit four (4) hard copies and one (1) electronic PDF to COR within seven (7) calendar days of testing per location, containing: company info; technician names/signatures; contract info and COR contacts; dates/times; licenses/certificates; tools/equipment models; equipment nameplate data;

work descriptions; test data; references (e.g., manufacturer specs, coordination study); deficiencies;

recommended corrective actions.

5.5 Safety & Compliance.

5.5.1 Submit a site‑specific safety plan addressing OSHA/VA requirements, PPE, hazard communication, hot‑work permits, emergency procedures, and weekly VA safety inspections.

5.5.2 Comply with OSHA 29 CFR 1910 (Subparts I & S); NFPA 70E; lockout/tagout; signage/barricades;

and VHA Directive 2004‑012.

5.6 Qualifications.

5.6.1 Assign NETA‑Certified Technician(s); ensure OSHA 10/30 training; minimum 5 years relevant experience; NFPA 70E training.

5.6.2 Maintain access to latest NFPA, OSHA, and NETA references; submit training certifications or employer certifications to COR prior to work commencement.

5.7 Materials and Spare Parts.

5.7.1 Provide new backup batteries and trip coils for Temple (20 batteries, 20 coils) and Waco (20 batteries, 20 coils).

5.7.2 For failed components, provide technical data, cost, installation labor cost, and lead time to facilitate potential contract modification; the VA reserves the right to execute repairs under separate contract.

5.8 Outage Coordination. Schedule power outages through COR/PM five (5) days prior; conduct outages on weekends to minimize patient‑care disruption; implement lockout/tagout procedures.

5.9 Housekeeping & Waste. Clean job site daily; dispose of waste off‑site per applicable laws; conduct a final walkthrough with COR/PM at completion.

6. Performance Standards.

6.1 Timeliness: Reports submitted per schedule; immediate notification of critical deficiencies.

6.2 Quality: Work performed per NETA, NFPA, ASTM, VA TIL; accurate torque documentation;

complete test datasets.

6.3 Safety: OSHA recordables; lockout/tagout and PPE strictly enforced; pass VA weekly safety inspections.

7. Security & Badging.

7.1 Comply with facility security policies; provide employee roster (names, titles, qualifications, responsibilities).

7.2 VA will issue badges/passes to Contractor and subcontractor personnel, as applicable.

8.1 Place of Performance. All work shall take place at the two (2) Central Texas Veterans Health Care System (CTVHCS) facilities listed. See Attachments A/B/C for buildings and equipment locations.

Temple VA Medical Center 1901 Veterans Memorial Drive Temple, TX 76504-7451

Waco VA Medical Center 4800 Memorial Drive Waco, TX 76711-1329

8.2 Period of Performance. The Period of Performance is 180 calendar days After Receipt of Order (ARO) for completion of all testing and reporting for both facilities.

8.3 Hours of Operation. All work and execution of services shall be accomplished during normal business hours, 7:30 AM - 4:00 PM, Monday - Friday. Work shall be performed on weekends when it is feasible to minimize patient‑care impacts and shall be approved in advance by the Contracting Officer Representative (COR) before such work begins.

8.4 Federal Holidays Observed. The Government observes these holidays:

New Year's Day January 1st Martin Luther King's Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas December 25th

In addition to the days designated as holidays, the Government observes the following days:

• Any other day designated by Federal Statute

• Any other day designated by Executive Order

• Any other day designated by the President’s Proclamation

The observance of such days by Contractor personnel shall not otherwise be a reason for an additional period of performance, or entitlement of compensation. In the event the Contractor’s personnel work during the holiday, they may be reimbursed by the Contractor, however, no form of holiday or other premium compensation will be reimbursed either as a direct or indirect cost, other than their normal compensation for the time worked.

9. Government‑Furnished & Government Responsibilities.

9.1 Provide access to work areas; water and electrical utilities; weekly safety inspections; coordination support with facility personnel.

9.2 The Government does not provide materials or staging areas.

10. Contractor Responsibilities. The Contractor shall:

• Provide all labor, tools, equipment, materials, supervision, and documentation

• Maintain professional conduct

• All employees or sub-contractors shall be accountable solely to the Contractor, not the

Government.

• Contractor personnel’s conduct shall not reflect discredit upon the Government.

• Ensure that personnel present a professional appearance.

• Ensuring that any Contractor employees providing services under this contract conduct themselves and perform services in a professional, safe, and responsible manner.

• Ensure no contractor employees conduct political related activities or events on VA Facilities.

• Employees observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substances.

• Remove employees for misconduct/security

• Notify COR/PM of accidents

• Notify the COR/PM of any accidents requiring medical treatment.

• Provide emergency medical treatment and services for Contractor personnel.

• Comply with VA policies (fire/safety/environmental protection/sanitation/security).

• Supervisor shall always be available to address any needs the VA COR or PM may have during the period of performance.

• Thoroughly clean inside and outside of project site daily with Contractor’s own equipment, including vacuums, mops, buckets, wash rags, dust mops, etc.

• Be responsible for all shipping, receiving, storage and security of any materials or equipment for the duration of this project.

• Be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

• Perform a final walkthrough with the VA COR or PM when completed.

• Provide adequate documentation verifying that any equipment and/or materials proposed meet or exceed all federal government requirements.

• Provide all applicable safety signage and barricades applicable to OSHA and VHA regulations.

• Comply with VHA DIRECTIVE 2004-012 and all VA Center Policy Memorandums, including but not limited to the following:

o Protection of patients, visitors, and employees from traumatic injury, as well as occupational and facility–associated infections.

o Compliance with OSHA and State construction safety regulations.

• Housekeeping and Traffic Control.

o Trash and debris are removed promptly and transported outside the construction area o Floor mats and dust tack mats are located at the entrance to construction area o Tools and equipment are properly stored o Signs installed to restrict patient access (doors locked as needed) o Dust control measures are in place o Barriers are in place and properly sealed

• Hazardous Chemicals/Conditions o Appropriate storage of hazardous chemicals o MSDS sheets are readily available on-site o Lock out/tag out procedures are in place o Hot work permits are current and posted

• Clothing o PPE is available and properly worn o Clothing is relatively dust free with the construction area and patient areas

11. Contracting Officer’s Representative (COR): The COR will be responsible for monitoring the contractor staff performance to ensure all specifications and requirements are fulfilled.

Greg Williams, Engineering Tech (COR), 254-624-7849, gregory.williams11@va.gov Project Manager (Temple): Mike Stanley, (254) 743-2976, michael.stanley5@va.gov Project Manager (Waco): Tracy Semmel, (254) 297-3456, Tracy.Semmel@va.gov

12. Safety Plan. Prior to performing any work, the Contractor shall submit a safety plan to the COR in accordance with OSHA and VA Regulations. The safety plan shall include, but not limited to the following:

• Safety and Health Policy (i.e. company policy)

• Safety and Health Objectives (i.e. company goals, procedures, etc.)

• Job Site Inspections (i.e. safety inspection/potential hazards/prevention, etc.)

• Contractor Safety Administrator (i.e. competent person/safety officer)

• Personal Protective Equipment (i.e. head, hearing, and eye protection, footwear, clothing, gloves, etc.)

• Safety Rules (i.e. rules applicable to the work/task being performed, equipment, ladders, confined spaces, open flame, etc.)

mailto:gregory.williams11@va.gov mailto:michael.stanley5@va.gov mailto:Tracy.Semmel@va.gov

• Job Safety Training (i.e. OSHA, safety meetings, etc.)

• 30 Hour OSHA Construction Safety Course - competent person

• 10 Hour OSHA Construction Safety Course - all others

• Safety Discipline (i.e. correction of violations, etc.)

• Hot Work Permit (i.e. responsibilities, procedures, etc.)

• Emergency Procedures (i.e. responsibilities, procedures, etc.)

• Written Hazard Communication Program (i.e. responsibilities, procedures, list of hazards, MSDS, etc.)

13. Safety Inspections. On a weekly basis, the VA will conduct a safety inspection of the work area.

This inspection includes, but is not limited to the following:

• Means of Egress

• Fire/Smoke Doors unlocked, free of obstructions

• Means of Egress (includes Exits) free of obstructions and clearly marked

• Fire Alarm, Fire Detection, and Fire Suppression Systems.

• Fire Alarm Pull Stations are unobstructed

• Smoke Detector smoke caps in use, or removed at end of the day

• Hot Work Permits are currently in use

• Sprinkler Heads are unobstructed

ATTACHMENT A - TEMPLE LOCATION

Building Circuit Breaker Size Quantity Testing Means Building 68 Campus MV Switch Gear

Medium voltage switch gear 12.5KV, main & Tie

3 Draw Out Bench

Medium voltage switch gear 12.5KV, main & Tie

14 Draw Out Bench

Building 163 MSB-1 480V Square D PowerPacT (1600A) 2 Secondary Inject 480V Square D PowerPacT (800A) 2 Secondary Inject 480V Square D PowerPacT (1200A) 1 Secondary Inject 480V Square D PowerPacT (400A) 1 Secondary Inject

MSB-2

480V Square D PowerPacT (1600A) 2 Secondary Inject 480V Square D PowerPacT (800A) 4 Secondary Inject

MSB-3

480V Square D PowerPacT (1600A) 1 Secondary Inject 480V Square D PowerPacT (800A) 3 Secondary Inject 480V Square D PowerPacT (1000A) 1 Secondary Inject

MSB-4

480V Square D PowerPacT (1600A) 1 Secondary Inject 480V Square D PowerPacT (800A) 1 Secondary Inject 480V Square D PowerPacT (1000A) 1 Secondary Inject 480V Square D PowerPacT (400A) 3 Secondary Inject

MSB-5

480V Square D PowerPacT (1600A) 1 Secondary Inject 480V Square D PowerPacT (800A) 2 Secondary Inject 480V Square D PowerPacT (400A) 1 Secondary Inject

Panel DPC 480V Square D PowerPacT (400A) 1 Secondary Inject

Panel DPCR 480V Square D PowerPacT (400A) 1 Secondary Inject

EBS

480V Square D PowerPacT (1000A) 1 Secondary Inject 480V Square D PowerPacT (800A) 2 Secondary Inject 480V Square D PowerPacT (400A) 1 Secondary Inject

Generator Baldor 480V Square D Power PacT (2000A) 1 Secondary Inject

Building 163C MSB-163C 480V Square D (2400A) Main 1 Draw Out Bench 480V Square D (400A to 1200A) Load 13 Draw Out Bench 480V Square D (750A) 1 Draw Out Bench

Panel PDS 480V Square D I-Limiter (400A) Main 1 Draw Out Bench 480V Square D Molded (700A) Main 1 Draw Out Bench

Generator CAT 480V Square D Molded (800A) 1 Remove Bench

Building 202 MSB-202 480V GE (3200A) 1 Draw Out Bench 480V GE PowerBrake (1600A) 1 Secondary Inject 480V GE PowerBrake (800A) 5 Secondary Inject 480V GE PowerBrake (400A) 3 Secondary Inject 480V GE PowerBrake (500A) 1 Secondary Inject

Panel EEMDP 480V GE MAG (500A) 1 Secondary Inject

Panel EMDP 480V GE SPECTRA (600A) 1 Secondary Inject

Generator CAT 480V Westing House (600A) 1 Remove Bench Building 203 MSB-203A

480V Square D (3000A) 1 Secondary Inject 480V Square D (800A) 1 Secondary Inject 480V Square D (600A) 1 Secondary Inject

MSB-203B

480V Square D (1000A) 1 Secondary Inject

480V Square D (600A) 2 Secondary Inject 480V Square D (1200A) 1 Secondary Inject

ESB-203

480V Square D (1000A) 1 Secondary Inject

480V Square D (600A) 3 Secondary Inject

Panel EQB

480V Square D (600A) 2 Secondary Inject

Panel LSB

480V Square D (400A) 1 Secondary Inject

Panel CRB

Generator Cummins

480V STR 45 SP 2 Draw Out Bench Building 204 Emergency Distribution

480V Square D Power PacT (400A) 1 Secondary Inject 480V Square D Power PacT (800A) 1 Secondary Inject

480V Square D Power PacT (600A) 2 Secondary Inject

Normal MSB-204

480V Square D (800A) – SWBD-MSB204 3 Secondary Inject 480V Square D (600A) – SWBD-MSB204 1 Secondary Inject 480V Square D (400A) – SWBD-MSB204 3 Secondary Inject

Building 205 Normal MSB-205

480V Square D PXF 361200GPL (1200A) 1 Secondary Inject 480V Square D MicroLogic (400A) 3 Secondary Inject

Panel EDPB

480V Square D MicroLogic (400A) 3 Secondary Inject

Generator Katolight

480V ABB SACE E2N-A12 (1200A) 1 Secondary Inject

Building 221 A&B ATS Switch Gear

208V Square D Power PacT (2000A) 1 Secondary Inject

MSB-221 A&B

208V GE Spectra RMS (1000A) 1 Secondary Inject 208V GE Spectra RMS (800A) 1 Secondary Inject 208V GE Spectra RMS (400A) 1 Secondary Inject

208V Square D Power Pact (2000A) 1 Secondary Inject 208V Square D Power Pact (400A) 1 Secondary Inject

Building 221 C&D ATS Switch Gear

208V Square D Power PacT (2000A) 1 Secondary Inject

MSB-221 C&D

208V GE Spectra RMS (1000A) 1 Secondary Inject 208V GE Spectra RMS (800A) 1 Secondary Inject

208V Square D Power Pact (2000A) 1 Secondary Inject 208V Square D Power Pact (400A) 1 Secondary Inject

Building 171 MDSA

480V GE Molded CB (1200A) 1 Remove Bench 480V GE Molded CB (600A) 1 Remove Bench

Generator CAT

480V GE Power CB (400A) 1 Secondary Inject Building 58 MSB-58

208V Square D MicroLogic (1200A) 1 Secondary Inject 208V Square D Thermal lagnetic (800A) 1 Secondary Inject

Building 44-47 MP-A

480V Square D Power PacT (2000A) 1 Secondary Inject 480V Square D Power PactT(400A) 1 Secondary Inject

MP-B

480V Square D Power PacT (400A) 3 Secondary Inject

Building 146-147 MSB-146-147

480V Square D Power PacT (800A) 1 Secondary Inject 480V Square D Power PacT (400A) 1 Secondary Inject 480V Square D LC (400A) 1 Secondary Inject

Building 222 MSB-222

480V Siemens WLL3F340 (4000A) 2 Secondary Inject 480V Siemens WLL2F316 (1600A) 3 Secondary Inject 480V Siemens WLL1F308 (800A) 1 Secondary Inject 480V Siemens MagneticAdj (600A) 3 Secondary Inject 480V Siemens MagneticAdj (500A) 1 Secondary Inject 480V Siemens MagneticAdj (400A) 2 Secondary Inject 480V Siemens M/N Series (800A) 3 Secondary Inject 480V Siemens M/N Series (400A) 1 Secondary Inject

UPS MAINT. BYPASS SWITCH

480V Square D Power PacT (1600A) 1 Secondary Inject 480V Square D Power PacT (800A) 3 Secondary Inject 480V Square D Power PacT (400A) 4 Secondary Inject

Generator Generac

480V Square D Power (800A) 4 Secondary Inject

Temple VAMC MV Transformers (Total 33 - 12.5KV/480V/208V) Bldg. 163 CIRCUIT # 1

T-1 1500KVA Bldg. 163 /

MSB-1

T-2 1500KVA Bldg. 163 /

MSB-2

T-3 1500KVA Bldg. 163 /

MSB-3

T-4 1500KVA Bldg. 163 /

MSB-4

T-5 1500KVA Bldg. 163 /

MSB-5

Bldg. 163C CIRCUIT # 2

T-29 2000KVA Bldg. 163C

Bldg. 166 CIRCUIT # 3

T-6 2000KVA Bldg.166

NORTH LOOP CIRCUIT # 4

T-18 500KVA Bldg. 146 & 147

T-22 300KVA Well House T-21 500KVA Pump House T-31 300KVA South

Parking Lot

T-7B 750KVA Bldg. 46 &

T-7A 750KVA Bldg. 44 &

T-8 750KVA Bldg. 205

SOUTH LOOP CIRCUIT # 5

T-17 112.5KVA Bldg. 59 & 60 & 61

T-16 300KVA Bldg.'s 57 &

T-15A 500KVA Bldg. 64 T-15 300KVA Bldg. 206 &

T-14A 500KVA Bldg. 221C & D

T-14B 500KVA Bldg. 221A & B

T-13 225KVA Bldg. 207 T-12 750KVA Bldg..171 T-11 750KVA Green Space T-11A 225KVA Parking

Garage

T-28 225KVA Dr. Parking Lot

Bldg. 202 CIRCUIT # 6

T-30 2000KVA Bldg. 202

Bldg. 203/204 CIRCUIT # 7

T-CH 2000KVA Bldg. 203

Bldg. 203/204 CIRCUIT # 8

T-B 2000KVA Bldg. 203 T-EM 2000KVA Bldg. 203 T-CH2 500KVA Bldg. 203

Bldg. 222 CIRCUIT # 9

T-IT 2000KVA Bldg. 222

SOLAR FARM SOLAR FIELD 1

T-SF1 2000KVA West Solar Farm

SOLAR FARM SOLAR FIELD 1

T-SF2 2000KVA East Solar Farm

Attachment B Waco Location

Waco VAMC Transformers (Total 30 – 12.5KV/480V transformer): Medium voltage life front transformers with exact locations to be provided later by the Contracting Officer’s Representative.

Circuit Building Breaker Size QTY

Building 133 1600A 4

Building 14 800A 1 Building 14 400A 1

Building 216 1200A 2 Building 216 1000A 1 Building 216 400A 3 Building 216 2000A 1 Building 216 2500A 1 Building 216 400A 2 Building 216 1000A 1 Building 216 1200A 1 Building 216 2500A 1

Building 17 600A 2

Building 225 3000A 3 Building 225 3200A 2 Building 225 1600A 4 Building 225 800A 7 Building 225 400A 2

Building 226 400A 4 Building 226 800A 2 Building 226 2000A 1

Building 223 400A 1 Building 99 400A 1 Building 24 1200A 1 Building 24 400A 1

Building 90 1600A 2 Building 90 1200A 2 Building 90 600A 1 Building 90 400A 8

Building 91 800A 1

Building 93 1600A 1 Building 93 600A 1 Building 93 400A 6

Building 7 800A 2 Building 7 400A 3

Building 8 1200A 1 Building 8 400A 11

Building 94 800A 2 Building 94 400A 3

Building 6 500A 1

Building 5 500A 1 Building 5 400A 1

Building 4 1200A 1 Building 4 500A 1 Building 4 400A 2

Building 202 1200A 1 Building 202 600A 1 Building 202 400A 5

Building 11 800A 2 Building 11 400A 3

Building 10 1200A 2 Building 10 500A 1

Building 2 600A 1

Building 129 600A 1 Building 129 400A 1

Building 219 400A 1

Building 1 3000A 1 Building 1 1000A 2 Building 1 400A 1

(END OF STATEMENT OF WORK)

(END OF SECTION B)

SECTION C - CONTRACT CLAUSES

C.1 ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS –

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

The following clauses are incorporated into FAR 52.212‑4, in addition to the standard text, and have the same force and effect as if set forth in full.

C.2 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/far-overhaul https://www.acquisition.gov/vaar

FAR 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS (NOV 2023)

FAR 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL (JAN 2017)

CONFIDENTIALITY AGREEMENTS OR STATEMENTS

FAR 52.204-9

PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (JAN 2011)

FAR 52.204-13 SYSTEM FOR AWARD MANAGEMENT - MAINTENANCE (OCT 2018)

FAR 52.222-3 CONVICT LABOR (DEVIATION) (NOV 2025)

FAR 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (DEVIATION) (NOV 2025)

FAR 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH (NOV 2025

DIASABILIITES (DEVIATION)

FAR 52.222-37 EMPLOYMENT REPORTS ON VETERANS (DEVIATION) (NOV 2025)

FAR 52.222-41 SERVICE CONTRACT LABOR STANDARDS (NOV 2025)

(DEVIATION)

FAR 52.222-50 COMBATING TRAFFICKING IN PERSONS (DEVIATION) (NOV 2025)

FAR 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (NOV 2025)

(DEVIATION)

FAR 52.222-55 EMPLOYMENT ELIGIBILITY VERIFICATION (NOV 2025)

(DEVIATION)

FAR 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 (NOV 2025)

(DEVIATION)

FAR 52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT (MAY 2024)

MESSAGING WHILE DRIVING

FAR 52.228-5 INSURANCE - WORK ON A GOVERNMENT (JAN 1997)

INSTALLATION

FAR 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL (MAR 2023)

BUSINESS SUBCONTRACTORS

FAR 52.233-3 PROTEST AFTER AWARD (DEVIATION) (NOV 2025)

FAR 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (NOV 2025)

(DEVIATION)

VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (NOV 2025)

(DEVIATION)

VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)

(End of clause)

C.3 SUPPLEMENTAL INSURANCE REQUIREMENTS

In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract:

https://www.acquisition.gov/far-overhaul https://www.acquisition.gov/vaar

(a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.

(b) General Liability: $500,000.00 per occurrences.

(c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage.

(d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage.

(End of Clause)

C.4 FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days.

(End of clause)

C.5 FAR 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES

(MAY 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5332. This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage-Fringe Benefits Maintenance Electrician (Bell County) $24.15 + Fringe Electronics Technician Maintenance III (Bell County) $29.52 + Fringe Engineering Technician V (Bell County) $34.51 + Fringe

Maintenance Electrician (McLennan County) $24.28 + Fringe Electronics Technician Maintenance III (McLennan County) $35.07 + Fringe Engineering Technician V (McLennan County) $33.28 + Fringe

(End of clause)

C.6 FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL

CONTRACTORS (APR 2026)

(a) Definitions. As used in this clause— Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor.

Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.

(b) In connection with the performance of work under this contract, the Contractor agrees as follows:

(1) The Contractor will not engage in any racially discriminatory DEI activities;

(2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;

(3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts;

(4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and

(5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.

(6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).

(c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.

(End of clause)

C.7 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

(b) The use in this solicitation or contract of any VA Acquisition Regulation (VAAR) (48 CFR Chapter 8) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

C.8 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-

DISABLED VETERAN-OWNED SMALL BUSINESSES (NOV 2022)

(a) Definition. for the Department of Veterans Affairs, “Service-disabled Veteran-owned small business concern or SDVOSB”:

(1) Means a small business concern -

(i) Not less than 51 percent of which is owned by one or more service-disabled Veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled Veterans or eligible surviving spouses (see VAAR802.101, Surviving Spouse definition);

(ii) The management and daily business operations of which are controlled by one or more service-disabled Veterans (or eligible surviving spouses) or, in the case of a service-disabled Veteran with permanent and severe disability, the spouse or permanent caregiver of such Veteran;

(iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document;

(iv) The business has been verified for ownership and control pursuant to 38 CFR part 74 and is listed in VA's Vendor Information Pages (VIP) database at https://www.vetbiz.va.gov/vip/; and

(v) The business will comply with VAAR subpart 819.70 and Small Business Administration (SBA) regulations regarding small business size and government contracting programs at 13 CFR parts 121 and 125, provided that any reference therein to a service-disabled veteran-owned small business concern or SDVO SBC, is to be construed to apply to a VA verified and VIP-listed SDVOSB, unless otherwise stated in this clause.

(2) The term “Service-disabled Veteran” means a Veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

(3) The term “small business concern” has the meaning given that term under section 3 of the Small Business Act (15 U.S.C. 632).

(4) The term “small business concern owned and controlled by Veterans with service-connected disabilities” has the meaning given the term “small business concern owned and controlled by service-disabled veterans” under section 3(q)(2) of the Small Business Act (15 U.S.C. 632(q)(2)), except that for a VA contract the firm must be listed in the VIP database (see paragraph (a)(1)(iv) of this clause).

(b) General.

(1) Offers are solicited only from VIP-listed SDVOSBs. Offers received from entities that are not VIP-listed SDVOSBs at the time of offer shall not be considered.

(2) Any award resulting from this solicitation shall be made to a VIP-listed SDVOSB who is eligible at the time of submission of offer(s) and at the time of award.

(3) The requirements in this clause apply to any contract, order or subcontract where the firm receives a benefit or preference from its designation as an SDVOSB, including set-asides, sole source awards, and evaluation preferences.

(c) Representation. Pursuant to 38 U.S.C. 8127(e), only VIP-listed SDVOSBs are considered eligible to receive award of a resulting contract. By submitting an offer, the prospective contractor represents that it is an eligible SDVOSB as defined in this clause, 38 CFR part 74, and VAAR subpart 819.70.

(d) Agreement. When awarded a contract action, including orders under multiple-award contracts, an SDVOSB agrees that in the performance of the contract, the SDVOSB shall comply with requirements in VAAR subpart 819.70 and SBA regulations on small business size and government contracting programs at 13 CFR part 121 and part 125, including the non-manufacturer rule and limitations on subcontracting requirements in 13 CFR 121.406(b) and 13 CFR 125.6. Unless otherwise stated in this clause, a requirement in 13 CFR parts 121 and 125 that applies to an SDVO SBC, is to be construed to also apply to a VIP-listed SDVOSB. For the purpose of limitations on subcontracting, only VIP-listed SDVOSBs (including independent contractors) shall be considered eligible and/or “similarly situated” (i.e., a firm that has the same small business program status as the prime contractor). An otherwise eligible firm further agrees to comply with the required certification requirements in this solicitation (see 852.219-75 or 852.219-76 as applicable). These requirements are summarized as follows:

(1) Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not VIP-listed SDVOSBs (excluding direct costs to the extent they are not the principal purpose of the acquisition and the SDVOSB/VOSB does not provide the service, such as airline travel, cloud computing services, or mass media purchases). When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract

(2) Supplies/products.

(i) In the case of a contract for supplies or products (other than from a non-manufacturer of such supplies), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not VIP-listed SDVOSBs. When a contract includes both supply and services, the 50 percent limitation shall apply only to the supply portion of the contract.

(ii) In the case of a contract for supplies from a non-manufacturer, the SDVOSB prime contractor will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted. Refer to 13 CRF 125.6(a)(2)(ii) for guidance pertaining to multiple item procurements.

(3) General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not VIP-listed SDVOSBs.

(4) Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not VIP-listed SDVOSBs.

(5) Subcontracting. An SDVOSB must meet the NAICS size standard assigned by the prime contractor and be listed in VIP to count as similarly situated. Any work that a first tier VIP-listed SDVOSB subcontractor further subcontracts will count towards the percent of subcontract amount that cannot be exceeded. For supply or construction contracts, the cost of materials is excluded and not considered to be subcontracted. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the portion of the contract with the preponderance of the expenditure upon which the assigned NAICS is based. For information and more specific requirements, refer to 13 CFR 125.6.

(e) Required limitations on subcontracting compliance measurement period. An SDVOSB shall comply with the limitations on subcontracting as follows:

[Contracting Officer check as appropriate.] [X] By the end of the base term of the contract or order, and then by the end of each subsequent option period; or [ ] By the end of the performance period for each order issued under the contract.

(f) Joint ventures. A joint venture may be considered eligible as an SDVOSB if the joint venture is listed in VIP and complies with the requirements in 13 CFR 125.18(b), provided that any requirement therein that applies to an SDVO SBC is to be construed to apply to a VIP-listed SDVOSB. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants.

(g) Precedence. The VA Veterans First Contracting Program, as defined in VAAR 802.101, subpart 819.70, and this clause takes precedence over any inconsistencies between the requirements of the SBA Program for SDVO SBCs, and the VA Veterans First Contracting Program.

(h) Misrepresentation. Pursuant to 38 U.S.C. 8127(g), any business concern, including all its principals, that is determined by VA to have willfully and intentionally misrepresented a company's SDVOSB status is subject to debarment from contracting with the Department for a period of not less than five years (see VAAR 809.406-2 Causes for Debarment).

(End of clause)

C.9 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN

2023) (DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

(i) [X] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) [] Special trade construction contractors.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .