Attachment B QASP Bed Rental 36C25727Q0087.doc

DOC document 72 KB Posted

Attached to
W065--NTX Bed Rentals Brand Name or equal
Solicitation number
36C25727Q0087
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for bed rental services procured by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 (VA VHA VISN 17) under solicitation 36C25727Q0087 for the W065 NTX region. The QASP establishes performance standards and monitoring procedures to ensure the contractor delivers compliant bed rental services meeting specifications for brand name or equal products.

The document outlines surveillance methodologies, inspection criteria, and acceptance standards that the government will employ to verify contractor performance throughout the contract period. Key evaluation areas include product quality verification, delivery compliance, documentation accuracy, and adherence to specified bed rental requirements. The QASP defines the roles and responsibilities of government surveillance personnel, establishes sampling and inspection protocols, and specifies corrective action procedures for identified deficiencies. Performance metrics and quality thresholds are established to maintain accountability and ensure the contractor meets all contractual obligations for the provision of bed rental services to VA medical facilities within VISN 17.

View the file

Other files

File Type Posted
36C25727Q0087_1.docx DOCX document
36C25727Q0087 rev.docx DOCX document
Attachment A Cover Letter 36C25727Q0087 Hospital Beds Rentals.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP) 36C25727Q0087 Bed Rental Services

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. Government Roles and Responsibilities

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

· Assigned Contracting Officer (CO): Frank Mendoza

· Assigned Contract Specialist: Rafael Rodriguez

· Organization or Agency: U.S. Department of Veterans Affairs

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR(S): Price, Roslyn

c. Other Key Government Personnel – N/A

3. Contractor Representatives

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager –TBD

b. Other Contractor Personnel - NA

4. Performance Standards Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

QUALITY ASSURANCE SURVEILLANCE PLAN

Scope Service

No.
Reference Para
Indicator/Performance Standard
Standard for Quality Level
Acceptable Quality Level
Method of Surveillance

Incentive

1
Para 1
The contractor shall provide lease and maintenance of bed frames and mattresses to the North Texas Healthcare System at 4500 South Lancaster Rd Dallas, TX 75216 to include all labor, equipment, supervision and expertise, to provide maintenance services bed rental equipment. Refer to Salient Characteristics- Scope of Work (B.4).
95%
95%
Periodic Reviews and spot checks
Positive past performance rating
2
Para 3
Provide requested equipment as outlined in Section 3.1 (SOW)

• 3.2 Provide personnel

· 3.3 Scheduled Preventative Maintenance

100%
100%
Periodic Reviews and spot checks
Positive past performance rating
3
Para 3
3.4 Unscheduled Corrective Maintenance

3.4.1 Contractor is required to be available to provide corrective maintenance 24 hours a day, 7 days a week, 365 days a year (24/7/365).

3.4.2 Fix within 2-4 hours of call for repair

3.4.3 Swap for functioning equipment if unable to repair within 4 hours. Replacement equipment shall arrive within 4 hours if unable to repair

95%
95%
Periodic Reviews and spot checks
Positive past performance rating
4
Para 3
3.5 Delivery

3.5.1 Equipment shall be delivered to the VANTXHCS located at 4500 South Lancaster Rd. Dallas TX, to patient care unit and room defined at the time of contact for service.

3.5.2 Equipment shall be delivered and/or retrieved 24/7/365 upon request including all federal holidays.

3.5.2.1 Deliveries (i.e. vendor arrival to hospital) shall be made within 2-4 hours of request

3.5.2.2 Pick-up shall be made within 8 hours of notification equipment is no longer needed.

100%
100%
Periodic Reviews and spot checks
Positive past performance rating
5
Para 3
All bariatric and standard equipment must be inspected by Nursing/Biomed prior to placing in service. Communication of status for equipment arrival and possible delays will be required for proper planning of personnel availability up until the delivery is complete•
95%
95%
Periodic Reviews and spot checks
Positive past performance rating
6
Para 3
All lease equipment must be cleaned and decontaminated prior to bringing to the facility. The equipment must be sanitized and ready for immediate patient use utilizing specified and traceable infection control and quality control guidelines as set forth by the JCAHO standards for both pre-delivery inspection (PDI) and pre-maintenance inspections (PMI)
95%
95%
Periodic Reviews and spot checks
Positive past performance rating
7
Para 3
3.6 Documentation

3.6.1 Pick-up and delivery records

3.6.2 All scheduled and unscheduled maintenance of all vendor supplied equipment on VANTXHCS campus

3.6.3 Maintenance manuals for all equipment

3.6.4 Operation/ User manuals for all equipment to be available upon request

3.6.5 Receipt of delivery

3.6.5.1 To be obtained by vendor technician from the patient care unit charge nurse or designee where the equipment was delivered

3.6.5.2 Copy of receipt will be taken to Wound Care located in the basement of building-2 room BA33. Contact ext 70680 or 72254 to confirm Wound Care staff availability during the hours of 07:00 AM- 4:00 PM. Located in the basement of Bldg 2, room BA33 (except Federal Holidays).

100%
100%
Periodic Reviews and spot checks
Positive past performance rating
8
Para 4
4.1 Conformance with standards and specifications as defined by documents noted in paragraphs 1.2.1 and 1.2.2 of this document.
100%
100%
Periodic Reviews and spot checks
Positive past performance rating

5. Incentives/RATING STANDARDS There will be no incentives associated with this contract

6. Methods of QA Surveillance

Various methods exist to monitor performance.

a. DIRECT OBSERVATION

b. PERIODIC INSPECTION

c. USER SURVEY

d. VALIDATED USER/CUSTOMER COMPLAINTS

e. INSPECTION

f. PERIODIC SAMPLING

g. RANDOM SAMPLING

h. PROGRESS OR STATUS MEETINGS

i. ANALYSIS OF CONTRACTOR’S PROGRESS REPORTS

7. Ratings Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

8. DOCUMENTING PERFORMANCE

a. Acceptable Performance

The Government shall document positive OR NEGATIVE performance. Any report may become a part of the supporting documentation for any contractual action.

b. Unacceptable performance When unacceptable performance occurs, the COR shall work with the Contracting Officer (CO) inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case, the COR shall document the discussion and place it in the COR file. In order to assure that the contractor receives impartial, fair, and equitable treatment under this contract, the COR will work with the contractor to increase performance to an acceptable level.

When the COR and CO determines formal written communication is required, the COR and CO shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. Frequency of Measurement

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor as needed to assess performance and shall provide a written assessment.

Signature – Contractor

Signature – Contracting Officer Representative See above Acceptable Quality Level & Method of Surveillance located in QASP

� See “Methods of Surveillance,” paragraph 6 of this QASP, for additional methods of monitoring performance.

Original Date: 05/02/2016

File details come from the government source that posted it. Updated .