This is Amendment 0001 to a federal solicitation for CTX Fire Sprinkler Reconfiguration for Dental Expansion services, issued by the Department of Veterans Affairs Network Contracting Office 17 in San Antonio, Texas. The solicitation number is 36C25726Q0827, effective August 6, 2026, with a project code of 36C257.
The amendment provides official responses to 24 questions submitted by offerors as of August 12, 2026 at 3:00 PM CDT. Key clarifications include: (1) 30 sprinkler heads require relocation to support 14 additional dental chairs; (2) the scope includes detailed breakdown billing for fire suppression parts, labor, project management, and overhead rather than lump-sum pricing; (3) the work is classified as a services contract (50% limitation on subcontracting) rather than construction, with no performance or payment bond required; (4) the contractor must obtain all required permits from the local Authority Having Jurisdiction; (5) acceptance testing requires hydrostatic and flow tests with contracting officer witness; (6) design and engineering work must be approved by NICET and Fire Protection Engineer per VA guidelines; (7) system shutdowns must be coordinated with the contracting officer five days in advance; (8) the 15-day period of performance begins after ICRA permit approval is granted; (9) the work is stand-alone during active construction with no site visit available; and (10) RCP drawings showing existing and new ceiling/wall layouts are attached. The wage determination referenced is P07 WD 2015-5237 rev30 05-13-2026 for Bell County, available on SAM.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25726Q0827 0001_1.docx | DOCX document | |
| Fire Sprinkler Scans.pdf | ||
| S02 - 36C25726Q0827 CTX Fire Sprinkler Reconfiguration for Dental Expansion.pdf | ||
| 36C25726Q0827_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0001 08-14-2026
36C257
Department Of Veterans Affairs Network Contracting Office 17
5441 Babcock Road Ste. 302 San Antonio, TX 78240
To all Offerors/Bidders
36C25726Q0827
08-06-2026
X
X X
See CONTINUATION Page
X 1
The purpose of this amendment is to:
a. To answer all the questions that were submitted by August 12, 2026 by 3:00pm CDT.
/// SEE CONTINUATION PAGES ///
Shawn R. Reinhart Contracting Officer
36C257Q0827 0007 CONTINUATION PAGES
Questions and Answers CTX Fire Sprinkler Reconfiguration for Dental Expansion
1. The SOW references "RCP Drawings" for sprinkler head relocation/layout, but no drawings appear to be attached to this solicitation package. Can the Government issue the RCP drawings and any existing fire sprinkler as-built/hydraulic calculation drawings via amendment?
Safety is the one in charge of the fire suppression system
2. Is an existing fire alarm/sprinkler system as-built or hydraulic calculation set available for reference (system type, zone, riser location, existing head count/coverage)?
Safety would be the ones with that information.
3. Will the Government hold a site visit or walkthrough prior to quote submission, given the scope depends heavily on existing conditions (ceiling type, existing head locations, occupied space)?
No site visit will be available
4. The Price Schedule (B.2) lists CLINs 0001-0004 (Fire Suppression Parts, Labor, Project Management, Overhead) at Qty 1.00 EA with no unit breakdown. Is the Government expecting a single lump-sum FFP per CLIN, or should offerors submit a detailed bill of materials/quantities (e.g., number of heads relocated/added, linear feet of flex line)?
This shall and will be a detailed breakdown
5. How many sprinkler heads are estimated to be added and/or relocated to support the 14 additional dental chairs?
There will be 30 sprinkler heads that need to be relocated
6. Are the areas affected finished ceiling (chrome semi-recessed/VS2 flex head) or exposed (brass sprinklers), or a mix, and can the ratio/quantity be identified?
Yes, the ceiling grid is in and yes you can identify ratio/quantity
7. Will the Dental Clinic (or adjacent areas) remain occupied and providing patient care during construction, or will the affected area be vacated?
The adjacent sections will be occupied and will be providing patient care. Our area will be vacant since it is under construction
8. Is an asbestos-containing materials (ACM) survey available for the work areas, given this is an occupied VA hospital building?
Yes, this information is available from our safety team.
9. What ICRA class (I-IV) is anticipated for this scope, and will the Government provide the ICRA permit template/checklist, or is the contractor expected to develop it independently?
You will be able to work under our current ICRA and PCRA
10. Who is the point of contact for the Local Fire Marshal that must be coordinated with, and is a specific impairment/notification procedure required (e.g., fire watch during system shutdown)? The SOW states that the system must in accordance with NFPA 13 and local fire marshal requirements, the coordination must be done by the contractor if the requirements aren’t known.
11. Is a fire watch required during system impairment/shutdown, and if so, is that a contractor-furnished responsibility or provided by VA Fire/Life Safety? Coordinate shutdowns with COR five (5) days ahead.
12. What acceptance testing is required after installation (hydrostatic test, flow test), and who is required to witness it (COR, VA Fire Protection Engineer, AHJ)? Hydrostatic test and flow test. COR will witness. The contractor will ensure proper operation of the system.
13. Are permits from the local Authority Having Jurisdiction (AHJ) required in addition to VA internal approvals, and if so, does the contractor or VA obtain them The contractor will obtain all required permits.
14. Section C.5 (852.219-75) only checks the "Services" limitation-on-subcontracting box (50%), not "General Construction" (85%) or "Special Trade Construction" (75%). Given this scope is fire sprinkler installation/reconfiguration work, please confirm the Government intends this to be evaluated and administered as a services contract (50% LOS) rather than construction. This is services, the construction box was checked on accident.
15. Is a payment and/or performance bond required for this effort, given it involves fire suppression system modification in an occupied federal building? No bond, this is not construction.
16. Please confirm the Wage Determination "P07 WD 2015-5237 rev30 05-13-2026 Bell County" referenced in Section D is the complete and correct attachment intended to accompany this solicitation, as it was not visible in the version received. WD is correct and it can be looked up in SAM.gov
17. Given the 15-day ARO period of performance, does that timeline account for ICRA permit approval lead time, or does the 15 days begin only after ICRA approval is granted?
The timeline starts when ICRA is granted.
18. Can we be supplied with the current drawings and locations of the installed sprinkler heads? Not available.
19. Are the number of heads increasing, or are they just moving locations The number should not be increasing just need relocation
20. SOW states “Add and relocate sprinkler heads as needed per wall and ceiling layout on RCP Drawings.” Can you supply these drawings so that we can have at minimum a count and an idea of locations for the service? Drawings are attached.
21. Can you please share the demo reflected ceiling plan showing existing sprinkler locations? Or will a site visit be provided so offerors can determine where existing sprinklers are located? Drawings are attached. No site visit is available.
22. Can you please share the new reflected ceiling plan showing the new wall locations so offerors can determine how many new sprinklers will be needed and compare to existing sprinkler locations to determine the extent of work required for the relocation. Drawings are attached.
23. Will this work be performed during active construction of the new ceiling and walls, or is it stand alone work that needs to be coordinated around an active dental clinic schedule? Stand-alone work during active construction
24. Please confirm that design and engineering work is required to be approved by NICET and FPE per the VA Fire Protection Design Guidelines. Yes
See attached document: Fire Sprinkler Scans.
(END OF QUESTIONS AND ANSWERS)
(END OF AMENDMENT)