This is a Question and Answer Document for solicitation 36C25726Q0543, addressing contractor inquiries regarding the repair and installation of irrigation systems at Veterans Affairs facilities in Waco and Temple, Texas. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17 is the contracting agency overseeing this one-time purchase solicitation.

The Q&A clarifies critical project parameters: existing infrastructure includes Rain Bird controllers and multiple water sources, though current as-built drawings are unavailable and water pressure/flow rates at connection points are unknown. The contractor is responsible for conducting an 811 underground utility check, obtaining Chief of Engineering authorization for road trenching, inspecting the cistern and existing pipes, and updating the pump house with a secondary tank. All damaged sod and landscaping must be replaced post-repair, and the contractor must program controllers, provide training on system operation, perform winterization and seasonal startups, and test and certify backflow preventers. The VA requires one-year warranties on new irrigation components and permits change orders to accommodate discovery of additional problem areas, particularly at the Temple location where old piping requires evaluation. Contractor-recommended equipment is permitted, and specific designated areas at both locations require new installations rather than matching existing equipment.

View the file

Other files

File Type Posted
4. Master Utility Plan-MASTER- Update 8-21-2025.pdf PDF
36C25726Q0543 0002_1.docx DOCX document
2. Master Site Plan - Temple.pdf PDF
3. Master Utility Plan- WATER.pdf PDF
5. Sign-In Sheet - Waco.pdf PDF
36C25726Q0543 0002.docx DOCX document
36C25726Q0543 0001_1.docx DOCX document
36C25726Q0543 0001.docx DOCX document
Service Contract Act WD 2015-5237 Rev 30.pdf PDF
36C25726Q0543_1.docx DOCX document
S02 36C25726Q0543.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer Document 36C25726Q0543 – CTX – Repair and Install Irrigation System for Waco/Temple Grounds

1. We request layout or linear footage of the existing irrigation system.

Answer: N/A

2. Do you have current as‑built drawings of the existing irrigation system?

(Controllers, valves, mainlines, zones, sleeves, backflow locations) Answer: NO

3. Are there updated utility maps showing water, electrical, fiber, and gas lines?

Answer: Yes

4. What is the existing water pressure and flow rate available at each connection point?

Answer: Don’t Know

5. Are there any known problem areas or zones that frequently fail or leak?

Answer: All

6. What irrigation controllers are currently installed?

(Hunter, Rain Bird, Toro, Baseline, etc.)

Answer: Rain Bird

7. Do you require matching existing equipment or is contractor‑recommended equipment allowed?

Answer: Is contractor-recommended equipment Is allowed.

8. Are there any water restrictions or VA sustainability requirements we must follow?

Answer: We want the well to be the first option, but there are no restrictions.

9. What are the allowed hours for irrigation work?

Answer: Please view the Statement of Work

10. Is there a designated staging area for materials and equipment?

Answer: No

11. Should damaged sod or landscaping be replaced after repairs?

Answer: Yes

12. Are we responsible for programming controllers after installation/repair?

Answer: Yes

13. Should we include winterization or seasonal startups in the quote?

Answer: Yes

14. Who is responsible for testing and certifying backflow preventers?

Answer: Contractor

15. Are there multiple water sources feeding different zones?

Answer: Yes

16. Are booster pumps or pressure regulators required?

Answer: If needed.

17. Is there specific designated areas at both locations that are required to be a new installation?

Answer: Yes

18. Will the VA require a warranty on new irrigation components? If so, how long?

Answer: Yes, one year

19. Is there time allotted for an underground utility check by 811 or would be the one to ask for this?

Answer: You would be the one.

20. Would an inspection of the cistern and existing pipes be part of this quote?

Answer: Yes

21. Who gives the authorization to trench across or under the road to replace old piping getting fed from the cistern?

Answer: Chief of Engineering

22. Updating the pump house and adding a secondary tank from the cistern be part of this quote?

Answer: Yes

23. Are we responsible for training of controllers and system after installation?

Answer: Yes

24. Please confirm whether the contract provides a discovery period and/or permits change orders to ensure adequate time for identifying specific breaks and related problem areas. (Temple may need this more than Waco based on the well system and old pipes recommended in the RFQ).

25. Answer: Yes, change orders can occur in Reason

26. We request any photos you can provide.

Answer: View the attachments from the amendment.

27. We request a copy of the sign-in sheets from the site visit.

Answer: View the attachments from the amendment.