This file is an Amendment to a Previous Combined Solicitation (SF 30) and accompanying Questions and Answers document for a federal contract opportunity to repair and paint three above-ground storage tanks (ASTs) at the Department of Veterans Affairs Sam Rayburn Memorial Veterans Center in Bonham, Texas. The solicitation number is 36C25726Q0321, with a response deadline extended to April 13, 2026 at 10:00 AM Central Time. The contracting office is the Department of Veterans Affairs Network Contracting Office 17 in Temple, Texas, with point of contact Contract Specialist Abduel Sanford.

The scope of work requires exterior surface preparation and painting of three fuel storage tanks of varying sizes—Tank 4 (boiler plant, 11' wide × 40' long), Tank 2 (E-85 tank, 8'6" side × 28' long), and Tank 5 (boiler plant, 6'10" to 11'2.5" × 4'8" high)—including their bases, supply and return piping, and refueling station cabinet. Surface preparation involves power washing and wire brushing to remove dirt and loose rust, with containment of debris to the work area. The coating system specified is PPG Amerlock 600 primer and Pit Thane Ultra Gloss topcoat, applied per manufacturer specifications to ensure a one-year workmanship warranty. Work must be performed on weekends with standard hours of 0730-1615, though extended hours and weather-dependent scheduling are permitted. The contractor must provide a NACE II certified coating inspector on staff and an on-site project supervisor with OSHA 30 certification. All equipment, including scaffolding and aerial lifts, must be contractor-supplied. The Product Service Code is J091 (Painting and Coating Work), NAICS Code 238320, with no set-aside designation indicated.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

Answer Technical Questions: REPAIR/PAINT Fuel Tanks Restoration | 549

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
76504
SOLICITATION NUMBER*
36C25726Q0321
RESPONSE DATE/TIME/ZONE
04-13-2026 10AM CENTRAL TIME, CHICAGO, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
J091
NAICS CODE*
238320
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 17 Central Texas Veterans HCS 1901 Veterans Memorial Dr.

Temple TX 76504

POINT OF CONTACT*

Contract Specialist Abduel Sanford abduel.sanford@va.gov

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

Sam Rayburn Memorial Veterans Center

1201 E. 9th St., Bonham

Bonham Texas

POSTAL CODE
75418
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
abduel.sanford@va.gov

EMAIL DESCRIPTION

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

DESCRIPTION

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-07-2026 36C257 Department of Veterans Affairs NCO 17 North Texas Healthcare System Regional Procurement Office West (RPO-W) 124 E. Hwy 67, Suite 100 Duncanville TX 75137 36C257

NCO 17

Department of Veterans Affairs North Texas Veterans Health Care Center 124 E. Hwy 67, Suite 100 Duncanville TX 75137 To all Offerors/Bidders

36C25726Q0321

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-13-2026 10AM CDT X one (1) The purpose of this amendment is to:

1. Post the answers to the technical questions asked.

2. Extend the due date to April 13, 2026, 10M CST.

3. All other terms and conditions remain the same.

Page 1 of Page 1 of Q & A for NTX – REPAIR/PAINT Fuel Tanks Restoration 36C25726Q0321

1. Can you provide us the size for each of the tanks, 25,000 Gallon AST Painting, 10,000 Gallon AST Painting, 2,000 Gallon AST Painting Physical dimensions can be accessed upon site visit.

2. Can you provide the height and OD for each of the tanks?

Tank 4 boiler plant—11’ wide—40’ long Tank 2 E-85 tank------8’ 6” side---28’ long Tank 5 boiler plant---6’ 10”—11’ 2.5” --4’8” high

3. Do you want us to blast the tanks, or can we use SSPC-SP 11, Bare Metal Power Tool Cleaning? Power wash tanks, to remove dirt, wire brush any areas with pitted rust to ensure all loose material is removed. Dust and debris must be contained to the area of work.

4. We are assuming this is just for exterior painting on the tanks, correct? Including exterior of tanks and base, supply and return piping and refueling station cabinet. Reattaching all required labels

5. Will all 3 tanks be available at the same time? Yes, Work should be completed on the weekend.

6. Do you have any pics of the tanks as we are not able to attend a site visit at this time?

Yes, pictures are available on request

7. Do we have to contain and dispose of spent water generated through pressure washing each tank?

Containment of paint debris can be contained but water can be released to the storm drain.

8. Surface prep in spec tells you to SP-2 wire brush but the Manufacture Product Data Sheet for Amerlock 600 specifies that at the minimum you need to mechanically clean surface if you cannot blast the steel. Does the owner what us to follow the RFQ identified specifications or the manufactures recommendations? If the coating contractor cannot follow the manufactures PDS surface preparation for Amerloc 600 the coating applicator cannot provide the specifications one year warrantee identified on page 4 No 14.

Manufacturer specifications are required.

9. Will the tanks be empty when coating contractor performs the steel preservation?

No, the tanks will not be empty, the tanks are dual wall therefore the integrity of the tanks will not be affected.

10. The specifications state that weekend work shall be performed during the weekend and working hours are between 0730 – 1615 hours each day. High-performance coating applications are at the mercy of environmental conditions. Each coatings product data sheet identified the environmental conditions that must be present at the time of coating applications. If exterior environmental conditions are favorable you want to work as long as possible. Can the coating contractor work weekends and/or past 1615 hours during the coating application if necessary?

Yes, this solicitation specifies weekends, working past 1615 is not an issue. We can get approval for Saturday and Sunday if necessary. Weather permitting.

11. Can you provide the size for each of the tanks.

See question Number 1 & 2.

12. Could you confirm what the existing coating system is on each of the tanks?

No, that information is not available.

13. Do we know what the current DFTs are on each of the tanks?

Tank 4 boiler plant—used for emergency purposes ie. Curtailment. Tank 2 E-85 tank------contain E-85 not in use. Tank 5 boiler plant---supplies fuel to boiler plant generator.

14. Can the government provide photographs of all three tanks showing current paint condition, extent of rust/pitting, tank dimensions, and surrounding access areas?

Yes, pictures are available on request, see question 1& 2 for tank dimensions

15. Are the tanks located outdoors (confirmed) or partially enclosed? Are there any overhead obstructions, adjacent structures, or utilities that would limit access for lifts or scaffolding?

All tanks are outside, with no overhead obstructions, tank 4 at boiler plant has adjacent structures and no utilities should be affected.

16. Will scaffolding or an aerial lift be required to access the full surface of the tanks? If so, what is the approximate height of each tank?

Scaffolding and lift will be required, see question 1 & 2

17. What are the approximate dimensions (height and diameter) of each of the three tanks? This information is critical for accurate material takeoff and labor estimating.

See question 1 & 2

18. Are all three tanks the same size, or do they vary?

See question 1 & 2

19. The SOW references priming “tanks and stairs.” How many stair structures are included?

There are no stairs. The top of the tank has gauges, sensors and fuel oil supply and return lines.

20. Section 16/Page 5: (Submittals) references a door/screen example but does not list specific submittal items for this project. Can the government confirm that manufacturer’s data sheets for PPG Amerlock 600 and Pit Thane Ultra Gloss are the only required submittals?

Contractors should provide SDS’s should be provided prior to beginning work for Engineering and Safety requirements. The paint to be used should be industry standard.

21. Does the prime contractor need to have a NACE II certified coating inspector on staff? PPG Amerlock 600 and Pit Thane Ultra Gloss have strict application requirements — including surface profile, film thickness, temperature, and dew point windows — and their manufacturers require certified inspection to validate proper application. A NACE II inspector is the recognized industry standard for verifying compliance on industrial coating projects and ensures adherence to manufacturer specifications and the contract’s 1-year workmanship warranty.”

Yes, contractor shall provide a NACE II certified coating inspector of staff.

22. Does the government require the on-site supervisor to hold an OSHA 30 certification to oversee the work?

Yes, Project Supervisor must have OSHA 30 certification

23. Could you tell me if the VA would provide a lift or would the contractor who gets awarded need to provide this? Do you need a sample or description of the expo paint use for the tanks.

No VA does not provide equipment to accommodate completion of this project. A sample of existing paint is not a requirement; The new primer and paint must meet industry standards for the painting of AGFT’s

24. What gallon size are the tanks?

See question 1 & 2

25. What is the diameter measurements of the tanks?

See question 1 & 2

Intentionally Left Blank