36C25724Q0817-RFI-Technical Questions.pdf
PDF 147 KB Posted
- Attached to
- Z1NB--Amendment to Post Technical Q's and Extend Closing Date - Dallas VA Boiler/Chiller Plant Contract
- Solicitation number
- 36C25724Q0817
About this file
This document is a Request for Information (RFI) containing technical questions related to a Performance Work Statement (PWS) for the Dallas VA Boiler/Chiller Plant Contract. The RFI seeks clarification on several aspects of the PWS, including the maintenance of a scissor lift for solar system work, the number of repair labor hours and parts/materials budget, and requirements for boiler maintenance and testing. The RFI also requests confirmation on the warranty and service requirements for the Mercury 50 Gas Turbine enclosure.
The related federal contract opportunity is a Request for Quote (RFQ) for the Dallas Boiler/Chiller Plant Contract at the VA North Texas Health Care System. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) and has a proposed period of performance of one base year from 11/15/2024 to 11/14/2025. Interested SDVOSBs must be listed as certified on the Veteran Small Business Certification (VetCert) to be eligible for award. Offers are to be submitted directly via email to the Senior Contract Specialist.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25724Q0817 0001_1.docx | DOCX document | |
| 36C25724Q0817 0001.pdf | ||
| Site Visit - Signin Sheet.pdf | ||
| Wage Determination No. 2015-5227, Rev. 23.pdf | ||
| 36C25724Q0817.pdf | ||
| PWS-Dallas VA BoilerChiller Plant.pdf | ||
| 36C25724Q0817_2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dallas VAMC Boiler/Chiller Plant Contract 36C25724Q0817
Request for Information (Technical Questions)
1. On page 3, section 1.5 of the Performance Work Statement (PWS) document mentions, the scissor lift needed for the Solar system will be provided by the VA; but the contractor is responsible for maintaining certification per Solar/manufacturer requirements. Could you provide additional clarifications, please? Solar requires scissor lifts to be maintained and in good working order if used by their techs. This means contractor will ensure the scissor lift they use is in good condition.
2. On page 4, section 1.7 of the PWS document mentions all corrective maintenance/repair and emergency/repair labor outside the scope of preventative maintenance defined in Section 1.5 will be drawn from a bank of 1200 repair labor hours for Dallas.
Are these hours per year? Also, in the case the contractor exceeds these hours, does the CO will approve additional hours? What will be the process to request additional hours? Per Year. Anything over will require a mod request for additional funding the CO has to authorize this.
3. On page 4, section 1.10 of the PWS document mentions any parts/materials outside the scope of testing, inspecting, and preventative maintenance will be approved and supplied by the VA. Corrective Repair and/or Emergency Repair parts will be purchased by the VA or will be purchased by the contractor upon approval of the VA and drawn from the $200,000.00.
Could you provide additional clarifications of this process, please? Is this amount approved by year?
Also, in the case the contractor exceeds this amount per year, does the CO will approve additional $ amount? Yes and Yes CO approval is needed.
4. Page 9 -10 of boiler equipment list does not show condensate tank. Is it included to this contract? Not the condensate tank. The DA Tank is.
5. Page 25 Boiler quarterly PM. Does the contractor need to follow the safety devise manual to perform boiler quarterly PM or just follow the required task/check points outlined on page 25? Follow VA Boiler Testing Manual Version 8.
6. As part of the additional tasks required to the boilers, it is mentioned the mechanical tube cleaning (rattling), is it required as part of the annual service and need to be performed one boiler each year, so each boiler is done every 4 years. However, per the pricing schedule provided, this solicitation is for two (2) years, please clarify. 1 Boiler per year.
Also, please confirm if the annual internal certification provided by non-jurisdictional inspector will be required for your boilers. Yes.
7. Regarding the Mercury 50 Gas Turbine enclosure, could you confirm when will expire the warranty of this system, please? We need to know whether the service of this unit needs to be provided only by Solar Technicians? Warranty expires at 46k hours. After overhaul we will have a new warranty. Service will only be provided by Qualified Solar Technicians.
End of Request for Information (Technical Questions)