About this file

This document is a Combined Synopsis/Solicitation for a Request for Quote (RFQ) from the Department of Veterans Affairs, Network Contracting Office 17. The objective is to provide all labor, equipment, materials, tools, and supervision for the removal and disposal of two abandoned Superior Boilers at the Garland VA Medical Center in Garland, Texas. The solicitation is set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB). The contractor must possess an R Stamp for Boiler Repair and Alterations. Offers are due by June 17, 2024 at 4:00 pm CDT. The government anticipates awarding a firm-fixed price contract resulting from this solicitation. Technical questions must be submitted by June 12, 2024 and offers must be submitted via email to the Contract Specialist, Brandy Riha. A site visit is scheduled for June 11, 2024 at 8:00 am.

View the file

Other files

File Type Posted
36C25724Q0596 0001_1.docx DOCX document
Amendment 36C25724Q0596 0001.docx DOCX document
P07 SAM WD 2015-5227 Rv 21 122623.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25724Q0596

SUBJECT*
NEW| ABANDONED BOILER REMOVAL, BLANK FLANGE PIPING AND EXHAUST TRUNK | GARLAND VA

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
78240
SOLICITATION NUMBER*
36C25724Q0596
RESPONSE DATE/TIME/ZONE
06-17-2024 4:00 pm CENTRAL TIME, CHICAGO, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
J045
NAICS CODE*
238220
CONTRACTING OFFICE ADDRESS
Department Of Veterans Affairs

Network Contracting Office 17

5441 Babcock Road Ste. 302 San Antonio TX 78240

POINT OF CONTACT*

Contract Specialist Brandy Riha brandy.riha@va.gov

PLACE OF PERFORMANCE

ADDRESS
Garland VA Medical Center

2300 Marie Curie BLVD

Garland TX

POSTAL CODE
75042

COUNTRY

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS
brandy.riha@va.gov

EMAIL DESCRIPTION

DESCRIPTION

This is a Request for Quote (RFQ). The government anticipates awarding a firm-fixed price contract resulting from this solicitation. This RFQ is set aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB).

All respondents must have an active registration in the System for Award Management at www.sam.gov. Interested SDVOSB must be listed as verified on the Certified Veteran Small Business Pages (VetCert) database located at https://veterans.certify.sba.gov/#search to receive contract awards under the Veterans First Contracting Program.

Department of Veterans Affairs, Network Contracting Office 17, is soliciting offers for the following:

This Scope of Work (SOW) describes the following: The objective of this project is to provide all labor, equipment, materials, tools, and supervision for abandoned Boilers removal and disposal of the Superior Boilers at Garland VA Medical Center at 2300 Marie Curie BLVD Garland, Texas 75042. Contractor to possess R Stamp for Boiler Repair and Alterations.

Site Visit: Tuesday, June 11th @ 8:00am POC: Ryan Stevens, (214) 742-8387, Ryan.Stevens@va.gov Engineering Services (138) Location: Garland VA Medical Center at 2300 Marie Curie BLVD Garland, Texas 75042

TECHNICAL QUESTIONS:

Technical questions shall be accepted by the Government in writing via email only no later than 5 PM CST, June 12th, 2024. Please list “Technical Questions – 36C25724Q0596 ABANDONED BOILER REMOVAL GARLAND” in the subject line of the e-mail and send to Brandy Riha, Contract Specialist, at Brandy.Riha@va.gov. Please include in your questions the section of the solicitation/page number that your question is referencing.

Offeror shall submit offers by Due Date/Time specified in Block 8 of the Standard Form (SF) 1449 of the solicitation via email to Brandy.Riha@va.gov. Please list “Quote – 36C25724Q0596 ABANDONED BOILER REMOVAL GARLAND” in the subject line of the e-mail.

Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice

*= Required Field
Combined Synopsis/Solicitation Notice

Combined Synopsis/Solicitation Notice

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

549-24-3-5096-0207 36C25724Q0596 -2024 Brandy Riha

210-617-5300 -2024 pm

CDT

36C257 Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio TX 78240 X X 238220 $19 Million N/A X 36C549 Department of Veterans Affairs Garland VA Medical Center 2300 Marie Curie BLVD Garland TX 75042 36C257 Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio TX 78240

This is accomplished through the Tungsten Network located at:

http://www.fsc.va.gov/einvoice.asp This is mandatory and the sole method for submitting invoices.

(877) 353-9791

(512) 460-5540 See CONTINUATION Page Remove and dispose of 2 abandoned boilers.

Install blank flange on all piping with drain valves.

Install blank flange on exhaust trunk.

For instructions to offeror see page Site Visit Tuesday , June th :00 a m Location:

Garland VA Medical Center

2300 Marie Curie BLVD

Garland, TX 75042 POC: Ryan Stevens @ 214-742- 8387 ext. 26034 ATTN: All vis i tors must have a valid driver’s license for entry.

See CONTINUATION Page

X X X Page 1 of Table of Contents

SECTION A4
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES4
SECTION B - CONTINUATION OF SF 1449 BLOCKS6
B.1 CONTRACT ADMINISTRATION DATA6
B.2 STATEMENT OF WORK7
B.3 PRICE/COST SCHEDULE21
ITEM INFORMATION21
SECTION C - CONTRACT CLAUSES22
C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)22
C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)22
C.3 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)30
C.4 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)31
C.5 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)34
C.6 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)36
C.7 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)37
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS38
SECTION E - SOLICITATION PROVISIONS39
E.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)39
E.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)39
E.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)42
E.4 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023)43
E.5 ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—47
COMMERCIAL ITEMS47
E.6 BASIS FOR AWARD48
E.7 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)49

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR: TBD

b. GOVERNMENT: Contracting Specialist Brandy Riha, brandy.riha@va.com Department Of Veterans Affairs Network Contracting Office 17 5441 Babcock Road Ste. 302 San Antonio TX 78240

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management.

3. INVOICES: Invoices shall be submitted in arrears:

a. Other [X] After all work is completed.

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

B.2 STATEMENT OF WORK

Abandoned Boilers Removal Garland Plant

1.0 Scope of Work: The objective of this project is to provide all labor, equipment, materials, tools, and supervision for abandoned Boilers removal and disposal of the Superior Boilers at Garland VA Medical Center at 2300 Marie Curie BLVD Garland, Texas 75042. Upon completion of daily work, the contractor shall clean site daily and haul away debris. Contractor to possess R Stamp for Boiler Repair and Alterations.

Superior Boilers date of MFD 1963, Contractor will need to abate asbestos if boiler is to be cut up for removal.

2.0 Background: The project is located at Garland VA Medical Center, 2300 Marie Curie BLVD Garland, Texas. Boiler Plant is in the basement,

3.0 Privacy Officer: The contractor will not have access to Patient Health Information (PHI), nor will they have the capability of accessing patient information during the services provided to the VA

4.0 General Requirements:

· Remove two (2) Superior Firetube Boilers from Boiler Pad

· Rig Boiler Skid from Boiler Plant or cut up Boiler for removal

· Dispose of removed Boilers

· All steam, gas, fuel oil, feedwater lines, exhaust stack, and electrical hookups etc. to remain in place for temporary rental boiler tie in.

· Blank Flange all piping and exhaust stack after boiler removal, provide drain valves on Blank Flange.

4.0.1 Normal working hours: are 7:30am to 4:00pm. Federal Holidays are excluded from this schedule.

The Contractor shall coordinate access to the facility work site with the delegated Contracting Officer's Representative (COR).

5.0 Period of performance: The period of performance for all work shall be 21 calendar days or less from the notice to proceed.

6.0. SECURITY REQUIREMENTS

· While on VA premises the Contractor or his representative shall wear a company uniform garment or display some means of identification showing he is an employee of the Contractor.

7.0. CONTRACTING OFFICER TECHNICAL REPRSENTATIVES

· Prior to contract award, the Contracting Officer shall designate a VA Medical Center employee as the COR. All work coordination shall be made through the COR. The Contractor shall be provided a copy of the letter of delegation authorizing the COR at the commencement of the term of the contract. No other person shall be authorized to act in such capacity unless appointed in writing by the Contracting Officer.

8.0. INFORMATION TECHNOLOGY SECURITY REQUIREMENTS

· The Contractor, their personnel, and their subcontractors shall be subject to the Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in this contract. The Contractor shall comply with all Federal laws and regulations the VA has developed when VA sensitive information is accessed, used, stored, generated, transmitted, or exchanged by and between VA and a Contractor. The information made available to the Contractor by VA for the performance of this contract will be used only for the purposes of performance under this contract. The certification and accreditation requirements do not apply to this requirement and a security accreditation package is not required.

8.0.1 INFORMATION SYSTEMS OFFICER/INFORMATION PROTECTION

· The C&A requirements do not apply, a Security Accreditation Package is not required.

· The Contractor will not have access to VA Desktop computers, nor will they have access to online resources belonging to the government while conducting services.

· Privacy Officer: The Contractor will not have access to Patient Health Information (PHI) nor will they have the capability of accessing patient information during the services provided to the VA.

9.0. SAFETY REQUIREMENTS

The general contractor is responsible for site safety to include the subcontractors. The extent of the measures that a general contractor must take to satisfy its duty to exercise reasonable care to prevent and detect violations is less than what is required of an employer with respect to protecting its own employees. See OSHA Multi-Employer Citation Policy CPL 2-0.124 - December 10, 1999: http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=DIRECTIVES&p_id=2024

VA Construction Safety Guidebook: http://vaww.hefp.va.gov NOTE: This is an internal VA website that is not available to the public.

Additionally, general contractors are responsible for adhering to VA requirements. Many locally developed sample documents containing VA requirements that can be provided to contractors for their reference are readily available. These include Sample Medical Center Requirements (Enclosure 1-1), Sample Contractor Safety Information Sheet (Enclosure 1-2) and Infection Control Orientation for Construction Workers (Enclosure 1-3) Enclosure 1-1 Sample Medical Center Requirements Attachments:

4. Contractor/Subcontractor/Employee Notification of Asbestos Form

5. Cutting and Welding with PR Gas or Arc Permit Form

6. Permit for Road Closure Form

Enclosure 1-2 Sample Contractor Safety Information Sheet

Enclosure 1-3 Infection Control Orientation for Construction Work

· In the performance of this contract, the Contractor shall take such safety precautions as the Contracting Officer may determine to be reasonably necessary to protect the lives and health of occupants of the building. The Contracting Officer shall notify the Contractor of any safety issues and the action necessary to correct these issues. Such notice, when served to the Contractor or his representative at the work site shall be deemed sufficient for the corrective actions to be taken. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work and hold the Contractor in default.

· Contractor shall provide a weekly work schedule to included location, time, and number of workers until the completion of the project. This schedule shall be provided to the COR a week in advance of the work to be performed.

· Contractor shall conduct preliminary inspections of work site, identify pre-existing site conditions, and coordinate with the COR before performing work in the designated areas.

· Prior to commencing and during work, the Contractor shall comply with ALL requirements contained within VANTXHCS Construction Safety Accident Prevention Plan.

· Contractor shall provide a work schedule to included location, time, and number of workers weekly until the completion of the project. This schedule shall be provided to the VA a week in advance of the work to be performed.

· Contractor shall conduct preliminary inspection of worksite, identify ANY preexisting damage and notify VA personnel before performing work in the designated area.

Sample Medical Center Requirements General Intention: This document pertains to station policy for construction projects performed at the Veterans Affairs Medical Center, (facility name). Safety and health concerns are taken seriously at this facility. Both VAMC and contractor staff members are expected to strictly adhere to the regulations and requirements. Because the primarily concern of the VAMC is patient safety, adhering to regulations and requirements is exceedingly important. In this regard, OSHA Standards may protect worker safety and health, but they have minimal benefit for protecting the safety and health of our patients, due primarily to their differing medical conditions. This information must be reviewed with VAMC and contractor personnel as orientation prior to performing on-site work. Where the requirements as outlined in this and Section 01 00 00, General Requirements from the Master Construction Specifications, are differing, the more stringent shall apply. Section 01 00 00 can be viewed online at: http://www.cfm.va.gov/TIL/spec.asp#01.

Requirements:

A.Security:
1.Secure all construction areas, especially mechanical and electrical rooms against entry of unauthorized individuals including patients.
2.Notify the Contracting Officer’s Representative (COR) for permission to work after hours and weekends. Standard work hours for the medical center are Monday-Friday, 8:00 a.m. to 4:30 p.m. (Standard union hours are 7 a.m.-3:30 p.m.)
B.Key Security:
1.Only a limited number of keys will be issued to the contractor.
2.If the contractor loses a key, all areas that are keyed to that key will be re-keyed at the contractor’s expense at a charge of (price) per key and (price) per change. All new keys will be issued at the contractor's expense.
3.All doors leading to and from construction are either monitored or locked to prevent access to the area from unauthorized persons.
C.General Safety:
1.Follow all federal, state, and local safety and health regulations.
2.Maintain safety in the construction site/area in accordance with the provisions of the contract including OSHA Regulations; National Electrical Codes; National Fire Protection Association (NFPA) 70, National Electric Code; and NFPA 101, Life Safety Code. Work in a safe manner and take all proper precautions while performing work. Extra precautions shall be taken when working around persons occupying the building during construction.
3.Provide Personal Protective Equipment (PPE) for employees.
4.Post appropriate signs in specific hazardous areas.
5.Keep tools, ladders, etc., away from patients to prevent injuries.
D.Safety Inspections: The professional occupational safety and health staff at this facility will perform safety inspections of all contract operations. Written reports of unsafe practices or conditions will be reported to the COR and Contracting Officer for immediate attention and resolution.
E.Fire Alarms:
1.The fire alarm system connects all buildings at this facility, and is activated by various heat, duct, manual pull stations, and smoke sensors. Manual pull stations are provided at each entrance. Please survey the construction area to locate the manual pull stations.
2.In the event of a fire alarm sounding, remain in the area unless medical center personnel (Safety, Nursing or Engineering) provide other instructions, or unless a fire situation is in the immediate area, in which case evacuation should be immediate.
3.Any work involving the fire protection systems will require written permission to proceed from the COR. Do not tamper with or otherwise disturb any fire alarm system components without prior written permission.
F.Hazardous Materials:
1.Many operations may involve the use of hazardous materials. Prior to locating hazardous materials on site, all Safety Data Sheets (SDS) will be submitted through the COR for evaluation by the facility Safety Officer.
2.Storage of hazardous materials within buildings will be minimal with only enough on hand to perform daily work tasks. Flammable materials will either be removed from buildings at the end of the work shift or stored in approved flammable storage containers.
3.Care must be taken to ensure adequate ventilation to remove vapors of hazardous materials in use. Many of the patients being cared for in the facility are susceptible to environmental contaminants, even when odors seem minimal. For example, chemotherapy patients can become nauseated by odors that do not affect other patients and staff. Areas where vapors are produced must be isolated and ventilated to the most extent possible to reduce the number of complaints. Pre-plan the ventilation process. Ensure that vapors ventilated to exterior are not then re-introduced to hospital by intake through a make-up air system. Arrange for after-hours shut down of hospital system if required.
4.Older hospitals have lead paint on interior structural and miscellaneous steel. Exposure to lead can be a greater health threat than asbestos. Great care must be taken to ensure that staff exposure to lead is reduced to a minimum level.
G.Airborne Dust Control During Construction:
1.Generation of dust is of major concern within staff occupied areas and especially in patient occupied buildings. Where operations involve the generation of dust, all efforts will be directed at reducing airborne generated dust to the lowest level feasible. This may be accomplished by a number of methods including misting the area with water, or use of tools attached to high efficiency particulate air (HEPA) filtering vacuums. Where large amounts of materials may be disturbed, resulting in airborne dust, establishment of full ceiling-to-floor fire-retardant barriers may be required. Note: Use drywall or fire-retardant plastic, never plain visqueen.
2.Classification of Jobs:
a.CLASS I: Includes, but is not limited to, minor disturbances involving plumbing, electrical, carpentry, ductwork, and minor aesthetic improvements.
b.CLASS II (projects that require barrier precautions): Includes, but is not limited to, construction of new walls, construction of new rooms, major utility changes, major equipment installation, demolition of wallboards, plaster, ceramic tiles or ceiling and floor tiles, removal of windows, removal of casework, etc.
H.Class I Procedures:
1.Mist work surfaces with water to control dust while cutting. A HEPA vacuum can also be used
2.Tape doors for activities that produce large amounts of dust. Block off and seal air vents, and bag smoke detectors.
3.Cover holes, openings, and penetrations in walls, ceilings, floors, or doors if they cannot be patched or fixed within 4 hours. Only approved fire-rated materials will be used to fill holes in fire/smoke walls.
4.Comply with OSHA Regulations regarding noise and vapor containment.
5.Construction waste must be contained using plastic bags and/or a covered transport receptacle and/or a cart and tape covering before transport.
6.Wet mop and/or HEPA vacuum before leaving work area.
7.Place dust walk-off mats at entrance and exit of work area. Clean or change mats daily to prevent tracking of dust into occupied areas.
8.After completion, coverings from air vents and smoke detectors may be removed.
I.Class II:
1.Construction warning signs must be posted.
2.Use of a HEPA vacuum is mandatory to control dust while cutting.
3.Construct all dust barriers before construction begins per the following instructions: For single rooms, seal door/frame with tape and plastic. The sheet should be divided vertically with a knife. Flaps should be taped on either side of the single sheet to create a flapped entrance.
4.For larger areas, install an airtight fire retardant plastic barrier that extends from floor to ceiling, or seal to prevent dust and debris from escaping. Seal all seams with duct tape. Install barrier partitions to prevent movement of air and debris into ceiling envelopes, chases, and/or ceiling spaces. Construct entrance with a double flap of plastic to prevent escape of debris, or, install solid barriers if elevator shafts or stairways are within the field of construction.
J.Contact with Asbestos Containing Materials (ACM):
1.Due to the age of buildings, many may contain ACMs. Primary ACM uses in the medical center include floor tile, mastic, piping, and HVAC insulation. The medical center has performed a comprehensive asbestos survey and has identified accessible ACM. Some areas contain damaged asbestos and should not be accessed without prior abatement.
2.The most common type of ACM insulation you may encounter includes thermal system insulation (TSI) and floor tile. ACM TSI is generally covered with a cloth wrap or lagging, and the asbestos substrate generally appear white in color. Do not sand, drill, gouge, or otherwise disturb this type of insulation. Contractors disturbing or releasing asbestos containing materials will be liable for all damages and cleanup costs.
3.Removal of asbestos must be addressed in the contract in the event the disturbance of asbestos is likely. If contact with asbestos occurs, stop all work in the immediate area and contact the COR or Safety Officer to make necessary arrangements for removal.
4.In some areas, asbestos insulation has been identified on elbows, between fiberglass piping insulation, as patching materials among the fiberglass insulation. Fiberglass insulation used in this facility is usually yellow or pink in color, wrapped either by cloth or paper lagging.
5.Prior to beginning construction work, all employees must review and sign the Contractor/Subcontractor/Employee Notification of Asbestos Form (Attachment 1). Once this form has been signed by all employees, it must be forwarded to the COR for documentation.
6.A complete assessment of asbestos materials and conditions is available for viewing by contacting the facility Safety Officer. Prior to performing work above any ceiling or starting in a new area, consult with the COR concerning existing conditions of ACM.
7.Some of the areas in the facility are identified as restricted areas due to the condition of ACM. These are readily labeled. Do not enter these areas unless first contacting the COR. Entry requirements to these areas are awareness of the hazards, proper protective clothing (coveralls and respirators), and personal monitoring, in accordance with OSHA Requirements.
K.Environmental Protection:
1.Adherence to environmental protection requirements is subject to continuing scrutiny from the community and backed by severe penalties such as fines and incarceration. These environmental requirements will be strictly enforced.
2.No hazardous materials will be disposed of on government property. All waste will be hauled off-site or disposed in contractor owned and operated waste removal containers.
3.A copy of all waste manifests for special or hazardous wastes will be forwarded to to the COR. Environmental requirements will be strictly enforced.
L.Permit-Required Confined Spaces:
1.Contractors performing work on this facility will follow all requirements outlined in the OSHA Standards for working in confined spaces. There are numerous permit-required confined spaces on this facility. These spaces have been identified. Some spaces have been posted, but due to their configuration, the majority has not. A complete listing of these areas is located in the Safety Office.
2.Confined spaces are areas that are large enough to be entered, have limited egress/exit potential, and are not designed for permanent human occupancy. Contact the COR if this type of space, or a space otherwise suspected of being a confined space, is located.
3.Contractors performing work in confined spaces are responsible for compliance with all applicable standards and regulations.
M.Housekeeping:
1.Protect patients and VA personnel in occupied areas from the hazards of dust, noise, construction debris, and material associated with a construction environment. Keep work area clear, clean, and free of loose debris, construction materials, and partially installed work that would create a safety hazard or interfere with VA personnel duties and traffic.
2.Wet mop occupied areas. Clean and remove any accumulation of dust and/or debris from cutting or drilling from any surface at the end of each workday.
3.Make every effort to keep dust and noise to a minimum at all times. Take special precautions to protect VA equipment from damage including excessive dust.
4.Maintain clear access to mechanical, electrical devices, equipment, and main corridors. This will ensure access to existing systems in the event of an emergency.
5.Clean area of all construction debris and dust upon completion of demolition and/or renovation.
6.During construction operations, keep existing finishes protected from damage. Cover and protect all carpets during construction. Any carpets or surfaces damaged as a result of construction activities will be replaced at the contractor’s expense.
N.Hot Work Permits:
1.Any hot work operations including cutting, welding, thermal welding, brazing, soldering, grinding, thermal spraying, thawing pipes, or any other similar activity will require a Daily Hot Work Permit to be obtained by the contractor from the Safety Officer (see Attachment 2, Cutting and Welding with PR Gas or Arc Permit Form). The contractor will be responsible for conforming to all medical center regulations, policies, and procedures concerning Hot Work Permits as outlined below:
a.Prior to the performance of hot work in patient-occupied buildings, a request for a Hot Work Permit will be made to the Fire Department.
b.The COR will inspect the area and ensure that the requirements of NFPA 241 and OSHA Standards have been satisfied. Once the Hot Work Permit is granted, it must be posted in the immediate area of the work.
c.The Hot Work Permit will apply only to the location identified on the permit. If additional areas involve hot work, additional permits must be requested. Separate fire watches will be required for each Hot Work Permit. Fire watch personnel and mechanics performing the hot work shall be trained in the use of fire extinguishers and medical center fire control procedures. Contractors will furnish their own Qualified Personnel for fire watch duties.
d.Upon completion of all hot work, the COR will be notified by the responsible individual to perform a re-inspection of the area.
2.Do not use any of the extinguishers in the medical center for standby purpose while conducting hot work. Contractors are required to supply their own Class ABC extinguishers. Medical center extinguishers are only to be used in the event of a fire.
O.Emergency Medical Services: Emergency medical services for stabilization purposes are available for contractors at this facility. For medical emergencies, dial (extension) when inside any building. Report the nature of the emergency and location. The operator will dispatch in-house personnel or coordinate outside emergency assistance based on the nature of the emergency.
P.Use of Government-Owned Material and Equipment: Use of government-owned material and equipment is prohibited.
Q.Superintendent Communications: At the beginning of the contract and prior to beginning any construction, the COR must be supplied with the telephone number for the contractor’s superintendent. The superintendent must be at the job site and available by cellular phone at all times during the performance of this contract.
R.Parking: Contractor employees shall be assigned a parking area during the preconstruction meeting.
S.Traffic:
1.Traffic hazards are minimal at this facility. Drivers should be particularly concerned with pedestrian traffic.
2.Seat belt use is mandatory on station.
3.Federal police officers maintain a 24-hour patrol of the area.
T.Contractor's Trailers: Contractor's trailers shall be located in an assigned area. All utility connections to the trailer shall be installed at the contractor’s expense. Trailer removal is required upon completion of the contract, unless approved by the COR to leave in place.
U.Smoking: No smoking is permitted in buildings or around hazardous areas. Any smoking inside a government building is subject to a fine without warning. Smoking areas will require written approval of the COR, including roofs.
V.Fluorescent, Polychlorinated Biphenyls (PCB) Containing Fixtures: All fluorescent lighting fixtures being removed as part of this project are to have their ballasts removed and turned over to the Safety Officer for disposal. All other components of the lighting fixture are to be disposed of by the contractor.
W.Road Closures: For any work requiring closure of a road or parking lot, a request for closure will be made in writing at least 5 days in advance for approval by the COR and Fire Department. Contractor-required road closures require that the contractor completes a permit and forwards it to the COR for authorization by the Fire Department. Permits will be issued for no longer than 1 week. Work lasting longer than 1 week will be authorized by multiple permits. A Permit for Road Closure Form is available in Attachment 2.

Enclosure:

1. Contractor/Subcontractor/Employee Notification of Asbestos Form

2. Cutting and Welding with PR Gas or Arc Permit Form

3. Infection Control Orientation for Construction Workers

Contractor/Subcontractor/Employee Notification of Asbestos Form The Department of Veterans Affairs Medical Center (location) was constructed during a period when asbestos was commonly used in building materials.

The medical center has completed a survey for asbestos. All buildings contain some type of asbestos (i.e., steam lines, floor ties, crawl spaces, etc.).

If you or your employee encounters suspected friable asbestos or conditions that may cause suspected asbestos to become friable, notify the Contracting Officer’s Representative (COR) immediately.

When working in areas that are suspected of having asbestos, relocate employees and patients from the area until work is completed.

If there are any questions regarding this form or asbestos in the medical center, please contact the COR at (extension).

Thank you for your assistance.

Please sign and date below as acknowledgement of the above information.

Employee Name Contractor/Subcontractor Date

Cutting and Welding with PR Gas or Arc Permit Form VA Project No: ___________________________________________________ Name of Contractor's Firm: __________________________________________ Date: ________________ Building/Location: ___________________________________________________ Work To Be Done: __________________________________________________ Special Precautions: _________________________________________________ Fire Watch Required: ____ Yes ____No The location where the work is to be performed has been examined, necessary precautions have been taken and permission is granted for this work.

Signed: _________________________________________ (Fire Department Official Authorizing Hot Work) Date Permit Expires: __________________ Time Hot Work Started: _________ Time Hot Work Completed: _________ Final Check-Up:

Work area and all adjacent areas to which sparks and heat might have spread (including floors above and below and on opposite sides of walls) were inspected 30 minutes after the work was completed and were found fire safe.

Signed: _________________________________________ (Contractor's Fire Watch)

Attention:

Before approving any cutting and welding permit, the contractor's authorized representative or their appointee shall inspect the work area and confirm that precautions have been taken to prevent fire in accordance with NFPA Standard No. 51B.

Interim Life Safety Measures/Precautions:

· Sprinklers are in service where installed.

· Cutting and welding equipment in good repair.

· Floors swept clean of combustible, non-combustible materials or flammable liquids, all wall and floor openings covered, and covers suspended beneath work to collect sparks within 10 meters (30 feet).

· When working on enclosed equipment and in confined space, equipment and area is free of flammable vapors.

· Fire watch provided during and 30 minutes after operation (60 minutes for torch-applied roofing operations).

· Portable fire extinguisher with adequate rating available in the immediate vicinity.

· Standpipe system in service where installed.

· Protection of any sprinkler heads when hot work is in close proximity.

· Smoking prohibited in immediate vicinity.

· Non-combustible shields provided when hot work is done near combustible walls, partitions, floors, roofs.

· Prohibition of hot work on pipes contacting combustible walls.

· Personnel trained in use of equipment including portable fire extinguishers and sounding a fire alarm.

Final check-up conducted after 30 minutes.

Infection Control Orientation for Construction Workers The goal of the Infection Control Program is to identify and reduce the risks of acquiring or transmitting infections among patients, employees, physicians and other licensed independent practitioners, contract service workers, volunteers, students and visitors.

During construction, renovation, and/or minor improvement projects, infectious pathogens or other hazards may be released into the air, carried on dust particles or on clothing. One such hazard is fungal organisms such as Aspergillus. Aspergillus species may be found in decaying leaves and compost, plaster and drywall, and settled dust. These organisms usually do not cause problems in healthy people, but can cause problems in a health care facility that contains many immuno-suppressed patients. Aspergillus and other fungal organisms can cause illness and rapidly fatal infections in people with certain medical conditions such as transplant patients, cancer treatment patients, and patients with lung problems or poor immunity. In addition to concern regarding Aspergillus, disruption of the potable water system during construction can result in dramatic increases in the concentrations of Legionella species that could result in cases of Legionnaires disease, which is a respiratory infection. Therefore, it is critical that you do your part to keep patients, employees, and visitors as safe and healthy as possible. We, in turn, will make conditions as safe as possible for you.

1.Medical Waste:
a.Medical waste, including sharps containers (for used needles and syringes) will be removed from construction areas prior to the start of projects.
b.If contract workers find any needles, syringes, or sharp medical objects, notify the supervisor and the Infection Control Professional immediately.
2.Barrier Walls:

Construction areas must be kept separate from patient care areas by barriers that keep dust and dirt inside the worksite. Walls must provide a complete seal of the construction area from adjacent areas at all times. Walls may be rigid or 4-6 mil thickness plastic depending on the duration or type of activity on the project. Barrier walls will be delineated in the project specific Infection Control Risk Assessment (ICRA), which must be done before the project begins.

3.Environmental Control:
a.When negative air pressure is required, it must be maintained continuously within the construction area until construction activity is completed.
b.Demolition debris must be removed in tightly fitted covered carts. Use specified traffic patterns.
c.Sticky or walk-off mats are placed immediately outside the construction zone and changed whenever necessary to control the spread of dust and dirt. They should be changed whenever they lose their effectiveness.
d.Exterior window seals are to be used to reduce the amount of outside excavation debris coming into the building.
e.If demolition chutes are used, they must be sealed when not in use. The chute and damper should be sprayed with water, as necessary, to maintain dust control.
f.Control, collection, and disposal must be provided for any drain liquid or sludge found when demolishing plumbing.
4.Traffic Control:
a.Use designated entry and exit procedures.
b.Keep all egress pathways free of debris.
c.No unauthorized personnel should be allowed to enter construction areas.
d.Use designated elevators only.
5.Cleaning:
a.Keep the construction area clean on a daily basis.
b.Dust and dirt must be kept to a minimum.
6.Workers:
a.Clothing must be free of loose soil and debris when exiting the construction area.
b.Use personal protective equipment (masks, face shields, etc.) as indicated for the task at hand.
c.Hand washing is the best method of reducing the transmission of infection. Always wash hands with soap and water after visiting the restroom, before eating or smoking, and when leaving the construction site.

Please contact the Infection Control Professional (enter pager or telephone number) with any questions regarding infection control policies or procedures.

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1.00
JB
__________________
__________________

Remove and dispose of 2 boilers. Install blank flange on all piping with drain valves, install blank flange on exhaust trunk.

GRAND TOTAL
__________________

Page 1 of

Page 1 of Page 1 of

SECTION C - CONTRACT CLAUSES

C.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/

(End of Clause)

FAR Number
Title
Date
52.204-13
SYSTEM FOR AWARD MANAGEMENT MAINTENANCE
OCT 2018
52.204-18
COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE
AUG 2020
52.212-4
CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
NOV 2023

C.2 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2024)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204–23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (DEC 2023) (Section 1634 of Pub. L. 115–91).

(3) 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115–232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015).

(5) 52.232–40, Providing Accelerated Payments to Small Business Subcontractors (MAR 2023) (31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[] (1) 52.203–6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

[] (2) 52.203–13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).

[] (3) 52.203–15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[] (4) 52.203–17, Contractor Employee Whistleblower Rights (NOV 2023) (41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

[] (5) 52.204–10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109–282) (31 U.S.C. 6101 note).

[] (6) [Reserved] [] (7) 52.204–14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).

[] (8) 52.204–15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016) (Pub. L. 111–117, section 743 of Div. C).

[X] (9) 52.204–27, Prohibition on a ByteDance Covered Application (JUN 2023) (Section 102 of Division R of Pub. L. 117–328).

[] (10) 52.204–28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (DEC 2023) (Pub. L. 115–390, title II).

[X] (11)(i) 52.204–30, Federal Acquisition Supply Chain Security Act Orders— Prohibition. (DEC 2023) (Pub. L. 115–390, title II).

[] (ii) Alternate I (DEC 2023) of 52.204–30.

[x] (12) 52.209–6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).

[] (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).

[] (14) [Reserved] [] (15) 52.219–3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT 2022) (15 U.S.C. 657a).

[] (16) 52.219–4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[] (17) [Reserved] [] (18)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

[] (ii) Alternate I (MAR 2020) of 52.219-6.

[] (19)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

[] (ii) Alternate I (MAR 2020) of 52.219-7.

[] (20) 52.219-8, Utilization of Small Business Concerns (FEB 2024) (15 U.S.C. 637(d)(2) and (3)).

[] (21)(i) 52.219–9, Small Business Subcontracting Plan (SEP 2023) (15 U.S.C. 637(d)(4)).

[] (ii) Alternate I (NOV 2016) of 52.219-9.

[] (iii) Alternate II (NOV 2016) of 52.219-9.

[] (iv) Alternate III (JUN 2020) of 52.219–9.

[] (v) Alternate IV (SEP 2023) of 52.219–9.

[] (22)(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

[] (ii) Alternate I (MAR 2020) of 52.219-13.

[] (23) 52.219–14, Limitations on Subcontracting (OCT 2022) (15 U.S.C. 657s).

[] (24) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).

[] (25) 52.219–27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (FEB 2024) (15 U.S.C. 657f).

[X] (26) (i) 52.219–28, Post-Award Small Business Program Representation (FEB 2024) (15 U.S.C. 632(a)(2)).

[] (ii) Alternate I (MAR 2020) of 52.219–28.

[] (27) 52.219–29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

[] (28) 52.219–30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).

[] (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

[x] (30) l(26) 52.219–33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).

[X] (31) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

[x] (32) 52.222–19, Child Labor—Cooperation with Authorities and Remedies (FEB 2024) (E.O. 13126).

[X] (33) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

[X] (34)(i) 52.222–26, Equal Opportunity (SEP 2016) (E.O. 11246).

[] (ii) Alternate I (FEB 1999) of 52.222-26.

[] (35)(i) 52.222–35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

[] (ii) Alternate I (JUL 2014) of 52.222-35.

[X] (36)(i) 52.222–36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

[] (ii) Alternate I (JUL 2014) of 52.222-36.

[] (37) 52.222–37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

[] (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[X] (39)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).

[] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

[] (40) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

[] (41)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008) (42 U.S.C.6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[] (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).

[] (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

[] (44)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

[] (ii) Alternate I (OCT 2015) of 52.223-13.

[] (45)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

[] (ii) Alternate I (JUN 2014) of 52.223-14.

[] (46) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

[] (47)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).

[] (ii) Alternate I (JUN 2014) of 52.223-16.

[X] (48) 52.223–18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .