549-19-191 - Pre-Bid RFI-Answers.docx

DOCX document 15 KB Posted

Attached to
Y1DA--Replace Isolation Valves & Correct Plumbing (VA-22-00108168) Federal contract opportunity
Solicitation number
36C25723B0040
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document contains answers to pre-bid requests for information (RFIs) related to solicitation number 36C25723B0040 from the Department of Veterans Affairs for project number 549-22-191 to replace isolation valves and correct plumbing at buildings 1 and 2 of the Dallas VA Medical Center. The answers indicate that asbestos reports are available, the infection control risk assessment (ICRA) level will be determined during construction but bidders should assume level IV, no additional site visits will be offered, work may require weekend and after-hours work, and the valves for replacement are in bold and within clouded areas of the drawings as specified.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--Replace Isolation Valves & Correct Plumbing (VA-22-00108168), newest first.
File Type Posted
36C25723B0040 0003.docx DOCX document
Copy of Pricing Estimation.xlsx XLSX spreadsheet
549-19-191 Pre-Bid Site Visit 04-11-2023.pdf PDF
36C25723B0040 0002.docx DOCX document
36C25723B0040 0001.docx DOCX document
2020-11-03_-_BUILDINGS_1_AND_2_IFC_DRAWINGS.pdf PDF
CD SPECIFICATIONS.pdf PDF
36C25723B0040_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFIs – PROJECT#549-19-191 – REPLACE ISOLATION VALVES & CORRECT PLUMBING BLDGS. 1&2

DALLAS VA MEDICAL CENTER

1. Please provide the asbestos hazardous material site survey report.

· See lasted ACM Reports.

1. What will the ICRA level be for this project?

· ICRA level to be determined at the time of construction. For pricing purposes, assume ICRA IV.

1. Will a second site visit be offered to contractors?

· No additional site visit will be offered at this time.

1. Will all work associated with this project able to be performed during regular working hours?

· No, weekend and after hours work will be required.

1. Please verify that the only valves to be priced for replacement are in bold and in the clouded areas of the drawings.

· Yes the valves to be replaced are in bold and within the clouded areas.