36C25723B0005 0001.pdf

PDF 93 KB Posted

Attached to
Z2DA--Correct Site Safety Deficiencies, Project 519-19-100 Federal contract opportunity
Solicitation number
36C25723B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

This document is an amendment to solicitation 36C25723B0005 for Correct Site Safety Deficiencies, Project 519-19-100 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The amendment incorporates answers to vendor questions, attaches a revised wage determination, and extends the bid due date from February 13, 2023 to February 23, 2023 at 11:00am CST. Per the answers provided, powder coating is required for all handrails and field welds should be minimized and coated with matching paint. The bid is to be submitted as a lump sum with no alternatives.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Correct Site Safety Deficiencies, Project 519-19-100, newest first.
File Type Posted
Revised Wage Determination.pdf PDF
36C25723B0005 0001_1.docx DOCX document
S04_Site Visit 20 jan23.pdf PDF
SEALED PLAN SET.pdf PDF
Construction Specifications.pdf PDF
36C25723B0005_Solicitation.docx DOCX document
S02_36C25723B0005_Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

0001 519-19-100

Department of Veterans Affairs (NCO 17) Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building #171 Temple TX 76504

Department of Veterans Affairs (NCO 17) Central Texas Veterans HCS 1901 Veterans Memorial Dr. Building 171 Temple TX 76504

To all Offerors/Bidders

36C25723B0005

X x x

02-23-2023, 11:00 am., CST

The purpose of this amendment is to:

1. Incorporate RFI answers.

2. Attach revised Wage Determination.

3. Extend the bid due date from February 13, 2023, 11:00am CST to February 23, 2023, 11:00am CST.

All other terms and conditions remain unchanged.

See attached document: Revised Wage Determination.

RFI Answers for Solicitation 36C25723B0005

Correct Site Safety Deficiencies, Project 519-19-100

1. The plans show that the proposed handrails require 2-1/2” diameter standard pipe (2.875” O.D. , 0.202” wall thickness) for the posts and 1-1/2” diameter standard pipe (1.900” O.D.) for the rails. This means that the I.D. of the post will be 0.773” larger than the O.D. of the rail. There is however no detail in the plans for a specific way to crimp or trim the posts to match the I.D. of the posts to the O.D. of the rail. Is there a certain way the posts need to be trimmed?

Answer: Pipe sizes are differentiated by approximately 3/4 “ from post to rail to accommodate a 3/8 weld on either side of the handrail joint to post.

2. The plans require “type A powder coated handrail”. The powder coating process will need to be completed in a suitable indoor environment where a heat-treating process can be performed in order to create the proper bond, finish, and hardening of the powder coating. However, installation of the handrails will require field welds which cannot be powder coated on the jobsite. Is there a required or suggested process to coat the field welds?

Answer: Handrail field welds can be coated with a suitable color matching paint but field welds should be kept to an absolute minimum.

3. The plans specify “type A powder coated handrail” on some sheets, and simply “handrail” or “type A handrail” on others. Are all of the handrail sections to be powder coated alike?

Answer: Type A powder coat is required for all handrails in the plan.

4. The bid alternatives are not shown on the bid sheet. The existing bid form shows a lump sum for the entire project. How are we to bid the project – lump sum or with alternatives? Please clarify.

Answer: The bid is lump sum.

END OF DOCUMENT