Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 549-22-1-5090-0017
549-SL-142
36C257 Department of Veterans Affairs Network Contracting Office NCO 17 2002 Scott Blvd.
Temple
TX
76504 36C257 Department of Veterans Affairs Network Contracting Office NCO 17 2002 Scott Blvd.
Temple
TX
76504 To all Offerors/Bidders
36C25722Q0132 12-17-2021
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
December 30, 2021 10:00 am CST See CONTINUATION Page X The purpose of this amendment will be as follows:
Post Questions and Answers Post Mold Survey
36C25722Q0132-P0001Mold Abatement Building 2J at Dallas VA Medical Center Questions and Answers
| 1. | Is this an open site visit or do we need to register? |
| 1a. this is an open site visit, so all are welcomed | |
| 2. | Can we get an extension to the end of the week on the 30th |
2a. Yes, a solicitation amendment will be posted with new response date and time by close of business today Site Map: 4500 S Lancaster Rd Dallas VA Building 9 Engineering circled in red 36C25722Q0132-P0002Mold Abatement Building 2J at Dallas VA Medical Center
3. Do you have an asbestos survey or mold protocol for this project?
3a. See attached survey
4. If there is an incumbent, could you please provide the current / previous contract number?
4a. This is a new requirement.
5. Is there any visible damage to floors, walls ect. from mold currently?
5a. See attached survey 6.What is the size in square feet of building 2J?
6a. See attached survey
7. What is the size in square feet of Service Bay 4?
7a. See attached survey
MOLD REMEDIATION PROTOCOL
Project Title: VAMC; Dallas, Texas - Project # 549-SL-142 Building 2J - Service Bay 1-4
Area(s) to be Remediated:
SERVICE BAY 1-4 LOCATED IN BUILDING 2J
Prepared for: VA North Texas Health Care System 4500 South Lancaster Road Dallas, Texas 75216
Prepared by:
Micro Air of Texas, Inc.
P.O. Box 1225 Dickinson, TX 77539
Eric L. Eitzen, I.H., President Licensed Mold Assessment Consultant #MAC0502 Expiration Date: March 1, 2022
MOLD REMEDIATION PROTOCOL
TABLE OF CONTENTS
Section 1 SCOPE OF WORK
· Background & Purpose
· Scope of Remediation
· Contractor Requirements
· Mold Remediation Work Practices
· General responsibilities of the Mold Remediation Contractor / Mold Assessment Consultant.
Section 2 PERSONAL PROTECTIVE EQUIPMENT AND DECONTAMINATION REQUIREMENTS
· Minimum Respiratory Protection
· Minimum Protective Clothing
· Decontamination Requirements
Section 3 POST-REMEDIATION ASSESSMENT AND CLEARANCE
· Visual Inspection
· Air Sampling
· Clearance Criteria
· Post-Clearance Requirements
| Appendix 1 | Drawings |
| Appendix 2 | Mold Air Report |
| Appendix 3 | Asbestos Information - Laboratory Report |
1. Scope of Work
1.1 Background and Purpose
Micro Air of Texas, Inc. was contracted by the VA North Texas Health Care System (VANTHCS) to prepare a Mold Remediation Protocol based on information provided to our office by our on-site Industrial Hygienist and a VA representative. According to the information received, Service Bay 1-4 located in Building 2J, had one or more steam leak(s), which have been repaired, according to the VAMC. Tape lift samples were collected in the southwest corner of this mechanical on August 3, 2021, and the results indicated that there is a relative abundance of Stachybotrys and Penicillium/Aspergillus-like molds located on the affected walls, HVAC insulation, and pipe insulation. On August 10, 2021, mold air samples were collected throughout the Service Bay 1-4 area, and the results indicated that there are airborne Stachybotrys and Penicillium/Aspergillus-like mold spores throughout the service bay area. For purposes of this document, the southwest corner of Service Bay 1-4 will be referenced as “Area 1", and the remaining portion of Service Bay 1-4 will be referenced as “Area 2" (see drawing 1 for locations of Area 1 and Area 2). Area 1 will entail a full mold remediation, while Area 2 will be limited, at this time, to cleaning and disinfecting of all surfaces.
1.2 Scope of Remediation
Area 1: This Mold Remediation Protocol includes the removal, cleaning, and disposal of all materials listed within this section (Scope of Work), that is directly impacted by visible fungal growth. The Remediation Contractor will be responsible for removing the following:
A. Remove all wallboard located inside Area 1 located in Service Bay 1-4. There is approximately 1100 SF of wallboard located in this area.
B. Remove all pipe insulation located inside Area 1 located in Service Bay 1-
4. There is approximately 300 LF of pipe insulation located in this area.
C. Remove all HVAC duct insulation located inside Area 1 located in Service Bay 1-4. There is approximately 300 SF of HVAC duct insulation located in this area.
The above listed quantities are estimates only, and were based on site conditions at the time of the on-site pre-remediation visual inspection (08/03/21). The Contractor shall be responsible for verifying all quantities and field conditions. The Contractor
M
ICRO
A
IR
OF
T
EXAS
I
NC
VA
Medical
Center;
Dallas, TX
Bldg.
2J
Mech
Rm
1-4 must supply all supervision, labor, materials, services, insurance, Texas licenses, and equipment necessary to carry out the work described herein. Mold Remediation work for this project will occur during the week (7:00 am to 4:00 pm), unless the VAMC changes the project work schedule, due to unforseen circumstances.
Area 2: This Mold Remediation Protocol also includes the cleaning and disinfecting of all surfaces located in Area 2 (see drawing 1 for the location of Area 2). Mold air samples collected throughout Service Bay 1-4 indicated that there are airborne Stachybotrys and Penicillium/Aspergillus-like mold spores throughout the service bay area. The following Scope of Work explains the cleaning processes and the order in which the remediation work will be conducted. The Remediation Contractor will be responsible for the following:
D. Contractor will construct a negative-pressure containment around the southwest corner of the Service Bay area (Area 1). The containment will encase this corner of the Service Bay, and totally seal this area off from the remaining portion of room. A fresh air vent located on the west wall must be sealed off with polyethylene sheeting and duct tape (if a dampener exists, it should be closed, as well). Contractor is cautioned to be extremely careful not to disturb any of the mold growth located in Area 1 during preparation of the containment. The pressure inside the enclosure must be a minimum of -0.02 inches water column (-0.02 in. WC) at all times, as verified by a continuously operating manometer, until final clearance has been achieved. All HEPA negative air machines will be exhausted to the exterior of the building.
E. After the negative pressure containment has been constructed in item D, the Contractor will install a minimum of three 2000 CFM rated HEPA filtration machines in Area 2. These machines will operate 24 hours per day to act as scrubbers (no exterior exhaust). The Contractor will then HEPA-vacuum and clean all surfaces, pipes, HVAC duct insulation, air handling units, etc. located within Area 2. Soap and water can be used to clean non-porous surfaces, and an EPA approved mold disinfectant(s) should be applied and wiped free after. Once this is completed, the HEPA filtration (scrubber) machines will be allowed to operate for a minimum of 12 hours to further filter the air in Area 2. After the filtration period is complete, ambient mold air samples will be collected in Area 2, and the sample results must have airborne concentrations of fungi below concentrations measured on August 10, 2021 (report is attached to this protocol). Stachybotrys mold spores of any concentration will not be allowed prior to the Contractor being authorized to proceed. If these criteria are not met for the ambient air samples collected, the area must be re-cleaned and re-tested until the sample results are acceptable.
F.
G. Following a successful cleaning / disinfecting of Area 2, the Consultant will inform the Contractor that remediation of Area 1 can begin. Contractor will maintain two HEPA filtration machines operating in Area 2 until clearance of Area 1 containment is achieved.
NOTE: Based on information from the VAMC Engineering Department, there is a fresh air intake located on the southwest wall in Area 1. This intake brings in fresh air from outside the building via the attached duct work to the air handler. The fresh air intake duct work is sealed to the opening in the exterior wall. It must be sealed before any work begins on this project. Additionally, there is a vent for the mechanical room located on the same wall that must be sealed with poly sheeting and duct tape. All return air located in Service Bay 1-4 is contained inside metal ducts. There should not be any air from the Service Bay entering the air handling system. The VAMC has requested that all of the doors on the air handling units located in Service Bay 1-4 be sealed with duct tape prior to any work occurring.
1.2.1 The Mold Remediation Contractor must prepare a Mold Remediation Work Plan, which will provide specific methods, materials, and procedures for the mold remediation project. The Work Plan must be specific to this project, and it must address, in detail, how the containment will be constructed, and how the removal of the wallboard, duct insulation, and pipe insulation will be done. The Work Plan must be provided to, and approved by, the Owner and the Mold Assessment Consultant prior to mobilization of the Contractor to the job site.
1.2.2 Prior to the start of remediation activities, the Contractor shall provide the Owner and Consultant with all applicable mold remediation licenses and training certificates for the company, supervisor(s), and workers that will be utilized during this project. This includes initial mold remediation training (and refresher courses). Workers who have successfully completed remediation work training and received a training certificate may perform mold remediation work for a period of not more than 30 days from training if:
A. The individual has submitted an application for registration to the Texas Department of Licensing and Regulation and provides proof of this.
B.
C. A copy of the training certificate is present at the work site at all times while the individual conducts mold remediation.
D. The individual is in possession of a valid government-issued photo identification at all times while performing mold remediation work.
1.2.3 Prior to the start of remediation activities, the Contractor shall provide the Owner and Consultant with insurance certificates indicating that the Contractor has Commercial General Liability insurance in the amount required by the contract supplied by the Owner. The Owner shall be listed as certificate holder, with a minimum of 30 days notice of cancellation of the policy (endorsements must be provided with the insurance certificate).
1.2.4 Prior to the start of remediation activities, the Contractor shall provide the Owner and Consultant with all Safety Data Sheets (SDS) for any product that will be utilized during the remediation project. All products must be approved by the VAMC prior to beginning the project.
1.2.5 Prior to the start of remediation activities, the Contractor shall provide the Owner and Consultant with a copy of the submitted Mold Remediation Notification (and amendments, if applicable) to the Texas Department of Licensing and Regulation.
1.2.6 Not later than one week after the completion of the mold remediation project, the Contractor shall provide the Consultant and Owner with the following:
A. A copy of the mold remediation work plan
B. Photographs of the area(s) of the mold remediation taken before and after the remediation
C. Written contract between the Owner and the Contractor
D. All invoices issued regarding the mold remediation
E. Copies of all records of mold remediation clearance issued by the Mold Assessment Consultant
1.2.7 Not later than 10 days following the project stop date, the Contractor shall provide a Certificate of Mold Damage Remediation to the Owner on the prescribed form, per TAC Title 16, Part 4, Chapter 78, Rule 78.150 of the Texas Mold Remediation Regulations. The certificate must contain the 1.2.8 required statements and signatures of the Mold Assessment Consultant and Mold Remediation Contractor.
1.3 Work Practices
1.3.1 Containment
The mold remediation project shall be performed within a negative pressure enclosure (containment) area. The containment shall include, at a minimum, two layers of 6 mil polyethylene sheeting for all critical barriers separating the interior and exterior of the containment area. A three-stage decontamination unit shall be attached to the entrance of the containment. All HVAC supply and return air vents must be wet-wiped and sealed with two layers of 6 mil poly sheeting. Essentially, all surfaces inside the contained area must be decontaminated. Air pressure within the containment must be lower than the pressure in areas adjacent to the containment and shall be maintained at a pressure of at least -0.02 inches water column at all times. Contractor shall attach a manometer to the containment area in order to continuously monitor the containment pressure until clearance has been achieved.
Prior to performing any preparation work in the containment area, the Contractor shall install air filtration machines with HEPA filters and direct the exhaust to the exterior of the building, while establishing critical barriers for the containment. No contact with or disturbance of any mold-contaminated materials will be permitted prior to the establishment of critical barriers and negative pressure within the containment area.
Throughout the remediation activities, notice signs and barrier tape will be utilized to restrict unauthorized access to the work areas. The signs shall be at least eight (8) inches by ten (10) inches in size and shall bare the word “NOTICE: Mold remediation project in progress” in black on a yellow background. The text of the signs must be legible from a distance of ten feet.
HEPA filtration machines shall be operated continuously for the duration of the project. The Mold Consultant and VAMC will determine where the machines will exhaust to the exterior of the building.
No person shall remove or dismantle any walk-in containment structure(s) or materials from a project site prior to receipt by the licensed Mold Remediation Contractor or Remediation Company overseeing the project of a written notice from a licensed Mold Assessment Consultant that the project has achieved clearance.
1.3.2 Removal
The Contractor will perform the removal and disposal of all outlined materials in accordance with current local, state, and federal regulations. All mold-affected materials shall be removed and disposed of, in as intact a state as possible, in order to minimize the disturbance of mold-contaminated materials. The Contractor shall clean and HEPA vacuum all areas located behind the removed walls. Any mold affected wood (if applicable) will be cleaned with brushes and damp wiped with an EPA approved disinfectant that the Contractor chooses. All exposed metal stud framing (if applicable) shall be thoroughly cleaned by the Contractor. Contractor shall also clean / decontaminate all exposed HVAC system components, electrical conduit, etc. within the contained area.
If the Contractor will use biocides for the mold remediation project, the biocide must be registered by the United States Environmental Protection Agency (EPA) for the intended use and its use is consistent with the manufacturer’s labeling instructions. The Contractor must provide the Owner and the Mold Assessment Consultant full information (SDS) of all such products prior to their use during this project.
The Contractor will dispose of waste materials in accordance with current local, state, and federal regulations. Waste will be containerized (e.g., bagged and sealed) in 6 mil poly bags inside the containment, the bags shall be wet- wiped and/or HEPA vacuumed prior to removal from the containment and sealed with duct tape so that no spillage will occur on the way to the Contractor’s waste container. The removal of containerized waste shall be performed along a pre-designated route and time, as authorized by the Owner and Consultant. The material will be disposed of as construction waste.
The Contractor will be responsible for routing necessary water and electricity to the containment work areas. Power and water will be provided by the Owner. Ground fault circuit interrupters (GFCI) shall be installed on all electrical circuits used within the regulated areas.
Fire extinguishers shall be installed inside and outside the containment.
Contractor’s employees shall not wear protective clothing and equipment in areas of the building outside the work area.
The Mold Assessment Consultant will not be responsible for site safety or the ways and means utilized by the Contractor.
Once remediation activities have begun, air filtration machines will run continuously for the duration of the project. Machines shall not be turned off at the end of the work shift or when work activities temporarily stop.
All Contractor submittals and project closeout documentation required for the project will be in accordance with all applicable state regulations and Section 1.2.6 of this Mold Remediation Protocol.
The Contractor will be responsible for properly completing and submitting the Mold Remediation Notification Form to the Texas Department of Licensing and Regulation. Notification shall be received by the department no less than five working days (not calendar days) prior to the anticipated start date of the activities, and shall be submitted by mail, email, or facsimile on a form specified by the department. The Contractor is responsible for payment of all notification fees. Copies of the notification (and amendments) shall be provided to the Consultant and Owner prior to the start of the project.
The Contractor will be required to either install scaffolding or utilize a lift in order to access all wallboard, pipe insulation, wall surfaces, etc. located inside of the Area 1 containment and for cleaning / disinfecting Area 2. As such, Contractor will be required to comply with OSHA 29 CFR 1926, Subpart L and M, during the construction and use of scaffolding or a lift. Contractor is responsible for all safety requirements, and the Owner and Consultant will not be responsible for site safety with regard to the use of scaffolding and a lift.
2. Personal Protective Equipment and Decontamination Requirements
2.1 Respiratory Protection: As a minimum, half-face or full-face air purifying respirators with HEPA filter cartridges must be used by anyone involved in the remediation project, including individuals entering the restricted area for supervision or any other activity until the clearance criteria have been accomplished.
2.2 Protective Clothing: The licensed mold remediation contractor shall provide and require the use of protective clothing, such as coveralls or similar whole-body clothing. Sleeves at wrists and cuffs at ankles shall be taped. Gloves and foot covering shall also be provided for any employee entering the mold remediation (restricted) area. Protect the eyes with 2.3 properly fitted goggles or a full-face respirator with HEPA filter. Goggles must be designed to prevent the entry of dust and small particles. Safety glasses or goggles with open vent holes are not acceptable. If biocides are used, the clothing to be used has to comply with the manufacturer’s recommendations.
2.4 Decontamination Requirements: Before any worker leaves the work area, work clothing must be removed inside the containment by the exit. Prior to exiting the containment, the workers will HEPA vacuum themselves and any clothing they have on under the protective suit. Workers will then exit the containment and remove respiratory protection, followed by dressing in a designated clean area outside the containment.
3. Post-Remediation Assessment and Clearance
At the conclusion of the remediation project, the licensed Mold Remediation Contractor will notify the licensed Mold Assessment Consultant that the remediation project is ready for clearance. The post-remediation assessment and clearance shall be conducted while the walk-in containment is in place. The Mold Assessment Consultant requires a minimum of 2 hours advance notice prior to the start of clearance inspection and sampling.
Clearance Procedures and Criteria:
3.1 Visual inspection of the work area by the Mold Assessment Consultant will be performed to confirm that all visible mold growth and mold contaminated materials have been properly removed and disposed of, and the work has been satisfactorily completed in compliance with the Mold Remediation Protocol and Mold Remediation Work Plan. The post-remediation visual assessment shall be conducted while the containment is in place. Clearance air sampling shall not be performed until the containment(s) has passed visual inspection. After a successful visual inspection, Contractor will be required to apply a suitable encapsulant material to all interior surfaces of Area 1 in order to lock down any remaining mold spores. Once this is completed, the HEPA filtration machines will filter the air without exhausting to the exterior of the building for a minimum of 12 hours prior to collection of clearance air samples in Area 1.
3.2 Following the minimum 12 hour filtration period, clearance air sampling will be conducted using high volume air sampling pumps and Allergenco-D® mold spore cassettes, manufactured by Environmental Monitoring Systems. The number and locations of air samples collected inside the containment(s), as well as outside the building, will be determined by the Consultant for each containment. Surface 3.3 sampling may also be performed by the Consultant, using tape-lift and/or cotton swab sampling media, in order to confirm the absence of high concentrations of mold spores on interior surfaces of the contained areas. Clearance sampling shall be performed while the walk-in containment is in place. Clearance samples will be submitted to a Texas licensed Mold Analysis Laboratory and will be analyzed in accordance with nationally-recognized analytical procedures. Results will be received within 24 hours of collection.
3.4 Clearance criteria for each containment:
1. Containment must pass visual inspection, as outlined in Sect. 3.1.
2. Clearance air sampling results must indicate that airborne mold spore levels are lower inside the containment area than ambient levels obtained outside the building and are qualitatively similar (types and relative abundances of mold spore types) to those measured outside the building at the time the sampling was performed. No levels of identifiable Stachybotrys spores are acceptable to meet the clearance criteria.
3. Surface sampling (if conducted) results must indicate “none detected”, “rare”, or “low” relative abundance of mold spores. No levels of identifiable Stachybotrys spores are acceptable to meet the clearance criteria.
3.5 Following successful clearance of the containment(s), the Consultant will inform the Contractor that clearance has been achieved. At that time, the Contractor will be authorized to dismantle the containment barriers, and they will be bagged as contaminated waste. The area will be thoroughly cleaned, and the work area will be returned to occupancy status before the Contractor vacates the project site.
3.6 Not later than one week after the completion of the mold remediation project, the Contractor shall provide the Consultant and property owner with copies of all information listed in Section 1.2.6 above, as outlined in TAC Title 16, Part 4, Chapter 78, Rule 78.150, of the Texas Mold Remediation Regulations.
3.7 Not later than 10 days following the project stop date, the Contractor shall provide a Certificate of Mold Damage Remediation to the property owner on the prescribed form, per Title 16, Part 4, Chapter 78, Rule 78.150 of the Texas Mold Remediation Regulations. The certificate must contain the required statements and signatures of the Mold Assessment Consultant and Mold Remediation Contractor, as outlined in this section.
3.8
APPENDIX 1
Q_ Q_ Q_
PHARM omcs 1D-620L
[g
EDUC OfflCE 1B-6201f
Building 2J, Service Bay 1-4 Mold Remediation Drawing#1 - Locations of Area 1 and Area 2 Area #1 • Area#2 -
Page 1 of
WA[T[NG
ClB-lB
VESTIBULE
ClB-lE
LAB WAITING
SECETARY lB-220
OFFICE
c,:
ON
-1 cc>,:::.p.,:i.
Ou b;;=d!=====::!!:=== Iu
COMMUNICATIONS
1B-223
'HARM
· FFICE
- 20K
□ g
Building 2J, Service Bay 1-4 Mold Remediation Drawing #2 - Location of Area 1 Containment
M
I VAUL \J □
B-620F
Fl.LT
1B-620PA
SERVICE BAY
1-4
Area#!
HEPA Filtration Machines can exhaust here llAJTING CIB-1B
VESTIBULE CIB-IE
W'AmNG ClB-1D )Q
TIIAVEL
18-212
LAB WAITING CID-IC
COMMUNICATIONS 1B-223
ELECTRICAL 1B-224
A )-1 e"0:'uO-l
Sl.lnF.S &
APPENDIX 2
Eurofins J3 Resources, Inc.
6110 W. 34th Street, Houston, Texas 77092 Phone: (713) 290-0221 – Fax: (713) 290-0248 j3resources.com Spore Trap Report - Total Airborne Fungal Spores
Analyst:
Jovahnny
Dominguez Scott
M.
Ward, Ph.D.
Lab
Director These results apply to the sample(s) as received. The laboratory is not responsible for concentrations which dependend on volume collected by non-laboratory personnel. Samples are analyzed according to SOP# 7-03-2, which includes a 100% scan of the trace at 200X magnification and a minimum of 20% of the trace counted at 400X magnification. Debris rank indicates loading of particulates, both biological and non-biological, which may interfere with analysis. High debris rankings (4+) may obscure small spores and/or prevent the adherence of airborne particulates. Fungal counts on samples with high debris or
'overloaded' rankings should be regarded as minimal with actual counts being higher than reported.
Blank corrections are not applied to data unless requested by the customer.
LOD
Limit of
Detection.
N/A
Not
Applicable.
TDLR
License
LAB0132
Page of
Melissa Kiser Micro Air of Texas P.O. Box 1225 Dickinson, TX 77539
Order #: Project #: Receipt Date: Analysis Date: Report Date:
Sample
Number 081021-01 081021-02 081021-03 Location Inside
Entrance/NE
Corner Southeast
Corner Northwest
Corner Volume
(liters) Debris
Rank
(0-5) Limit of
Detection
(Particles/m Total
Fungal
Count
(Spores/m
INDIVIDUAL
FUNGAL
SPORE
DETAIL
Raw
Count Spores m Raw
Count Spores m Raw
Count Spores m Alternaria Ascospores Basidiospores Cercospora-like < 1 < 1 Chaetomium Cladosporium Curvularia < 1 Drechslera-like < 1 Epicoccum < 1 Fusarium Memnoniella Nigrospora Oidium Penicillium/Aspergillus-like < 1 Pithomyces/Ulocladium Rust/Smuts/Myxomycetes/Perconia < 1 Spegazzinia Stachybotrys Tetraploa Torula Unidentified
Spores Totals
MISCELLANEOUS
PARTICLES
DETAIL
Raw
Count Particles m Raw
Count Particles m Raw
Count Particles m Hyphal
Fragments Pollen )VANTHCS - Bldg. 2J, Mech Rm 1-4
JH21129772 H2101
11-Aug-2021 11-Aug-2021 11-Aug-2021
Page 1 of Eurofins J3 Resources, Inc.
6110 W. 34th Street, Houston, Texas 77092 Phone: (713) 290-0221 – Fax: (713) 290-0248 j3resources.com Spore Trap Report - Total Airborne Fungal Spores
Melissa Kiser Micro Air of Texas P.O. Box 1225 Dickinson, TX 77539
Order #: Project #: Receipt Date: Analysis Date: Report Date:
Sample
Number 081021-04 081021-05 Location Southwest
Corner Exterior-Adj to
1-4 Volume
(liters) Debris
Rank
(0-5) Limit of
Detection
(Particles/m Total
Fungal
Count
(Spores/m
INDIVIDUAL
FUNGAL
SPORE
DETAIL
Raw
Count Spores m Raw
Count Spores m Raw
Count Spores m Alternaria < 1 Ascospores Basidiospores Cercospora-like < 1 Chaetomium Cladosporium Curvularia < 1 < 1 Drechslera-like Epicoccum Fusarium Memnoniella Nigrospora Oidium Penicillium/Aspergillus-like Pithomyces/Ulocladium Rust/Smuts/Myxomycetes/Perconia Spegazzinia Stachybotrys Tetraploa Torula < 1 Unidentified
Spores Totals
MISCELLANEOUS
PARTICLES
DETAIL
Raw
Count Particles m Raw
Count Particles m Raw
Count Particles m Hyphal
Fragments Pollen )VANTHCS - Bldg. 2J, Mech Rm 1-4
JH21129772 H2101
11-Aug-2021 11-Aug-2021 11-Aug-2021
Page 1 of Eurofins J3 Resources, Inc.
6110 W. 34th Street, Houston, Texas 77092 Phone: (713) 290-0221 – Fax: (713) 290-0248 j3resources.com Qualitative Fungal Spore Investigation of Bulk Samples
Page of
Milissa Kiser Micro Air of Texas P.O. Box 1225 Dickinson, TX 77539
Order #: Project #: Receipt Date: Analysis Date:
JH21129772
H2101 11-Aug-2021 11-Aug-2021
Page 1 of
VANTHCS - Bldg. 2J, Mech Rm 1-4
Report Date: 11-Aug-2021
Page 1 of
Sample
ID
| Material Description |
| Media |
Type
| Fungal Structures Identified |
| Relative |
Abundance
T-01
Tapelift - White AHU, Top
Tape Stachybotrys Nigrospora Alternaria Moderate* Rare* Rare*
T-02
Tapelift - Silver AHU, Top
Tape Chaetomium Stachybotrys Cladosporium High* Low* Rare*
Relative Abundance (Fungal Structures): Rare= < 10; Low= 10-100; Moderate= 101-1000; High= > 1000
* Denotes presence of hyphal growth structures
Analyst:
Jovahnny Dominguez
Scott M. Ward, Ph.D.
Lab Director
These results relate only to the sample(s) submitted. This report is for the exclusive use of the addressed client and shall not be reproduced except in full without written approval by Eurofins J3 Resources, Inc. Samples were received in acceptable condition unless stated otherwise on this report. Samples are analyzed according to SOP# 7-03-3, which is solely qualitative; indications of relative abundance are based solely on a visual estimation of the sample submitted. A “Rare” designation implies a very low occurrence consistent with a random occurrence/background concentration. Penicllium/Aspergillus-like fungal spores references spherical, morphologically indistinguishable 2-6µm spores. Only the top three fungal spores in relative abundance, unless noted otherwise, are reported. There is no current data supporting a critical or threshold exposure limit to fungal aeroallergens. Blank corrections are not applied to data unless requested by the customer. To date, occupational health related organizations, such as OSHA and NIOSH have not established Permissible Exposure Limits or Recommended Action Levels, or other limit values for aeroallergens.
TDLR License LAB0132
Page 1 of
MICRO AIR OF TEXAS2 INC. I ZC/772
P.O. Box 1225 Dickinson, TX 77539 281- 280-9965 281- 280-9847 (fax)
Licensed Asbestos Consultants Industrial Hygiene Services Environmental Site Assessments Indoor Air Quality/ Mold/ Lead I Radon Testing
Licensed, Accredi1ed Laboratory
MOLD AIR SAMPLE DATA SHEET
EMAIL/
PHONE
RESULTS
TO:
| SAMPLE ID# |
| SAMPLE LOCATION |
| START I TIME |
| STOP I |
TIME
TOTAL I
TIME
FLOW RATE
(1pm)
VOLUME
(L)
| TEMP. |
| rh |
SAMPLES
COLLECTED
BY:
SAMPLES
RECEIVED
TN
LAB
BY
(DATE):
V
REQUESTE
D
LA
B
TURNAROUN
TIME
C:.re e:d ;r: 1\:tbo::. D t. i-t i,5•:"•:\:V-l H·:.· s:D -::i ·;:-•• :.:-:··-:
G tf6-\C- ct\
u) oma;
)tb--g 111---
\d J> i t F\,, Rm i-L\ -i- o\a Nr- 5o°'p 5
□ 1\:t··J·
B-520 iii )'.J c=- (l) .,:ir
)WI\ITING
ClB-1B
I
I
| 1=_= 1'%ln11·1 | - | ||
| 1,r u | I!, | C,l>r | •l>V |
rn ·-_-st;:c :· l?<S::lF: ·:=r
)ClB-lE
RECEP
)_I1::i 1,2..5 :-222 r OYT'J1 □1i=,,,= ,,.,,::;.;.:::,,:.:: ;::;J
OFFICE
7j )-2:?.t!ril J 1 lB-222" ~1
5ou-\-n £n\fuoce
APPENDIX 3
6110 W. 34th Street, Houston, Texas 77092 Phone: (713) 290-0221 - Fax: (713) 290-0248 J3Resources.com
Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM) Appx E Sub E 40 CFR 763 / EPA 600/R-93/116
Arnold
Flores Analyst Scott
Ward, Ph.D.
Lab
Director These results apply to the sample(s) as received. This report is for the exclusive use of the addressed client and shall not be reproduced except in full, without written approval by
Eurofins
J3 Resources, Inc. (EJ3).
Samples are analyzed according to the methods listed above and are subject to the inherent limitations of PLM and interference of matrix components. Reporting limit for the above method is a function of the quantity of sample analyzed, matrix interference, sample preparation, fiber size, and distribution.
Asbestos may be detected in concentrations of <1% by area if sufficient material is analyzed. EJ3 recommends TEM confirmation of soils, vermiculite and non-friable organically bound materials (NOB) reported as None Detected or < 1% Asbestos by PLM. All samples received in good condition unless otherwise noted. This report shall not be used to claim product approval, certification, or endorsement by NVLAP, NIST, or any agency of the federal government.
Page of
NVLAP
Lab
Code:
200525-0
TDSHS
License:
30-0273 Jennifer McMillin Micro Air of Texas
Order #:
Project #:
JH21129617
A2101
Page 1 of PO Box 1225 Dickinson TX 77539
| Date Received: | 04-Aug-2021 |
| Date Analyzed: | 04-Aug-2021 |
| Date Reported: | 09-Aug-2021 |
VANTHCS-Dallas - Bldg 2J, 1st Flr, Mech Rm 1-4
Sample ID #
Sample Description
| Asbestos Constituents |
| Non-Asbestos Constituents |
| 080321-01 |
| LAYER 1 |
Joint Compound, White, Homogeneous
| None Detected |
| Non-Fibrous Material |
| 100% |
| LAYER 2 |
| None Detected |
| Cellulose Fiber |
| 10% |
Wallboard, Brown/ White, Homogeneous
| Fibrous Glass |
| <1 |
| Non-Fibrous Material |
| 90% |
| 080321-02 |
| LAYER 1 |
Joint Compound, White, Homogeneous
| None Detected |
| Non-Fibrous Material |
| 100% |
| LAYER 2 |
| None Detected |
| Cellulose Fiber |
| 10% |
Wallboard, Brown/ White, Homogeneous
| Fibrous Glass |
| <1 |
| Non-Fibrous Material |
| 90% |
| 080321-03 |
| LAYER 1 |
Joint Compound, White, Homogeneous
| None Detected |
| Non-Fibrous Material |
| 100% |
LAYER 2
Wallboard, Brown/ White, Homogeneous
| None Detected |
| Cellulose Fiber Fibrous Glass |
| 10% |
<1
| Non-Fibrous Material |
| 90% |
| 080321-04 |
| LAYER 1 |
Mastic, White, Homogeneous
| None Detected |
| Non-Fibrous Material |
| 100% |
| LAYER 2 |
| None Detected |
| Cellulose Fiber |
| 45% |
Paper/ Foil Wrap, White/ Silver,
| Fibrous Glass |
| 10% |
Homogeneous
| Non-Fibrous Material |
| 45% |
| LAYER 3 |
| None Detected |
| Mineral Wool |
| 95% |
Insulation, Yellow, Homogeneous
| Non-Fibrous Material |
| 5% |
6110 W. 34th Street, Houston, Texas 77092 Phone: (713) 290-0221 - Fax: (713) 290-0248 J3Resources.com
Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM) Appx E Sub E 40 CFR 763 / EPA 600/R-93/116
Jennifer McMillin Micro Air of Texas
Order #:
Project #:
JH21129617
A2101
Page 1 of PO Box 1225 Dickinson TX 77539
| Date Received: | 04-Aug-2021 |
| Date Analyzed: | 04-Aug-2021 |
| Date Reported: | 09-Aug-2021 |
| Asbestos Constituents |
| Non-Asbestos Constituents |
| 080321-05 |
| LAYER 1 |
Mastic, White, Homogeneous
| None Detected |
| Non-Fibrous Material |
| 100% |
| LAYER 2 |
| None Detected |
| Cellulose Fiber |
| 45% |
Paper/ Foil Wrap, White/ Silver,
| Fibrous Glass |
| 10% |
Homogeneous
| Non-Fibrous Material |
| 45% |
| LAYER 3 |
| None Detected |
| Mineral Wool |
| 95% |
Insulation, Yellow, Homogeneous
| Non-Fibrous Material |
| 5% |
| 080321-06 |
| LAYER 1 |
Mastic, White, Homogeneous
| None Detected |
| Non-Fibrous Material |
| 100% |
| LAYER 2 |
| None Detected |
| Cellulose Fiber |
| 45% |
Paper/ Foil Wrap, White/ Silver,
| Fibrous Glass |
| 10% |
Homogeneous
| Non-Fibrous Material |
| 45% |
| LAYER 3 |
| None Detected |
| Mineral Wool |
| 95% |
Insulation, Yellow, Homogeneous
| Non-Fibrous Material |
| 5% |
| 080321-07 |
| LAYER 1 |
| None Detected |
| Wollastonite |
| 3% |
Mastic, White, Homogeneous
| Non-Fibrous Material |
| 97% |
| LAYER 2 |
| None Detected |
| Cellulose Fiber |
| 45% |
Paper/ Foil Wrap, White/ Silver,
| Fibrous Glass |
| 10% |
Homogeneous
| Non-Fibrous Material |
| 45% |
| LAYER 3 |
| None Detected |
| Mineral Wool |
| 95% |
Insulation, Yellow, Homogeneous
| Non-Fibrous Material |
| 5% |
6110 W. 34th Street, Houston, Texas 77092 Phone: (713) 290-0221 - Fax: (713) 290-0248 J3Resources.com
Bulk Asbestos Fiber Analysis by Polarized Light Microscopy (PLM) Appx E Sub E 40 CFR 763 / EPA 600/R-93/116
Jennifer McMillin Micro Air of Texas
Order #:
Project #:
JH21129617
A2101
Page 1 of PO Box 1225 Dickinson TX 77539
| Date Received: | 04-Aug-2021 |
| Date Analyzed: | 04-Aug-2021 |
| Date Reported: | 09-Aug-2021 |
| Asbestos Constituents |
| Non-Asbestos Constituents |
| 080321-08 |
| LAYER 1 |
| None Detected |
| Wollastonite |
| 3% |
Mastic, White, Homogeneous
| Non-Fibrous Material |
| 97% |
| LAYER 2 |
| None Detected |
| Cellulose Fiber |
| 45% |
Paper/ Foil Wrap, White/ Silver,
| Fibrous Glass |
| 10% |
Homogeneous
| Non-Fibrous Material |
| 45% |
| LAYER 3 |
| None Detected |
| Mineral Wool |
| 95% |
Insulation, Yellow, Homogeneous
| Non-Fibrous Material |
| 5% |
| 080321-09 |
| LAYER 1 |
| None Detected |
| Wollastonite |
| 3% |
Mastic, White, Homogeneous
| Non-Fibrous Material |
| 97% |
| LAYER 2 |
| None Detected |
| Cellulose Fiber |
| 45% |
Paper/ Foil Wrap, White/ Silver,
| Fibrous Glass |
| 10% |
Homogeneous
| Non-Fibrous Material |
| 45% |
| LAYER 3 |
| None Detected |
| Mineral Wool |
| 95% |
Insulation, Yellow, Homogeneous
| Non-Fibrous Material |
| 5% |
MICRO
AIR
OF
TEXAS,
INC.
P.O. Box 1225 Dickinson, TX 77539
(281) 280-9965
BULK SAMPLE DATA SHEET
| Analyze All Collected Samples: | Analyze on a Positive Stop Basis: 0 |
| Client: VANT\,\t - Da\\as |
I \ Sampling Location (Bldg.): lbtdc a:1' :i. -\ F\r
| f('Jf\ (}_ | -i-L\ | I |
| Date: CS- [;).. i. |
| MAT Project# |
| A i.01- |
Field Sample
ID
Lab Sample
| Sample Description |
| Homo. |
Area No.
| Sample Location |
| Total Quantity of Matl. |
Photo Sample Result (+/-)
Q"@ol\" -0( s i
5ou\n UJO.\\
-Od
Of-th \J)Q.\\
-0--
,1
L()e-=5-\- Lt)0J\
-0
| \.\-VAi Q u -\- | ||
| :tf\ l) \ - | f" | I |
t1.
-l\\c- t()of-\h .,o{)\J
-D5
Luh-\- t,urop, W n\-- Ma -\)c, I ' I
- UOC\\J
-Dln
| - | |
| ' ' | I |
- Re.,h)r()
,b'
-Ol
T I - '5'\tal rn(\'=> - Pe.a-\too lr\,J) At -\o u"tV> l l_"\r\ \\
-0i t--\P n.n l'1l"
-09
| \.l |
| I |
| \ |
| I |
| { ( |
i
SAMPLING
PERFORMED
BY
11.
-fflc.ak a
D iM._.
ANALYSIS
TO
BE
PERFORMED:
TEM
OTHER:
Turn
Around
Time
Requested-':>=------------ Laboratory
Cost per
Sample -------------------1
TRANSFERRE
D
TO
Dat e Emai l
Result s to
{V\ e
-oe
(o a c l
1'" 1--------=---r----Ti_m e
-:rt-rt-=--1
M
,r·,,ft'@>QOl'-l!DVV)
REC'D.
IN
LAB
BY
Date ?I Comments:
Time q '2, )CHAIN OF CUSTODY INFORMATION:
Created m TurboCAO LTE (1,vvi,w lfvlSlDes1gn conai t-J
)11 PHARM OFFICE IB-5201
g [J
EDUC OFFICE
18-520W
LOUNGE
IB-5 0N
_c_-t:- --
FLLT
1B-520PA
FLLT
520/'---
□ □ '-C
)MLLTS V
B-520R
SERVICE BAY
1-4
0">1
u. f;:/'J ,'Olf2 9-'d-lO )
Q.1 O 'QO
)ST.CHIE 8-520AC
ELECTRICAL
1-48 o?J =
WAITING
ClB-1B
OFFICE/CHIEF;
1B-520SA
BMS STOR. 18-226
------,--,---,,--, 1-·-
)STAIRr- - ,r-
'1_!_"L :_ -
VESTIBULE
C1B-1E
500-\r) £0\i'Gnee
/,1
)§ JI
SECETARY 18-220
BOFFIC-E
IB-220A
SECETARY
18-221
OFFICE 18-222B
UTRITION THERAPY 1B-222A
ON
)0--, u )""Ou''"-' image43.jpeg image44.jpeg image45.jpeg image46.png image47.jpeg image48.png image49.png image50.png image51.png image52.png image53.png image54.png image55.png image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image16.jpeg image1.png image17.jpeg image18.jpeg image19.jpeg image20.jpeg image21.jpeg image22.jpeg image24.jpeg image23.png image2.jpeg image25.jpeg image26.jpeg image27.png image28.jpeg image29.jpeg image30.jpeg image31.jpeg image32.jpeg image33.png image34.jpeg image35.jpeg image36.jpeg image37.jpeg image38.jpeg image39.jpeg image40.jpeg image41.jpeg image42.jpeg