36C25721Q1096 0002_1.docx
DOCX document 374 KB Posted
- Solicitation number
- 36C25721Q1096
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25721Q1096 0003.docx | DOCX document | |
| 36C25721Q1096 0002.pdf | ||
| 36C25721Q1096 Questions_Answers.pdf | ||
| 36C25721Q1096 0001_1.docx | DOCX document | |
| 36C25721Q1096 0001.docx | DOCX document | |
| S02 - 15-5261 Wage Determination McLennan County Waco Texas.docx | DOCX document | |
| S02 - 36C25721Q1096_1.docx | DOCX document | |
| 36C25721Q1096.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to a Previous Combined Solicitation
Amendment to a Previous Combined Solicitation
| SUBJECT* |
| Switchgear and Circuit Breaker Testing at the Waco VA Questions and Answers |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 78240 |
| SOLICITATION NUMBER* |
| 36C25721Q1096 |
| RESPONSE DATE/TIME/ZONE |
| 07-30-2021 4:00 PM CENTRAL TIME, CHICAGO, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
SET-ASIDE
| PRODUCT SERVICE CODE* |
| J059 |
| NAICS CODE* |
| 238210 |
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs VISN17 Network Contracting Activity 5441 Babcock Road Ste. 302 San Antonio TX 78240
POINT OF CONTACT*
Contract Specialist T Miller t.miller@va.gov 210-694-6323
PLACE OF PERFORMANCE
| ADDRESS |
| Central Texas Veterans Health Care Facility |
4800 Memorial Drive
Waco, Texas, 76711
POSTAL CODE
| COUNTRY |
| USA |
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
| AGENCY CONTACT’S EMAIL ADDRESS |
| t.miller@va.gov |
| EMAIL DESCRIPTION |
| Contract Specialist |
DESCRIPTION
The purpose of this amendment is to incorporate the following changes:
1.) Attach Technical Questions and Answers.
Questions/Answers
Q: We would like either the model number or type (50/51, overcurrent, differential, under-voltage, etc.) of electromechanical relays, quantity 24. If they are standard overcurrent, or ground relays that is fine, however, if they are not these, then we need to know what they are, because the testing time will increase.
A: We have 53’s not 50/51 See picture below:
Q: Can you tell us if there any drawings or one lines for the existing 15kV SWGR?
A: Yes, there are drawings in the building. They are old style blueprints and cannot be removed from the building.
Q: What are the requirements for Infection Control Risk Assessment? The contractor must comply with the requirements for Type C/Class II (Lowest Risk) Infection Control Risk Assessment (ICRA) A: This clause will always be enclosed in a contract in case the contractor has to go into a patient care building.
Q: Can we get clarification on the following requirement? There was a number of people attending the site walk and there were no COVID restrictions at that time. Contractor personnel will bid by all federal codes and regulations of COVID-19 while working on the government premises.
A: If the contractor is working in a patient care building, they will have to a COVID test.
Q: Need verification that we will not be required to provide generator power during the outages. The questions was brought up during the site walk and the VA rep. indicated that this would not be required. Contractor will need to provide temporary during shuts downs to patient care buildings if power is turned off to those buildings during the performance of work.
A: The contractor will not need temporary; the VA has backup generator power for buildings that are down.
Q: Warranty Period need clarification on what the VA requirement is for warranty on this older equipment? Is this statement in there in the case we provide some new or replacement? Contractor must provide one (1) year warranty on parts and labor.
A: The government requires a warranty period on all services perform if something goes wrong after the completion of the project. That is why we ask for deficiency report after to clarify any issues and fix them right then.
Q: Would like to know if the VA can schedule back to back outages, for instance can they schedule an outage on 2 circuits on a Thursday night, 2 other circuits on Friday night and a full outage Saturday during the day.
A: We can look at scheduling back to back outages starting Wednesday night 2 circuits Thursday night 2 circuits, and the full outage Saturday night. We would need a 2-week head notice for leadership to be informed, fill all generators, and obtain spot coolers for patient building. The main reason if something goes wrong, we can still go to parts warehouse to get stuff if needed.
See attached document: 36C25721Q1096 0002.
See attached document: 36C25721Q1096 Questions_Answers.
| *= Required Field |
| Amendment to a Previous Combined Solicitation |
Page 1 of
Amendment to a Previous Combined Solicitation image1.png
File details come from the government source that posted it. Updated .