This document is an amendment to a solicitation for annual inspections and maintenance of two chillers and two cooling towers at a Veterans Affairs medical facility. The amendment provides answers to four questions from potential offerors. It clarifies that replacing air intake louvers would be considered a repair rather than maintenance, and maintenance is only required for the chillers, cooling towers, and condenser water pumps, not chilled water pumps. It also confirms the tanks are considered non-confined spaces, and that the price schedule in the solicitation requires one annual inspection per piece of equipment. No changes were made to the response due date. The amendment serves to address offeror questions on scope and requirements for the underlying solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25721Q0837 0001_1.docx | DOCX document | |
| 36C25721Q0837_1.docx | DOCX document | |
| 36C25721Q0837.pdf | ||
| Wage Determination 2015-5293 Rev 16 Dated 12-20-2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRAC T ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this am endment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, rema ins unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0001 06-04-2021
671-21-3-5060-0068
36C257
Department of Veterans Affairs VISN17 Network Contracting Activity
7400 Merton Minter Blvd. (10N17/90C) San Antonio TX 78229
36C257
Department of Veterans Affairs VISN17 Network Contracting Activity
7400 Merton Minter Blvd. (10N17/90C) San Antonio TX 78229
To all Offerors/Bidders
36C25721Q0837
X
X
See CONTINUATION Page
X 1
The purpose of this amendment is to:
1. Post the questions and answers received in response to this RFQ.
2. The due date of quotes has NOT changed.
3. All other terms and conditions remain the same.
36C25721Q0837
Questions and Answers
Question #1
5.3.1.1 Clean and/or Replace Air intake Louvers, Clean Cooling Tower Water Basins.
Should the "Replace Air Intake Louvers" not be part of the maintenance but be part of the major repairs? Will it be okay to exclude replacing the louvers in our Annual Inspection Bid? We can price new louvers separately when identified. Cleaning will be a part of the maintenance, if Air
Intake Louvers need to be replaced then we can charge against line item for Parts but they must be at a minimum cleaned annually.
Question# 2
Section 5.3.1.5 Condenser Water Pumps – Are these pumps included in the bid? If so, are the chilled water pumps also included? Table 1 on Page 4 only shows the two chiller and two cooling towers.
There is no maintenance on the chiller water pumps just the condenser water pumps?
Maintenance is only the two chillers and two cooling towers and condenser water pumps. Chill
Water Pumps will be handled separately as needed.
Question #3
Section 5.3.1.8 Condensing water sumps – Has there been an air quality test performed for the sump tank? Our proposal will assume that the tank is safe to access. Our Safety Rep can test if needed but all tanks before entering should be tested. These tanks are well ventilated and there has never been an issue when having to go into the tanks but we do have the Safety Rep check air quality. These tanks are not considered confined space.
Question #4
B.3 PRICE/COST SCHEDULE – The price schedule shows “Quantity 2 Unit JB” for the services for both the chillers and the cooling towers. Does this mean (2) inspections per year –
(1) annual inspection and (1) semi-annual inspection? If not, can you please clarify? This means one inspection annually per chiller and per cooling tower. There is two chillers for annual inspection and maintenance on each and two cooling towers annual inspection and maintenance on each.