07-13 Contract Opportunity Combined Synopsis/Solicitation Notice
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Combined Synopsis/Solicitation Notice N041 Installation of AC units in police server, police offices and controls for RTU and exhaust fans 76504 36C25720Q0265 02-03-2020 N
SDVOSBC
238220 Department of Veterans Affairs
NCO 17
2002 Scott Blvd Temple TX 76504 Lynn Pettit Corpus Christi Outpatient Clinic 5283 Old Brownsville Rd Corpus Christi TX 78405
USA
Lynn.Pettit@va.gov
COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS
General Information
| Document Type: |
| Combined Solicitation/Synopsis |
| Solicitation Number: |
| 36C257-20-Q-0265 |
| Posted Date: |
| January 21, 2020 |
| Original Response Date: |
| February 3, 2020 4:30PM CST |
Current Response Date:
Site Visit Date:
Questions from Solicitation and Site Visit:
February 3, 2020 4:30PM CST January 29, 2020 10:30AM CST January 30, 2020 12:00PM CST
| Product or Service Code: |
| N – Equipment Installation |
| Set Aside (SDVOSB/VOSB): |
| SDVOSB Set Aside |
| NAICS Code: |
| 238220 |
Contracting Office Address Network Contracting Office 17 2002 Scott Blvd.
Temple, TX 76504 Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation document will not be issued.
| L/I# |
| DESCRIPTION |
| QUANTITY |
| UNIT |
| COST |
| 1 |
| EXHAUST CONTROLS |
| 1 |
| JB |
| 2 |
| POLICE SERVER AND POLICE MINI SPLIT |
| 1 |
| JB |
This solicitation is a request for quotations (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2020-03.
The associated North American Industrial Classification System (NAICS) code for this procurement is 238220, with a small business size standard of $16.5M.
The Network Contracting Office 17, 2002 Scott Blvd., Temple, TX 76504 is seeking to purchase installation of AC units in Police Server, Police Office and Controls for roof top units and exhaust fans at the Corpus Christi Outpatient Clinic (CCOPC).
All interested companies shall provide a quotation for the following:
SCOPE OF WORK
For Installation of AC units in Police Server, Police Offices and Controls for RTU and Exhaust Fans
-- Services --
Provide:
1. Professional construction services to include but not limited to:
a. Site investigation- mechanical, electrical, plastering, painting and construction Construction period of services- Furnish and Install all items per plan and specification as shown documents Project: Installation of AC units in Police Server, Police Office and Controls for RTU and Exhaust Fans.
b. Infection Control Risk Assessment.
-- Documentation and Acronyms --
Applicable Documents:
2. The following laws, regulations, policies, and procedures in effect on date of contract issuance and all subsequent changes or updates apply:
a. Federal Acquisition Regulation
b. Veterans Administration Acquisition Regulation
c. Service Contract Act (SCA) Directory of Occupations (Fifth edition) http://www.dol.gov/whd/contracts/sca.htm
d. ANSI: https://pdflakekxng.files.wordpress.com/2015/04/ansi-z133-safety-standard-pdf.pdf
e. VA Directive 0058- VA Green Purchasing Program
f. VA Directive 0057- VA Environmental Program
g. Master Construction Specification: https://www.cfm.va.gov/TIL/spec.asp#03 Acronyms:
3. Glossary: Acronyms used in this SOW are listed below for easy reference:
| a. CO | Contracting Officer |
| b. COR | Contracting Officer’s Representative |
| c. FAR | Federal Acquisition Regulation |
| d. CFM | Construction & Facilities Management |
| e. VA | Veteran Affairs |
| f. EPA | Environmental Protection Agency |
| g. PPE | Personal Protective Equipment |
| h. SOW | Statement of Work |
| i. OSHA | Occupational Safety and Health Administration |
-- Project Scope --
GENERAL:
4. VA Valley Coastal Bend Health Care Services intends to issue a construction contract. The project consists of:
a. The Contractor shall provide all labor, transportation, materials, equipment, and supervision required installation of AC units in Police Server, Police Office and Controls for RTU and Exhaust Fans. Corpus Christi Outpatient Clinic VA Valley Coastal Bend Health Care Services, located at 5283 Old Brownsville Road, Corpus Christi, Texas.
SPECIFICS:
5. Front End existing carrier front end.
a. Provide and program floor plans for first and second floor
b. Undated existing roof plan to show new equipment.
c. Control installation with a factory es certified.
6. Installation of control RTU 1, 2,4 remotely with Carrier iVu Control System.
a. Provide and install transform, relays, terminal strips and wire duct in each unit as needed for proper operation and neatness.
b. Provide labeling of all wires.
c. Provide and install 10K type 2 supply air temperature sensor mounted in SA of RTU.
d. Provide control and programming for RTU’s.
e. OPN-RTUM2 BACnet controllers will provided and installed.
f. Provide and install ZS2P-CAR space sensor for provide controls.
g. Provide all wiring need for installation of job.
h. Provide and install RA temp
i. All electrical wiring will need to be inside electrical conduit and label in accordance with VA Policy and Guidance.
7. Installation of controls and monitoring for all exhaust fans.
a. Provide and install all new exhaust fans on the first and second roof.
b. Provide and install transform, relays, terminal strips and wire duct in each unit as needed for proper operations and neatness of panel.
c. Provide labeling of all wires
d. Provide and install CT’s on all exhaust fans for status.
e. Provide control and programming for fans.
f. Provide and install OPN-UC-BACnet controller for exhaust fans in an enclosure
g. Provide all wiring needed for installation of job.
8. Installation of AC units in room 1A-113 and 1A-111 remotely monitor with existing Carrier iVu Control System.
a. The contractor will install mini split 12000 BTU, 230-volt, single zone unit with disconnect including 55’ of control wire and 25’ line set.
b. Back net compatible.
c. The units will be connected to back up power. All electrical wiring will need to be inside electrical conduit and label in accordance with VA Policy and Guidance.
9. Installation of temperature monitoring device IT Server Room and Police server room on second floor.
a. Provide and install temperature monitoring equipment in rooms: 142 and 221.
b. Connect monitoring system to existing Carrier iVu control system.
c. All electrical wiring will need to be inside electrical conduit and label in accordance with VA Policy and Guidance.
10. All penetration through smoke wall need to be fire caulk in accordance with VA policy and guidance.
11. Work to be scheduled to interfere as little as possible with normal VA operations.
Other Specifics:
12. Prime Contractor to plan all phasing of work in coordination with Hospital staff to minimize down-time to areas affected by the project.
13. Construction Waste Management, Specification 01 74 19 is to be included.
14. Prime Contractor to maintain all infection control/ dust prevention measures required.
15. Contractor will get all Permits Necessary to complete the project.
16. Consolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process.
17. Contractor will submit picture of affected area before, during, and after construction or testing.
-- Site Investigation --
Expectation: Contractors will make site visits as necessary to survey existing conditions.
18. Make site visit as required to determine existing as-built conditions affecting this project.
a. Provide any structural, architectural, electrical, and mechanical investigation work including interior site work, of both existing and designed systems necessary to insure the accuracy of the design.
b. Provide any measured drawings of existing systems of facility required to insure the accuracy of the design.
-- Environmental/Occupational Safety and health (EOSH) --
Expectation: All projects and project designs shall contain language that addresses all applicable EOSH requirements.
19. Regulatory Compliance- EOSH requirements for work performed at the above location can be found in:
a. Volume 29 of the Code of Federal Regulations, Part 1910- Occupational Safety for General industry.
b. Volume 29 of the Code of Federal Regulations, Part 1926- Occupational Safety for the Construction Industry.
c. Volume 40 of Code of Federal Regulations, Protecting of the Environment.
d. Volume 49 of the Code of Federal Regulations, Part 397- Transportation of Hazardous Materials.
Specification: The VA Master Construction Specification contains work procedures and material requirements designed to meet regulatory compliance requirements. Whenever possible, the Master Construction Specification must be used as the basis for the project designs.
20. Contractor and Subcontractor to following specifications:
a. 01 00 00 General Requirements
b. 01 32 16.17 Project Schedules
c. 01 33 23 Shop Drawings, Product Data, and Samples
d. 01 35 26 Safety Requirements
e. 01 42 19 Reference Standards
f. 01 74 19 Construction Waste Management
g. 01 81 11 Sustainable Design Requirements
h. 01 91 00 General Commissioning Requirements
i. 02 21 13 Site Surveys
j. 02 41 00 Demolition
k. 23 05 11 Common Work Results for HVAC
l. 23 05 12 General Motors Requirements for HVAC and Steam Generation Equipment
m. 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
n. 23 05 93 Testing, Adjusting, and Balancing for HVAC
o. 23 08 00 Commissioning of HVAC Systems
p. 23 11 23 Facility Natural-Gas Piping
q. 23 40 00 HVAC Air Cleaning Devices
r. 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units
s. 26 05 11 Requirements for Electrical installations
t. 26 05 19 Low-Voltage Electrical Power Conductors and Cables
u. 26 05 33 Raceway and Boxes for Electrical Systems
v. 26 27 26 Wiring Devices
w. 26 29 21 Enclosed Switches and Circuit Breakers
x. 26 51 00 Interior Lighting
y. National Electrical Code (NEC) 2017 Edition
z. NFPA 99 standard for Health Care Facilities
aa. C2 national Electrical Safety Code
ab. VA HVAC Design manual November 2017
-- Location/Hours/Deliverables --
Performance Location:
21. The Contractor shall provide all labor, transportation, materials, equipment, and supervision required to required installation of AC units in Police Server, Police Office and Controls for RTU and Exhaust Fans. Corpus Christi Outpatient Clinic VA Valley Coastal Bend Health Care Services, located at 5283 Old Brownsville Road, Corpus Christi, Texas.
Hours:
22. Work is to be performed on Monday to Friday at 5:00PM – 12:00 AM, Saturday and Sunday from 0800AM to 6:00PM. Contractor access will be provided during this time, except special federal holidays.
23. The contractor will not have any personnel on site any other day without the proper approval from the COR.
Deliverables:
24. The Contractor will submit a daily log, pictures, work performed each time services is render.
-- Contractor Personnel and Management --
Contractor Personnel:
25. The Contractor shall be responsible for employing qualified personnel to perform the work specified in this SOW. The Contractor shall make sure that subcontractor and employees have proper documentation to authorize personnel to work in the United States of America. The Contractor shall maintain the personnel, organization and administrative control necessary to ensure that the work delivered meets the contract specifications and requirements.
26. The Contractor is required that all subcontractor or employees have been screen by the VHA VCB Harlingen Healthcare System. All personnel are required to wear a VA government furnished badge. All contractor and subcontractor are required to wear a government and company furnish badge while performing services under this contract. The badge will contain a personal picture, name of employee, and Contractor's name. Badges shall be worn on the outer garment attached to the outer shirt or jacket pocket by a button or clip or worn around the neck secured by an appropriate identification card lanyard.
27. Government issued identification badge remains the property of the Government and shall be returned to the issuing office or other designated Government personnel upon transfer of Contractor employees from the contract.
28. The contractor shall insure that employee or subcontractor have valid driver license when driving a vehicle on property.
Management:
29. All information generated in performance of this contract becomes property of the Government and must be surrendered upon request and/or completion of the contract. The Contractor must protect against the destruction and/or misplacement of all information produced under this contract, unless directed under local policy to destroy. This includes both hard and soft copies of data.
30. The Contractor shall not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any part of the subject matter of this contract or any phase of any program hereunder without the prior written approval of the COR.
31. Contractor personnel or subcontractor shall conduct themselves in a professional manner (i.e. timeliness, communication; spoken and written etc.). The Contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reasons of suspected misconduct, a suspected security breach, or suspected to be under the influence of alcohol, drugs, or any other incapacitating agent. Contractor employees shall be subject to dismissal from the premises upon determination by the Contracting Officer that such action is necessary in the interests of the Government. The hospital director or designated representative has the authority to bar individuals from the Government facility. The removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this performance work statement. The Government shall not reimburse the Contractor for travel and other expenses associated with the removal of personnel.
32. Contractor personnel are not authorized to carry or possess personal weapons to include, but not limited to, firearms and knives with a blade length in excess of three inches, while assigned under this contract.
Safety/Security Requirements:
33. The Contractor shall comply with all applicable federal, state and local laws and ensure performance is secure while protecting material, equipment, and supplies from damage and loss. The Contractor shall ensure that employees or subcontractor have the proper PPE for the job. Government security personnel shall have the express right to inspect for security violations at any time during the term of the contract.
Work Attire and Appearance:
34. Contractor personnel shall present a professional appearance commensurate with standards delineated for Government civilian personnel acting in similar capacities.
Personnel Qualification:
35. The Contractor shall be responsible for employing technically qualified personnel to perform the work specified in this SOW and authorized to work in the United States. The Contractor shall maintain the personnel, organization, and administrative control necessary to ensure that the work delivered meets the contract specifications and requirements. The work history of each contractor employee must contain experience directly related to the task and functions he/she is intended to perform under this contract. The Government reserves the right, during the life of the resulting contract, to request work histories on any contractor employee for the purposes of verifying compliance with the above requirements; additionally, the Government reserves the right to review resumes of contractor personnel proposed to be assigned. Personnel assigned to, or utilized by, the Contractor in performance of work shall be fully capable of performing the requirements contained in the SOW in an efficient, reliable, and professional manner.
36. Contractor shall provide a supervisor who speaks English on site at all time.
37. Personnel should be properly trained for safety and performance of their respective duties.
38. Appropriate safety equipment shall be furnished by the Contractor to contractor personnel or subcontractor and shall be used as prescribed by OSHA Standards.
39. The Government reserves the right to review Contractor personnel qualifications. Upon request, resume shall be provided to the Contracting Office prior to clearance approval, for review and acceptance by the COR. The intent is verification purpose and not for the Government to become the hiring authority.
Non-Personal Service Statement:
40. Contractor employees performing services under this order will be controlled, directed, and supervised at all times by management personnel of the contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the SOW. Contractor employees will perform their duties independent of, and without the supervision of, any Government official. The tasks, duties, and responsibilities set forth in the contract may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform the inspection and acceptance of the completed work.
-- Damages/Insurance --
Damages:
41. The Contractor is liable for all damages to Government equipment, property; utilities, etc., located at the site (e.g. sprinkler heads, ceiling tiles, manholes, fire hydrants, vehicles, windows, etc.) caused by the Contractor, its employees or it subcontractors. The Contractor shall immediately report all damages to the COR and shall provide the Contracting Officer (CO) and COR, a written report, within 24 hrs. The report shall include: What occurred, who was involved, when it occurred (Time/Date), where did it occurred, why it occurred, how it occurred, and the proposed means to repair or replace.
42. Contractor is to maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.
The period of performance and contract completion is sixty (60) days after the notice to proceed (NTP).
Place of Performance
| Address: |
| Corpus Christi Outpatient Clinic |
| Postal Code: |
| 5283 Old Brownsville Road, Corpus Christi, TX 78405 |
| Country: |
| UNITED STATES |
Award shall be made to the lowest priced offeror whose quotation meets the requirements of the solicitation. Basis of award, price and past performance.
The full text of FAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
The following solicitation provisions apply to this acquisition:
1. FAR 52.212-1, “Instructions to Offerors–Commercial Items” (OCT 2018) Addendum to FAR 52.212-1 – FAR 52.204-7, System for Award Management (OCT 2018) FAR 52.204-16, Commercial and Government Entity Code Reporting (JUL 2016) FAR 52.216-1, Type of Contract (APR 1984) FAR 52.252-1, Solicitation Provisions Incorporated by Reference (FEB 1998)
2. FAR 52.212-3, “Offerors Representations and Certifications–Commercial Items” (DEC 2019) Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://www.sam.gov/portal in accordance with FAR 52.212-3, “Offerors Representations and Certifications–Commercial Items.” If paragraph (j) of the provision is applicable, a written submission is required.
The following contract clauses apply to this acquisition:
· FAR 52.212-4, “Contract Terms and Conditions–Commercial Items” (OCT 2018) Addendum to FAR 52.212-4 - FAR 52.204-13, System for Award Management Maintenance (OCT 2018) FAR 52.204-18, Commercial and Government Entity Code Maintenance (JUL 2016) FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) VAAR 852.203-70, Commercial Advertising (MAY 2018) VAAR 852.211-72, Technical Industry Standards (NOV 2018) VAAR 852.219-10, VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (JULY 2019) (Deviation) VAAR 852.219-74, Limitations on Subcontracting – Monitoring and Compliance (JULY 2018) VAAR 852.232-72, Electronic Submission of Payment Requests (NOV 2018) VAAR 852.270-1, Representatives of Contracting Officers (JAN 2008) VAAR 852.237-75, Key Personnel (SEPT 2019)
· FAR 52.212-5, “Contract Terms and Conditions Required to Implement Statutes or Executive Orders” (OCT 2019) The following subparagraphs of FAR 52.212-5 are applicable:
FAR 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (OCT 2018) FAR 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) FAR 52.219-13, Notice of Set-Aside Orders (NOV 2011) FAR 52.219-28, Post-Award Small Business Program Representation (JUL 2013) FAR 52.222-3, Convict Labor (JUN 2003) FAR 52.222-21, Prohibition of Segregated Facilities (APR 2015) FAR 52.222-26, Equal Opportunity (SEPT 2015) FAR 52.222-36, Equal Opportunity for Workers with Disabilities (JULY 2014) FAR 52.222-41, Service Contract Labor Standards (AUG 2018) FAR 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) FAR 52.222-50, Combating Trafficking in Persons (JAN 2019) FAR 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) FAR 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) FAR 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) FAR 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008) FAR 52.232-33, Payment by Electronic Funds Transfer – System for Award Management (OCT 2018)
This is an open-market combined synopsis/solicitation for construction services as defined herein. The government intends to award a contract as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:
"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition."
OR
"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:"
Offeror shall list exception(s) and rationale for the exception(s).
The VA is strongly encouraging all interested parties to attend the Site Visit scheduled on January 29, 2020, 10:30AM CST. Participants will meet at CCOPC, 2nd Floor Conference Room. Interested parties must inform the VA of your intent to attend the Site Visit by email. Please note that interested parties will not be authorized to use this site visit to present or “pitch” their offer, services, or capabilities to any Government representative. “Interest in Site Visit” notices must be received by Monday, January 28, 2020 at 12:00PM CST by email to Lynn Pettit at Lynn.Pettit@va.gov. The content of this notice should be as follows: The company name, the names of the representatives who will be attending, valid phone number and email.
Any questions or concerns regarding this solicitation and site visit should be forwarded in writing via e-mail to the Contracting Officer at Lynn.Pettit@va.gov. Questions in response to this solicitation are due no later than January 30, 2020, 12:00PM CST.
Submission of offers/quotes shall be received not later than February 3, 2020, 4:30PM CST. Only e-mailed offers/quotes will be accepted. All offers/quotes shall be sent to Lynn.Pettit@va.gov. Reference “RFQ 36C257-20-Q-0265 Installation of AC Units at CCOPC” on subject line of email.
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 GENERAL INTENTION
| 43. A. | Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for VA Valley Coastal Bend Health Care Services intends to issue a construction contract. The project consists of: |
| a. The Contractor shall provide all labor, transportation, materials, equipment, and supervision required installation of AC units in Police Server, Police Office and Controls for RTU and Exhaust Fans. Corpus Christi Outpatient Clinic VA Valley Coastal Bend Health Care Services, located at 5283 Old Brownsville Road, Corpus Christi, Texas. |
| B. | Visits to the site by Bidders may be made only by appointment with the COTR. |
| C. | Contractor will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative. |
| D. | Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COTR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COTR. |
| E. | All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. |
| F. | Prior to commencing work, general contractor shall provide proof that a OSHA designated “competent person” (CP) (29 CFR 1926.20(b) (2) will maintain a presence at the work site whenever the general or subcontractors are present. |
| G. | Training: |
| 1. | All employees of general contractor or subcontractors shall have the 10-hour OSHA Construction Safety course and other relevant competency training, as determined by COTR acting as the Construction Safety Officer with input from the facility Construction Safety Committee. All Superintendents shall have the 30-hour OSHA certified Construction Safety course and/or other relevant competency training, as determined by VA CP with input from the ICRA team. |
| 2. | Submit training records of all such employees for approval before the start of work. |
| 3. | All employees (Trade Persons) of general contractor or subcontractors shall provide Training Certificates, Licenses, Apprenticeship and/or Manufacture (equipment) training documents to prove Journey Person in Trade they are working and/or have been trained in the equipment that they are installing. |
1.2 STATEMENT OF BID ITEM(S)
| 1. A. | ITEM I, GENERAL CONSTRUCTION: Work includes general demolition and replacement of flooring and ceiling of the perform work for VA Valley Coastal Bend Health Care Services intends to issue a construction contract. The project consists of: |
| a. The Contractor shall provide all labor, transportation, materials, equipment, and supervision required to install Replacement of RTU-3, RTU-5, RTU-6, RTU-7, RTU-8, Second Floor with new LED lighting and relocation of the Fire Alarm Panel at CCOBC area of VA Valley Coastal Bend Health Care Services, located at 5283 Old Brownsville Road, Corpus Cristi, Texas |
Painting and wall protection are also included. Miscellaneous demolition and renovation work.
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
| A. | AFTER AWARD OF CONTRACT, five (5) sets of specifications and drawings will be furnished. These drawings and specifications will consist of those returned by prospective bidders. |
| B. | Additional sets of drawings may be made by the Contractor, at Contractor's expense, from reproducible sepia prints furnished by Issuing Office. Such sepia prints shall be returned to the Issuing Office immediately after printing is completed. |
1.4 construction security requirements
| A. | Security Plan: |
| 1. | The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. |
| 2. | The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. |
| B. | Security Procedures: |
| 1. | General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. |
| 2. | For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 days notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section. |
| 3. | No photography of VA premises is allowed without written permission of the Contracting Officer. |
| 4. | VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer. |
| C. | Key Control: |
| 1. | The General Contractor shall provide duplicate keys and lock combinations to the COTR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action. |
| 2. | The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate. |
| D. | Document Control: |
| 1. | Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”. |
| 2. | The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project. |
| 4. | Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request. |
| 5. | These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer. |
| 6. | All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA. |
| 7. | Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”. |
| 8. | All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS). |
| a. | Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system. |
| b. | “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed. |
| E. | Motor Vehicle Restrictions |
| 1. | Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies. |
| 2. | There is no designated contractor parking on the Wilmington V.A. campus. Contractors must park along Kirkwood Highway. |
1.5 FIRE SAFETY
| A. | Applicable Publications: Publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only. |
| 1. | American Society for Testing and Materials (ASTM): |
| E84-2009 | Surface Burning Characteristics of Building Materials |
| 2. | National Fire Protection Association (NFPA): |
| 10-2010 | Standard for Portable Fire Extinguishers |
| 30-2008 | Flammable and Combustible Liquids Code |
| 51B-2009 | Standard for Fire Prevention during Welding, Cutting and Other Hot Work |
| 70-2011 | National Electrical Code |
| 241-2009 | Standard for Safeguarding Construction, Alteration, and Demolition Operations |
| 3. | Occupational Safety and Health Administration (OSHA): |
| 29 CFR 1926 | Safety and Health Regulations for Construction |
B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR 1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to the COTR and Facility Safety Manager for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the general contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of VAMC equipment, etc. Documentation shall be provided to the COTR that individuals have undergone contractor’s safety briefing.
| C. | Site and Building Access: Maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241. |
| D. | Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 6 m (20 feet) exposing overall length, separate by 3m (10 feet). |
| E. | Temporary Construction Partitions: |
| 1. | Install and maintain temporary construction partitions to provide smoke-tight separations between construction areas, the areas that are described in phasing requirements and adjoining areas. Construct partitions of gypsum board or treated plywood (flame spread rating of 25 or less in accordance with ASTM E84) on both sides of fire retardant treated wood or metal steel studs. Extend the partitions through suspended ceilings to floor slab deck or roof. Seal joints and penetrations. At door openings, install Class C, ¾ hour fire/smoke rated doors with self-closing devices. |
| 2. | Install one-hour fire-rated temporary construction partitions as shown on drawings to maintain integrity of existing exit stair enclosures, exit passageways, fire-rated enclosures of hazardous areas, horizontal exits, smoke barriers, vertical shafts and openings enclosures. |
| 3. | Close openings in smoke barriers and fire-rated construction to maintain fire ratings. Seal penetrations with listed through-penetration firestop materials in accordance with Section 07 84 00, FIRESTOPPING. |
| F. | Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70. |
| G. | Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with the COTR and facility Safety Manager. |
| H. | Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report any findings and the corrective actions weekly to the COTR and facility Safety Manager Officer. |
| I. | Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA 241 and NFPA 10. |
| J. | Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30. |
| K. | Standpipes: Existing standpipes shall be maintained in accordance with 29 CFR 1926 and NFPA 241. |
| L. | Sprinklers: Install, test and activate new automatic sprinklers prior to removing existing sprinklers. |
| M. | Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections. Provide fire watch for impairments more than 4 hours in a 24-hour period. Request interruptions in accordance with Article, OPERATIONS AND STORAGE AREAS, and coordinate with the COTR and Facility Safety Manager. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as coordinated with the medical center. Parameters for the testing and results of any tests performed shall be recorded by the medical center and copies provided to the COTR. |
| N. | Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with the COTR and Facility Safety Manager. |
| O. | Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with the COTR. Obtain permits from facility Safety Manager Officer at least 24 hours in advance. Designate contractor's responsible project-site fire prevention program manager to permit hot work. |
| P. | Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly. Coordinate with, and report findings and corrective actions weekly to the COTR and Facility Safety Manager. |
| Q. | Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas. |
| R. | Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily. |
| S. | Perform other construction, alteration and demolition operations in accordance with 29 CFR 1926. |
1.6 OPERATIONS AND STORAGE AREAS
| A. | The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance. |
| B. | Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed. |
| C. | The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads. |
(FAR 52.23610)
| D. | Working space and space available for storing materials shall be as determined by the COTR. |
| E. | Workmen are subject to rules of Medical Center applicable to their conduct. |
| F. | Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COTR where required by limited working space. |
| 1. | Do not store materials and equipment in other than assigned areas. |
| 2. | Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation. |
| 3. | Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements. |
| G. | Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COTR. All such actions shall be coordinated with the Utility Company involved: |
| 1. | Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor. |
| H. | Phasing: To insure such executions, Contractor shall furnish the COTR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COTR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COTR and Contractor, as follows: |
| Phase I: | All work associated with West Corridor. |
| Phase II: | All work associated with Elevator Lobby. |
| Phase III: | All work associated with East Corridor (Bid Deduct No.1). |
| I. | Building No. 10 will be occupied during performance of work; but immediate areas of alterations might be vacated. All work shall be performed during non-business hours (9:00 AM through 5:00 PM), weekend and/or Holidays and shall be coordinated with the COTR. |
| Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to The Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period. | |
| J. | When a building or portion thereof is turned over to Contractor, Contractor shall accept entire responsibility therefore. |
| 1. | Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified. |
| 2. | Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for preinspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman. |
| K. | Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COTR. |
| 1. | No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COTR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 11, REQUIREMENTS FOR ELECTRONIC SAFETY AND SECURITY INSTALLATIONS for additional requirements. |
| 2. | Contractor shall submit a request to interrupt any such services to COTR, in writing, 48 hours in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption. |
| 3. | Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours. |
| 4. | Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COTR. |
| 5. | In case of a contract construction emergency, service will be interrupted on approval of COTR. Such approval will be confirmed in writing as soon as practical. |
| 6. | Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor. |
| L. | Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. All existing and recently abandoned lines and associated equipment shall be completely removed within the project area unless it is scheduled to be re-used. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces at the perimeter of the project area. |
| M. | Coordinate the work for this contract with other construction operations as directed by COTR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS. |
1.7 ALTERATIONS
| A. | Survey: Before any work is started, the Contractor shall make a thorough survey with the COTR, a representative of VA Supply Service and a representative of building areas in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces: |
| 1. | Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building. |
| 2. | Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both. |
| 3. | Shall note any discrepancies between drawings and existing conditions at site. |
| 4. | Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COTR. |
| B. | Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COTR to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.2362) and "CHANGES" (FAR 52.2434 and VAAR 852.23688). |
| C. | ReSurvey: Thirty days before expected partial or final inspection date, the Contractor and COTR together shall make a thorough resurvey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report: |
| 1. | Resurvey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmen in executing work of this contract. |
| D. | Protection: Provide the following protective measures: |
| 1. | Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery. |