36C25720Q0155-007.docx
DOCX document Posted
- Solicitation number
- 36C25720Q0155
About this file
36C25720Q0155 D6. QASP.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25720Q0155-0002004.docx | DOCX document | |
| 36C25720Q0155-0001000.docx | DOCX document | |
| 36C25720Q0155-008.pdf | ||
| 36C25720Q0155-003.pdf | ||
| 36C25720Q0155-004.pdf | ||
| 36C25720Q0155-002.docx | DOCX document | |
| 36C25720Q0155-009.docx | DOCX document | |
| 36C25720Q0155-010.docx | DOCX document | |
| 36C25720Q0155-006.docx | DOCX document | |
| 36C25720Q0155-001.docx | DOCX document | |
| 36C25720Q0155-005.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
For: WTVAHCS HCHV Residential Housing
Contract Number: (WILL BE COMPLETED UPON CONTRACT AWARD)
Contract Description: The Department of Veteran Affairs, West Texas VA Health Care System (WTVAHCS) in Big Spring, TX (“VA”) requires contractor to provide services as part of its Community Based Health Care for Homeless Veterans (HCHV) program. The goal of the HCHV program is to remove homeless Veterans from the street or habitation unfit for Veterans and place them in community-based, residential environments to meet their needs.
Contractor’s name: TBD (hereafter referred to as the contractor).
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Marisela Galarza Organization or Agency: Department of Veterans Affairs, V17 Network Contracting Office
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Thomas Mattison
c. Other Key Government Personnel –
TBD
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager – Contractor is to complete this area and submit with proposal
b. Other Contractor Personnel – Contractor is to complete this area and submit with proposal
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, described below, includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
| Task |
| ID |
| Indicator |
| Standard |
| Acceptable Quality Level |
| Method of Surveillance |
| Residential Care Facilities and Management |
| 1 |
| Provide clean and comfortable environment of care (I.I a-l). |
| Clean and comfortable environment that meets the conditions detailed in I.I a-l. |
| 90% |
| Observation, valid customer complaints, and random inspection (auditing) or any other method that was proposed in your solution. |
| 2 |
| Provide clean and comfortable environment of care (I.I k). |
| Housing and Equipment are free from pests, inspections and vermin. Bed Bug infestations are quickly addressed by a licensed exterminator. |
| 100% |
| Observation, valid customer complaints, and random inspection (auditing) or any other method that was proposed in your solution. |
| 3 |
| Contracted Facility VA Inspection |
| Annual Inspection IAW R.6 |
| 100% |
| Observation |
| Case Management Services |
| 4 |
| Provide case management services (II.A-C) |
| Provide credentialed: |
Clinical Supervisor Case Management personnel ratio 1:20 With at least one member being CPR certified (II.A-C)
| 98% |
| Observation and random inspection (auditing) or any other method that was proposed in your solution. |
| 5 |
| Individual Service Plan. |
| Within 2 weeks of admission, and (II D.c1-10) |
| 100% |
| Observation and random inspection (auditing) or any other method that was proposed in your solution. |
| Discharge Expectations |
| 6 |
| Type of Discharge |
| Positive Discharge-85% or greater of all Veterans admitted to the program |
Administrative Discharge- No more than 10% of all Veterans admitted to the program
Negative discharges- No more than 5% of all Veterans admitted to the program
Unacceptable discharges- Zero (0) occurrences
Reference Admissions, Length of Stay and Discharges D and E
| 100% |
| Observation and random inspection (auditing) or any other method that was proposed in your solution |
Records and Reports
| 7 |
| Progress Notes |
| Notes for each management encounter to include information regarding progress toward meeting the Individual Service Plan goals |
| 95% |
| <Observation and random inspection (auditing) or any other method that was proposed in your solution.> |
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
1., 2., 4., 5, 6, 7
b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
3. annually or as needed.
c. USER SURVEY. (Combines elements of validated user complaints and random sampling. Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)
1., 2.
d. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies. Complaints are then investigated and validated.)
1., 2.
e. 100% INSPECTION. (Evaluates all outcomes.)
2., 3., 5.
f. Progress or status meetings.
6.
8. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Exceeds = Contractor performs greater than the expected quality level percentage provided in section 4 above.
Meets = Contractor performs at the target in the expected quality level percentage provided in section 4 above.
Does Not Meet = Contractor performs less than the expected quality level percentage provided in section 4 above.
9. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
10. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.
Signature – Contractor Program Manager
File details come from the government source that posted it. Updated .