36C25718B0004-00004003.pdf

PDF 30 KB Posted

Attached to
Replace Roofs Building 1 and 28 (504-18-103) Federal contract opportunity
Solicitation number
36C25718B0004
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17

About this file

36C25718B0004 00004 SECTION B-SCHEDULE.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Roofs Building 1 and 28 (504-18-103), newest first.
File Type Posted
36C25718B0004-00004000.docx DOCX document
36C25718B0004-00004002.pdf PDF
36C25718B0004-00004001.pdf PDF
36C25718B0004-00004004.pdf PDF
36C25718B0004-00003001.pdf PDF
36C25718B0004-00003000.docx DOCX document
36C25718B0004-00002000.docx DOCX document
36C25718B0004-004.pdf PDF
36C25718B0004-009.pdf PDF
36C25718B0004-002.pdf PDF
36C25718B0004-006.pdf PDF
36C25718B0004-008.pdf PDF
36C25718B0004-003.pdf PDF
36C25718B0004-007.pdf PDF
36C25718B0004-001.docx DOCX document
36C25718B0004-005.pdf PDF
36C25718B0004-000.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B – SCHEDULE OF PRICES/DESCRIPTION

DESCRIPTION: The Contractor shall provide all labor, materials, equipment, and supervision to replace roofs at the VA Amarillo facility as specified by the drawings and specifications and turn over the completed work to the VA within 60 calendar days after issuance of the Notice to Proceed (excluding VA Campus holidays).

ITEM UNIT TOTAL

NO. DESCRIPTION OF SERVICE QTY UNIT PRICE AMOUNT

BASE BID:

0001 PROVIDE ALL NECESSARY 1 JB $_____________ $______________

LABOR, TOOLS, MATERIALS, EQUIPMENT

AND SUPERVISION NECESSARY TO

REPLACE ROOFS PER THE PROVIDED

SPECIFICATIONS AND DRAWINGS.

0002 COST OF PERFORMANCE AND 1 EA $______________ $_______________

PAYMENT BONDS

0003 DEDUCTIVE ALTERNATE 1: 1 JB $_______________ $_____________

DEDUCT ALL WORK WHICH ENTAILS

TO THE PITCHED ROOF TO BUILDING 1 –

AREA B ON DRAWING A-101.

0003A DEDUCT COST OF PERFORMANCE AND 1 EA $______________ $___________

PAYMENT BONDS.

TOTAL PROJECT DURATION FOR BASE BID AND BID ALTERNATES: 60 Calendar Days from Issuance of the Notice to Proceed To Complete Project Work.

BASE BID TOTAL (Items 0001 – 0002): $ _______________________

BASE BID TOTAL MINUS DEDUCTIVE ALTERNATE 1 $ ___________________