This file is a Questions and Answers amendment to solicitation 36C25627Q0081 issued by the Department of Veterans Affairs Veterans Health Administration Network Contracting Office. The amendment posts responses to 10 submitted questions regarding the Building 41 Isolation Valve Installation project at the Eugene J. Towbin Healthcare Center in North Little Rock, Arkansas. Key clarifications include: a concrete access vault with a removable lid is acceptable for steam and condensate isolation valve access; pipe insulation replacement is included in scope with quantities based on contractor preference; landscaping restoration is not required, only soil seeding; asbestos is not present in existing insulation; existing steam lines are high-pressure steel Schedule 80 pipe; and steam shutdown can be performed by the government for at least one week. The amendment also clarifies that bid bonds and payment/performance bonds are not required.
The amendment includes a corrected VAAR 852.219-75 VA Notice of Limitations on Subcontracting that establishes the SDVOSB performance requirement as services-based, limiting non-SDVOSB subcontracting to 50% of amounts paid by the government (not the previously stated 75% for special trade contractors). This solicitation is a 100% SDVOSB set-aside with firm-fixed pricing under NAICS code 238220 and FSC/PSC N048. All other terms and conditions of the original solicitation remain unchanged, and all questions and answers posted in this amendment are effective immediately for responding offerors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25627Q0081 0001 amendment.docx | DOCX document | |
| 36C25627Q0081.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
36C25627Q0081
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
11-05-2026
None
Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 715 S. Pear Orchard Rd.
Ridgeland MS 39157
Same as block 6
To all Offerors/Bidders
36C25627Q0081
X
The purpose of this amendment is to post questions and answers for subject solicitation.
A. See attached for the submitted questions and their answers.
B. All other terms and conditions remain unchanged.
Joseph L Warren Contracting Officer
CONTINUATION PAGE
1. During the site visit, it was mentioned that an access cover would be required for the steam and condensate isolation valves. Will the government consider a concrete access box sized to the existing concrete vault, with a removable lid, to allow future access without excavation? Please confirm if this should be included in the contractor's pricing.
Yes, a concrete vault can be provided
2. During the site visit, it was mentioned that replacement of the existing pipe insulation would be required. Will the government confirm whether this work is included in the scope and provide the approximate lengths or quantities to be replaced?
Insulation is included and the length and quantity are based on contractor preference
3. Per SOW Section 2.4, sod and landscaping are excluded. Will the government confirm that the contractor is not required to provide sod replacement or landscaping restoration?
Landscaping is not required. Seeding the soil is fine
4. Will the government provide available as-built drawings showing existing underground utilities, including plumbing, electrical, and telecommunications, near the concrete vaults?
I do not have access to that information
5. Will the government confirm whether the existing underground pipe insulation contains asbestos and provide any available testing reports? If asbestos is present, will the required abatement be included in the contractor's scope?
No asbestos present
6. Will the government provide the operating pressure, temperature, pipe material, and schedule of the existing steam and condensate lines to confirm the required valve ratings and welding procedures?
High Pressure Steam Put Down ; Steel; Schedule 80 pipe
7. Will the government confirm whether the VA or the contractor will perform steam isolation, drain-down, and lockout/tagout, and provide the approved shutdown window?
Steam is shut down for at least the next week, but it can be shut down by us
8. Page 36 of the Solicitation asks offerors to “Provide a plan that clearly shows the SDVOSB prime (alone or with similarly situated SDVOSB subs) will perform at least 50% of the cost for personnel on the contract to include how the prime will self-perform primary and vital tasks, if applicable.” However, page 30 of the Solicitation (VAAR 852.219-75) indicates that “…the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs…”. Will the government please clarify the self-/ similarly situated performance requirements on this requirement?
See corrected VAAR 852.219-75 VA Notice of Limitations.
9. Are bid bonds necessary for this requirement?
No
10. Should offerors account for Payment and Performance bonds on this requirement?
No
C.8 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)
(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that—
(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:
(i) [X] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.
(ii) [] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.
(iii) [] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219–73 or certified VOSBs listed in the SBA certification database as set forth in 852.219–74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.
(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.
(3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:
(i) Referral to the VA Suspension and Debarment Committee;
(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and
(iii) Prosecution for violating 18 U.S.C. 1001.
(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.
(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.
(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.
Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].
Printed Name of Signee: ___________ Printed Title of Signee: _____________ Signature: ____________ Date: ______________ Company Name and Address: _______________
File details come from the government source that posted it. Updated .