586-SOW-Vehicle Repair and Preventive Maintenance Services.pdf

PDF 208 KB Posted

Download PDF, 208 KB

Attached to
Jackson MS, Chevy Van Repair and service
Solicitation number
36C256-27-AP-1345
Issued by

About this file

Statement of Work Summary

This Statement of Work (SOW) is a non-personnel services requirement for vehicle repair and preventive maintenance services at the G.V. "Sonny" Montgomery VA Medical Center in Jackson, Mississippi. The contractor must restore a 2012 Chevrolet Express 3500 (VIN: 1GBZG1FG3C1187198, Mileage: 67,539) to safe operating condition while ensuring compliance with fleet maintenance standards, minimizing downtime, and extending vehicle service life. Work will be performed at the VA Medical Center facility located at 1500 E Woodrow Wilson Drive, Jackson, MS 39216.

The scope of services includes transmission replacement with full installation, adjustments, programming, testing, and road testing; tie rod replacement with steering system verification; complete wheel alignment to manufacturer specifications; brake fluid service including system flushing and hydraulic system inspection; engine oil and filter service using full synthetic oil; and throttle body cleaning and service. The contractor must furnish all labor, materials, equipment, fluids, parts, and supervision necessary to complete these services. Work shall be performed during normal business hours (8:00 a.m. through 4:30 p.m., Monday through Friday, excluding Federal Holidays), with any work outside these hours requiring advance approval from the Contracting Officer Representative. Personnel performing work must be certified as a Chevrolet Repair Service Center with appropriate qualifications and certifications. The contractor shall provide a one-year warranty on all equipment and services, submit detailed invoices for payment following VAAR Clause 852.232-72 for electronic submission, and deliver documentation including parts installed, final repair invoice, vehicle operational test results, and warranty information. The SOW also includes comprehensive records management requirements, personnel identification and badgeting requirements, and flow-down obligations to any subcontractors.

View the file

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Vehicle Repair and Preventive Maintenance Services

G.V. “Sonny” Montgomery VA Medical Center (GVSMVAMC) 1500 E Woodrow Wilson Drive

Jackson, MS 39216

1. OBJECTIVE: The G.V. “Sonny” Montgomery VA Medical Center located in Jackson, MS requires the following services for the facility: Restore the vehicle to safe operating condition, ensure compliance with fleet maintenance standards, minimize downtime, and extend the service life of the vehicle.

2. GENERAL: This is a non-personnel services requirement. The contractor shall provide all management, supervision, labor, transportation, tools, materials, parts, and other items necessary to perform work, execute services, and to successfully complete all deliverables as contained within this Scope of Work. The Government shall not exercise any supervision and/or control over contractor personnel (which includes contractor service providers, contractor representatives, and subcontractors employed with and/or being utilized by the prime contractor) during all active performance periods of the contract. All contractor personnel shall be accountable solely to the Contractor, who in turn is responsible to the Government.

3. BACKGROUND: The vehicle was inspected and diagnosed by Gray-Daniels Chevrolet. A multi-point vehicle inspection identified several mechanical deficiencies that require corrective action to restore safe and reliable operation. The repairs include replacement of the transmission assembly, replacement of steering components, alignment services, and preventive maintenance services.

4. SCOPE OF SERVICES:

The contractor shall furnish all labor, materials, equipment, fluids, parts, and supervision necessary to complete the following services:

1. Transmission Replacement

• Remove existing transmission assembly.

• Install replacement transmission assembly.

• Perform all required adjustments, programming, testing, and verification.

• Road test vehicle to confirm proper operation.

2. Tie Rod Replacement

• Remove and replace defective tie rod component(s).

• Verify steering system integrity and operation.

3. Wheel Alignment

• Perform complete wheel alignment following steering repairs.

• Adjust alignment to manufacturer specifications.

4. Brake Fluid Service

• Flush and replace brake fluid.

• Inspect brake hydraulic system for proper operation.

5. Engine Oil and Filter Service

• Drain engine oil.

• Replace oil filter.

• Refill with full synthetic engine oil.

• Verify no leaks and proper fluid levels.

6. Throttle Body Service

• Perform throttle body cleaning/service.

• Verify proper engine idle and throttle response.

7. Deliverables

The contractor shall provide:

1. Completed repairs and maintenance services described herein.

2. Documentation of all parts installed.

3. Final repair invoice.

4. Vehicle operational test results.

5. Warranty information on parts and labor, if applicable.

8. Acceptance Criteria

The work shall be considered complete upon:

• Successful completion of all listed repairs and services.

• Verification that the vehicle is safe and fully operational.

• Submission of final repair documentation and invoice.

• Acceptance by the Government Representative or Fleet Manager.

9. Vehicle Information

• Vehicle: 2012 Chevrolet Express 3500

• VIN: 1GBZG1FG3C1187198

• Mileage: 67,539

5. PLACE AND PERIOD OF PERFORMANCE: Work will be performed, services will be executed, and deliverables will be completed at G.V. “Sonny” Montgomery VA Medical Center, 1500 E Woodrow Wilson Drive, Jackson, MS 39216. This project, as encompassed by the final contract when executed, will consist of a single service. Work shall commence upon receipt of authorized approval and be completed in accordance with the contractor's scheduling availability and parts procurement timelines.

6. WORK HOURS AND SCHEDULE: All work, execution of services, and completion of deliverables must be accomplished during normal business hours, 8:00 a.m. through 4:30 p.m. Monday through Friday, Federal Holidays excluded. Prior to work being performed proper coordination shall be initiated between the contractor and the government to ensure that services/work can be executed when scheduled. Any work, services, and/or other tasks performed during other than normal business hours must be approved in advance by the Contracting Officer Representative (COR), Contracting Officer, and/or other authorized facility designee/representative before such work begins. The Federal Holidays that are currently being observed by the facility are listed in the table below.

New Year’s Day January 1 Martin Luther King‘s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Juneteenth Independence Day June 19th Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25

Other Federal Holidays (that could occur) Any other day specifically declared to be a national holiday (per Federal Statute, Executive Order, or by the President’s Proclamation).

An alternative schedule (different from the schedule described above) may be utilized if there is mutual agreement between the government and the contractor regarding this alternative schedule if implemented.

7. PERSONNEL PERFORMING WORK/SERVICES - REQUIRED “CORE COMPETENCIES”:

Personnel performing work, executing services, and completing deliverables during the active performance periods of the contract shall possess the knowledge, skills, and abilities required to successfully accomplish the following: Vehicle Repair and Preventive Maintenance Services. No unqualified individual shall be allowed to perform work, execute services, and to complete deliverables at any time under the contract while active. Must be certified Chevrolet Repair Service Center.

8. KEY PERSONNEL

During the active performance periods of the contract a Key Personnel Person shall be designated by the contractor (to be contacted by the government when needed) regarding performance of work, execution of services, and completion of Deliverables as contained within this Scope of Work and covered by the final contract. This Key Personnel person must have sufficient knowledge to be able to respond to technical questions by the government. Licensing and certifications must be provided to the COR.

9. OTHER REQUIREMENTS:

• Identification and Badges: Any individual performing work under this contract shall wear a badge or other identification while on site that is clearly displayed at all times. While on site, any person performing work directly or indirectly must be in a position to specify their authorized purpose for their presence at the facility in the event that such information is requested by VA facility personnel.

• Parking: It is the responsibility of the contractor to park in the appropriate designated parking areas, to avoid ticketing or towing. Information on parking is available from the facility if requested by the contractor.

• Contract Administration: The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract. The Contractor shall communicate with the Contracting Officer on all matters pertaining to contract administration. Only the Contracting Officer is authorized to make commitments or issue changes that will affect price, quantity, or quality of performance of this contract. In the event the Contractor makes any such change at the direction of any person other than the Contracting Officer, this change shall be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof. All changes to the contract will be issued via an amendment and/or modifications in writing from the Contracting Officer to the Contractor.

• Invoicing and Payment: Contractor is authorized prompt payment IAW applicable regulation following the successful performance of work, execution of services, and completion of required deliverables. Contractor invoices shall be submitted IAW VAAR Clause 852.232-72 Electronic Submission of Payment Requests. Invoices submitted for payment must be detailed to the extent necessary to reflect the work done and the services performed during the time periods when completed so an accurate assessment can be made by the facility for certification of these invoices for payment.

Advance payments are not authorized, and contractor is not authorized payment for future work not performed and/or for work that has not been successfully completed.

• VA authorized personnel who may contact contractor for repair service (Note: names will be provided but are subject to change)

Contracting Officer Representative Electrical Shop Contracting Specialist

• Warranty: Contractor shall provide a one (1) year warranty on all equipment/services covered in this contract.

10. RECORDS MANAGEMENT

1. Contractor shall comply with all applicable records management laws and regulations, as well as

National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C.

chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created while performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

4. G.V. Sonny Montgomery VAMC (GVSMVAMC) and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of [Agency] or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to [Agency]. The agency must report promptly to NARA in accordance with 36 CFR 1230.

5. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. Contractor personnel shall sign VA Form 10-0708 “Employee Clearance from Indebtedness” before resigning or termination from Contractor working for GVSMVAMC and Facility Records Officer must sign form. A copy of completed signed VA Form 10-0708 (Contractor personnel and Facility Records Officer signatures) shall be place in each competency folder. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to [Agency] control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle].

Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and [Agency] guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with GVSMVAMC policy.

8. The Contractor shall not create or maintain any records containing any non-public GVSMVAMC information that are not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The GVSMVAMC owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which GVSMVAC shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

11. Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take [Agency]-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. TMS (Talent Management System) course VA 4192704:

“Records Management for Everyone” [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.]

12. Flow-down of requirements to subcontractors:

a. The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.

b. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.

Statement of Work

File details come from the government source that posted it. Updated .