This is a Solicitation, Offer, and Award (SF 1442) document for a construction project issued by the Department of Veterans Affairs, Gulf Coast Veterans Health Care System in Biloxi, Mississippi.
The solicitation seeks a Service-Disabled Veteran-Owned Small Business (SDVOSB) to install catwalks, access stairs, safety railings, anchorage systems, and fuel-level monitoring equipment at ten aboveground fuel tank locations (NAICS code 236220; $45 million size standard). The project includes structural fabrication and installation, electrical conduit modifications, continuous capacitance fuel-level transmitter installation, integration with Siemens field panels for remote monitoring, and site protection during construction. The estimated project magnitude is between $250,000 and $500,000. The contractor must begin performance within 10 calendar days of notice to proceed and complete all work within 120 calendar days, including testing, punch-list corrections, and final closeout. Proposals are due by 2:00 PM CST on January 8, 2027, submitted via email as a single consolidated PDF file (maximum 10 MB). The solicitation is a firm-fixed-price, negotiated (RFP) procurement with best-value evaluation methodology, where past performance is significantly more important than price. Offerors must submit a technical narrative addressing construction methodology, shop drawings coordination, work sequencing among ten locations, electrical modifications, fuel-monitoring system integration, testing verification, and site protection; a draft 120-day project schedule; one to three relevant past performance projects from the last five years with similar scope and complexity; completed pricing with divisional breakdown; completed VAAR Clause 852.219-75 (certificate of compliance); SF 24 bid bond; SDVOSB verification in SAM and SBA VetCert database; Experience Modification Rate (EMR) documentation; OSHA safety records for three years; VETS-4212 documentation; and all required FAR/VAAR certifications and representations. A site visit was scheduled for December 3, 2026, at 9:00 AM Central Time. Requests for information were due by December 11, 2026. Award is contingent upon appropriated funds availability and successful offeror maintaining SDVOSB certification at time of award, though award shall not be delayed due to loss of certification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25626R0114 EXHIBIT E.docx | DOCX document | |
| 36C25626R0114 GRACELAND SITE PLAN.pdf | ||
| 36C25626R0114 Specifications.pdf | ||
| 36C25626R0114 WD MS20260050 Dated 051826.pdf | ||
| 36C25626R0114 EXHIBIT C.docx | DOCX document | |
| 36C25626R0114 VHA PCRA - Catwalks.pdf | ||
| 36C25626R0114 EXHIBIT D.docx | DOCX document | |
| 36C25626R0114 EXHIBIT F.docx | DOCX document | |
| 36C25626R0114 SOW-520-27-102- 072926.pdf | ||
| 36C25626R0114 locations.pdf | ||
| 36C25626R0114 EXHIBIT A.docx | DOCX document | |
| 36C25626R0114 EXHIBIT B.docx | DOCX document | |
| 36C25626R0114 Fuel Tank Info.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C25626R0114 X
TBD
520-27-2-7527-0002 520-27-102 00502
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 16
Gulf Coast Veterans Health Care System 400 Veterans Avenue Biloxi MS 39531-2410
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 16
Gulf Coast Veterans Health Care System 400 Veterans Avenue Biloxi MS 39531-2410 Alexis Meyers 228-523-5000 x8216 This procurement is a total Service Disabled Veteran Owned Small Business (SDVOSB) set-aside under Public Law 109-461.
Offerors must be registered and certified as a SDVOSB in the SBA Veteran Small Business Certification site at https://veterans.certify.sba.gov. Proposals received from contractors who are not certified as a SDVOSB at the SBA site shall not be considered for evaluation and award. This includes Joint Ventures. Joint Venture Agreements must be submitted with proposal to be considered. Contract award shall not be delayed due to loss of SDVOSB certification.
Verification showing seal shall be included with proposal (pricing volume).
SITE VISIT: Information including the location, time and date for the site visit can be found in Section A.5
INFORMATION PROVIDED AT THE SITE VISIT SHALL NOT ALTER THE TERMS AND CONDITIONS OF THE SOLICITATION. TERMS OF THE SOLICITATION REMAIN UNCHANGED UNLESS THE SOLICITATION IS AMENDED IN WRITING. CONTRACTORS ARE REQUIRED TO SUBMIT ALL QUESTIONS IN WRITING, USING EXHIBIT F, (EMAIL IS ACCEPTABLE) TO THE CONTRACT SPECIALIST SHOWN ABOVE NO LATER THAN NOON CT 14 CALENDAR DAYS PRIOR TO THE DATE/TIME SET FOR RECEIPT OF PROPOSALS.
SEE BLOCK 13A FOR SOLICITATION CLOSING DATE.
PER FAR 36.204 THE ESTIMATED MAGNITUDE OF THIS PROJECT IS BETWEEN $250,000.00 and $500,000.00.
IN NEGOTIATED SOLICITATIONS “BID” AND “BIDDER” MEAN “OFFER” AND “OFFEROR”
NAICS CODE: 236220 SIZE STANDARD: $45M
GEOGRAPHICAL AREA WHERE WORK IS TO BE PERFORMED: Biloxi, MS.
This project is not tax exempt.
Base Offer Item: furnish all labor, tools, materials, equipment and supervision necessary to perform all work associated with Project #520-27-102; Install Catwalks, Access Stairs and Safety Railings for Aboveground Fuel Tanks, located at Gulf Coast Veterans Health Care Systems, 400 Veterans Avenue, Biloxi, MS 39531.
VAAR Clause 852.219-75 (included herein) is required to be completed and returned with each proposal. Proposals without a completed VAAR Clause 852.219-75 will be considered ineligible for evaluation and award.
X 52.211-10 X One (1) Email 14:00
CST
01-08-2027 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( U.S.C.
d
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Please see Schedule of Offer Items & Continuation of SF 1442 (Divisions) located in Sections A.3 and A.4 x 00502
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING OFFICE 16
GULF COAST VETERANS AFFAIRS HEALTH CARE
400 Veterans Ave Biloxi MS 39531-2410 FSC e-Invoice Payment http://www.fsc.va.gov/fsc/einvoice.asp Invoice Setup Information 1-877-489-6135 invoice must be submitted electronically 1-877-489-6135 X Kaitlyn West
VA-VHA-RPOC-2025-0042
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 6 |
| ITEM INFORMATION | 6 |
| A.4 Continuation of SF 1442 Block # 17 | 7 |
| A.5 GENERAL PROPOSAL INFORMATION | 8 |
| A.6 Proposal Preparation | 11 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 20 |
| 2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION) | 20 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) | 20 |
| 2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 20 |
| 2.4 52.233-2 SERVICE OF PROTEST (NOV 2025) (DEVIATION) | 21 |
| 2.5 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION) | 21 |
| 2.6 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 26 |
| 2.7 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) | 26 |
| 2.8 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2026) (DEVIATION) | 26 |
| 2.9 VAAR 852.236-93 SITE VISIT (CONSTRUCTION) (OCT 2026) (DEVIATION) | 27 |
| 2.10 VAAR 852.236-94 PREPARATION OF PROPOSALS (CONSTRUCTION) (OCT 2026) (DEVIATION) | 27 |
| 2.11 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE (OCT 2026) (DEVIATION) | 28 |
| 2.12 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 28 |
| REPRESENTATIONS AND CERTIFICATIONS | 29 |
| 3.1 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (NOV 2025) (DEVIATION) | 29 |
| GENERAL CONDITIONS | 32 |
| 4.1 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2025) (DEVIATION) | 32 |
| 4.2 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION) | 32 |
| 4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025) (DEVIATION) | 34 |
| 4.4 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026) | 36 |
| 4.5 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV 2025) | 37 |
| 4.6 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007) ALTERNATE I (DEC 2007) | 42 |
| 4.7 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION) | 42 |
| 4.8 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (DEVIATION) (NOV 2025) | 52 |
| 4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS | 53 |
| 4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 54 |
| 4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 56 |
| 4.12 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (OCT 2026) (DEVIATION) | 57 |
| 4.13 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (OCT 2026) (DEVIATION) | 57 |
| 4.14 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 60 |
| 4.15 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR VERIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (NOV 2022) | 60 |
| 4.16 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (OCT 2026) (DEVIATION) | 63 |
| 4.17 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019) | 64 |
| 4.18 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (OCT 2026) (DEVIATION) | 66 |
| 4.19 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (OCT 2026) (DEVIATION) | 66 |
| 4.20 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (OCT 2026) (DEVIATION) | 69 |
| 4.21 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (OCT 2026) (DEVIATION) | 70 |
| 4.22 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL PRODUCTS (APR 2019) | 70 |
| 4.23 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES— SUPPLEMENT (OCT 2026) (DEVIATION) | 71 |
| 4.24 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018) | 71 |
| 4.25 Contractor Performance Assessment Reporting System | 71 |
| 5.0 List of Attachments | 73 |
| See attached document: 36C25626R0114 EXHIBIT A. | 73 |
| See attached document: 36C25626R0114 EXHIBIT B. | 73 |
| See attached document: 36C25626R0114 EXHIBIT C. | 73 |
| See attached document: 36C25626R0114 EXHIBIT D. | 73 |
| See attached document: 36C25626R0114 EXHIBIT E. | 73 |
| See attached document: 36C25626R0114 EXHIBIT F. | 73 |
| See attached document: 36C25626R0114 SOW-520-27-102- 072926. | 73 |
| See attached document: 36C25626R0114 Specifications. | 73 |
| See attached document: 36C25626R0114 GRACELAND SITE PLAN. | 73 |
| See attached document: 36C25626R0114 VHA PCRA - Catwalks. | 73 |
| See attached document: 36C25626R0114 Fuel Tank Info. | 73 |
| See attached document: 36C25626R0114 locations. | 73 |
| See attached document: 36C25626R0114 WD MS20260050 Dated 051826. | 73 |
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
The Base Offer for CLIN 0001 includes all labor, tools, materials, equipment and supervision necessary to complete the project: 520-27-102; Install Catwalks, Access Stairs and Safety Railings for Aboveground Fuel Tanks.
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z2DZ - Repair or Alteration of Other Hospital Buildings
| GRAND TOTAL |
| __________________ |
A.4 Continuation of SF 1442 Block # 17
Offerors must complete the divisional breakdown provided below and provide enough detail in their price proposals to allow the government to review and make an informed decision, ensuring the prices are fair and reasonable. The price proposals should include detailed pricing that makes up the entire division price.
| MATERIAL |
| LABOR |
| EQUIPMENT |
| TOTAL |
| DIVISION 01: |
| GENERAL REQUIREMENTS |
| DIVISION 02: |
| EXISTING CONDITIONS |
| DIVISION 03: |
| CONCRETE |
| DIVISION 04: |
| MASONRY |
| DIVISION 05: |
| METALS |
| DIVISION 06: |
| WOOD, PLASTICS & COMPOSITES |
| DIVISION 07: |
| THERMAL & MOISTURE PROTECTION |
| DIVISION 08: |
| OPENINGS |
| DIVISION 09: |
| FINISHES |
| DIVISION 10: |
| SPECIALTIES |
| DIVISION 11: |
| EQUIPMENT |
| DIVISION 12: |
| FURNISHINGS |
| DIVISION 13: |
| SPECIAL CONSTRUCTION |
| DIVISION 14: |
| CONVEYING EQUIPMENT |
| DIVISION 21: |
| FIRE SUPPRESSION |
| DIVISION 22: |
| PLUMBING |
| DIVISION 23: |
| HVAC |
| DIVISION 25: |
| INTEGRATED AUTOMATION |
| DIVISION 26: |
| ELECTRICAL |
| DIVISION 27: |
| COMMUNICATIONS |
| DIVISION 28: |
| ELECTRONIC SAFETY AND SECURITY |
| DIVISION 31: |
| EARTHWORK |
| DIVISION 32: |
| EXTERIOR IMPROVEMENTS |
| DIVISION 33: |
| UTILITIES |
| DIVISION 34: |
| TRANSPORTATION |
| DIVISION 48: |
| ELECTRICAL POWER GENERATION |
SUBTOTAL COST:
GENERAL LIABILITY / INSURANCE:
OVERHEAD & PROFIT:
BOND:
PROJECT TOTAL COST:
A.5 GENERAL PROPOSAL INFORMATION
Project: 520-27-102; Install Catwalks and Safety Railings for Aboveground Fuel Tanks Issuing Office: NCO 16 Location of Project: Biloxi, MS- GCVHCS Point of Contact: Alexis Meyers- Contract Specialist, NCO 16 E-mail: alexis.meyers@va.gov
1. VAAR Clause 852.219-75 (included herein) is required to be completed and returned with each proposal. Proposals without a completed VAAR Clause 852.219-75 will be considered ineligible for evaluation and award.
1. Service-Disabled Veteran-Owned Small Business Verification: This action is a 100% set aside for verified Service-Disabled Veteran Owned Small Businesses (SDVOSB) in Veteran Small Business Certification (sba.gov). The award of this solicitation shall not be delayed due to loss of SDVOSB verification. Proposals submitted by non-verified SDVOSB shall be excluded from award consideration.
1. Joint Ventures must be verified SDVOSBs and registered in SAM at the time of solicitation response and at award.
1. VETS-4212: Title 38, USC Section 4212(d), and Public Law 105-339, requires that federal contractors report, at least annually, the number and category of veterans who are within their workforce. This VETS-4212 report can be submitted per the instructions at https://www.dol.gov/agencies/vets/programs/vets4212. For assistance contact VETS-4212 customer support at 1-866-237-0275 or vets4212-customersupport@dolncc.dol.gov. For procurement awards in excess of $150,000, this report must be completed and accepted prior to any Federal contract award. Therefore, all potential contractors are encouraged to file every year.
4. Past Safety Record: VHA DIRECTIVE 7715 SAFETY AND HEALTH DURING CONSTRUCTION requires that Contracting Officers evaluate and consider past safety records of prospective contractors in awarding contracts. OFFERORS SHALL SUBMIT EXHIBIT D CONTRACTOR EVALUATION FORM CONSTRUCTION SAFETY AS A PART OF THE PRICE PROPOSAL.
All offerors shall submit, as part of their price proposal, information pertaining to their past Safety and Environmental record using Exhibit D. The information must show that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA violation(s) in the past three years. If those totals are exceeded, the offeror shall attach an explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
All offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If an offeror’s EMR is above 1.0, offeror must attach a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.
Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
If the NCCI cannot issue an EMR because the offeror lacks insurance history, offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned offeror a Unity Rating of 1.0.
This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors
The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
OFFERORS WHO FAIL TO SUBMIT EXHIBIT D AND EXHIBIT E (SURETY FORM) (AND THE ASSOCIATED ADDITIONAL REQUIRED INFORMATION) AS A PART OF THEIR PROPOSAL PACKAGE WILL BE RATED LOWER THAN AN OFFEROR THAT DOES PROVIDE.
1. Site Visit: An organized site is scheduled. Attendance at the site visit is not mandatory but highly suggested for proper proposal preparation.
An organized site visit has been scheduled for: Thursday, December 3, 2026 @ 9am Central Time Zone.
Participants will meet at: Gulf Coast Veterans Health Care System, 400 Veterans Avenue, Biloxi, MS 39531; Graceland Compound.
1. Requests for Information (RFIs): RFIs are due, utilizing Exhibit F, no later than (NLT) 12:00 PM CST December 11, 2026 or as amended and will not be accepted after this date. RFIs should be submitted by email to the Contract Specialist, Alexis Meyers at Alexis.meyers@va.gov. Responses will be provided by amendment to the solicitation in a question and answer format. Example: Subject Line of the RFI e-mail should be as follows: Company Name, RFI 1, 36C25626R0114 and Project 520-27-102.
1. Proposal Due Date: Proposals and Bid Bonds are due NLT the date/time shown in Block 13a of Standard Form (SF) 1442. All proposals will be submitted by E-Mail (all volumes & a copy of the Bid Bond) and received NLT date/time shown in Block 13A:
NOTE: Bid Bond signatures should be wet signed and there should be no white out corrections. Impressions from Notary must be clearly visible.
1. Magnitude of Construction: Pursuant to FAR 36.204 the magnitude of construction is between $250,000.00 and $500,000.00.
1. North American Industry Classification (NAICS) code: The applicable NAICS code for this procurement is 236220 Commercial and Institutional Building Construction. The Small Business size standard is $45 Million.
1. Wage Determination (WD): The applicable Davis Bacon WD for this solicitation is incorporated as an attachment to this solicitation.
1. Period of Performance: The successful offeror shall begin performance within 10 calendar days after receiving the notice to proceed and complete all work within the time specified in the award. All punch list items must be completed during the established period of performance.
1. Funding: Award is contingent upon the availability of appropriated funds. The Government does not compensate vendors for proposal development and submission.
1. Superintendence: The offeror shall provide, from their own staff, a competent 30-hour OSHA certified superintendent. This individual shall be 100% full time dedicated and assigned to this project while work is being performed on site. The offeror shall not divide or split up their superintendence duties among multiple projects at the same facility. Each project stands alone and requires a dedicated superintendent to be allocated and funded to that particular project.
14. Holidays: The following federal holidays are observed:
| New Year's Day | Martin Luther King Jr.’s Birthday | President's Day |
| Memorial Day | Independence Day | Labor Day |
| Columbus Day | Veterans Day | Thanksgiving Day |
Christmas Day Juneteenth National Independence Day
Any other holiday proclaimed by the President as a Federal Holiday.
When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed by U.S. Government agencies.
A.6 Proposal Preparation
This part describes the precise mechanism for evaluating and selecting offers for this procurement for:
Project #520-27-102; Install Catwalks and Safety Railings for Aboveground Fuel Tanks
A. COMPLIANCE REVIEW
The Contract Specialist and/or SSA will undertake the following steps:
· Review Proposals: Verify each proposal’s adherence to proposal instructions.
· FAR/VAAR Clause Certification/Verification: Verify that the Federal Acquisition Regulation (FAR) and Veterans Affairs Acquisition Regulation (VAAR) clause certifications/verifications are completed and returned. (i.e. VAAR 852.219-75 as an example)
· SDVOSB Verification: Confirm that each Service-Disabled Veteran-Owned Small Business (SDVOSB) is verified in Sam.gov and the SBA Dynamic Small Business Search database.
· Notification of Non-Compliance: Notify offerors immediately, in writing, if their proposal is determined not in compliance with proposal instructions. Such proposals will not be considered for award.
Requirements:
· Timely and Equitable Evaluation: Proposals must be complete, self-sufficient, and respond directly to the solicitation requirements.
· Government Discretion: The Government reserves the right to make a final determination on a proposal’s acceptability based solely on the submitted proposal without requesting additional information.
· Proposal Removal: Failure to meet any requirement may result in the proposal being removed from consideration.
Proposal Submission Guidelines:
· Provide all requested information for each factor.
· Address each element of the factors as applicable.
· Highlight factor headings in yellow or bold text.
· Ensure the proposal is in the proper format, clear, and free of ambiguities.
· Submit the best terms from a price standpoint.
· Format the proposal as specified in the instructions.
· Resolve minor or clerical errors without constituting discussions. The Contracting Officer reserves the right to award a contract without requesting revisions or discussions.
B. EVALUATION CRITERIA
The evaluation process is detailed in the solicitation section titled “PROPOSAL PREPARATION AND EVALUATION INFORMATION”. In case of any ambiguity between the solicitation and the SSEP, the solicitation prevails.
Evaluation Process:
· Best Value Determination: The Government will award a contract to the offeror whose proposal conforms to the solicitation and is determined to be “Best Value”.
· Tradeoff Strategy: Evaluation of all acceptable offers against the source selection criteria in the solicitation.
· Evaluation Factors: Offers will be evaluated using the specified evaluation factors.
· Offer Completeness: Ensures the completeness of the proposal. The SSEB will evaluate only the information provided in the initial proposal without assuming any capability not explicitly identified within it.
C. COMMUNICATION AND COMPETITIVE RANGE
In accordance with RFO FAR 15, the government may:
· Pre-Establishment Clarifications:
· In accordance with RFO FAR 15.202(a)(2), clarifications may occur with offerors for the relevance of an offeror’s past performance information and adverse past performance information to which the offeror has not previously had an opportunity to respond. If discussions are required, the CO will establish a competitive range of the most highly rated proposals and will then enter into negotiations and will allow for Final Proposal Revisions. Final Proposal Revisions shall be submitted as specified except as noted below and will be due at a time and place to be determined.
· Submission Deadline:
· Final Proposal Revisions will be due at a time and place to be determined.
D. PROPOSAL FORMAT AND EVALUATION
Proposal size will be limited as shown and font/size shall be Arial 11. Title pages, headers, and exhibits do not count towards the page limitations. If these page limits are exceeded, the pages in excess of the limit will not be read or considered.
Offerors shall submit 1 (one) email. Email shall include a consolidated PDF file, no larger than 10mb, as an attachment, outlining each factor, as listed below:
· Email Requirements:
· Subject Line: Company Name, 36C25626R0114, and Project 520-27-102
· See Proposal Submission Requirements in the table below.
| VOL |
| FACTOR |
| PROPOSAL SUBMISSION REQUIREMENTS |
| I |
| Factor 1 |
| Submission Requirement: |
1) Material to satisfy Subfactor 1a criteria outlined below.
2) Material to satisfy Subfactor 1b criteria outlined below.
| I |
| Factor 2 |
| Submission Requirement: |
1) Offeror Shall provide a minimum of one (1) and a maximum of three (3) projects completed within the last five (5) years similar in size, complexity, and scope to this project.
2) Exhibit A – Offeror shall provide a completed Exhibit A to satisfy evaluation criteria below or may be used for consideration of current project examples (the form must clearly annotate what it is being used for).
3) Exhibit B –This exhibit is to be completed by an end user and submitted to contracting separately from an offeror’s proposal. Exhibits received will be used for as part of the evaluation – If Exhibit B is not received by an end user, offerors will not be penalized.
3) Exhibit C – (if applicable) to be used for subcontractor past performance if the prime intends to use subcontractor past performance to support this evaluation.
| 2 |
| Factor 3 |
| Submission Requirement: |
1) Signed 1442 and Amendments
2) Completed Schedule of Offer Items
3) Completed Continuation of 1442 (Divisional Price Distribution Sheet)
4) Price Breakdown (CLIN 0001)
5) Bid Bond/ Bid Guarantee (SF 24)
6) SDVOSB Verification & Required Registrations
7) Completed Exhibit D (EMR) & Exhibit E (Surety)
8) OSHA Records- OSHA safety records for the last (3) years
9) Completed VAAR Clause 852.219-75
10) VETS-4212 Documentation
11) 52.219-1 Small Business Representation
12) 52.209-7 Information Regarding Responsibility Matters (if applicable)
13) 52.209-13 Violation of Arms Control Treaties or Agreements – Certification (if applicable)
14) 52.219-28 Post-Award Small Business Program Representation
15) 52.225-9 Buy American – Construction Materials (Oct 2022)
***Definitions*** ***Recent-with in past five (5) years from the date of solicitation issuance*** ***Relevant-Construction Contracts/Task Orders between $250,000.00 and $500,000.00***
E. BASIS FOR CONTRACT AWARD
1) The government will make one award to the eligible and responsible offeror whose proposal conforms to the solicitation and represents the best value to the Government.
2) This acquisition uses the Tradeoff approach under RFO FAR 15.103-1. Past Performance is significantly more important than Price. The Government may select a higher-priced proposal when the Source Selection Authority determines that the benefits associated with the higher-rated record of past performance merit the additional price. The Government will not pay a price premium that is unsupported by discernible benefits.
F. EVALUATION FACTORS
The evaluation factors are:
Factor 1: Technical Acceptability Factor 2: Past Performance Factor 3: Price
Factor 1 will be evaluated as Acceptable or Unacceptable and will not be included in the comparative tradeoff among proposals rated Acceptable. Among proposals rated Acceptable under Factor 1, Past Performance is more important than Price.
FACTOR 1 — Technical Acceptance:
1. The Government will evaluate the Technical Acceptability submission in its entirety. Factor 1 will receive one overall rating of Acceptable or Unacceptable.
2. The technical narrative shall not exceed five pages. Resumes, OSHA certification documentation, and the draft project schedule are excluded from the five-page limitation.
3. Pages exceeding the stated page limitation will not be evaluated.
SUBFACTORS:
· Subfactor 1a – Technical Narrative
· Subfactor 1b – Draft Project Schedule
Subfactor 1a- Technical Narrative The Offeror shall provide one integrated narrative addressing its proposed approach to the following:
1. Installation of catwalks, access stairs, ladders, safety railings, anchorage systems, foundations or footings, and associated structural components at the ten fuel-tank locations identified in the Scope of Work;
2. Preparation, coordination, and submission of required shop drawings and product data;
3. Sequencing and coordination of work among the ten fuel-tank locations within the required contract performance period;
4. Modification of existing electrical conduits at the locations identified in the Scope of Work;
5. Installation of continuous capacitance fuel-level transmitters and associated monitoring components at each required fuel tank;
6. Integration of the fuel-level monitoring system with the applicable Siemens field panels to support the remote-monitoring capability required by the Scope of Work;
7. Field testing and verification of the fuel-level monitoring system before Government acceptance;
8. Protection of existing fuel tanks, buildings, utilities, equipment, pavements, and other existing improvements during construction; and
9. Maintenance of safe access and site operations while work is performed.
Subfactor 1b- Draft Project Schedule The Offeror shall submit a draft project schedule showing its proposed sequence for completing all required work within 120 calendar days after receipt of the Notice to Proceed.
The draft schedule shall:
1. Begin with receipt of the Notice to Proceed;
2. End with completion of all work, testing, punch-list work, closeout submissions, and final acceptance within 120 calendar days;
3. Identify, at a minimum:
a. Mobilization and site coordination;
b. Field verification;
c. Shop-drawing and product-data preparation;
d. Government submittal-review periods;
e. Material and equipment procurement;
f. Structural fabrication;
g. Foundation or footing work;
h. Catwalk, stair, ladder, railing, and anchorage installation;
i. Electrical-conduit modifications;
j. Fuel-monitoring equipment installation;
k. Siemens field-panel integration;
l. Testing and functional verification;
m. Punch-list correction; and
n. Project closeout;
4. Identify the planned sequencing of work among the ten fuel-tank locations;
5. Identify dependencies between major activities; and
6. Be consistent with the technical narrative and the solicitation’s required 120-calendar-day performance period.
FACTOR 2 — Past Performance:
The Past Performance evaluation will assess the relative risks associated with an Offeror's likelihood of success in fulfilling the solicitation's requirements as indicated by that Offeror's record of past performance. In this context, “Offeror” refers to the proposed prime SDVOSB. A single past performance rating will be based on the total package submitted by the offeror.
The Offeror shall submit no fewer than one and no more than three recent projects. If more than three projects are submitted, the Government will evaluate only the first three projects presented in Volume I.
Offerors are reminded that the burden of demonstrating low performance risk rests with the Offeror. Failure to provide adequate supporting information may result in a lower performance confidence rating.
***Definitions*** ***Recent-with in past five (5) years from the date of solicitation issuance*** ***Relevant- For purposes of this evaluation, a relevant project is defined as “construction on an occupied healthcare or comparable institutional campus, with heightened relevance for work involving fuel systems, industrial access structures, and uninterrupted operations.” ***
· Projects must demonstrate an offeror’s experience as a prime contractor managing multiple subcontractors.
· Project (s) shall have a minimum Construction value of between $250,000.00 and $500,000.00 and be 100% completed
· For each project submitted, Offeror shall provide a narrative that describes recent successful performance and demonstrates experience in hospital construction on a similar campus as GCVHCS. Information shall include details on complexity, magnitude, challenges, and degree of success. Offerors are encouraged to include supporting documents such as photographs that support the narrative. The narrative should discuss items such as challenges with schedule, unforeseen site conditions, or other unusual factors, and provide details on how the offeror overcame those challenges.
· The Offeror’s submission should include at a minimum:
· Project Title.
· Contract Number.
· Project Location (Physical Address)
· Contract Type (Example: Design-Build, Design-Bid-Build)
· Project Owner’s Name & Current Contact Information
· Government Agency/ Company
· Brief Description of the Scope of Work (Details of construction requirements, challenges, and solutions)
· Project Start & Completion Date (schedule impacts and efficiencies)
· Project Cost and Cost Control Measures. Original and final contract costs, contract mods, cost containment measures, value engineering, etc;
· Subcontractors (Names, Roles, Responsibilities, and Percentage of work.)
· *Should more than three projects be submitted, only the first three listed will be evaluated.*
· For multiple award and indefinite delivery/indefinite quantity type contracts, the whole contract shall not be submitted as a project; rather Offerors shall submit the work performed under a single task order as a project to demonstrate recent/relevancy.
· If the Offeror is a Joint Venture (JV), relevant past performance should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared past performance, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit past performance for all Joint Venture partners may be rated lower.
· Performance Relevancy Survey (Exhibit A): Utilizing Performance Relevancy Survey (Exhibit A). The Offeror shall demonstrate completed recent and relevant projects at a hospital/ medical center (Federal or other than Federal) project of this same size, scope, and complexity (or greater). Note: Clearly identify those examples where an Offeror’s proposed Subcontractor was the Prime (or the Subcontractor) on the Project Examples if utilizing Subcontractor Construction Project Capability.
· Past Performance Questionnaire (PPQ-Exhibit B): – Offerors shall prepare and forward to prior client(s) for submission to the Contracting Office EXHIBIT B PAST AND PRESENT PERFORMANCE QUESTIONNAIRE for all the projects listed by Offeror and submitted using EXHIBIT A PERFORMANCE RELEVANCY SURVEY. Exhibit B includes correspondence explaining the requirement to obtain an independent evaluation of prior contract performance and the Past and Present Performance Questionnaire for use in evaluating Past Performance. ***PPQ may have been completed no later than one (1) year prior to the effective date of this action*** If an Offerors Exhibit B is not received by the Contracting Officer, Offerors will not be penalized.
· An offeror with limited or no past performance may receive a rating based on the evaluation of its subcontractors and/or key personnel, provided an EXHIBIT C SUBCONTRACTOR INFORMATION AND CONSENT FORM has been executed and included in the proposal for proposed subcontractors and/or potential key personnel not employed by the offeror. These ratings shall have the same weight as the ratings of the offeror. Offerors without a record of relevant past performance will be assigned a neutral rating in accordance with RFO FAR 15.202 (c)(1). However, the proposal of an offeror with no relevant Past Performance history, while rated “Neutral” in Past Performance, may not represent the most advantageous proposal to the Government and thus, may be an unsuccessful proposal when compared to the proposal of other offerors.
Evaluation Methodology: Past performance will be evaluated based on the projects provided by the offeror, and performance information from government databases. Focus will be on recent and relevant construction contracts that are comparable in size, scope, and complexity. The Intent of this evaluation is to evaluate the demonstrated ability to successfully complete comparable requirements, ensuring they have the experience and capability to deliver quality results on time, within budget, and incompliance with project specifications.
The Government may evaluate Past/Present Performance information through the use of Exhibit A & B completed by the offeror's references; The Government may evaluate Key Staff-Subcontractor Performance information through the use of Exhibit C completed by the offeror; use data independently obtained from other Government or commercial sources, including, but not limited to, Government databases; and/or rely upon professional business/working experience with the offeror. The evaluation may take into account Past Performance information regarding predecessor companies, key personnel who have relevant experience, and/or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to this acquisition.
Past Performance information on contracts not listed by the offeror, or that of planned subcontractors, may also be evaluated. The Government may contact references and contact parties other than those identified by the offeror and information received may be used in the evaluation of the offeror’s Past Performance. While the Government may elect to consider data obtained from other sources, the burden of providing current accurate and complete Past Performance information rests with the offeror. The Government reserves the right to obtain and evaluate Past Performance information from any source it deems appropriate.
In accordance with RFO FAR 15.202(a)(2), if award will be made without conducting discussions, an offeror may be given the opportunity to clarify certain aspects of their proposal (i.e., the relevance of an offeror's past performance information) as related to this acquisition, address adverse past performance information to which the offeror has not previously had an opportunity to respond or to resolve minor clerical errors.
Performance Currency, Trends, and Relevancy: The Government will consider the currency, trends and relevancy of the performance information while conducting its performance evaluation. For the purpose of this solicitation, performance currency is performance occurring within the last five (5) years from the proposal issuance date. Within this period, performance occurring later in the period may have greater significance than work occurring earlier in the period. For example, performance information for work occurring during March 2023 may have greater importance than performance information for work occurring during March 2018. Performance Trends may, depending upon the circumstances, have greater significance than sporadic incidents of "Exceptional" or "Unsatisfactory" performance. For the purpose of this solicitation, Performance Relevancy is defined as contracts (ongoing or completed) which are similar in scope, magnitude, and complexity to the current requirement. Higher relevancy will be assessed for contracts that are similar to the effort, or portion of effort, for which that contractor is being proposed, and may contribute to an overall higher relevancy score for the offeror. Based on the evaluation of offers, the Government will assign a performance confidence rating for each proposal at the factor level. The evaluation will consider the sub-factors as described herein. Following assignment of the performance confidence rating for each proposal, each offeror will receive a final risk rating for performance based on the cumulative rating of performance currency, trends, and relevancy.
FACTOR 3 – Price:
The Government will evaluate price to determine whether proposals are fair and reasonable.
Submission Requirement: (See Table Above)
1. Completed and Signed SF 1442 and All Amendments A fully executed and signed two‑page SF 1442 completed by an authorized signatory. All blocks under the “OFFER” section on page 2 (Items 14 through 20C), including any required continuation sheets, must be completed. All solicitation amendments must be acknowledged, signed, and submitted.
2. Completed Schedule of Offer Items Provide a complete Schedule of Offer Items in accordance with the solicitation.
3. Continuation of SF 1442 (Divisional Price Distribution Sheet) Submit all continuation pages detailing the divisional price distribution.
4. Price Breakdown (CLIN 0001) A completed price breakdown for CLIN 0001, using the price breakdown form provided in the solicitation.
5. Bid Bond / Bid Guarantee (SF 24) A duly executed SF 24 Bid Bond meeting the requirements of FAR 52.228‑1, Bid Guarantee. Bid bond notary impressions must be clearly visible.
6. SDVOSB Verification and Required Registrations The Offeror must be VetCert‑certified as an SDVOSB at the time offers are due and at award. The Offeror shall be actively registered in SAM.gov and must have completed all required Representations and Certifications.
7. Completed Exhibit D (EMR) and Exhibit E (Surety) Submit documentation from the Offeror’s insurance carrier confirming an EMR less than 1, along with required surety information.
8. OSHA Records Provide OSHA safety records for the last three (3) years.
9. VAAR Clause 852.219‑75 Submit a completed and signed copy of VAAR 852.219‑75, VA Notice of Limitations on Subcontracting – Certificate of Compliance (JAN 2023) (Deviation).
10. VETS‑4212 Documentation Provide documentation confirming the Offeror has filed the required VETS‑4212 report.
11. FAR 52.219‑1 Small Business Representation
12. FAR 52.209‑7 Information Regarding Responsibility Matters (if applicable)
13. FAR 52.209‑13 Violation of Arms Control Treaties or Agreements – Certification (if applicable)
14. FAR 52.219‑28 Post‑Award Small Business Program Representation
15. FAR 52.225‑9 Buy American – Construction Materials (Oct 2022)
Evaluation Methodology: The purpose of the price evaluation is to provide an assessment of the completeness and reasonableness of the proposed price in relation to the solicitation requirements. Price proposals will be evaluated to determine if the prices and support costs areas are:
· Complete – The proposal contains costs to perform all tasks required by the Scope of Work (SOW), specifications, and design drawings if provided.
· Reasonable – The price is determined fair and reasonable using cost or price analysis techniques described in RFO FAR 15.404.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION) (a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.4 52.233-2 SERVICE OF PROTEST (NOV 2025) (DEVIATION)
(a) Protests, (as defined in FAR 33.102), that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), must be served on the Contracting Officer identified in the solicitation by obtaining written and dated acknowledgment of receipt from them.
(b) The copy of any protest must be received in the office designated above within one day of filing a protest with the GAO.
(End of Provision)
2.5 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)
(a) Definitions. As used in this provision— Backhaul, covered article, covered telecommunications equipment or services, critical technology, FASCSA order, Intelligence community, interconnection arrangements, national security system, roaming, sensitive compartmented information, sensitive compartmented information system, source, and substantial or essential component have the meanings provided in the clause 52.240-91, Security Prohibitions and Exclusions.
Business operations means engaging in commerce in any form, including by acquiring, developing, maintaining, owning, selling, possessing, leasing, or operating equipment, facilities, personnel, products, services, personal property, real property, or any other apparatus of business or commerce.
Marginalized populations of Sudan means—
(1) Adversely affected groups in regions authorized to receive assistance under section 8(c) of the Darfur Peace and Accountability Act (Pub. L. 109-344) (50 U.S.C. 1701 note); and
(2) Marginalized areas in Northern Sudan described in section 4(9) of such Act.
Restricted business operations means business operations in Sudan that include power production activities, mineral extraction activities, oil-related activities, or the production of military equipment, as those terms are defined in the Sudan Accountability and Divestment Act of 2007 (Pub. L. 110-174). Restricted business operations do not include business operations that the person (as that term is defined in Section 2 of the Sudan Accountability and Divestment Act of 2007) conducting the business can demonstrate—
(1) Are conducted under contract directly and exclusively with the regional government of southern Sudan;
(2) Are conducted under specific authorization from the Office of Foreign Assets Control in the Department…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .