This file is an Amendment to Solicitation/Modification of Contract (Standard Form 30) for solicitation 36C25626Q0370, issued by the Department of Veterans Affairs Veterans Healthcare System of the Ozarks Network Contracting Office in Fayetteville, Arkansas. The amendment documents the official questions and answers provided in response to a Request for Information (RFI) regarding a window re-caulking repair service project at a VA facility.
The scope of work is limited to re-caulking of the curtain wall system in Courtyard 1 only, with the primary issue being displaced exterior caps that have caused water intrusion into adjacent restrooms (G101A and G101B). Key clarifications provided include: no payment or performance bonds are required; the VA does not have as-built drawings or manufacturer specifications for the existing curtain wall system; contractors should use manufacturers' recommended sealant products; work is limited to re-caulking with minimal cap removal unless damage requires replacement; no asbestos or lead abatement is anticipated; no roof waterproofing work is required unless existing damage is discovered; the TPO roofing membrane exists beneath the courtyard pavers; work must comply with quiet hours from 2:00-3:00 p.m. and 10:00 p.m.-5:00 a.m. due to hospital operations; contractors must submit an anticipated work schedule prior to notice to proceed; and the adjacent courtyard on the east side of Building 170 is excluded from the scope. The VA confirmed the water leak source has been identified and attributed to displaced caps, with photographic documentation provided showing the affected restroom ceilings and above-ceiling leak conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25626Q0370 0001.docx | DOCX document | |
| 36C25626Q0370.docx | DOCX document | |
| Wage Determination Services LR 15-5117.txt | TXT text file | |
| SOW - B170 Courtyard Window Re-caulk.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703
Department of Veterans Affairs Veterans Healthcare System of the Ozarks Network Contracting Office 16 2575 Keystone Crossing Fayetteville AR 72703 To all Offerors/Bidders
36C25626Q0370
X
Questions and answers provided to RFI's about project.
1. This is a services contract, are payment and performance bonds required for this project?
No, they will not be required.
2. Will the VA provide as-built drawings of the courtyard 1 curtain wall elevation where re-caulking is required?
Currently, we do not have access to that information
3. To ensure the curtain wall is functioning properly and shedding water as intended, the contractor may need to remove the exterior caps/cover plates to clean and inspect the pressure bars, glazing pockets, and weep paths. Removing these caps often causes twisting/warping and may require replacement caps. Please confirm the level of repair the VA expects the contractor to perform:
· Re-caulking only, with minimal removal of caps; or Re-caulking only, with the option of temporary removal of caps
· Removal of caps for cleaning/inspection, with replacement caps as needed, or
· Complete frame replacement (if necessary).
4. Will the VA provide the manufacturer name, model/system type, and any available details of the existing curtain wall system? This information will help offerors price accurately and identify compatible caps/accessories.
Currently, we do not have access to that information / Is not required.
5. Will the VA confirm if the offeror's scope is limited to the curtain wall work only at courtyard 1?
Yes, only Courtyard 1
6. Will the VA confirm if any work on the waterproofing/roof membrane beneath the courtyard 1 is required as part of this project?
No work is required unless damaged
7. Will the VA confirm what roofing/waterproofing system is installed beneath the courtyard 1 pavers?
TPO roofing membrane
8. Please provide the roof-to-wall (courtyard slab / curtain wall) flashing detail and/or shop drawing detail that the contractor is required to follow to seal this junction and direct water away from the ground floor.
Currently, we do not have access to that information / Is not required.
9. Will the VA provide the specific minimum requirements for the glazing/curtain wall sealant to be used?
It would be associated with the specific windows currently installed, but we do not have access to that information as the windows were installed a long time ago. Use the manufacturers’ recommended products.
10. During the site visit, it was mentioned that the roof area from which the contractor would need to support a swing stage was replaced around 2014. Will the VA provide as-built drawings and/or roof cut sections for that area (showing structure and membrane build-up)? This information will help offerors determine the feasibility and means/methods for supporting a swing stage.
At this time we do not have access to that information
11. Does the roof currently have an active warranty? If so, please provide information on the current manufacturer's roof and the company holding the warranty.
There’s no active warranty
12. This is a services contract, will the contractor be required to provide a full-time on-site Superintendent, CQM, and SSHO for this project?
No
13. Please confirm any restricted work hours, noise limitations, or requirements for night or weekend work affecting activities inside the hospital.
All units will have to be quiet 2p.m. - 3 p.m. & 10 p.m. – 5 a.m. The windows are connected to the main hallway and not to any of the patients’ rooms, however coordination with nurses would be warranted due to occupying the courtyard.
14. What is the period of performance (PoP) established for this project?
Contractor shall present an anticipated work schedule prior to notice to proceed is given.
15. Has an asbestos and lead survey been conducted for material that may be disturbed by this work (e.g., sealants/caulking, gaskets, etc.)? If so, will the VA provide copies of the survey results?
No. Result were taken from a section of the floor and surrounding sections results were assumed homogenous. Contact with the black tar barrier is not expected. See Figure 1. below
16. Should the offeror include a cost allowance in their bid for potential asbestos or lead abatement? If so, will the government provide estimated quantities to support accurate pricing?
There should be no asbestos or lead encountered during this project
17. During the site visit, it was mentioned that similar water intrusion issues may be occurring in an adjacent courtyard on the east side of Bldg.170. Will the VA confirm whether this additional courtyard is included in the solicitation scope, and whether offerors are required to provide two separate prices?
The additional courtyard will not be included in the solicitation
18. Will the VA provide photos of rooms G101A and G101B, men’s and women’s restrooms, where water leaks were observed? These areas were not accessible during the walkthrough. Please include:
a. One wide-angle photo inside each restroom showing the affected ceiling area (to identify the location), and See Figure 2.
b. Close-up photo(s) of the staining/leak evidence, and See Figure 3.
c. If available, above-ceiling photo(s) showing the leak condition.
See Figures 4. & 5.
19. Will the VA provide the as-built drawings for Courtyard 1, the first floor, and the ground-floor area below, including Rooms G101A and G101B?
At this time we do not have access to that information
20. Has the VA identified the source of the water leak? During the site visit, it was mentioned that no leaks were found coming through the curtain wall into the interior hallway. If the weep holes are still open and water is draining to the exterior courtyard as intended, then the curtain wall system itself may be functioning properly, and the source of the leak may be located elsewhere.
Yes, we’ve located the leaks. The caps have moved out of place over the years
Figure 1. Asbestos and lead Survey results
Figure 2. G101A (left) & G101B (right)
Figure 3. G101B (before Tiles were replaced)
Figure 4. G101A Above Ceiling
Figure 5. G101B Above ceiling image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image1.jpeg image2.jpeg image3.jpeg