36C25626Q0142 0001-Questions and Responses 11-18-25.pdf
PDF 336 KB Posted
- Attached to
- 4410--PK 12 Steam Fired Domestic Water Heaters and PK 8” Copper Tube Bundle Name Brand or Equal
- Solicitation number
- 36C25626Q0142
About this file
This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs Network Contracting Office 16 in Houston, TX for solicitation 36C25626Q0142. The amendment provides responses to eight questions from potential bidders regarding a project involving Trane Ensemble building automation system and P-K 12 water heaters in building 170. Key details include: the Trane panel is located in the same room as the water heaters and less than 50 feet away, no control wiring has been run to the water heaters, and existing pneumatic controls are not integrated into the building automation system. The site visit occurred on November 14, 2025, and the solicitation is for a commodity (supply) buy with incidental installation services. Bidders can request a brief explanation of award results after the contract is awarded, in accordance with FAR Part 12.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25626Q0142 0001_1.docx | DOCX document | |
| 36C25626Q0142_1.docx | DOCX document | |
| S02-36C25626Q0142 PK Name Brand or Equal Water Heaters 110725.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0001 11-18-2025
598-26-1-8723-0057
Department of Veterans Affairs
Network Contracting Office 16
5075 Westheimer Road, Suite 750
Houston TX 77056-5643
Department of Veterans Affairs
Network Contracting Office 16
5075 Westheimer Road, Suite 750
Houston TX 77056-5643
To all Offerors/Bidders
36C25626Q0142
X
X X x 1
RE 1: Provide response to questions received for solicitation 36C25626Q0142.
See Below
Re 2: Add Questions cutoff date 11-18-25 by 10:00 am (cst)to Solicitation.
Anthony Marion
Contracting Officer
VA-VHA-2021-8BF5EFDA
A.1 QUESTIONS AND RESPONSES
1. How far from the P-K 12 water heaters in building 170 is the nearest Trane Ensemble junction point capable of supporting the DDC connection?
Response: Trane panel is in the same room as the heaters and is less than 50 feet away.
2. Has the control wiring been run from this Trane Ensemble junction point to the P-K 12 water heaters?
Response: No
3. Are the existing P-K 12 pneumatic controls integrated into the Trane Ensemble building automation system?
4. Question: Confirm the bid date and time listed above are unchanged.
Response: Unchanged
5. Question: Construction cost estimate or a construction cost range for the project.
Response: Requirement is for a commodity (Supply) buy with incidental service for installation.
6. Question: Planholders list/bidders list and Non-Mandatory pre-bid attendance list
Response: Site visit was provided November 14, 2025 for contractors to attend.
7. Question: Have you issued an addendum? If so, please attach them to this response.
8. Question: When is the best time to follow up for bid results?
Response: Quoters can request a brief explanation after award per FAR Part 12.