This document is a Quarterly Sampling Plan for the Gulf Coast VA Health Care System's Legionella Prevention Program for FY24 FY25 Q1. The comprehensive plan details a systematic water sampling approach across seven VA buildings (Buildings 3, 5, 14, 15, 19, 25, and 30), requiring at least 20 samples per building with specific collection protocols. Key sampling parameters include measuring water temperature (hot water < 110°F, cold water < 67°F), biocide levels (0.2-2 ppm chlorine), and pH range (6.5-8.5), with samples collected from various locations such as patient care areas, emergency departments, ICUs, residential quarters, and clinical spaces.

The sampling plan also includes specific instructions for collecting potable and non-potable water samples, with minimum detection limits of 0.4 colony forming units (CFU) per milliliter for potable systems and 5 CFU/mL for non-potable/utility water systems. Additionally, the plan covers cooling tower sampling, with eight total samples to be collected from different locations in Building 3, including condenser return and supply ports, cooling tower sumps, and chiller return and supply ports. The document is prepared by Misty Madison, Industrial Hygienist and Water Safety Program Manager, in accordance with VHA Directive 1061 for preventing healthcare-associated Legionella disease.

View the file

Other files

File Type Posted
36C25625Q1462SSN 0002.docx DOCX document
S04-Site Plan-Biloxi 1 MAP.pdf PDF
36C25625Q1462SSN 0001.docx DOCX document
36C25625Q1462SSN_1.docx DOCX document
ATTACHMENT D Harrison County MS WD 2015-5147 R27 dtd 07-08-2025.pdf PDF
ATTACHMENT B Past Performance Questionaire fillable.pdf PDF
ATTACHMENT A LIST OF PAST PERF REF.docx DOCX document
ATTACHMENT C QASP Legionella.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gulf Coast VA Health Care System Legionella Prevention Program Sampling Plan

FY24

FY25 Q1 Quarter Sampling Plan, prepared by Misty Madison, Industrial Hygienist, Water Safety Program Manager Gulf Coast VA Healthcare System prepared on October 22, 2024.

As part of an integral Water Safety Management Plan, in accordance with VHA 1061, Prevention of Health Care-Associated Legionella Disease and Scald Injury from Water Systems (February 2021), the following Sampling Plan is set forth to provide guidance to sampling personnel and ensure sampling integrity and compliance.

Biloxi campus VA buildings which meet the criteria for required sampling locations are 3, 5, 14, 15, 19, 25, and 30. No less than 20 samples shall be taken per building, with at least 2 of those 20 samples being collected from a pure cold water source (water fountain, ice machine) and at least 2 of those samples being collected from a pure hot water source, (water heater or the hot side of sink or shower-no mixing valve). Samples must fill a container of 250 milliliter (mL) or greater.

Note: Bldg. 30 2nd floor Oncology section shall be sampled each quarter.

Parameters which must be recorded at each sampling point are: sample volume, biocide level, pH, and water temperature. When collecting samples from a fixture, the sample must represent one sample per fixture. It is not acceptable to take more than one sample from the same sink, shower, or other type of collection source.

Note: Sampler and VA representative will ensure samples are collected from areas which most accurately representative the building’s overnight patient care or overnight resident/employee areas.

The minimum detection limit for potable water system is 0.4 colony forming units (CFU) per milliliter (mL) and 5 CFU/mL for non-potable/utility water system.

Bldg. 3 and Bldg. 30, focus will be in the overnight areas such as the Emergency Department, ICU, and 30-4.

pH range: 6.5 to 8.5 (Any readings < 6.4 or > 8.6, notification to Engineering must be made prior to end of sampling event) Chlorine range: 0.2 ppm to 2 ppm Chlorine shall be measured first catch following legionella sample collection. Any readings < 0.1 or > 3.5 ppm, notification must be made to Engineering at once.

Temperature range: hot < 110° Fahrenheit (F) and cold temps < than 67°F (due to location, this temperature might be > 67°F, but notification should be made to Engineering when out of range.

VHA 1061, Sampling Guide, for collection of legionella, follow these steps: Guidance Document Routine Legionella Testing for Buildings_April 2021.pdf (va.gov) GD.1061, April 2021

4.1 Order of Taking Samples For routine testing in accordance with VHA Directive 1061, sampling at each outlet is for the purpose of determining the presence of Legionella, as well as understanding water temperature, level of residual biocide and pH in water at/to the outlet.

The following order should be used for collection of samples to determine those parameter levels:

1) collect 250 mL water sample for legionella analysis. Collect the water sample immediately after opening the outlet without flushing water first.

2) collect the next immediate water sample (i.e. no flushing) to take the biocide residual reading.

3) After taking the sample for the biocide reading, run the water for 60 seconds. Collect a water sample to measure water temperature and pH. If hot water temps are below 110°F, run water additional 60 seconds, record temperature, and notify Engineering immediately.

4) Following collection of 140 samples (20 per building), the samples shall either be shipped overnight to the lab (any samples damaged in transit must still be analyzed) for analysis or kept on ice until the sampler returns to lab location.

5) Fill out chain of custody COMPLETELY. Mark sample source, such as sink, shower, ice machine, water fountain and note whether source is before or after mixing valve (if hot water sample)

6) If any sample parameters are out of range, notify Engineering personnel prior to departing the facility.

The chart below outlines rooms that should be used as a guide for the sampler, to ensure overnight patient care rooms are being sampled/analyzed. The room listing can be chosen from, as long as the 20 samples per building are taken, with the 2 pure cold (ice machine & water fountain) and 2 pure hot (hot water tank & hot water outlet with no mixing valve). While some room locations may be repeated each quarter, the goal will be to review the previous quarter’s sampling locations to determine if there is the need for repeated sampling, and to maximize variety of locations on each end of each building, to ensure representative sampling is being conducted.

Bldg. 3

First Floor: Emergency Dept.
1F-118
1F-119
1F-130
1F-113
1F-128
1F-133A
1F-112
1F-137
1F-141
1F-107
1F-117
1F-129

Second Floor:

Nuclear Medicine

Nuclear Med 2B-138
2B-135
2B-130A

Third Floor:

Lab

Blood Draw
Lobby Water Fountain
SPS
Sterile Processing Sink (hot)
Sterile Processing Decontamination

(hot) Sterile Processing Rm. 3D113 Right Rear Sink

Fourth Floor:
Endoscopy 4D103F H&C sink w/ leg activation
4D124J Scrub Sink

Dialysis Storage 4D122 sink

ICU
Dialysis Rm. 4B101
Dialysis Rm.

4B102 Patient room 4B103

Ante Room 4B104 Patient room 4B105 4B106 Ice Machine

Ice Machine: 1F-129, 4B106 Water Fountain: near 1B-105, near 1F-112 Bldg. 5 (Residential quarters for VA medical students and/or facility employees staying overnight)

First Floor:
1A-109
1A-103
1A114
1A-114C
1A114B
1A114D
Second Floor:
2A-110A

1) Sink

2) Shower

2A-109A
2A-104A
2A-103A
2A-112A
2A-111B
2A-111D
2A-114A

Ice Machine: none in Bldg. 5 Water Fountain: by stairs, near elevator

Bldg. 14 (Blind Rehabilitation Unit) A&B Sides

First Floor:
1A-124B
1A-133
1A-135
1A-137
1B-102A
1B-100B
1B-104A
1B-108A
1B-103A
1B-101A
1B-107A
1B-109A
1B-115A
1B-117A
1B-119A
1B-114A
1B-116A
1B-118A
1B-120A
1B-123A
1B-124A
1B-121A
1B-126A
1B-130A
1B-129A
1B-131A
1B-128A
1B-135A
Second Floor:
2A-143A,B,C

Ice Machine: 2A143 Water Fountain: near 1B-137, near 2A-143, and C2-9B Bldg. 15 (CLC) Collect 2 samples per neighborhood from 2 different locations/rooms First Floor Neighborhoods: Rio Grande – 1C, Yellowstone – 1E , Niagara – 1F, Delaware – 1H Second Floor Neighborhoods: Sacramento – 2C Columbia – 2E, Potomac – 2F, Mississippi – 2H

First Floor
Rio Grande 1C
1C-101,1C-101A

Sink

1C-103, 1C-103A
1C-107, 1C-107A
1C-110A, 1C-111A
1C-113A

shower

1C-119A
1C-120A

shower

1C-121A shower

1C-122A
1C-128 Food Prep (Hot)
1D103 Kitchen (Hot)
Yellowstone 1E
1E-107, 1E-107A
1E-110A
1E-111A
1E-119, 1E-119A
1E-120, 1E-120A
1E-122, 1E-122A
1E-113, 1E-113A
1E-127, 1E-127A
1E-128A (Hot)
1E-129, 1E-129A
1E-112, 1E-112A
Niagara 1F
1F-123, 1F-123A
1F-121, 1F-121A
1F-120, 1F120A
1F-121, 1F-121A
1F-119, 1F-119A
1F-118, 1F-118A
1F-112, 1F-112A
1F-107, 1F-107A
1F-111, 1F-111A
1F-112, 1F-112A
1F-103, 1F-103A
Delaware 1H
1H-109, 1H-109A
1H-110, 1H-110A
1G-103 Kitchen
1H-111, 1H-111A
1H-112, 1H-112A
1H-117, 1H-117A
1H-119, 1H-119A
1H-120, 1H-120A
1H-122, 1H-122A
1H-127, 1H-127A
1H-129, 1H-129A
Second Floor
Sacramento 2C
2C-101, 2C-101A
2C-103, 2C-103A
2C-105
2C-106
2C-107, 2C-107A
2C-110, 2C-110A
2C-111, 2C-111A
2C-113, 2C-113A
2C-119, 2C-119A
2C-120,2C-120A
2C-121, 2C-121A
2C-122, 2C-122A
2C-129 food prep
2D-103 Kitchen
2C-05 sink
Columbia 2E
2E-107, 2E-107A
2E-110, 2E-110A
2E-111, 2E-111A
2E-112, 2E112A
2E-113, 2E-113A
2E119, 2E-119A
2E-120, 2E-120A
2C-129, 2E-129A
2E-122, 2E-122A
2E-124,2E-124A
2E-127, 2E-127A
Potomac 2F
2F-101, 2F-101A
2F-103, 2F-103A
2G-103 Kitchen
2F-107, 2F-107A
2F111, 2F-111A
2F-112, 2F112A
2F-118, 2F-118A
2F-119, 2F-119A
2F-120, 2F-120A
2F-121, 2F-121A
2F-122, 2F-122A
2F-123, 2F-123A
2F-128
2F-129
Mississippi 2H
2H-109, 2H109A
2H-110, 2H-110A
2H-111, 2H-111A
2H-112, 2H-112A
2H-113, 2H113A
2H-117, 2H-117A
2H-119, 2H-119A
2H-120, 2H-120A
2H-122, 2H-122A
2H-127, 2H-127A
2H-129, 2H-129A

Ice Machine: 1D103 (kitchen between Rio Grande & Yellowstone), 1G103 (kitchen Niagara & Delaware Water Fountain: 2nd Floor near vending machines ***Note that Sacramento has been closed for construction and will need to be flushed daily to prevent dead leg water build up.*** Bldg. 19 Domiciliary/RRTP (currently unoccupied) First Floor Mostly social work offices 1A-116A Office restroom 1A-114A restroom

Second Floor RRTP
2A-121A
2A-119A
2B-119A
2B-116A
Acute inpatient
2A-103A
2A-101A
2B-110A
2B-114A
Psych
2B-108A
2B-118A
2B-119A
2B-123A
2C-105
2C-107
2C-120
2E-112
Third Floor
3B-114A
3B-115A
3B-116A
3B-113A
Residential domiciliary
3B-120A
3B-107A
3B-103A
3B-130A
3B-109A
3A-121A
3A-118A
3A-112A
3A119A
3B128A
3A-115A

Ice Machine: 3B126 Water Fountain: near 1B-113, near 3A-116 Bldg. 25 Behavioral Health Acute Inpatient

First Floor
1A-139
1B-110 Nourishment room
1B-102/Kitchenette
1A-146 Nourishment Room
1A-123A
1A-124A
1A-125A
1A-126A
1A-127A
1A-128A
1A-139A
1A-140A
1A-141A
1A-142A
1A-143A
1A-144A
1A-143A
1A-144A
1B-109A
1B-115A
1B-111A
1B-112A
1B-113A
1B-114A
1B-115A
1B-116A
1B-117A
1B-119
Second Floor
2B-103 kitchenette
2B-116A
2B-115A
2B-114A
2A-145A
2A-144A
2A-143A
2A-142A
2A-141A
2A-140A
2A-124A
2A-125A
2A-126A
2A-127A
2A-128A
2A-129A
2A-146A
2B-127A
2B-127B
2B-147
2B-114A
2B-111A
2B-115A
2B-113A
2B-116A
2B-112A
2B-111A
2B-110A

Ice Machine: 1A-146, 1B-110 Water Fountain: Next to 2A100 Bldg. 30

First Floor
1J-114 Primary care exam room
1J-141 Women’s Clinic exam room
1H-144 Test Room
1H-125 Exam Room
1H-113 exam room
1J-162 exam room
1J-156 exam room
1J-154 exam room
Second Floor
Oncology

2G139 Sample this location every quarter

2G129
2H-132 Blood Gas Analysis room
2J-134 Eye exam room
2G140
2G132
2G133
2G137
Third Floor
3F-111 Special Therapy room
3G-130 Medication Room
Fourth Floor
30-4

4F-124A

4F-125A
4G-128A
4F-114A
4F-141A
4F-137A
4F-139A
4G-134A
4F-128A
4F-140A
4F-109A
4G-103
4G-113
4G-117A
4F-129
4F-138 Nourishment Room
4G-127A
4G-125A
4G-123A
4G-121A
4G-132A
4G-135A
4G-102A
4G-118A

Ice Machine: 1J-171 near elevators, 2G-140, 3F111, 4G-122, 4F-138A Water Fountain: 1st Flr near 1H-102, 2ndFlr near CT Scan Rm, 3rd Flr near 2H100 Floor Plan of Oncology: Collect samples from nourishment kitchen water fountain/ice machine and any other potential fixture that would dispense water for patients.

COOLING TOWERS (Utility-Non Potable Water) The minimum detection limit for non-potable water is 5 CFU/mL Biloxi VA Cooling Towers are located in Bldg. 3. Sample collection must be coordinated through COR and M&O Supervisor so Boiler operator can open supply and return ports for chiller, condenser, and Tower Tech (cooling tower 1) Collect 8 samples total.

Cooling Tower 1 (Tower Tech) samples are collected from Bldg. 3 Rm 1A177. Collect one sample from condenser return and one sample from condenser supply.

Cooling tower 2 & 3 are out of service. Cooling Tower 4,5,6 are the 3 big towers above the chiller plant ;Take one Sample from each sump Prior to sampling Chiller, contact M&O Supervisor at 228-523-5757 to find out which chiller to sample from.

Cooling Tower
Sample

1 Tower Tech Bldg. 3 1A177 (green and blue room)

CH1

Collect one sample from condenser return (spigot is marked for sample collection) Collect one sample from condenser supply (spigot is marked for sample collection)

2 OUT OF SERVICE
No samples required
3 OUT OF SERVICE
No samples required
4 sump
Collect one sample from cooling tower sump
5 sump
Collect one sample from cooling tower sump
6 sump
Collect one sample from cooling tower sump
Chiller return 1A185 (CH2, CH3, CH4, CH5)
Return port*1
Chiller supply 1A185 (CH2, CH3, CH4, CH5)
Supply port*2

1Collect one sample from Chiller Return from CH2, CH3, CH4, CH5 in Bldg.3 Rm.1A185 SAMPLE FROM CHILLER THAT IS ONLINE AND 2Collect one sample from Chiller Supply from CH2, CH3, CH4, CH5 in Bldg. 3 Rm. 1A185 SAMPLE FROM CHILLER THAT IS ONLINE image1.png

File details come from the government source that posted it. Updated .