4110--Walk-In Cooler/Freezer and Hood - Delivery and Installation
Solicitation number
36C25625Q0910
Issued by

About this file

This document is a Request for Quote (RFQ) solicitation for the Department of Veterans Affairs, specifically for the North Little Rock Eugene Towbin Memorial Hospital. The solicitation seeks a Service-Disabled Veteran-Owned Small Business (SDVOSB) contractor to furnish and install kitchen equipment for a new Nutrition and Food Service facility, including 7 kitchen hood systems, multiple walk-in coolers and freezers, and associated evaporator and condensing units. The equipment will support food preparation, cooking, dining services, and inpatient meal delivery.

The RFQ (Solicitation Number 36C25625Q0910) requires quotes to be submitted by June 30, 2025, at 8:00 AM CST, with a preferred delivery time of within 30 days. The procurement is classified under NAICS code 333415 with a small business size standard of 1,250 employees. Contractors must be registered in the System for Award Management (SAM) and Small Business Administration (SBA), with SDVOSB & VOSB contractors required to be verified in the Small Business VetCert. The government anticipates awarding a single firm-fixed-price purchase order, with quotes to be evaluated based on technical capability, past performance, delivery schedule, and price.

View the file

Other files

File Type Posted
36C25625Q0910_2.docx DOCX document
APPENDIX A - SOW REFERENCE DRAWINGS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25625Q0910

SUBJECT*
Walk-In Cooler/Freezer and Hood - Delivery and Installation

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
71306-9004
SOLICITATION NUMBER*
36C25625Q0910
RESPONSE DATE/TIME/ZONE
06-30-2025 8:00AM CENTRAL TIME, CHICAGO, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
4110
NAICS CODE*
333415
CONTRACTING OFFICE ADDRESS
ALEXANDRIA VA HEALTH CARE SYSTEM

NETWORK CONTRACTING OFFICE 16

ALEXANDRIA VA HEALTH CARE SYSTEM

PO BOX 69004

ALEXANDRIA LA 71306-9004

POINT OF CONTACT*

Contracting Officer Arlene A. Blade arlene.blade@va.gov

(318) 466-4281

PLACE OF PERFORMANCE

ADDRESS
Department of Veterans Affairs

Central Arkansas Veterans Healthcare System

Eugene J. Towbin Healthcare Center

2200 Fort Roots Drive

North LIttle Rock Arkansas

POSTAL CODE
72114
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

Description:

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, “Streamlined Procedures for Evaluation and Solicitation for Commercial Items,” in conjunction with FAR Part 13.5 for Certain Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation document will not be issued. Requirement is being evaluated under the procedures of FAR Part 13. As such, in accordance with FAR 13.106-2(b)(3), the quotes will undergo a comparative analysis evaluation to determine which vendor provides the best value to the government in terms of technical capability, past performance, delivery schedule while also providing a competitive price.

This combined synopsis/solicitation number is 36C25625Q0910. It is issued as a Request for Quote. The Government anticipates awarding one, firm-fixed price purchase order resulting from this solicitation.

The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2025-03 dated 01/17/2025. This competitive solicitation is being issued as a Total Service-Disabled Veteran Owned Small Business Set-Aside.

The associated North American Industrial Classification System (NAICS) code for this procurement is 333415, with a small business size standard of 1,250 employees.

Quotes shall be valid for 30 days.

Contractor is required to be actively registered in the System for Award Management (SAM) and Small Business Administration (SBA). SDVOSB & VOSB contractors are also required to be active in and shall be verified in the Small Business VetCert. Quotes may be considered non-compliant and rejected if the Contracting Officer is unable to verify active registration status.

The North Little Rock Eugene Towbin Memorial Hospital Campus is under construction for a new Nutrition and Food Service (NFS) Facility. This facility serves all food prep, cooking, dining services, delivery of food to inpatient patients. The new facility needs several new pieces of equipment for the cooking services. The North Little Rock Eugene Towbin Memorial Hospital is seeking a contract to furnish and install various pieces of equipment indicated in this package.

· 7 Kitchen hood systems

· 1 Walk-in combo unit (refrigerator/freezer)

· 1 Walk-in Cooler (large)

· 1 Walk-in Freezer

· 1 Walk-in cooler (small)

· 1 Walk-in Evaporator & Condensing units

· Kitchen Hood system and installation

· Walk-in cooler/freezer installation

F.O.B. destination, quoters submitted on a basis other than F.O.B. destination will be deemed as nonresponsive.

Preferred Delivery Time: Within 30 days (please specify the exact delivery time in your quote.)

All questions regarding this RFQ must be in writing and may be sent by e‐mail to arlene.blade@va.gov. Questions must be received no later than June 11, 2025, at 08:00 AM CST. No further questions will be accepted after that date and time.

Quotes must be received by June 30, 2025, by 8:00 AM CST. Email your quote to arlene.blade@va.gov. The subject line must have the solicitation the offeror is responding to listed. There will be no automated email notification of receipt of quotes. All quotes received without requested documentation will not be considered.

Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice

*= Required Field
Combined Synopsis/Solicitation Notice

Combined Synopsis/Solicitation Notice

SECTION B

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR: Name: ________________________________ Address: ____________________________

UEI #: _______________________________

POC Name:___________________________

TELEPHONE:__________________________

EMAIL:_______________________________

b. GOVERNMENT: Contracting Officer 36C256

ALEXANDRIA VA HEALTH CARE SYSTEM

NETWORK CONTRACTING OFFICE 16

ALEXANDRIA VA HEALTH CARE SYSTEM

PO BOX 69004

ALEXANDRIA LA 71306-9004

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[X] After completion of installation and acceptance.

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

Tungsten e-Invoice Setup Information: 1-877-489-6135 Tungsten e-Invoice email: VA.Registration@Tungsten-Network.com

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

Page 1 of Page 1 of Page 1 of Page 1 of

STATEMENT OF WORK

Purchase and Installation of Walk-In Cooler/Freezer and Hood Ventilation Systems

SUMMARY: The North Little Rock Eugene Towbin Memorial Hospital Campus is under construction for a new Nutrition and Food Service (NFS) Facility. This facility serves all food prep, cooking, dining services, delivery of food to inpatient patients. The new facility needs several new pieces of equipment for the cooking services. This contract would be responsible for purchasing and installation of various pieces of equipment indicated in this package. Installation will be completed during current construction. The construction contractor will be ready for the curbs (SOW 2.E) on 7/21/2025. The remainder of the equipment shall be delivered/installed starting 10/1/2025.

1. Walk-In Cooler/Freezer: The walk-in refrigerator and freezer/cooler systems shall be a complete factory engineered system from one manufacturer to include complete installation. See Attachment A for design drawings of Kitchen Equipment Plan. System specifications outlined below.

A. Quantities: Three (3) walk-in coolers and two (2) walk-in freezers of varying non-standard sizes.

Table 1: Walk-In Cooler/Freezer Information

B. Physical Characteristics:

i. Prefabricated panels in 1” increments up to 46” wide and 1’ x 1’ corners.

ii. Standard stucco aluminum finish.

iii. Standard floor panels of smooth aluminum, made to withstand uniformly distributed loads up to 600 lbs. per sq. ft.

iv. All floor, ceiling, wall, and corner panel joints fabricated in compliance with NSF International Requirements for ease of cleaning and sanitation. Provide equipment that bears NSF Certification mark certifying compliance with applicable standards.

v. Provide electrical equipment and components that are evaluated by UL for fire, shock, and casualty hazards according to applicable safety standards and that are UL certified for compliance and labeled for intended use.

vi. T-panels designed for placement of the partition wall in 1” increments. T- panels combined with tongue and grooved partition panels to prevent conduction between compartments by providing a complete break in metal continuity.

vii. Panel gasket, double-bead vinyl gasketing affixed to both the exterior and interior of the tongue side of all panels for a double gasket seal. Double seal serrated neoprene rubber gaskets to assure air and vapor tight joints.

viii. The core material to have a flame spread of 25 or less and smoke density of 250.

ix. Dial Thermometer – 2 ½” diameter dual reading, adjustable dial thermometer indicating temperatures from -40 degrees Fahrenheit to 60 degrees Fahrenheit and -40 degrees Celsius to 15 degrees Celsius.

x. Provide pressure relief port for all freezers operating at 18 degree C (0 degree F), or lower, twoway type ports, to allow for an increase or decrease of air pressure on the interior of the freezer to equalize with air pressure on the exterior. Provide ports with automatically controlled UL approved antisweat heaters. Complete device to carry UL Label and be assembled ready for connection. Install port in a wall panel away from the direct air stream flowing from the coils.

xi. Set walk-in walls 2” off all building walls and structures.

xii. All units to sit in 8” floor recess foundation for smooth transition between finish floor elevation and walk-in finish floor elevation. Cooler/freezer flooring shall be installed to ensure building finished flooring and cooler/freezer flooring is level.

xiii. Provide nonskid floor strips 101 x 915 mm (4 x 36 inch) and field apply at 305 mm (12 inch) spacing in all aisles.

xiv. Doors shall include break-away hardware including a break away type latch with adjustable strike, an inside safety release handle so that the door can be opened from inside even if locked, and nine-inch modified strap, cam lift, self-closing designed hinges with door lift off capability.

xv. Door shall be equipped a hydraulic closer and replaceable magnetic door seal at top and both side edges to assure automatic closing and a positive door seal.

xvi. Door hinge shall be flush mounted with Underwriters Laboratories seal.

xvii. Door and frame shall be fabricated with heavy reinforced 12-gauge G-90 galvanized steel U-channel frame foamed-in-place to provide rigidity to the frame and prevent warping, sagging, or buckling under heavy use.

xviii. Door bottom edge shall be equipped with adjustable vinyl double wiper gasket.

xix. Door threshold shall be reinforced with no less than 14-gauge U-channel stainless steel and anti-sweat heater cable.

xx. Doors shall include 14”x14” heated (-20F), double glass view windows.

xxi. Door to be equipped with a minimum of three (3) hinges for rough usage including aluminum diamond plate on door panel and frame to height of 36”.

xxii. Entrance door shall include vinyl strip climate control curtains.

C. Electrical:

i. NEMA 4 devices shall be utilized for walk-in panel electrical penetrations, seal airtight with foam sealant, and seal airtight around wires the 4” thickness of the walk-in panel.

ii. Electrical components inside walk-in units shall be watertight.

iii. A shatterproof incandescent vapor proof light shall be mounted on the interior of each door frame and connected to an exterior switch and pilot light. A toggle switch and indicating pilot light shall operate the interior vapor proof light assembly.

D. Installation:

i. Wherever compartment dimensions exceed clearspan ability of ceiling panels, provide Ibeam support on exterior of ceiling or spline-hangers. Install 13 mm (1/2 inch) diameter steel rods through beam/hangers and secure to structure above. Beams or posts within compartments are not acceptable.

ii. System must be broken down and installed in a manner that does not require tearing down any walls or envelope structures to install.

iii. Installation in accordance with “Kitchen Equipment Contractor” (KEC) requirements identified in Attachment A.

iv. Install equipment to comply with ASHREA 15 “Safety Code for Mechanical Refrigeration” and NFPA 70 “National Electric Code”.

v. Condenser installation and refrigerant line roof penetrations shall be coordinated with the general building contractor to ensure roofing membrane is not damaged or void roofing membrane warranty.

vi. Install prefabricated floor seismic restraint system-Simpson Titen or similar concrete screws @ 24"o/c.

vii. Install interior stucco aluminum seismic tie-downs at ceiling level.

E. Unit Dimensions for Walk-Ins: (Reference Appendix A)

i. Walk-in Cooler – (K60)

a. Floor recess dimensions are 9’-10” Length x 7’-10” Width.

b. Height is 8’6” per SOW Attachment A, Sheet K-501, Detail #2.

c. Door on 7’-10” side.

ii. Walk-in Cooler – (K87)

a. Floor recess dimensions are 38’-5” Length x 25’-7” Width.

b. Height is 8’6” per SOW Attachment A, Sheet K-501, Detail #2.

c. Door on 38’-5” side.

iii. Walk-in Freezer – (K90) – Not rectangular

a. Floor recess dimensions are 49’-11.5” Long Length x 28’-7” Short Length x 31’-1.5” Long Width x 20’-6” Short Width.

b. Height is 8’6” per SOW Attachment A, Sheet K-501, Detail #2.

c. Door on 20’-6” Short Width side.

iv. Walk-in Cooler – (K93)

a. Floor recess dimensions are 26’-10” Length x 15’-7” Width.

b. Height is 8’6” per SOW Attachment A, Sheet K-501, Detail #2.

c. Door on 26’-10” side.

v. Walk-in Freezer – (K96)

a. Floor recess dimensions are 26’-10” Length x 15’-7” Width.

b. Height is 8’6” per SOW Attachment A, Sheet K-501, Detail #2.

c. Door on 26’-10” side into K93 Cooler.

F. Condensing Units:

i. Provide motor driven integral compressor, motor starter, condenser, receiver, common base, and safety/operational controls.

ii. Receiver capacity not to be less than 125 percent of system refrigerant charge.

iii. Do not locate compressors on top of refrigerators or freezers.

iv. Provide positive oil lubrication and oil level indicating device for each compressor.

v. Compressor Motor: Squirrel cage induction type of ample size for continuous operating at maximum compressor performance. Provide inherent protection, in compressor terminal box, for each phase of motor.

vi. Pressure Switches: Automatic reset low pressure switch, and automatic or manual reset high pressure cutout.

vii. Comply with ARI Standard 520. Air cooled, water cooled, or combination air/water cooled type as shown in construction documents.

J. Evaporator Units:

i. Comply with ARI Standard 420. Units to be UL listed, forcedventilation type. Provide demand defrost controllers for defrosting, internal or external refrigerant distributor, single or multiple fans and motors, drippan, deflectors, aluminum or bakedenamel steel housing, hangers, and all accessories.

ii. Motors: Permanent split capacitor type. Provide motors with thermal overload protection and manual starting switch.

iii. Drain Pans: Galvanized sheet steel. Provide additional drain pans under uncovered refrigerant connections and interconnect them with main drain pan. For freezer units, provide electrically heated drain pan with heated tape over condensate drain line. Provide and install ¾” type “K” copper drain line for walk-in cooler and freezer blower coils. Slope drain lines to 12” above floor. Route lines out of walk-in and extend to floor drain. Install p-trap to prevent air from backing up into freezer and cooler compartment.

iv. Defrost Provision:

a. Refrigerators: Defrost to be as needed with demand defrost controllers and occur during compressor off cycle with evaporator fan running continuously.

b. Freezer Defrost: Defrost to be by demand defrost with evaporator efficiency controller.

K. Monitoring Alarm System: Provide an electronic monitoring and alarm system for each section of each unit.

i. Electrical Hook-up to controls shall be compatible with the building HVAC controls system and connections.

ii. System Components: Detecting thermostat, master control panel, interconnecting wiring, remote audible alarm, and defrost compensator. Provide dials showing temperatures and pilot lights, warning lights, switches, transformer, and buzzer, all as a part of the master control panel. Locate master control panel and remote audible alarm as indicated on construction documents. Provide power fuse to protect system components.

iii. System Operation: Set alarms at 5 degrees C (10 degrees F) above and below specified operating temperatures.

L. Fire Suppression System: Provide 32 dry pendent sprinkler assemblies with installation of coolers/freezer. Sprinkler shall be chrome dry barrel pendent sprinkler head, 200°, ¾” orifice, 8.0 K-rating, ¾” NPT, chrome recessed, Victaulic V3608 with flat recessed chrome escutcheon and sprinkler head guard.

M. Startup and Performance Testing:

i. Follow the manufacturer’s procedures and place the systems under all modes of operation.

ii. Operational tests must cover a period of not less than three (3) days. Submit operational test report prior to or with final invoice.

N. Condenser & Evaporator Details:

i. Walk-In Cooler Condenser – (K62)

a. Quantity: One (1) unit, roof mountable.

b. Dimensions: 26 ¼” W x 28 ¼” L x 18 ¾” H.

c. Electrical: 208–230/60/3θ.

d. Supports Cooler: K60 at Room 121A

e. Meet specs in table below:

ii. Walk-In Cooler Evaporator Coil – (K61)

a. Quantity: One (1) unit.

b. Dimensions: 15 ½” W x 43 5/8” L X 16 ¾” H (without drain connections).

c. Electrical: 115/60/1θ.

d. Supports Cooler: K60 at Room 121A.

e. Meet specs in table below:

iii. Walk-In Freezer Condenser – (K92)

a. Quantity: Two (2) air-cooled units, roof-mountable

b. Dimensions: 47 3/16” W x 68 5/16” L x 36 3/8” H

c. Electrical: 208–230/60/3θ

d. Supports Freezer: K90 at Room 107.

e. Meet specs in table below:

iv. Walk-in Freezer Evaporator Coil – (K91)

a. Quantity: Four (4) units.

b. Dimensions: 18-13/16” W x 47-1/2” L X 31-13/16” H (without drain connections).

c. Electrical: 208-230/60/1θ.

d. Supports Freezer: K90 at Room 107.

e. Meet specs in table below:

v. Walk-In Cooler Condenser – (K95)

a. Quantity: One (1) unit air cooled unit, roof mountable.

b. Dimensions: 42-1/4” W x 33” L x 35” H.

c. Electrical: 208–230/60/3θ.

d. Support Cooler: K93 at Room 109.

e. Meet specs in table below:

vi. Walk-in Cooler Evaporator Coil – (K94)

a. Quantity: One (1) unit.

b. Dimensions: 15-1/2” W x 76-5/8” L X 16-3/4” H (without drain connections)

c. Electrical: 115/60/1θ

d. Supports Cooler: K93 at Room 109.

e. Meet specs in table below:

vii. Walk-In Cooler Condenser – (K89)

a. Quantity: Two (2) air cooled unit, roof mountable.

b. Dimensions: 42-1/4” W x 33” L x 35” H

c. Electrical: 208–230/60/3θ

d. Supports Cooler: K87 at Room 101.

e. Meet specs in table below:

viii. Walk-in Cooler Evaporator Coil – (K88)

a. Quantity: Four (4) units.

b. Dimensions: 18-13/16” W x 47-1/2” L X 31-13/16” H (without drain connections).

c. Electrical: 115/60/1θ.

d. Supports Cooler: K87 at Room 101.

e. Meet specs in table below:

ix. Walk-In Freezer Condenser – (K98)

a. Quantity: One (1) air-cooled unit, roof mountable.

b. Dimensions: 47-3/16” W x 68-5/16” L x 36-3/8” H.

c. Electrical: 208–230/60/3θ.

d. Supports Freezer: K96 at Room 109A.

e. Meet specs in table below:

x. Walk-in Freezer Evaporator Coil – (K97)

a. Quantity: One (1) unit.

b. Dimensions: 15-1/2” W x 109-5/8” L X 16-3/4” H (without drain connections).

c. Electrical: 208-230/60/1θ.

d. Supports Freezer: K96 at Room 109A.

e. Meet specs in table below:

2. Hood Ventilation Systems The kitchen hood systems shall be a complete factory engineered system from one manufacturer to include complete installation. Purchase and full installation of full hood systems as identified in Appendix A “Kitchen Equipment Plan) including hoods, exhaust fans, makeup air units, fire suppressions system.

A. Hood Equipment: Information for each component identified below.

Table 2: Hood Performance

Table 3: Hood Characteristics

Grease-Stop Filter Specifications:

· A single-stage filter featuring a unique s-baffle design in conjunction with a slotted rear baffle design to deliver exceptional filtration efficiency.

· Filter is stainless steel construction and sized to fit into standard 2-inch-deep hood channel(s).

· Units shall include stainless steel handles and a fastening device to secure the two components when assembled.

· Grease extraction efficiency performance shall remove at least 75% of grease particles five microns in size, and 85% grease particles seven microns in size and larger, with a corresponding pressure drop not to exceed 1.0 inches of water gauge.

· Grease-stop solo shall be tested to ASTM standard AST F2519-05. Manufacturer approved for use in solid fuel applications as a spark arrester.

· Filters shall be built in compliance with NFPA #96, NSF Standard #2, UL Standard #1046, International Mechanical Code (IMC), ULC-S649, All Federal, State and Local code regulations.

Table 4: Hood Options

Table 5: Perforated Supply Plenum Dimensions

i. General notes for equipment:

1. Electrical Hook-up to hood controls (motor starters, fan switches, duct stats, fan disconnects, relays, etc.) shall be compatible with the building HVAC controls system and connections.

2. Field Verify fire chase, if required.

3. All phases of installation shall comply with NFPA 96.

4. Provide cleanouts in exhaust air ducts to allow cleaning at all bends and horizontal runs.

5. Exhaust duct to be single wall with 2 layers of fire wrap or double wall prefabricated grease duct. Alternatively, field fabricated welded grease duct with 2 layers of fire wrap is acceptable as long as duct as built without sharp bends or any features that cause excessive static pressure or system effect. Ducting to be installed under this scope of work.

6. Fan to have a minimum of 10 feet of clearance from the outlet to adjacent buildings, property lines, air intakes or 3 feet vertical clearance per NFPA 96.

7. Horizontal exhaust duct to slope not less than ¼” per foot toward hood for duct less than 75 feet long.

8. Hood to overhang cooking equipment 6” on all open sides.

9. Exhaust duct to be protected from combustibles per NFPA 96 and latest version of Federal, State and Local Code.

10. Building Pressure shall not exceed 0.02” water column at exterior doors.

11. Kitchen shall be balanced to be negative with respect to the dining room.

12. Installer must confirm hood is installed such that the specified wall, acting as an end panel, is mated tight to the correct end of hood to achieve a reduced minimum exhaust CFM listing. Non-compliance will nullify the ETL listing, void the manufacturer’s warranty, and hold the contractor liable for all losses, costs, and expenses related to the non-conformance of the manufacturer’s specified instruction. The wall acting as an end panel must extend no less than 20” from the intersecting wall on which hood is mounted and must extend no less than 20” under bottom of hood to be eligible for reduced minimum exhaust CFM listing.

13. Assembly Instructions:

14. Hood Corner Hanging Angle:

a. Hanging angle must be supported with ½” – 13 TPI Grade 5 (minimum) all-thread, sandwich hanging angles and ceiling anchor points with ½” grade 5 (minimum) hex nuts.

b. Must use doubled hex nut configuration beneath hood hanging angles and above ceiling anchors.

c. Maintain ¼” of exposed threads beneath bottom hex nut. Torque all hex nuts to 57 ft-lbs.

15. Full Length Hanging Angle:

a. Hanging angle must be supported with ½” – 13 TPI Grade 5 (minimum) all-thread, sandwich hanging angles and ceiling anchor points with ½” grade 5 (minimum) steel flat washers and ½” – 13 TPI grade (minimum) hex nuts.

b. Must use doubled hex nut configuration above ceiling anchors.

c. Single Hex nut beneath hanging angle is acceptable for full length hanging angles.

d. Maintain ¼” of exposed threads beneath bottom hex nut. Torque all hex nuts to 57 ft-lbs.

16. Supply Plenum Hanging Angle:

a. Hanging angle must be supported with ½” – 13 TPI Grade 5 (minimum) all-thread, sandwich hanging angles and ceiling anchor points with ½” grade 5 (minimum) steel flat washers and ½” – 13 TPI grade (minimum) hex nuts.

b. Must use doubled hex nut configuration above ceiling anchors.

c. Single Hex nut beneath hanging angle is acceptable for PSP hanging angles.

d. Maintain ¼” of exposed threads beneath bottom hex nut. Torque all hex nuts to 57 ft-lbs.

ii. Hood electrical controls:

Table 6: Hood Electrical Control Requirements

1. Hood Control Panel Specs:

2. Controls shall be listed by ETL (UL508A) and shall comply with demand ventilation system turndown requirements outlined in IECC 403.2.8 (2015 or latest version)

3. The control enclosure shall be NEMA 1 rated and listed for installation inside of the exhaust hood utility cabinet. The control enclosure may be constructed of stainless steel or painted steel.

4. Temperature probe(s) located in the exhaust duct riser(s) shall be constructed of stainless steel.

5. A digital controller shall be provided to activate the hood exhaust fans dynamically based on a fixed differential between the ambient and duct temperatures sensor. This function shall meet the requirements of IMC 507.1.1.

6. A digital controller shall provide adjustable hysteresis settings to prevent cycling of the fans after the cooking appliances have been turned off and/or the heat in the exhaust system is reduced.

7. A digital controller shall provide an adjustable minimum fan run-time setting to prevent fan cycling.

8. Variable frequency drives (VFDS) shall be provided for fans as required. The digital controller shall modulate the VFDS between a minimum setpoint and a maximum setpoint on demand. The duct temperature sensor input(s) to the digital controller shall be used to calculate the speed reference signal.

9. The VFD speed range of operation shall be from 0% to 100% for the system, with the actual minimum speed set as required to meet minimum ventilation requirements.

10. An internal algorithm to the digital controller shall modulate supply fan CFD speed proportional to all exhaust fans that are located in the same fan group as the supply fan.

11. The system shall operate in prep mode during light cooing load or cool down mode when sufficient heat remains underneath the hood system after cooking operations have completed. Operations during either of these periods will disable the supply fans and provide an exhaust fan speed that is equal to the minimum ventilation requirement.

12. A digital controller shall disable the supply fan(s), activate the exhaust fan(s), activate the appliance shunt trip, and disable an electric gas valve automatically when fire condition is detected on a covered hood.

13. A digital controller shall allow for external BMS fan control via dry contact (external control shall not override fan operation logic as required by code.)

14. An LCD interface shall be provided with the following feature:

a. On/Off push button fan and light switch activation

b. Integrated gas valve reset for electronic gas valves (no reset relay required)

c. VFD fault display with audible and visual alarm notification

d. Duct temperature sensor failure detection with audible and visual alarm notification

e. Mis-wired duct temperature sensor detection with audible and visual alarm notification

f. A single low voltage CAT-5 RJ45 wiring connection.

g. An energy saving indicator that utilizes measured KWH from the VFDS

15. Sequence of Operations (Control Panel)

16. The hood control panel is capable of operating in one or more of the following states at any given time:

a. Automatic: The system operates based on the differential between room temperature and the temperature at the hood cavity or exhaust duct collar. Fans activate at a configurable temperature differential threshold. Depending on the job configuration each fan zone can be configured as static or dynamic. These terms refer to whether a variable motor (such as EC motors or VFD driven motors) modulate with temperature. If the panel is equipped with carriable speed fans and the zone is defined as “Dynamic”, these will modulate within a user-defined range based on the temperature differential. Panels equipped with variable speed fans and a fan zone defined as “Static”, fans will run at a set speed calculated for the drive. Demand control ventilation systems are capable of modulating exhaust and make up air fan speeds per the requirements outlined in IECC 403.2.8.

b. Manual: The system operates based on human input from an HMI.

c. Schedule: A weekly schedule can be set to run fans for a specified period throughout the day. There are three occupied times per day to allow for the user to set a time that is suitable to their needs. Any time that is within the defined occupied time, the system will run at modulation mode and follow the fan procedure algorithm based on temperature during this time. During unoccupied time, the system will have an extra offset to prevent unintended activation of the system during a time where the system is no being occupied.

d. Other: The system operates based on the input from an external source (DDC, BMS or Hard-wired interlock)

e. Fire: Upon activation of the hood fire suppression system, the exhaust fan will come on or continue to run, the hood makeup air will shut down, and a signal will be sent for activating the shunt trip breaker provided by the electrician. Fuel gas will shut off via a mechanical/electrical gas valve actuated by the hood fire suppression system.

f. Monitoring and Control Points: Monitoring and controls shall meet the following needs: Hood Control panel to support communications to the Building Management System (BMS), hood control panel to allow BMS to monitor real time parameters outlined as MONITOR in the points list, hood control panel to allow BMS to control parameters outlined as CONTROL in the points list, hood control panel to allow BMS to implement SYSTEM ECONOMIZER control strategies for fully integrated Building Management.

g. Monitoring and Control Points List:

Table 7: Control Points

B. Exhaust Fans: Exhaust fan equipment information for each component identified below.

Table 8: Exhaust Fan Performance

i. General requirements for equipment.

1. Equipment Characteristics: Direct drive construction, roof mounted fans, restaurant model, UL7056, UL762, and ULC-S645 compliant, variable speed controls, internal wiring, thermal overload protection, high heat continuous operation (300°F), grease classification testing, NEMA 3R safety disconnect switch. The following options shall be included: grease box, fan base ceramic seal (installed at manufacturing plant), exhaust fan baffle, unit mounted VFD, and VFD mounting bracket, ECM wiring package (exhaust, Modbus control, MSC, CCW rotation), grease cup, .

2. Equipment Performance Testing: Exhaust fan must operate continuously under normal operation while exhausting air at 300°F until all fan parts have reached thermal equilibrium, and without any deteriorating effects to the fan which would cause unsafe operation. Exhaust fan must operate continuously under abnormal flare-up while exhausting burning grease vapors at 600°F for a period of 15 minutes without the fan becoming damaged to any extent that could cause an unsafe condition.

C. GAS Fired Make-up Air Units: Exhaust fan equipment information for each component identified below.

Table 9: Gas-Fired Makeup Air Unit Performance

i. General requirements for equipment.

1. Direct gas fired heated makeup air unit with various mixed flow direct drive fan. See Table 7 for sizes.

2. Intake hood with EZ Filters.

3. Down discharge - Air flow Right -> Left.

4. Gas pressure gauge, 0-35”, 2.5” diameter, ¼” thread size.

5. Gas pressure gauge, -5 to +15 inches W.C., 2.5” diameter, ¼” thread size.

6. Low fire start allows the burner circuit to energize when the modulation control is in a low fire position.

7. Ship loose gas strainer. to be installed upstream of unit connection. 1” connection.

8. Cooling interlock relay 24 VAC coil, 120V contacts to lockout burner circuit when AC is energized.

9. Motorized back draft damper sizes vary for various standard and modular heater units with extended shaft, standard galvanized construction, ¾” rear flange, low leakage, Actuator included. See Table 7 for sizes.

10. Various modular package cooling option for various sizes of DF/EH modular packaged unit. Includes condenser, DX coil, filter/dryer kit, thermal expansion valve, refrigerant, and refrigerant piping. Drain and sleds will move to the opposite side. Any other change will require CLI. Condensers require separate 208V, 3 phase power supply unless ordered with single point connection. See Table 7 for sizes.

11. Downturn plenum for size 2 cooling coil module – required for down discharge cooling coil applications.

12. DX cooling intake air thermostat and relays mounted in unit – set point for thermostat should be 85⁰F.

13. Profile plate configuration for size 2 direct fired unit for low CFM applications.

14. Unit mounted VFD for use.

15. Hinged double wall insulated door assembly (Burner/Blower/MPU Section).

16. Supply duct must be installed to meet SMACNA standards. A minimum straight duct length must be maintained downstream of unit discharge as outlined in AMCA Publication 201. When using rectangular ductwork, elbows must be radius throat, radius back with turning vanes, flexible ductwork and square throat/square back elbows should not be used. Any transition and/or turns in the ductwork will cause system effect. System effect will drastically increase static pressure and reduce airflow. Do no rely on unit to support duct in any way. Failure to properly size ductwork may cause system effects and reduce performance of the equipment.

17. Direct Fired (DF) Profile Plate Assembly:

a. Description: Direct fired burners shall have self-adjusting profile plates designed to ensure proper air velocity and pressure drop across the burner. Profile plates shall allow burners to achieve clean combustion by limiting by-product levels to a maximum of 5PPM of carbon monoxide (CO), and 0.5PPM of nitrogen dioxide (NO2) Direct fired units shall be configured with the blower mounted downstream of the burner. This arrangement will ensure a consistent airflow, regardless of inlet air temperature.

b. Application: Spring-loaded burner profile plates are engineered to automatically react to the momentum of a fresh air stream, without the need for any motors or actuators to mechanically adjust them. With this feature, all DF units are designed for demand control ventilation (DCV) requirements.

c. Certifications: All profile plate assemblies shall be included in the DF unit’s ETL listing and comply with combined safety standards ANSI Z83.4 and CSA 3.7 (Non-recirculating DF heaters) and ANSI Z83.18 (Recirculating DF heaters).

d. General Construction: Profile Plates shall be formed from G90 Galvanized Steel, profile plates shall be mounted along the same plane as the discharge of the burner, design shall incorporate properly torqued, permanently mounted spring hinges, spring hinges shall be made from plated steel.

ii. Condenser: Condenser equipment information for each component identified below.

Table 10: Condenser Specifications

iii. Makeup Air Fan: Fan information for each component identified below.

Table 11: Makeup Air Fan Performance Requirements

Table 12: Makeup Air Fan Specifications

iv. Supply Side Heater: Heater information for each component identified below.

Table 13: Supply Side Heater Requirements

v. Coils: Coil information for each component identified below.

Table 14: Coil Performance Requirements

D. Fire System

Table 16: Fire System Characteristics

i. Field pipe drops as shown.

ii. Overlapping coverage shall not be used on any appliance with an obstruction.

iii. Fire system shall comply with UL300.

iv. Gas Valves/Strainers: Proper clearance must be provided in order to service the strainers. A minimum of 4” clearance distance must be provided at the base of the strainer.

LEGEND: Fire Cabinet Tank System 1: 4-Gallon Tank 2: Primary Actuator Release 3: Secondary Actuator Release 4: Pressure Supervision Switch 5: Primary Hose Assembly 6: Secondary Hose Assembly 7: Remote Manual Actuation Device

NOTES

System Size: Tank-SP-3 Total FP Required: 46 Hood #1: 15’ 0.00” Long x 60” Wide x 24” High Riser #1: Size 12” Dia.

Riser #2: Size 12” Dia.

Hood #1: Metal blow-off caps included.

Figure 1: Hood #1, KH-1 Griddle/Fryer

NOTES

System Size: Tank-SP- 2.

Total FP Required:

24.

Hood # : 1 ’ 0.00” Long x 60” Wide x 24” High Riser #1: Size 1 ” Dia.

Hood #2: Metal blow-off caps included.

Hood #3: 13’ 0.00” Long x 60” Wide x 24” High.

Riser # : Size 1 ” Dia.

Hood # : Metal blow-off caps included.

LEGEND: Fire Cabinet Tank System 1: 4-Gallon Tank 2: Primary Actuator Release 3: Secondary Actuator Release 4: Pressure Supervision Switch 5: Primary Hose Assembly 6: Secondary Hose Assembly 7: Remote Manual Actuation Device

Figure 2: Hood #2 & #3, KH-2-L (Ovens) & KH-2-R (Ovens)

NOTES

System Size: Tank-SP- 2.

Total FP Required:

36.

Hood # : 1 .00” Long x 60” Wide x 24” High Riser #1: Size 1 ” Dia.

Hood #4: Metal blow-off caps included.

Hood #5: 12’ 3.00” Long x 60” Wide x 24” High.

Riser # : Size 1 ” Dia.

Hood # : Metal blow-off caps included.

Hood #6: 12’ 2.00” Long x 60” Wide x 24” High.

Riser #1: Size 14” Dia.

Hood #6: Metal blow-off caps included.

LEGEND: Fire Cabinet Tank System 1: 4-Gallon Tank 2: Primary Actuator Release 3: Secondary Actuator Release 4: Pressure Supervision Switch 5: Primary Hose Assembly 6: Secondary Hose Assembly 7: Remote Manual Actuation Device

Figure 3: Hood #4, #5, & #6, KH-3-L (Kettles), KH-3-L (Kettles), & KH-3-L (Kettles)

LEGEND: Fire Cabinet Tank System 1: 4-Gallon Tank 2: Primary Actuator Release 3: Secondary Actuator Release 4: Pressure Supervision Switch 5: Primary Hose Assembly 6: Secondary Hose Assembly 7: Remote Manual Actuation Device

NOTES

System Size: Tank-SP- 2.

Total FP Required:

22.

Hood # : 1 ’ 0.00” Long x 60” Wide x 24” High Riser #1: Size 1 ” Dia.

Hood #7: Metal blow-off caps included.

Figure 4: Hood #7, KH-4 (Kettles/Tilt)

Figure #5: Tank Protection Electrical Requirements

Figure #6: Tank Protection Low Voltage Requirements

E. Curb Sizes: The equipment shall fit onto these curb dimensions. Curbs to be provided and installed under this scope of work. NOTE: Construction contractor will be ready for the curbs on 7/21/2025.

Table 17: Curb Size Summary

Figure 7: Exhaust Fan Curb Function

Figure 8: Exhaust Fan Curb Details

Figure 9: MAU Curb Details

3. Startup/Testing/Certification: Perform startup, testing, and certification in accordance with NFPA99, NFPA101, and Joint Commission requirements.

4. Warranty A. One (1) year written warranty for installation of equipment.

B. Five (5) year warranty on equipment parts.

5. Proposal Requirements A. Products: Submission shall include product data, literature, cut sheets, measurements, performance characteristic and operation and maintenance manuals.

B. Delivery/Installation: Delivery and installation shall start on 5 MAY 2025.

6. Submittals A. Pre-installation building space photographs.

B. Post-installation building and equipment photographs.

C. Post-installation checklist.

D. Startup reports.

E. Testing reports in accordance with NFPA99, NFPA101, and Joint Commission requirements.

F. Warranty letter.

7. Delivery:

A. Times: All deliveries must be scheduled 14 days in advance and approved by the project Contracting Officer’s Representative (COR). Deliveries pertaining to this contract will need to be performed Monday thru Friday unless a Federal holiday falls on one of these days. Typical hours are between 7am and 4pm. If delivery is required outside of these hours of operations, it must be coordinated with the project COR. On the days listed below delivery shall not be scheduled unless unique situations arrive and prior approval between the delivery and CAVHS parties involved is agreed upon. Delivery and Installation will be dependent on the facility’s readiness for receiving of equipment. Equipment will not be stored on-site for installation later. All deliveries must start installation within 1 workday of delivery. Unless otherwise prior approval between delivery and CAVHS parties involved is agreed upon.

B. Storage: No enclosed storage space shall be provided by CAVHS, and no storage area is available immediately adjacent to the construction site. CAVHS will provide an open site at Lot 10 for a contractor provide storage unit. Secured storage and transportation of equipment to the construction site is the responsibility of the contractor. Lot 10 is located at Cypress Street and 4th Street on the Eugene J. Towbin VA campus (2200 Fort Roots Drive, North Little Rock, Arkansas 72114). The construction site is located at the Eugene J. Towbin VA Healthcare Center, Building 170, 2200 Fort Roots Drive, North Little Rock, Arkansas 72114. In the event that the facility is not ready for equipment installation by the delivery date, the contractor shall store the equipment at this location in the contractor provided secure storage unit.

Construction Site Storage Area Figure #7: Eugene J. Towbin Medical Center Campus Map

8. Installation:

A. Installation methods of equipment must follow the manufacturer’s recommendation.

B. Pre – Installation walk-thru is required prior to delivery of equipment to determine equipment delivery route access, pre-existing conditions, and final coordination of site staff with installation.

C. Day of or 1 day prior to installation photographs of building area impacted and documented to track current conditions of the space.

D. During delivery and installation, any damages incurred to the building during the delivery and installation of equipment that is caused by the installation contractor will be held responsible for damages.

E. Within 8 hours of completing installation, photographs of building area impacted by the installation of equipment and route of delivery of equipment into the building need to be documented. This is to verify what damages are incurred at the fault of installation.

F. Post installation checklist for equipment must be provided to project COR upon completion walk-thru.

G. Post installation cleaning of equipment from installation methods must occur within 15 days of installation complete.

H. Post installation start up testing to be completed within 15 days prior to FINAL cleaning.

I. Post installation FINAL cleaning for cooking must be coordinated and completed prior to building activation date, within 30 to 45 days prior to activation. Date to be confirmed with COR.

J. Warranty for installation start date is based on the date the post installation FINAL clean and installation is deemed acceptable by the VA Engineering and VA Food Service Kitchen Inspector.

K. Warranty for equipment start date is based on final acceptance by the VA Engineering and VA Food Service Kitchen Inspector.

9. Government Personnel Observed Holidays A. The Government hereby provides notice and Supplier hereby acknowledges receipt that Government personnel observe the listed days as holidays:

New Year's Day Martin Luther King's Birthday President's Birthday Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas B. In addition to the days designated as holidays, the Government observes the following days:

Any other day designated by Federal Statute Any other day designated by Executive Order Any other day designated by the President’s Proclamation

10. General Requirements A. Equipment furnished must meet the Buy American Act.

B. Approved equal products may be considered as long as they meet the specifications provided above.

11. Statement of Work Changes The Contracting Officer (CO) is the only individual authorized to approve changes or modify any of the requirements for this purchase. The Supplier shall communicate with the Contracting Officer’s Representative (COR) on all matters pertaining to contract administration. The COR is designated to represent the Contracting Officer (CO) in furnishing technical guidance and advice regarding the purchase. The foregoing is not to be construed as authorization to interpret or furnish advice and information to the Supplier relative to the financial or legal aspects of the contract. Enforcement of these segments is vested in and is the responsibility of the CO. Only the CO is authorized to make commitments or issue changes affecting price, quantity or performance of this contract. In the event the Contractor effects any such change at the direction of any person other than the CO, the change shall be considered to have been made without authority and no adjustment shall be made in the contract price to cover any increase in cost incurred as a result thereof.

12. Reporting Requirements All documents will be given to the Contracting Officer and or the Contracting Officer Representative in a Word Document, or Adobe pdf and Excel spreadsheet file.

13. Confidentiality and Nondisclosure The Supplier understands and agrees that confidential information (patients, employee, or facility) must always be secured and protected. The Supplier and its personnel shall be held liable in the event a breach of confidentiality occurs as a result of the Supplier or its employees. Each contract employee will be required to read and sign the Contractor Rules of Behavior and provide the original signature page to the COR.

14. Special Consideration All contractors and visitors are required to adhere to Universal Masking Guidance which requires people to wear a cloth face covering or facemask over their mouth and nose while in any medical facility of Central Arkansas Veterans Healthcare System (CAVHS). Daily healthcare screening is required before entrance to VA facilities due to COVID-19. No one with a cold or flu like symptoms will be allowed on VA property. In the event that symptoms occur while on site, the contractor will notify the COR immediately. The individual(s) maybe required to be COVID tested and quarantine until released by Infection Control to return to site.”

15. Information System Officer, Information Protection The Supplier will not have access to VA Desktop computers, nor will they have access to online resources belonging to the government while conducting services.

16. Privacy Officer The Supplier will not have access to protected Patient Health Information (PHI) nor will they have the capability of accessing patient information during the services provided to the VA.

17. Records manager A. Supplier shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. Chapters. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

C. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

D. In accordance with 36 CFR 1222.32, Supplier shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

E. Central Arkansas Veterans Healthcare System and its contractors/suppliers are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of Central Arkansas Veterans Healthcare System or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Supplier must report to Central Arkansas Veterans Healthcare System. The agency must report promptly to NARA in accordance with 36 CFR 1230.

F. The Supplier shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Supplier shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Supplier shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government's behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to Central Arkansas Veterans Healthcare System control or the Supplier must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

G. The Supplier is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts.