564-24-104 Design Amendment 02.pdf
PDF 22 MB Posted
- Solicitation number
- 36C25624R0102
About this file
This document is a Design Amendment to Solicitation 36C25624R0102, which is for the renovation of space for logistics at facility 564-24-104 for the Department of Veterans Affairs, Veterans Integrated Service Network 16. The amendment provides revised design specifications and drawings for the renovation project. Key details include a revised project schedule, updated design requirements, and clarification on construction materials and finishes. The amendment also addresses several questions submitted by prospective offerors. The overall scope of the project remains the renovation of approximately 12,000 square feet of existing space to support logistics operations. Offers in response to the solicitation are due by June 15, 2023, with a contract award expected by July 1, 2023. The procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 564-24-104 PRE_BID RFIs_Batch 2_Answered.docx | DOCX document | |
| 564-24-104 Design Amendment 03.pdf | ||
| 564-24-104 PRE_BID RFIs_Batch 2_Answered.docx | DOCX document | |
| 36C25624R0102 Amendment 0004.docx | DOCX document | |
| Amendment 0003 36C25624R0102.docx | DOCX document | |
| 564-24-104 Sheet HA101-A.pdf | ||
| 564-24-104 PRE_BID RFIs_ Answered.pdf | ||
| Amendment 0002 36C25624R0102.docx | DOCX document | |
| 564-24-104 Site Visit Instructions.docx | DOCX document | |
| Amendment 0001 for 36C25624R0102.docx | DOCX document | |
| 36C25624R0102 Solicitation_Final.docx | DOCX document | |
| 564-24-104 Bid Drawings.pdf | ||
| 564-24-104 Specifications.pdf | ||
| 564-24-104 SOW Renovate Space for Logistics.docx | DOCX document | |
| 36C25624R0102 Solicitation_Final.docx | DOCX document | |
| 564-24-104 Site Visit Instructions.docx | DOCX document | |
| 564-24-104 EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx | DOCX document | |
| 564-24-104 Wage Determination AR20240128.docx | DOCX document | |
| 564-24-104 EXHIBIT B CONTRACTOR EVALUATION FORM.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Harrell Design Group, PC
AMENDMENT 02
July 11, 2024
RENOVATE SPACE FOR LOGISTICS (B-1)
VA PROJECT #564-24-104
Veterans’ Healthcare System of the Ozarks
HDG Project Number: 19022-A
I. BIDDER’S QUESTION RESPONSES: not applicable to this amendment.
II. DRAWINGS:
1. The following nineteen (19) drawings are revised as follows:
a. GI501-A:
i. Detail B3, Equipment Pad: Equipment pad length and width to be 8” greater than the equipment mounting plate/footprint versus previous 12” dimension.
b. GC102-A:
i. A room tag was added to Corridor L109.
ii. The scope box boundary was adjusted to include the wall change in the Service
Elevator Lobby.
c. AE101-A:
i. A room tag was added to Service Elevator Lobby 1-L051.
d. AE102-A:
i. A bar scale was added to Detail D1.
ii. A room tag was added to Corridor L109 on Drawing F4 – First Floor – Construction
Plan.
iii. Modification of existing wall condition relating to Room L101 – Electrical on
Drawing F4 – First Floor – Construction Plan.
iv. Addition of smoke wall to vestibule found between Room C231 – Service Elevator
Lobby and Room L102 – Breakdown on Drawing F4 – First Floor – Construction
Plan.
v. Placement of equipment pad was modified in Room M1-3 – Mechanical Room on
Drawing F4 – First Floor – Construction Plan.
vi. Size of equipment pad was modified in Room M1-3 – Mechanical Room on
Drawing F4 – First Floor – Construction Plan.
vii. Elevation markers were deleted from HAC L113 and Toilet L111.
e. AE111-A:
i. Relocation of 2 supply diffusers on Drawing F4 – First Floor – Reflected Ceiling
Plan.
f. AE201-A:
i. Bar scales were added to elevations C4, C6, and C8.
g. AF601-A
i. Elevation markers were deleted from HAC L113 and Toilet L111.
ii. Tags were added to all signage.
h. AF602-A:
i. The Signage Schedule was updated to reflect the correct room names, room numbers, and quantities of all signage.
ii. Corridor L109 was added to the Finish Schedule.
i. FA101-A
i. Added area and notes about keeping an area in Sterile Storage free from overhead conduits and equipment, for the future Cart Lift.
j. PD101-A
i. Added demolition of drainpipe from the medical air vacuum to floor drain.
ii. Keynote 11 was added to describe drainpipe demolition.
k. PL201-A
i. Added installation of drainpipe to floor drain plan north of the dental air compressor.
ii. Keynote 12 was added to describe drainpipe installation.
l. MD101-A
i. Location of existing duct was modified to reflect existing conditions.
ii. Extent of demolition was revised to leave existing fire dampers in the wall.
m. MH101-A
i. Location of existing duct was modified to reflect existing conditions.
ii. Location of connection point was revised to coordinate with updated existing ductwork.
iii. The locations of two supply diffusers were revised in Sterile Storage, Overflow
Room L112.
iv. Location of VAV-LOG-1 was revised.
v. Supply air ductwork was revised to coordinate with VAV-LOG-1 updated location.
vi. Location of 1-AHU-LOG was revised.
vii. Outside air ductwork was revised to coordinate with 1-AHU-LOG updated location.
n. MP101-A
i. Hot water piping was revised to coordinate with VAV-LOG-1 updated location.
ii. Hot water and chilled water piping was revised to coordinate with 1-AHU-LOG updated location.
iii. Connect-to-existing symbol was added to the new chilled water tie-in locations.
o. EG001-A
i. Added symbol for access points.
p. ED101-A
i. Added notes about existing items to be rerouted and demolished in existing pipe chase
q. EL101-A
i. Added area and notes about keeping an area in Sterile Storage free from conduits and equipment, for the future Cart Lift.
r. EP101-A
i. Added area and notes about keeping an area in Sterile Storage free from conduits and equipment, for the future Cart Lift.
ii. Added notes about existing items to be rerouted in existing pipe chase.
s. EY101-A
i. Added area and notes about keeping an area in Sterile Storage free from conduits and equipment.
ii. Added access points to plan.
III. SPECIFICATIONS: not applicable to this amendment.
END OF AMENDMENT 02
A0 7/8" 1 1/2" - - -
A1 1 5/8" 2 1/4"
A2 2 1/2" 3 1/8"
A6 6" 6 5/8"
A8 8" 8 5/8"
ACOUSTIC INSULATION
C1 1 5/8" 2 7/8"
C2 2 1/2" 3 3/4"
C3 3 5/8" 4 7/8"
C4 4" 5 1/4"
C6 6" 7 1/4"
C8 8" 9 1/4"
1 HR U419 47
1 HR U419 47
1 HR U419 47
1 HR U419 47
REFER TO WALL DETAIL
SHEET AND PARTITION
NOTES FOR HEAD DETAILS
PARTITION TYPE - A
PARTITION TYPE - C
MARK STUD SIZE OVERALL THK. "R" RATING FIRE TESTMARK STUD SIZE OVERALL THK. "R" RATING FIRE TEST
ONE LAYER OF 5/8" GWB
ON METAL STUDS
/2
ACOUSTIC INSULATION
REFER TO WALL DETAIL
SHEET AND PARTITION
NOTES FOR HEAD DETAILS
ONE LAYER OF 5/8" GWB
EACH SIDE OF METAL
STUDS
HOLD BOTTOM OF GWB 1/2"
OFF FINISH FLOOR. NO
EXCEPTIONS
/2
"A" STC RATING
PARTITION MODIFICATIONS
"A" STC RATING
PARTITION MODIFICATIONS
FLOOR
APPLY CONTINUOUS BEAD
ACOUSTIC SEALANT UNDER
FLOOR TRACK
COMPOSITE WALL
NON-COMPOSITE WALL
APPLY CONTINUOUS BEAD
ACOUSTIC SEALANT UNDER
FLOOR TRACK
HOLD BOTTOM OF GWB 1/2"
OFF FINISH FLOOR. NO
EXCEPTIONS
FLOOR
INSTALL HORIZONTAL STUD
BRIDGING VERTICALLY
SPACED PER
MANUFACTURER'S TABLES
A4 4" 4 5/8"
RUNNER TRACK. REFER TO
DETAIL F8 ON SHEET AE511-
A
RUNNER TRACK. REFER TO
DETAIL F8 ON SHEET AE511-
A
A00 - 1/4" GWB - - -
PARTITION TYPE - R
FOR SHAFT WALL
CONSTRUCTION REFER TO UL
DETAIL U415 SYSTEM A
ONE LAYER OF
5/8" TYPE X GWB
O.C.
2' - 0"
2 1/2" DEEP GALVANIZED
STEEL STUD
1" TYPE X SHAFT LINER
PANEL GWB
S1 2 1/2" 4 3/4" 1 HR U415 -
MARK STUD SIZE OVERALL THK. "R" RATING FIRE TEST "A" STC RATING
/8
STRUCTURESTRUCTURE
CONTINUOUS STRAPS AT 16"
O.C. TO SECURE INSULATION
ACOUSTIC
INSULATION
M
IN
IM
U
M
M
IN
IM
U
M E
M B
E D
M E
N T
I N
C O
N C
R E
T E
/2
/2
THIS SPACE FOR PROJECT TITLE.
LETTERING TO BE HELVETICA 5" HIGH CENTERED
BETWEEN LETTERING ABOVE AND BELOW
ONE OR TWO LINES AS REQUIRED
DESIGNED AND SUPERVISED BY:
DEPARTMENT OF VETERANS AFFAIRS
WASHINGTON, D.C.
GENERAL CONTRACTORDESIGNER
THIS SPACE FOR
CONTRACTOR
INFORMATION
2" 7' - 8" 2"
8' - 0"
VA LOGO. OBTAIN APPROVED
GRAPHIC FROM COR
PROJECT TITLE LETTERING TO BE
APPROVED VA BLUE
2x BORDER MEMBER
PAINT BLACK
METAL SIGN FACE - 3/4"
MINIMUM BACKING THICKNESS.
PAINT WHITE ENAMEL
CONTRACTOR INFORMATION
LETTERING TO BE 1 1/2" HIGH
HELVETICA
SUPPORT POSTS AND FRAMING
MEMBERS
PAINT WHITE ENAMEL
DESIGNER INFORMATION:OBTAIN
APPROVED GRAPHIC FROM
DESIGNER
2x BACK FRAME AND CROSS
BRACING
PAINT WHITE ENAMEL
NOTES:
1. LOCATE SIGN ON CAMPUS PER VA-COR.
2. SEE SPEC SECTION 010000 FOR SIMILAR
SAFETY SIGN.
3. LOCATE BOTH SIGNS ADJACENT TO EACH
OTHER.
AT NEW SLABS, PROVIDE #3 BARS 12"
O.C. EW IN THE BASE AND DOWEL
BASE TO FLOOR. MIN EMBEDMENT OF
DOWELS TO BE 1/2 FLOOR THICKNESS
OR 3" MIN
AT EXISTING SLABS, ROUGHEN THE
SURFACE OF THE EXISTING
CONCRETE TO A 1/4"
AMPLITUDE. CLEAN ALL DEBRIS FROM
THE SURFACE AND APPLY AN EPOXY
BONDING AGENT PER
MANUFACTURER’S INSTRUCTIONS
PRIOR TO POURING THE EQUIPMENT
PAD.
M
IN
L /1
NOTES:
1. L & W TO BE 8" GREATER THAN THE
EQUIPMENT MOUNTING PLATE /
FOOTPRINT
2. PROVIDE 3/4" CHAMFER AROUND
ENTIRE UPPER EDGE
3. PAINT ENTIRE PAD SAFETY YELLOW
IN EPOXY FLOOR PAINT
VA STANDARD DETAIL SD230541-03
SECTION A-A (PAD NOT POURED WITH SLAB )
EQUIPMENT
PROVIDE DOUBLE
REINFORCING IN AREA
OF PAD
M
IN
L /1
SECTION A-A (PAD POURED WITH SLAB )
EQUIPMENT
16" MIN
L
W
A
A
FLOOR
5D
2D
WELD HEAD TO PLATE OR
BEND OVER 5D
PIPE SLEEVE (5D, 3" MIN.
LENGTH)
ANCHOR BOLT
EQUIPMENT PAD
SCHEDULED PARTITION
WALL AND FINISH
(NEW WALL)
SCHEDULED TILE, SEAL POROUS TILE,
AND GROUT (SEE MANUFACTURER'S
INSTRUCTIONS)
5/8" GYPSUM WALL BOARD,
PAINT AS SCHEDULED
"J" CASING BEAD
8' - 0" A.F.F. U.N.O (SEE ELEVATIONS)
LINE OF CEILING, SEE
REFLECTED CEILING PLANS
FOR INFORMATION
EPOXY GROUT, SEAL POROUS
TILE, AND GROUT (SEE
MANUFACTURER'S INSTRUCTIONS)
LATEX-PORTLAND CEMENT
BOND MORTAR
TILE COUNCIL ASSOCIATION
TILE SETTING METHOD (TCA) W243
T2 - FULL HEIGHT TILE CONDITION
FIBER-REINFORCED
WATER RESISTANT
GYPSUM BACKER
BOARD
VARIES
AS SCHD
SCHEDULED TILE, SEAL POROUS
TILE, AND GROUT (SEE
MANUFACTURER'S INSTRUCTIONS)
5/8" GYPSUM WALL BOARD,
PAINT AS SCHEDULED
"J" CASING BEAD
5' - 0" A.F.F. U.N.O (SEE ELEVATIONS)
TILE COUNCIL ASSOCIATION
TILE SETTING METHOD (TCA) W243
EPOXY GROUT, SEAL POROUS
TILE, AND GROUT (SEE
MANUFACTURER'S INSTRUCTIONS)
LATEX-PORTLAND CEMENT
BOND MORTAR
T1 - WAINSCOT TILE WALL CONDITION
CONTINUOUS BEVELED
ALUMINUM TRIM CAP,
MITERED AT CORNERS, TYP.
ACOUSTIC INSULATION
RED
WHITE
BLUE
JOINT
BRACING
2"X4" FRAME
AND BRACE IN
BACK
WOOD
STRIPS
CONTRACTOR'S NAME
THE LIFE YOU SAVE MAY BE YOUR OWN
THIS PROJECT
HAS WORKED 0 00 DAYS
WITHOUT A LOST TIME ACCIDENT
ZERO
in ON SAFETY
BLUE
BLUE
OUTLINE
WITH WHITE
INTERIOR
4"x4" IF SIGN IS
INSTALLED ON
GRADE FINISH GRADE
ELEVATION
ALL LETTERING TO BE
PAINTED BLACK WITH
EXCEPTION OF PROJECT
TITLE, WHICH IS TO BE
PANTONE 19-4035 TCX
4 " -3
/4
4'-0"
V A
R
IE
S
U.S. Department of Veterans Affairs
ETERANS EALTH ARE YSTEMV H C S
OF THE ZARKSO
Engineering Service
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
10720 SIKES PLACE, SUITE 100
CHARLOTTE, NC 28277
704-814-1346
CONSULTING STRUCTURAL ENGINEERS
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2024
WWW.HARRELLDG.COM
21 JUNE 2024
564-24-104
FAYETTEVILLE VA MEDICAL CENTER
HDG PROJECT: 19022
CONSTRUCTION
DOCUMENTS SUBMISSION
RENOVATE SPACE FOR LOGISTICS
(B-1)
A u to d e s k D o c s /1
F a y e tt e v ill e I D
IQ
P ro je c t
N o
-1
-4
R e n o v a ti o n o f S
P S
/1
A R
C H
R
.r v t
/1
/2
:5
:0
P
M
GI501-A
MSJC
PARTITION TYPES AND STANDARD
DETAILS
0 1 1/2'1'1/2'
1' 2' 3'0
1. REFER TO PLANS FOR LOCATION OF PARTITION TYPES. C4
(UNRATED) IS THE TYPICAL PARTITION TYPE UON.
2. ERECT PARTITIONS IN ORDER OF RATING PRIORITY BEGINNING WITH
HIGHEST FIRE RATED PARTITION. CONSTRUCTION OF HIGHER
RATED PARTITIONS SHALL BE CONTINUOUS PAST/THROUGH LOWER
RATED INTERSECTING PARTITION.
3. ALL STUD GAUGES AND LIMITING HEIGHTS IN GYPSUM BOARD
REFERENCE SPECIFICATIONS.
4. ALL PARTITIONS CONTAINING PLUMBING OR HAVING AN EXTERIOR
FACE TO BE INSULATED.
5. THE FOLLOWING LIST OF ROOMS (IF USED) SHALL HAVE THEIR
PERIMETER PARTITIONS INSULATED USING THERMAL INSULATION: (1)
ALL ELECTRICAL / MECHANICAL ROOMS; (2) A/V EQUIPMENT /
LIGHTING ROOMS; AND (3) STAIRWAYS.
6. ALL NEW STUD WALLS RECEIVE ACOUSTIC INSULATION UNLESS
NOTED OTHERWISE.
7. ALL PARTITIONS SHALL EXTEND FULL HEIGHT TO UNDERSIDE OF
DECK / INTERSTITIAL ABOVE OR HAVE THEIR TOPS BRACED PER
PARTITION BRACING DETAILS.
8. ALL RATED PARTITIONS TO EXTEND FROM TOP OF SLAB TO
UNDERSIDE OF STRUCTURE. SEAL ENTIRE PERIMETER WITH
FIRESTOP SEALANT UON.
9. ALL INTERIOR ROOF AND OVERFLOW DRAIN LEADERS TO BE
WRAPPED CONTINUOUSLY WITH SOUND ATTENUATION INSULATION.
10. INSTALL FRAMING AND GWB TO OFFSET AROUND STRUCTURAL
MEMBERS OR OTHER OBSTRUCTIONS TO MAINTAIN FIRE RESISTIVE
RATINGS.
11. WHERE GWB EXTENDS TO THE UNDERSIDE OF STRUCTURE, STOP
GWB 1/2” BELOW LINE OF STRUCTURE AND SEAL AS REQUIRED.
12. NON-RATED PARTITIONS SHALL HAVE ENTIRE PERIMETER SEALED
WITH ACOUSTICAL SEALANT, UON.
13. REFER TO MECHANICAL DRAWINGS FOR DETAILS ON PIPE
PENETRATIONS THROUGH ACOUSTICAL PARTITIONS AS WELL AS
RATED PARTITIONS.
14. INSTALL METAL STUD BLOCKING IN PARTITIONS AT ALL WALL
MOUNTED EQUIPMENT, WHETHER CC, VC OR VV.
15. ALL PARTITIONS SCHEDULED TO RECEIVE TILE, IN BATHING ROOMS
AND/OR LOCATED ADJACENT TO OR BEHIND PLUMBING FIXTURES
SHALL BE CONSTRUCTED OF WATER-RESISTANT CORE GWB.
16. FOR MOLD PREVENTION, DO NOT INSTALL GWB IN DIRECT CONTACT
WITH THE FLOOR. ALL GWB SHALL BE SHIMMED 1/2” OFF THE FLOOR
WITH NON-POROUS SHIMS. PLASTIC NON-POROUS HORSESHOE
SHIMS ARE RECOMMENDED. GWB SHIMS ARE NOT ACCEPTABLE.
17. CABLES PENETRATING RATED PARTITIONS (WITH OR WITHOUT
SLEEVES) SHALL BE SECURED ON BOTH SIDES OF THE PARTITION.
METHOD OF SECURING THE CABLES SHALL BE SLEEVED TO
PRECLUDE ANY MOVEMENT OF THE CABLE DISTURBING THE
INTEGRITY OF THE PENETRATION FIRE - STOPPING ASSEMBLY. SEE
SPECIFICATIONS.
18. REFER TO DRAWINGS FOR TYPICAL WALL FRAMING FOR FIRE
DAMPERS IN RATED WALLS. COORDINATE EXACT FRAMING
REQUIREMENTS WITH FIRE DAMPER MANUFACTURER. COORDINATE
ALL PARTITION CONSTRUCTION WITH MECHANICAL PRIME
CONTRACTOR PRIOR TO COMMENCING PARTITION CONSTRUCTION.
GENERAL CONTRACTOR SHALL OBTAIN FROM THE MECHANICAL
CONTRACTOR THE PROPER INSTALLATION INSTRUCTIONS FOR ALL
FIRE AND SMOKE DAMPERS AND SHALL PROVIDE THE REQUIRED
METAL FRAMING, DRYWALL, ETC., ACCORDING TO THESE
INSTRUCTIONS. INSTALLATION INSTRUCTIONS TO BE SUBMITTED TO
THE ARCHITECT AND OWNER FOR REVIEW.
19. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING FIRE AND
SMOKE SEALED PENETRATIONS IN ACCORDANCE WITH TESTED AND
APPROVED PENETRATION SEALING SYSTEM FOR THE PARTITION
CONSTRUCTION / FIRE RATING AND THE PENETRATING ELEMENTS.
20. PARTITION TYPES AS NOTED BY THE SYMBOL CONTINUE BETWEEN
ROOM/SPACE CORNERS OR ANY INTERSECTING PARTITION.
21. DIFFERING PARTITION TYPES SHALL ALIGN SO THAT WALL PLANES
CONTINUE UNBROKEN WITHIN/ACROSS ROOMS AND/OR SPACES.
22. COVER ALL EXISTING EXTERIOR WALLS AND MASONRY / CONCRETE
WALLS WITH PARTITION TYPE A00 UON.
23. INSTALL BRIDGING ON NON-COMPOSITE STUD WALLS.
INTERIOR PARTITION NOTES
PARTITION TAG NOTES
PARTITION TAGS ARE READ LEFT TO RIGHT:
1. THE FIRST CHARACTER INDICATES WHICH PARTITION / BARRIER
TYPE TO REFERENCE FOR CONSTRUCTION.
2. THE SECOND CHARACTER INDICATES A REFERENCE TO THE
STRUCTURAL CORE THICKNESS (STUD OR CMU).
3. THE THIRD CHARACTER INDICATES:
"A" - ACOUSTICAL PARTITION
"R" - FIRE RATED
"S" - SMOKE-RESISTIVE PARTITION (UNRATED)
"T" = "R" + "A" - FIRE RATED / ACOUSTICAL BARRIER
"V" = "R" + "S" - FIRE RATED / SMOKE BARRIER
"W" = "A" + "S" - ACOUSTICAL / SMOKE RESISTANT PARTITION
"Z" = "R" + "S" + "A" - FIRE RATED / SMOKE / ACOUSTICAL BARRIER
EXAMPLE:
A PARTITION TYPE C3T INDICATES A 4 7/8" 1 HOUR RATED BARRIER WITH
ACOUSTICAL INSULATION
NOTE:
THE RATING (FIRE) AND UL ASSEMBLY DESIGNATION ONLY APPLIES
WHEN THE PARTITION SUFFIX "R" IS ADDED TO THE WALL TAG(S)
OTHERWISE THE PARTITION TYPE IS A NON-RATED WALL AND / OR SOME
OTHER DISTINCTION NOTED UNDER PARTITION TAG NOTES.
3/4" = 1'-0" E3
PROJECT SIGNS
1 1/2" = 1'-0" B3
EQUIPMENT PAD
TILE CONDITIONS
WALL TAG SUFFIX TILE CONDITIONS (WHERE APPLICABLE) WALL TAGS I.E., C3T-T2
WHERE APPLICABLE SEE TILE CONDITIONS SUFFIX -T1, OR -T2
Revision Number Revisions: Date:
1 AMENDMENT 02 07/11/2024
1 1/2" = 1'-0" F3
PROJECT SAFETY SIGN
0 1 1/2'1'1/2'
F .E
.C
F .E
.C
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F .E
.C
F.E.C.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE FOLLOWING INFECTION CONTROL PRECAUTIONS DEPENDING UPON THE
AREA CLASS DESIGNATION
TYPE OF CONSTRUCTION/PROJECT ACTIVITY TABLE
GROUP 1-LOW RISK
● OFFICE AREAS (NON-
CLINICAL)
PATIENT RISK GROUP TABLE
GROUP 2-MEDIUM RISK
GROUP 3-HIGH RISK GROUP 4-HIGHEST RISK
INFECTION CONTROL MATRIX-CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
PATIENT RISK GROUP TYPE A
I I I
III
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION
ACTIVITY AND RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES
ARE NECESSARY.
LOW RISK GROUP 1
MEDIUM RISK GROUP 2
HIGH RISK GROUP 3
HIGHEST RISK GROUP 4
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM CONSTRUCTION
OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED FOR VISUAL INSPECTION.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS I.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE AND EXIT OF WORK AREA. REPLACE
USED MATS IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
7. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS II.
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR
FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT BEFORE
CONSTRUCTION BEGINS.
3. REMOVE OR ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS BEFORE CONSTRUCTION BEGINS OR IMPLEMENT
CONTROL CUBE METHOD.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-EQUIPPED AIR
FILTRATION UNITS.
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
7. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERS.
8. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK
AREAS.
1. WIPE SURFACES TO REMOVE DUST.
1. WIPE WORK SURFACES WITH
DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE
BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WORK
AREA WITH HEPA FILTERED VACUUM
BEFORE LEAVING WORK AREAS.
4. REMOVE ISOLATION OF HVAC SYSTEM
IN AREAS WHERE WORK WAS BEING
PERFORMED.
1. REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED
WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE
BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING.
4. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM
IN AREAS WHERE WORK WAS BEING
PERFORMED.
1. INCLUDES ALL ACTIVITIES REQUIRED BY CLASS III.
2. OBTAIN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR
FACILITIES MANAGEMENT MAINTENANCE AND ENGINEERING DEPARTMENT BEFORE
CONSTRUCTION BEGINS.
3. ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
4. COMPLETE ALL CRITICAL BARRIERS OR IMPLEMENT CONTROL CUBE METHOD BEFORE
CONSTRUCTION BEGINS.
5. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA-EQUIPPED AIR
FILTRATION UNITS.
6. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY. CONSTRUCT
ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS-THROUGH THIS ROOM SO THEY
CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR
THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
7. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
8. PLACE ADHESIVE WALK-OFF MATS AT ENTRANCE TO WORK AREA WITH ANTEROOM.
REPLACE PER MANUFACTURER'S RECOMMENDATIONS.
9. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL EACH COMPLETED PROJECT
PHASE IS INSPECTED BY THE HOSPITAL SAFETY OFFICER, FACILITIES MANAGEMENT
MAINTENANCE AND ENGINEERING DEPARTMENT AND THOROUGHLY CLEANED BY THE
HOSPITAL ENVIRONMENTAL SERVICES DEPARTMENT OR THEIR CONTRACTED
ENVIRONMENTAL SERVICES COMPANY.
10. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
11. COVER TRANSPORT RECEPTACLES OR CARS. TAPE COVERING.
12. VACUUM WITH HEPA FILTERED VACUUM. WET MOP WITH DISINFECTANT AFTER
BARRIERS ARE REMOVED.
1. REMOVE BARRIER MATERIALS
CAREFULLY TO MINIMIZE SPREADING
OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE
BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES
OR CARTS. TAPE COVERING.
4. VACUUM WORK WITH HEPA-
FILTERED VACUUMS.
5. WET MOP WITH DISINFECTANT
AFTER BARRIERS ARE REMOVED.
6. REMOVE ISOLATION OF HVAC SYSTEM
IN AREAS WHERE WORK WAS BEING
PERFORMED.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
CLASS I
CLASS II
CLASS III
CLASS IV
INSPECTION AND NON-INVASIVE ACTIVITIES
INCLUDES BUT IS NOT LIMITED TO:
● REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TILE IN 50 SQUARE FEET
● PAINTING (BUT NOT SANDING), WALL COVERING
● ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES THAT
DO NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR
ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION
TYPE A
SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL DUST
INCLUDES BUT IS NOT LIMITED TO:
● INSTALLATION OF TELEPHONE AND COMPUTER CABLING
● ACCESS TO CHASE SPACES
● CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED
TYPE B
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES
INCLUDES BUT IS NOT LIMITED TO:
● SANDING OF WALLS FOR PAINTING OR WALL COVERING
● REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK
● NEW WALL CONSTRUCTION
● MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS
● MAJOR CABLING ACTIVITIES
● ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE
WORK SHIFT
TYPE C
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES BUT IS NOT LIMITED TO:
● ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS
● REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM
● NEW CONSTRUCTION
TYPE D
ICRA GENERAL NOTES
● CARDIOLOGY
● ECHOCARDIOLOGY
● ENDOSCOPY-GI
● PHYSICAL THERAPY
● RADIOLOGY/MRI
● NUCLEAR MEDICINE
● RESPIRATORY CARE (EXCEPT -
BRONCHOSCOPY AREA)
● CAFETERIA
● OUTPATIENT AREAS-CLINICS AND OFFICES
(EXCEPTION: TRANSPLANT AND ONCOLOGY)
● EMERGENCY ROOM
● POST ANESTHESIA
● CARE UNITS
● LABOR AND DELIVERY
● PEDIATRICS
● ADMISSION/DISCHARGE
AREA
● LABORATORIES
● PHARMACY
● INPATIENT UNITS (NOT
OTHERWISE SPECIFIED)
● ALL OPERATING ROOMS INCLUDING LABOR
AND DELIVERY
● ANESTHESIA AND PUMP AREAS
● CENTRAL EQUIPMENT/STERILE SUPPLY
● CARDIAC CATHETERIZATION AND ANGIOGRAPHY
AREAS
● INTERVENTIONAL RADIOLOGY
● RADIATION ONCOLOGY
● ALL INTENSIVE CARE UNITS
● NEWBORN NURSERIES, INCLUDING NICU
● DIALYSIS UNIT
● ONCOLOGY-INPATIENT AND OUTPATIENT
● TRANSPLANT-INPATIENT AND OUTPATIENT
● PHARMACY ADMIXTURE
● NEGATIVE PRESSURE ISOLATION
ROOMS/AREAS (INCLUDING
BRONCHOSCOPY AREA)
TYPE B
II
II
III
III / IV
TYPE C
II
III
III / IV
III / IV
TYPE D
III / IV
IV
IV
IV
A. PROVIDE CONTAINMENT AS REQUIRED (BY HOSPITAL) INFECTION CONTROL REPRESENTATIVE FOR WORK OUTSIDE MAJOR AREA.
B. PROVIDE CONTAINMENT AT THE FLOOR BELOW FOR ANY WORK IN THE CEILING PLENUM.
C. PROVIDE TEMPORARY DOOR WITH GASKETING TO PREVENT THE MOVEMENT OF DUST.
D. PROVIDE TEMPORARY EMERGENCY EXIT FROM CONSTRUCTION ZONE; HOWEVER, ALL GENERAL CONSTRUCTION TRAFFIC SHOULD BE THROUGH VESTIBULE.
E. CONTRACTOR TO PROTECT ALL FINISHES INCLUDING (BUT NOT LIMITED TO) FLOORING, CEILING, WALL SURFACES, DOORS, AND DOOR FRAMES DURING THE MOVEMENT OF
MATERIALS TO/FROM LIMIT OF WORK. COORDINATE WITH COR AND SPECIFICATIONS FOR PROCEDURES/REQUIREMENTS.
DURING CONSTRUCTION PROJECT UPON COMPLETION OF PROJECT
B C D
A
02.12
STERILE STORAGE
L108
IT
L106
STORAGE
L104
ELECTRICAL
L101
BREAK DOWN
L102
CORR
L103
SUPPLY OFFICE
L105
COPY ROOM
L107
TOILET
L110
TOILET
L111
STERILE STORAGE,
OVERFLOW
L112
HAC
L113
ELECTRICAL
E-102
IT
T-100
MECHANICAL ROOM
M1-3
NITROUS OXIDE
STOR
M1-4
SUPPLY TECH
OFFICE
L115
EMS PRIMARY
L116
SPS RECEIVING
BREAKDOWN
L114
SPECIAL SYSTEMS
DATA ROOM
CAT SCAN EXAM
CAT SCAN CONTROL
CAT SCAN
BREAKROOM
STORAGE
TOILET
OPERATIONS
ARMORY OFFICE
DISPATCH
CABLE TV DATA
ROOM
CORR
DINING
SERVICE ELEV
SERVICE ELEV
ELEV EQUIP
HOLDING
ELEC SW ROOM
OFFICEOFFICE
CORR
OFFICE
CONF RM
STORAGE
IV ANTE RM & CLEAN
STOR
IV ADMIXTURE
STAIRWELL
STERILE FLUIDS
STOR
STOR. PROSTHETIC &
MED
DRUG RECEIVING
SERVICE ELEV
LOBBY
COVERED DOCK
EMPTY CYLINDER
MEDICAL GAS
STORAGE RM
FULL CYLINDER
MEDICAL GAS
STORAGE RM
DIRTY LINEN CART
HOLDING
SUPPLY TECH
SUPERVISOR
L115A
E
CORRIDOR
L109
INDICATES AREA IN SCOPE
OF WORK
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
U.S. Department of Veterans Affairs
ETERANS EALTH ARE YSTEMV H C S
OF THE ZARKSO
Engineering Service
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTH
TRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION LEGEND
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
10720 SIKES PLACE, SUITE 100
CHARLOTTE, NC 28277
704-814-1346
CONSULTING STRUCTURAL ENGINEERS
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 0'-0"
KEY PLAN
COPYRIGHT © 2024
WWW.HARRELLDG.COM
21 JUNE 2024
564-24-104
FAYETTEVILLE VA MEDICAL CENTER
HDG PROJECT: 19022
CONSTRUCTION
DOCUMENTS SUBMISSION
RENOVATE SPACE FOR LOGISTICS
(B-1)
AREA OF WORK
A u to d e s k D o c s /1
F a y e tt e v ill e I D
IQ
P ro je c t
N o
-1
-4
R e n o v a ti o n o f S
P S
/1
A R
C H
R
.r v t
/1
/2
:3
:1
P
M
GC102-A
AuthorChecker
FIRST FLOOR - ICRA PLAN
3/32" = 1'-0" F5
FIRST FLOOR - ICRA PLAN
CLASS IV
CLASS IV
GENERAL SHEET NOTES
SYMBOL LEGEND
- SHEET KEYNOTES
02.12 ICRA BARRIER TO BE INSTALLED PRIOR TO START OF
CONSTRUCTION PERIOD WORK ACTIVITIES. BARRIER TO BE
REMOVED UPON COMPLETING CONSTRUCTION PERIOD WORK
ACTIVITIES. EXISTING CEILING & FLOOR TO BE REPAIRED
FOLLOWING REMOVAL OF BARRIER. BARRIER INCLUDES PAINTED
TEMPORARY WALLS, DOOR, AND LOCKING HARDWARE.
COORDINATE KEYING WITH VA-COR.
8'0 16' 32'
*DEDUCT ALTERNATE 4: KEEP FUNCTIONALITY OF
DOUBLE-SIDED ELEVATOR DOORS THAT OPEN
INTO EMS PRIMARY STORAGE L116. REMOVE EAST
FURRING WALL A4R IN EMS PRIMARY L116.
Revision Number Revisions: Date:
1 AMENDMENT 02 07/11/2024
- 597
EXIT
PASSAGEWAY
C-L021
SERVICE
VESTIBULE
C-L022
DN
C10
B C D
A
SLAB ON GRADE
A4
09.17
09.1609.1509.14
26.01 26.0209.19
PIPE TRENCH
P
IP
E T
R E
N C
H
A R
E A
W A
Y
SLAB ON GRADE
PIPE TRENCH
P
IP
E T
R E
N C
H
A R
E A
W A
Y
PIPE TRENCH
P
IP
E T
R E
N C
H
A R
E A
W A
Y
CANTEEN
STORAGE
CANTEEN
STORAGE
CANTEEN
STORAGE
CANTEEN
OFFICE
CANTEEN
OFFICE
GIFT SHOP
WOMEN'S
LOUNGE
WOMEN'S
TOILETWOMEN'S
LOCKER
MEN'S
LOCKER
MEN'S
LOUNGE
MEN'S
TOILET
VENDING ROOM
OFFICE STOR
ELECT
CLO.
STAIR 9 OFFICE OFFICE OFFICE OFFICE OFFICE
CORRIDOR
ELEV.
ELEV.
STAIR 8
DRESS
RM.
IP/STAFF
CLOTHING
RM
CLEAN
UNIFORM
STORAGE
FIRE ALARM
PIPE
CHASE
ELECT. DIST.
REFRIGERATION
AUTOPSY
ROOM
ENTRY
SHOWER
SERVICE
VESTIBULE
E
2' - 0"
SERVICE ELEVATOR
LOBBY
1-L051
U.S. Department of Veterans Affairs
ETERANS EALTH ARE YSTEMV H C S
OF THE ZARKSO
Engineering Service
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTH
TRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION LEGEND
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
10720 SIKES PLACE, SUITE 100
CHARLOTTE, NC 28277
704-814-1346
CONSULTING STRUCTURAL ENGINEERS
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 0'-0"
COPYRIGHT © 2024
WWW.HARRELLDG.COM
21 JUNE 2024
564-24-104
FAYETTEVILLE VA MEDICAL CENTER
HDG PROJECT: 19022
CONSTRUCTION
DOCUMENTS SUBMISSION
RENOVATE SPACE FOR LOGISTICS
(B-1)
A u to d e s k D o c s /1
F a y e tt e v ill e I D
IQ
P ro je c t
N o
-1
-4
R e n o v a ti o n o f S
P S
/1
A R
C H
R
.r v t
/1
/2
:1
:0
P
M
AE101-A
AuthorJC
BASEMENT FLOOR -
CONSTRUCTION PLAN
GENERAL SHEET NOTES
- SHEET KEYNOTES
A. REFER TO GI501-A FOR PARTITION TYPES AND AE511-A FOR HEAD OF
WALL CONSTRUCTION.
B. REFER TO LIFE SAFETY DRAWINGS FOR PROJECT-WIDE LIFE SAFETY
SCOPE OF RATED WALLS, BARRIERS, SMOKE RESISTANT
PARTITIONS, SUITE DESIGNATIONS, EGRESS, AND EXIT DISCHARGE
INFORMATION.
C. REFER TO QH101 FOR EQUIPMENT NOT SHOWN ON THIS PLAN.
D. DIMENSIONS ARE TO FINISH FACE OF WALL OR SOFFIT AND TO
COLUMN CENTER LINE UNLESS OTHERWISE NOTED.
E. PROVIDE 3" GROMMETS 48" O.C. IN ALL COUNTERTOPS ABOVE OPEN
KNEE SPACE. CENTER ON OUTLETS BELOW.
F. PARTITION TYPES, AS NOTED BY SYMBOL, CONTINUE BETWEEN
ROOM/SPACE CORNERS OR ANY INTERSECTING PARTITION.
G. DIFFERING PARTITION TYPES SHALL ALIGN SO THAT WALL PLANES
CONTINUE UNBROKEN WITHIN/ACROSS ROOMS AND/OR SPACES.
H. REFER TO AE600-A FOR DOOR SCHEDULE.
I. DISTANCE FROM HINGE SIDE OF DOOR TO INTERSECTING STUD
WALL SHALL BE 4" UNLESS NOTED OR DETAILED OTHERWISE
(MEASURED FROM OUTSIDE OF FRAME.)
J. CONTRACTOR SHALL VERIFY ALL DIMENSIONS NOTED AS "CLR",
"CLEAR", OR "MIN." DIMENSIONS NOTED AS "HOLD" ARE CRITICAL TO
COORDINATE OTHER WORK (E.G. CEILING GRIDS, LIGHTING,
FINISHES, ETC.)
K. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO INITIATING
CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO
ARCHITECT PRIOR TO COMMENCING WORK.
L. CONTRACTOR SHALL PROVIDE ALL BLOCKING REQUIRED TO
ANCHOR ALL WALL AND CEILING MOUNTED ITEMS.
M. FIRE STOPPING SYSTEMS - REFER TO SPECIFICATIONS SECTION 07
84 00 FOR INFORMATION REGARDING PENETRATIONS OF ALL RATED
ASSEMBLIES (BOTH SINGLE AND DOUBLE MEMBRANE
PENETRATIONS), INCLUDING BUT NOT LIMITED TO: PENETRATIONS
FROM DUCTWORK, CONDUIT, PIPING, SUPPORT FOR WALL MOUNTED
EQUIPMENT, CABINETS, AND COUNTERTOPS.
N. ALL NEW PARTITIONS TO BE TYPE C4 UNLESS OTHERWISE NOTED.
1/8" = 1'-0" F5
BASEMENT FLOOR PLAN - 1
4'0 8' 16'
09.14 PAINT NEW FURRING WALLS TO MATCH EXISTING.
09.15 INSTALL NEW STAINLESS STEEL WALL PROTECTION AT 48
INCHES AFF ON NEW FURRING WALLS.
09.16 ON NEW FURRING WALLS, INSTALL NEW 4-INCH BEIGE
RUBBER BASE TO MATCH EXISTING.
09.17 INSTALL NEW WALL ACT WALL MOULDING ALONG NEW
FURRING WALL. REUSE EXISTING TEES AND REPLACE
REMOVED CEILING TILES WITH NEW.
09.19 PAINT STRUCTURE.
26.01 PROTECT EXISTING SWITCHES ON WALL DURING
CONSTRUCTION
26.02 RELOCATE EXIT SIGN TO THIS WALL, REFER TO ELECTRICAL
DRAWINGS.
Revision Number Revisions: Date:
1 AMENDMENT 02 07/11/2024
C R
P P
C R
PP
KP
CR
PP
C R
PP
P P
C R
PP
PP
F .E
.C
F .E
.C
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F .E
.C
F.E.C.
YELLOW.
ISOMETRIC
8" X 8" X 1/2" STL. PLATE
W/ (4) 5/8" Ø X 4" EXP.
ANCHORS - GALV.
1/4" NEOPRENE PAD
SEALANT ALL AROUND
FILLET, TYP.
1/2
4"Ø GALV. STL. PIPE,
SET PLUMB, FILLED W/
CONC. PAINT TRAFFIC
4"
3'
B C D
A
C4T
C6T
C8T
A4R
C4T
102A
108B
102B
108A
21' - 5" 13' - 4"
CLEAR
8' - 0"
A4
37' - 4" 3' - 8" CLEAR
8' - 9"
32' - 7 1/2"
AE201-AD4
11' - 1"
32' - 6 1/2"
ALIGN
WALLS
A4
A0A0
A4 A4
E3
AE300-A
E3
AE301-A
C4S
C4S
C4T
A4
C4T
C4T
C4S
IT
L106
ELECTRICAL
L101
BREAK DOWN
L102
TOILET
L110
TOILET
L111
STERILE STORAGE,
OVERFLOW
L112
HAC
L113
IT
T-100
MECHANICAL ROOM
M1-3
NITROUS OXIDE
STOR
M1-4
SUPPLY TECH
OFFICE
L115
EMS PRIMARY
L116
SPS RECEIVING
BREAKDOWN
L114
STERILE STORAGE
L108
STORAGE
L104
SUPPLY OFFICE
L105
ELECTRICAL
E-102
CORR
L103
COPY ROOM
L107
A00
A4
A00
C4T
C4S
A0
A00
A00
A00
A00
A00
C4T
AE201-A
A8
A00A00
A00A00
A00
A00
/2
/2
/2
GI501-A
B3
AE201-A
A1
/2
AE201-A
E1
09.14
1' - 5"
/2
" EQ EQ
A4
A4R
A00
C4Z
09.15
A4
A4
A0A0
A00
A00
A00A00
A00A00A00
A00
A4R 14.09
14.09
A4
S1R
A00A00
A00A00A00
3' - 4"
A1
AE102-A
A1
AE102-A
07.31
08.05
C1
AE102-A
03.04
67' - 6 1/2"
115A
/2
SUPPLY TECH
SUPERVISOR
L115A
A00
A4
A00
2' - 5 1/2" 8' - 8 1/2"10' - 2"
112A
A3
AE201-A
A6
/2
EQ 4' - 0" EQ
C4S
E
7' - 4"
E Q
E Q
6' - 11"
C4S
03.06
C4Z
W-1
D1
AE102-A
DIRTY LINEN CART
HOLDING
1-1264C
FULL CYLINDER
MEDICAL GAS
STORAGE RM
S-3
SERVICE ELEV
C233
SERVICE ELEV
C232
SERVICE ELEV
LOBBY
C231
ELEV EQUIP
C234
ELEC SW ROOM
C215
SPECIAL SYSTEMS
DATA ROOM
CAT SCAN EXAM
CAT SCAN CONTROL
149A
CAT SCAN
BREAKROOM
STORAGE
TOILET
HOLDING
OPERATIONS
ARMORY OFFICE
DISPATCH
CABLE TV DATA
ROOM
DRUG RECEIVING
C230
STOR. PROSTHETIC &
MED
C229
STERILE FLUIDS
STOR
C228
IV ANTE RM & CLEAN
STOR
C225
IV ADMIXTURE
C226
STAIRWELL
C227
OFFICE
C217 OFFICE
C216
CORR
C218
OFFICE
C220
CONF RM
C221 STORAGE
C222
DINING
CORRIDOR
L109
4' - 5"
EXISTING WALL
DUCT - SEE
MECHANICAL
DRAWINGS
STEEL ANGLE AND PLATE -
SEE STRUCTURAL
DRAWINGS (ALL-WELDED
CONSTRUCTION). PRIME
AND PAINT.
SEALANT, CONTINUOUS
STEEL ANGLE - SEE
SPEC SECTION 05 50 00
(ALL-WELDED
CONSTRUCTION), PRIME
AND PAINT.
BACKER ROD
AND SEALANT
BACKER ROD AND SEALANTPOWDER-COATED
STEEL DUCT RING
AT EACH DUCT
PENETRATION, SEE
MECHANICAL
DRAWINGS
EXISTING 2HR FIRE RATED MONOLITHIC MASONRY WALL
16GA MIN RETAINING
ANGLE SIZED TO LAP
DUCT A MIN 2" AND LAP
WALL MIN 1"
MINERAL WOOL PACKING
MATERIAL.
MIN. 5/8" FILL MATERIAL
AND MIN 1/4" DIA BEAD OF
SEALANT
36" x 30" MAX x 24 GA MIN
GALV STEEL DUCT.
INSULATION AND
DAMPERS WO
2-HR UL W-L-7008
FIRST FLOOR
0' - 0"
/2
ENCLOSURE SIDELOADING DOCK/EXTERIOR
2" EIFS
DRAINAGE MAT
5/8" GLASS FIBER REINFORCED
GYPSUM BOARD SHEATHING
WEEP SCREED FLASHING
EXISTING LOADING DOCK SLAB
BASIS OF DESIGN: STO THERM RAINSCREEN CLASS PB
SEALANT AND BACKER ROD
6" CFMF
MINERAL WOOL INSULATION
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
U.S. Department of Veterans Affairs
ETERANS EALTH ARE YSTEMV H C S
OF THE ZARKSO
Engineering Service
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTH
TRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION LEGEND
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
10720 SIKES PLACE, SUITE 100
CHARLOTTE, NC 28277
704-814-1346
CONSULTING STRUCTURAL ENGINEERS
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 0'-0"
KEY PLAN
COPYRIGHT © 2024
WWW.HARRELLDG.COM
21 JUNE 2024
564-24-104
FAYETTEVILLE VA MEDICAL CENTER
HDG PROJECT: 19022
CONSTRUCTION
DOCUMENTS SUBMISSION
RENOVATE SPACE FOR LOGISTICS
(B-1)
AREA OF WORK
A u to d e s k D o c s /1
F a y e tt e v ill e I D
IQ
P ro je c t
N o
-1
-4
R e n o v a ti o n o f S
P S
/1
A R
C H
R
.r v t
/1
/2
:0
:3
P
M
AE102-A
GO/MSJC
FIRST FLOOR - CONSTRUCTION
PLAN
1/8" = 1'-0" F4
FIRST FLOOR - CONSTRUCTION PLAN
GENERAL SHEET NOTES
- SHEET KEYNOTES
A. REFER TO GI501-A FOR PARTITION TYPES AND AE511-A FOR HEAD OF
WALL CONSTRUCTION.
B. REFER TO LIFE SAFETY DRAWINGS FOR PROJECT-WIDE LIFE SAFETY
SCOPE OF RATED WALLS, BARRIERS, SMOKE RESISTANT
PARTITIONS, SUITE DESIGNATIONS, EGRESS, AND EXIT DISCHARGE
INFORMATION.
C. REFER TO QH101-A FOR EQUIPMENT NOT SHOWN ON THIS PLAN.
D. DIMENSIONS ARE TO FINISH FACE OF WALL OR SOFFITT AND TO
COLUMN CENTER LINE UNLESS OTHERWISE NOTED.
E. PROVIDE 3" GROMMETS 48" O.C. IN ALL COUNTERTOPS ABOVE OPEN
KNEE SPACE. CENTER ON OUTLETS BELOW.
F. PARTITION TYPES, AS NOTED BY SYMBOL, CONTINUE BETWEEN
ROOM/SPACE CORNERS OR ANY INTERSECTING PARTITION.
G. DIFFERING PARTITION TYPES SHALL ALIGN SO THAT WALL PLANES
CONTINUE UNBROKEN WITHIN/ACROSS ROOMS AND/OR SPACES.
H. REFER TO AE600-A FOR DOOR SCHEDULE.
I. DISTANCE FROM HINGE SIDE OF DOOR TO INTERSECTING STUD
WALL SHALL BE 4" UNLESS NOTED OR DETAILED OTHERWISE
(MEASURED FROM OUTSIDE OF FRAME.)
J. CONTRACTOR SHALL VERIFY ALL DIMENSIONS NOTED AS "CLR",
"CLEAR", OR "MIN." DIMENSIONS NOTED AS "HOLD" ARE CRITICAL TO
COORDINATE OTHER WORK (E.G. CEILING GRIDS, LIGHTING,
FINISHES, ETC.)
K. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO INITIATING
CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO
ARCHITECT PRIOR TO COMMENCING WORK.
L. CONTRACTOR SHALL PROVIDE ALL BLOCKING REQUIRED TO
ANCHOR ALL WALL AND CEILING MOUNTED ITEMS.
M. FIRE STOPPING SYSTEMS - REFER TO SPECIFICATIONS SECTION 07
84 00 FOR INFORMATION REGARDING PENETRATIONS OF ALL RATED
ASSEMBLIES (BOTH SINGLE AND DOUBLE MEMBRANE
PENETRATIONS), INCLUDING BUT NOT LIMITED TO: PENETRATIONS
FROM DUCTWORK, CONDUIT, PIPING, SUPPORT FOR WALL MOUNTED
EQUIPMENT, CABINETS, AND COUNTERTOPS.
N. ALL PARTITIONS TO BE TYPE C4 UNLESS OTHERWISE NOTED.
4'0 8' 16'
3" = 1'-0" A1
SECTION -MECHANICAL
PENETRATION THRU EXISTING
EXTERIOR WALL
03.04 CONCRETE BOLLARD (TYP.) SEE DETAIL F1/AE102-A.
03.06 PAD DIMENSIONS ARE FOR BASIS OF DESIGN UNIT. CONTRACTOR
MUST ALTER PAD DIMENSIONS PER B3/GI501-A TO CONFORM TO
APPROVED UNIT.
07.31 2" THICK RIGID INSULATION WITH EIFS OVER 5/8" GYPSUM BOARD
SHEATHING AND 6" CFMF.
08.05 24" x 24" ACCESS PANEL.
09.14 PAINT NEW FURRING WALLS TO MATCH EXISTING.
09.15 INSTALL NEW STAINLESS STEEL WALL PROTECTION AT 48
INCHES AFF ON NEW FURRING WALLS.
14.09 DEACTIVATE ELEVATORS DOORS. DISCONNECT BUTTON
OPERATION AND DOME LIGHT AT THE ELEVATOR CONTROLLER.
REMOVE WALL DEVICES.
3" = 1'-0" C1
MECHANICAL PENETRATION THRU 2HR RATED EXTERIOR WALL
0 9"6"3"
0 9"6"3"
2'1'0 1/2'1" = 1'-0" F1
EXTERIOR STEEL PIPE BOLLARD DETAIL
*DEDUCT ALTERNATE 3: REMOVE
EIFS/CFMF FROM DUCT ENCLOSURE.
USE EXTERIOR DUCT JACKETING
INSTEAD OF EIFS/CFMF. KEEP BOLLARDS.
*DEDUCT ALTERNATE 4: KEEP FUNCTIONALITY OF
DOUBLE-SIDED ELEVATOR DOORS THAT OPEN
INTO EMS PRIMARY STORAGE L116. REMOVE EAST
FURRING WALL A4R IN EMS PRIMARY L116.
3" = 1'-0" D1
CFMF EIFS DUCT ENCLOSURE
Revision Number Revisions: Date:
1 AMENDMENT 02 07/11/2024
0 9"6"3"
F
F
F
F
F
OS
F S S
S
S
S
S
F
F
S
OS
OS
OS
OS
W A
P O
S
S
B C D
A.F.F.
AT
8' - 0"
A.F.F.
AT
8' - 0"
A.F.F.
AT
8' - 0"
A
A.F.F.
AT
8' - 0"
A.F.F.
AT
8' - 0"
A.F.F.
AT
9' - 0"
A.F.F.
AT
9' - 0"
A.F.F.
AT
8' - 0"
A.F.F.
AT
8' - 0"
STERILE STORAGE
L108
IT
L106
STORAGE
L104
ELECTRICAL
L101
BREAK DOWN
L102
SUPPLY OFFICE
L105
TOILET
L110
TOILET
L111
STERILE STORAGE,
OVERFLOW
L112
HAC
L113
ELECTRICAL
E-102
MECHANICAL ROOM
M1-3
NITROUS OXIDE
STOR
M1-4
SUPPLY TECH
OFFICE
L115
EMS PRIMARY
L116
SPS RECEIVING
BREAKDOWN
L114
COPY ROOM
L107
CORR
L103
09.13
09.17
9"
8" 8"
A.F.F.
AT
8' - 0"
A.F.F.
GWB
8' - 0"
E Q
E Q
ALIGN
SOFFIT/WALL
6 1/2"
09.19
A.F.F.
GWB
8' - 0"
-SP
SUPPLY TECH
SUPERVISOR
L115A
A.F.F.
GWB
8' - 0"
E
7 1/2"
7' - 5"
9"
/2
9"
E Q
E Q
7 1/2"
A.F.F.
12' - 0"
SPECIAL SYSTEMS
DATA ROOM
CAT SCAN EXAM
CAT SCAN CONTROL
149A
CAT SCAN
BREAKROOM
STORAGE
TOILET
OPERATIONS
ARMORY OFFICE
DISPATCH
CABLE TV DATA
ROOM
ELEC SW ROOM
E103
OFFICE
118B
OFFICE
118A
CORR
C104
OFFICE
118C
CONF RM
STORAGE
120A
DINING
IV ANTE RM & CLEAN
STOR
1-1223
INTRAVENOUS
ADMIXTURE
1-1224
STAIRWELL
S102
STERILE FLUIDS &
ADMIXTURE STOR
1-1227
STOR. PROSTHETIC &
MED SUPPLIES
1-1228
DRUG RECEIVING
1-1229
SERVICE ELEVATOR
LOBBY
C120
SERVICE ELEVATOR
L05
SERVICE ELEVATOR
L06
ELEV EQUIP
HOLDING
CORR
C110
ELEVATOR LOBBY
COVERED DOCK
1-1264
EMPTY CYLINDER
MEDICAL GAS
STORAGE RM
1-1264B
FULL CYLINDER
MEDICAL GAS
STORAGE RM
1-1264B
DIRTY LINEN CART
HOLDING
1-1264C
ELEVATOR
ELEVATOR
4' LINEAR PENDANT DIRECT/
INDIRECT LED LIGHT
FIXTURE
SYMBOLS - RCP
SPEAKER - COMMUNICATIONS
CEILING MOUNTED -
WIRELESS ACCESS POINT
SUPPLY DIFFUSER
RETURN GRILLE
OCCUPANCY SENSOR
2' x 4' TROFFER LIGHT
2' x 4' TROFFER LIGHT
CRITICAL
2' x 4' TROFFER LIGHT
LIFE SAFETY
EXHAUST GRILLE
CHASE SYMBOL
CEILING EXIT SIGN - VARIOUS DIRECTIONAL
AND NON-DIRECTIONAL CONFIGURATIONS
CEILING MOUNTED FIRE ALARM SPEAKER DEVICE
FIRE ALARM SMOKE DETECTOR
FIRE ALARM HEAT DETECTOR
FIRE ALARM SYSTEM CEILING MONTED SMOKE
DETECTOR FOR ELEVATOR RECALL
F
E
CEILING MOUNTED COMBINATION FIRE ALARM
SPEAKER/STROBE DEVICE
F
STRUC EXPOSED TO STRUCTURE
R FIRE ALARM CONNECTION
RELAY
CEILING MOUNTED CAMERA
ACT CEILING SYSTEM
GWB CEILING
CEILING ACCESS PANEL
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
U.S. Department of Veterans Affairs
ETERANS EALTH ARE YSTEMV H C S
OF THE ZARKSO
Engineering Service
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTH
TRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION LEGEND
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
10720 SIKES PLACE, SUITE 100
CHARLOTTE, NC 28277
704-814-1346
CONSULTING STRUCTURAL ENGINEERS
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 0'-0"
KEY PLAN
COPYRIGHT © 2024
WWW.HARRELLDG.COM
21 JUNE 2024
564-24-104
FAYETTEVILLE VA MEDICAL CENTER
HDG PROJECT: 19022
CONSTRUCTION
DOCUMENTS SUBMISSION
RENOVATE SPACE FOR LOGISTICS
(B-1)
AREA OF WORK
A u to d e s k D o c s /1
F a y e tt e v ill e I D
IQ
P ro je c t
N o
-1
-4
R e n o v a ti o n o f S
P S
/1
A R
C H
R
.r v t
/1
/2
:0
:1
P
M
AE111-A
GO/MSJC
FIRST FLOOR - REFLECTED CEILING
PLAN
A. CEILING HEIGHTS TO BE 8'-0" UON.
B. DIMENSIONS ARE TO FINISH FACE OF WALL OR SOFFIT UON.
C. RATED WALLS: ARE INDICATED IN PLAN AND REFLECTED CEILING
PLAN WITH GRAPHIC DENOTING HOURLY RATING AND/OR
RESISTANT TO PASSAGE OF SMOKE. REFER TO PARTITION TAGS
ON FLOOR PLANS AND PARTITION SCHEDULE SHEET FOR MORE
INFORMATION.
D. GYPSUM BOARD SOFFITS: HEIGHT AFF TO MATCH ADJACENT
CEILING OR TOP OF CASEWORK UON ON REFLECTED CEILING
PLAN.
E. CEILING MATERIAL TRANSITIONS, FLUSH AND NON-FLUSH
CONDITIONS: REFER TO STANDARD DETAILS.
F. CEILING FINISHES/MATERIALS ARE NOTED ON FINISH SCHEDULE.
G. ACOUSTIC TILE CEILINGS TO BE CENTERED IN BOTH DIRECTIONS IN
ROOM TYP, UON OR DIMENSIONED OTHERWISE. IF DIMENSION IS
PROVIDED IN ONE DIRECTION ONLY, ASSUME GRID IS CENTERED IN
OTHER DIRECTION.
H. CUT TILES SHALL BE NO SMALLER THAN 4 INCHES IN ANY
DIRECTION. CEILING FINISHES / MATERIALS NOTED ON TYPICALS
FINISH SCHEDULE.
I. PLASTIC LAMINATE (P-LAM) CLOSURE PANELS (IN LIEU OF GYPSUM
BOARD SOFFITS) OVER CASEWORK - SEE INTERIOR ELEVATIONS.
J. CENTER LIGHT FIXTURE AND OTHER CEILING DEVICES WITHIN
ACOUSTIC TILE UON. IF ONLY DIMENSIONED IN ONE DIRECTION,
ASSUME DEVICE IS CENTERED IN THE OTHER DIRECTION.
K. DIMENSIONS TO CENTERLINE OF LIGHT FIXTURE UON.
L. EXIT SIGNAGE/LIGHTING SHOWN ON ELECTRICAL LIGHTING
DRAWINGS.
M. ALL CORRIDOR HEADERS ARE 7'-8" AFF, UNLESS NOTED
OTHERWISE.
1/8" = 1'-0" F4
FIRST FLOOR - REFLECTED CEILING PLAN
GENERAL SHEET NOTES
- SHEET KEYNOTES
4'0 8' 16'
09.13 PORTION OF ACOUSTICAL CEILING TILE SYSTEM TO BE
COMPLETED AT CONCLUSION OF CONSTRUCTION PERIOD.
ACOUSTICAL CEILING TILE SYSTEM, LIGHTING, AND CEILING
DEVICES TO BE INSTALLED ONCE TEMPORARY CONSTRUCTION
BARRIER HAS BEEN REMOVED.
09.17 INSTALL NEW WALL ACT WALL MOULDING ALONG NEW FURRING
WALL. REUSE EXISTING TEES AND REPLACE REMOVED CEILING
TILES WITH NEW.
09.19 PAINT STRUCTURE.
*DEDUCT ALTERNATE 3: REMOVE
EIFS/CFMF FROM DUCT ENCLOSURE.
USE EXTERIOR DUCT JACKETING
INSTEAD OF EIFS/CFMF. KEEP BOLLARDS.
*DEDUCT ALTERNATE 4: KEEP FUNCTIONALITY OF
DOUBLE-SIDED ELEVATOR DOORS THAT OPEN
INTO EMS PRIMARY STORAGE L116. REMOVE EAST
FURRING WALL A4R IN EMS PRIMARY L116.
Revision Number Revisions: Date:
1 AMENDMENT 02 07/11/2024
1 1
.C
F.E.C.
FIRST FLOOR
0' - 0"
A5195
A5090
PWT-1
FIRST FLOOR
CEILING
8' - 0"
A5109.3
1/4" VERTICAL ALUMINUM
EXPANSION STRIPS AT ALL
CORNERS, TYPICAL
1' - 7" 1' - 7"
EQ FULL TILES EQ
FIRST FLOOR
0' - 0"
A5082
A5075
A5109.2
A1066
PWT-1
FIRST FLOOR
CEILING
8' - 0"
1/4" VERTICAL ALUMINUM
EXPANSION STRIPS AT ALL
CORNERS, TYPICAL
EQ EQ
1' - 6" 1' - 0 1/2" 3 1/2"
TYPICAL
FULL TILES
FIRST FLOOR
0' - 0"
FIRE ALARM DEVICE: SEE ELECTRICAL
PWT-1
FIRST FLOOR
CEILING
8' - 0"
1/4" VERTICAL ALUMINUM
EXPANSION STRIPS AT ALL
CORNERS, TYPICAL
A5075
EQ FULL TILES EQ
FIRST FLOOR
0' - 0"
C4
AE510-A
TYP
B4
AE510-A
TYP
E3
AE301-A
113 108B108A111112
CARD READER: SEE ELECTRICAL
FIRST FLOOR
CEILING
8' - 0"
WP-1
WP-1
WP-1WP-1
WP-1
P-1 P-1 GC-SGC-SP-1 GC-SGC-SGC-SP-1
D C A
FIRST FLOOR
0' - 0"
M1802
M2055
FIRST FLOOR
CEILING
8' - 0"
WP-2 WP-2
M1801
WP-2
GC-S GC-S
P-1 P-1P-1
EQ EQ
6"6"
FIRST FLOOR
0' - 0"
PWT-1
A5080
A5075
FIRST FLOOR
CEILING
8' - 0"
1' - 3" 1' - 1"
EQ EQ
P-1
EQ
P4700 MOP SINK,
REFER TO PULMBING
DRAWINGS
1/4" VERTICAL ALUMINUM
EXPANSION STRIPS AT ALL
CORNERS, TYPICAL
FIRST FLOOR
0' - 0"
PWT-1
FIRST FLOOR
CEILING
8' - 0"
1' - 8"
EQ EQ
P-1
P4700 MOP SINK,
REFER TO PULMBING
DRAWINGS
P2000 EYE WASH,
REFER TO PULMBING
DRAWINGS
1' - 0"
1/4" VERTICAL ALUMINUM
EXPANSION STRIPS AT ALL
CORNERS, TYPICAL
FIRST FLOOR
0' - 0"
PWT-1
A5135
SECURITY CAMERA: SEE
ELECTRICAL FIRST FLOOR
CEILING
8' - 0"
A5160
2' - 8" 1' - 0"
P-1
1/4" VERTICAL ALUMINUM
EXPANSION STRIPS AT ALL
CORNERS, TYPICAL
C
AE201-AE8
E6
E3
7' - 5 1/2"
C4T-T2
C4S-T2
A4-T2A4-T2
C4T-T2
C4S-T2
FLUSH
AE201-A
E6
E3
A4-T2
A5075A5082
C4T-T2
C4T-T2
1' - 3 1/2"
1' - 6"
TOILET
L111
TOILET
L110
A5109.2
A5090
A5109.3
A1066
E8
E6
E6 (TILE SIMILAR)
E6 (TILE SIMILAR)
C
AE201-A C4
C6
C8
7' - 3"
C4R-T1C4R-T1
C6T-T1
A5080
A5075
HAC
L113
A4-T1
A4-T1
C4S-T1
1' - 7 1/2"
6"5 1/2"
C6 (TILE SIMILAR)
FIRST FLOOR
0' - 0"
FIRST FLOOR
CEILING
8' - 0"
A1
AE510-A
E0042
M1801
A1015
P-1
W-1
4' - 0"
HOLLOW METAL FRAME
U.S. Department of Veterans Affairs
ETERANS EALTH ARE YSTEMV H C S
OF THE ZARKSO
Engineering Service
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
10720 SIKES PLACE, SUITE 100
CHARLOTTE, NC 28277
704-814-1346
CONSULTING STRUCTURAL ENGINEERS
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2024
WWW.HARRELLDG.COM
21 JUNE 2024
564-24-104
FAYETTEVILLE VA MEDICAL CENTER
HDG PROJECT: 19022
CONSTRUCTION
DOCUMENTS SUBMISSION
RENOVATE SPACE FOR LOGISTICS
(B-1)
A u to d e s k D o c s /1
F a y e tt e v ill e I D
IQ
P ro je c t
N o
-1
-4
R e n o v a ti o n o f S
P S
/1
A R
C H
R
.r v t
/1
/2
:2
:3
P
M
AE201-A
AuthorChecker
INTERIOR ELEVATIONS - FIRST
FLOOR
1/2" = 1'-0" E8
INTERIOR ELEVATION - TOILET (L111) - WEST
1/2" = 1'-0"
E6
INTERIOR ELEVATION - TOILET (L111) - NORTH
1/2" = 1'-0" E3
INTERIOR ELEVATION - TOILET (L111) - EAST
1/2" = 1'-0" D4
INTERIOR ELEVATION - SPS AREA - CORRIDOR (L109)
1'0 2' 4'
1'0 2' 4'1'0 2' 4' 1'0 2' 4'
1/2" = 1'-0" A8
TYPICAL WORK STATION
1'0 2' 4'
1/2" = 1'-0" C4
INTERIOR ELEVATION- HAC (L113) - EAST 1/2" = 1'-0"
C6
INTERIOR ELEVATION- HAC (L113) - SOUTH
1/2" = 1'-0"
C8
INTERIOR ELEVATION- HAC (L113) - WEST
SECURITY CAMERA: SEE ELECTRICAL
1/2" = 1'-0" A1
ENLARGED PLANS - L110/L111
1/2" = 1'-0" E1
ENLARGED PLAN - L113
1/2" = 1'-0" A6
SUPPLY TECH SUPERVISOR
1'0 2' 4'
*DEDUCT ALTERNATE 1: DOWNGRADE
BATHROOM PORCELAIN TILE WALLS
AND FLOORS TO WALL PAINT AND
RESINOUS EPOXY FLOORING.
*DEDUCT ALTERNATE 1:
DOWNGRADE BATHROOM
PORCELAIN TILE WALLS AND
FLOORS TO WALL PAINT AND
RESINOUS EPOXY FLOORING.
1'0 2' 4'
1'0 2' 4'
Revision Number Revisions: Date:
1 AMENDMENT 02 07/11/2024
1'0 2' 4'
1'0 2' 4' 1'0 2' 4'
1 1
.C
F .E
.C
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F.E.C.
F .E
.C
F.E.C.
B C D
A
STERILE STORAGE
L108
IT
L106 STORAGE
L104
ELECTRICAL
L101
BREAK DOWN
L102
SUPPLY OFFICE
L105
TOILET
L110
TOILET
L111
STERILE STORAGE,
OVERFLOW
L112
HAC
L113
ELECTRICAL
E-102
IT
T-100
MECHANICAL ROOM
M1-3
NITROUS OXIDE
STOR
M1-4
SUPPLY TECH
OFFICE
L115
EMS PRIMARY
L116
SPS RECEIVING
BREAKDOWN
L114
WP-1 WP-1
WP-1
WP-1
WP-1
WP-1
COPY ROOM
L107
CG-S
CG-S
CG-S
CG-S
CG-S
CG-S
CG-S
CG-S
CG-S
CG-S
CG-S
CG-S
CG-S
CG-S CG-S
CG-SCG-S
CG-S
CG-S
CG-S
CG-SCG-S
CG-S
CG-S CG-S
CG-S CG-S
CG-S
CG-S
CG-S
CG-S
CG-S
09.18
WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
WP-2
WP-3
WP-3
WP-3
WP-3
WP-2
RES-6APWT-1
RES-6APWT-1
R E
S -6
A R
E S
-3
R E
S
- 6A
C P
T
- 1
R E
S -6
A E
P Y
-1
R E
S -6
A E
P Y
-1
R E
S -6
A E
X
IS
T
IN
G
LV
T
EXISTING
LVTRES-6A
CG-S
CG-S
SUPPLY TECH
SUPERVISOR
L115A
WP-3
E
RES-6APWT-1
06.07
D
F
A
D
A
F
A
A
F
C
F
D
C
A
DD
A
A
A
A
CG-S
N
I
I
I
I
CORR
L103
CORRIDOR
L109
A
A
TYPE DESCRIPTION
C-1 CONCRETE FLOORING
CG-S CORNER GUARD (STAINLESS STEEL)
CPT-1
RES-3
CARPET TILE
RESINOUS FLOORING
MARK
PWT-1 PORCELAIN TILE FLOORING
RES-6A RESINOUS HEAVY DUTY FLOORING
EPY-1 EPOXY FLOORING
A. REFER TO SHEET AI002-B FOR GENERAL FINISH PLAN NOTES AND
SYMBOLS.
B. ALL CORRIDORS TO RECEIVE WALL PROTECTION WP-1. INSTALL
CAPS AROUND ALL PENETRATIONS.
C. ALL CORRIDORS CORNERS TO RECEIVE CORNER GUARDS.
SPECIAL SYSTEMS
DATA ROOM
CAT SCAN EXAM
CAT SCAN CONTROL
149A
CAT SCAN
BREAKROOM
STORAGE
TOILET
OPERATIONS
ARMORY OFFICE
DISPATCH
CABLE TV DATA
ROOM
ELEC SW ROOM
E103
OFFICE
118B
OFFICE
118A
CORR
C104
OFFICE
118C
CONF RM
STORAGE
120A
DINING
120 IV ANTE RM & CLEAN
STOR
1-1223
INTRAVENOUS
ADMIXTURE
1-1224
STAIRWELL
S102
STERILE FLUIDS &
ADMIXTURE STOR
1-1227
STOR. PROSTHETIC &
MED SUPPLIES
1-1228
DRUG RECEIVING
1-1229
SERVICE ELEVATOR
LOBBY
C120
SERVICE ELEVATOR
L05
SERVICE ELEVATOR
L06
ELEV EQUIP
HOLDING
CORR
C110
ELEVATOR LOBBY
COVERED DOCK
1-1264
EMPTY CYLINDER
MEDICAL GAS
STORAGE RM
1-1264B
FULL CYLINDER
MEDICAL GAS
STORAGE RM
1-1264B
DIRTY LINEN CART
HOLDING
1-1264C
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
U.S. Department of Veterans Affairs
ETERANS EALTH ARE YSTEMV H C S
OF THE ZARKSO
Engineering Service
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
PARTITION GRAPHICS
NORTH LEGEND
PLAN
NORTH
TRUE
NORTH
EXISTING PARTITION /
BARRIER - WALL TO REMAIN
EXISTING PARTITION /
BARRIER - WALL TO BE
REMOVED
NEW PARTITION / BARRIER - WALL
PARTITION LEGEND
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/ SMOKE BARRIER
HARRELL DESIGN GROUP PC
10720 SIKES PLACE, SUITE 100
CHARLOTTE, NC 28277
704-814-1346
CONSULTING STRUCTURAL ENGINEERS
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
FIRST FLOOR - FFE: 0'-0"
KEY PLAN
COPYRIGHT © 2024
WWW.HARRELLDG.COM
21 JUNE 2024
564-24-104
FAYETTEVILLE VA MEDICAL CENTER
HDG PROJECT: 19022
CONSTRUCTION
DOCUMENTS SUBMISSION
RENOVATE SPACE FOR LOGISTICS
(B-1)
AREA OF WORK
A u to d e s k D o c s /1
F a y e tt e v ill e I D
IQ
P ro je c t
N o
-1
-4
R e n o v a ti o n o f S
P S
/1
A R
C H
R
.r v t
/1
/2
:2
:0
P
M
AF601-A
GO/MSJC
FIRST FLOOR FINISH PLAN
1/8" = 1'-0" F4
FIRST FLOOR FINISH PLAN
GENERAL SHEET NOTES
FINISH FLOOR LEGEND
4'0 8' 16'
- SHEET KEYNOTES
06.07 INSTALL PAINTED, 5/8-INCH THICK, 4-FOOT BY 8-FOOT, GRADE A-C
FIRE RETARDANT PLYWOOD ON ALL GYPSUM BOARD WALLS
EXCEPT DOOR WALL AND BELOW WINDOW, PLYWOOD A-SIDE
FACING THE ROOM INTERIOR. DO NOT PAINT OVER PLYWOOD
STAMP. MOUNT BOTTOM OF PLYWOOD 8-INCHES ABOVE
FINISHED FLOOR, LONGEST BOARD LENGTH ORIENTED
VERTICALLY.
09.18 ON NEW FURRING WALLS ON EXISTING LVT FLOORING, INSTALL
NEW 4-INCH BEIGE RUBBER BASE TO MATCH EXISTING.
*DEDUCT ALTERNATE 1:
DOWNGRADE BATHROOM
PORCELAIN TILE WALLS AND
FLOORS TO WALL PAINT AND
RESINOUS EPOXY FLOORING.
Revision Number Revisions: Date:
1 AMENDMENT 02 07/11/2024
U.S. Department of Veterans Affairs
ETERANS EALTH ARE YSTEMV H C S
OF THE ZARKSO
Engineering Service
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED
VA FORM 08 - 6231
A
FULLY SPRINKLERED
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASE
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANTS
321 4 5 6 7 8 9 10
HARRELL DESIGN GROUP PC
10720 SIKES PLACE, SUITE 100
CHARLOTTE, NC 28277
704-814-1346
CONSULTING STRUCTURAL ENGINEERS
POC: LEE HARRELL PE, LEED AP, QCxP
PRESIDENT
COPYRIGHT © 2024
WWW.HARRELLDG.COM
21 JUNE 2024
564-24-104
FAYETTEVILLE VA MEDICAL CENTER
HDG PROJECT: 19022
CONSTRUCTION
DOCUMENTS SUBMISSION
RENOVATE SPACE FOR LOGISTICS
(B-1)
A u to d e s k D o c s /1
F a y e tt e v ill e I D
IQ
P ro je c t
N o
-1
-4
R e n o v a ti o n o f S
P S
/1
A R
C H
R
.r v t
/1
/2
:2
:1
P
M
AF602-A
AuthorChecker
INTERIOR FINISH SCHEDULE AND
SIGNAGE SCHEDULE
INTERIOR FINISH SCHEDULE - A
Room No. Room Name Level Floor Finish
Base Finish
Wall Finish Ceiling Finish
Millwork Horizontal
Millwork Vertical Wall Protection CommentsNorth South East West
FIRST FLOOR
E-102 ELECTRICAL FIRST FLOOR EPY-1 RB-1 P-2 P-2 P-2 P-2 EXISTING --- --- ---
L101 ELECTRICAL FIRST FLOOR EPY-1 RB-1 P-2 P-2 P-2 P-2 EXISTING --- --- ---
L102 BREAK DOWN FIRST FLOOR C-1 RB-1 P-1 P-1 P-1 P-1 AT-1 --- --- WP-3
L103 CORR FIRST FLOOR RES-6A RES-6A P-1 P-1 P-1 P-1 AT-1 --- --- WP-1
L104 STORAGE FIRST FLOOR RES-3 RES-3 P-2 P-2 P-2 P-2 AT-1 --- --- ---
L105 SUPPLY OFFICE FIRST FLOOR CPT-1 RB-1 P-1 P-1 P-1 P-1 AT-1 --- --- ---
L106 IT FIRST FLOOR EPY-1 RB-1 P-1 P-1 P-1 P-1 EXISTING --- --- --- 3/4" PLYWOOD
L107 COPY ROOM FIRST FLOOR CPT-1 RB-1 P-1 P-1 P-1 P-1 AT-1 --- --- ---
L108 STERILE STORAGE FIRST FLOOR RES-6A RES-6A P-1 P-1 P-1 P-1 AT-1 --- --- WP-2
L109 CORRIDOR FIRST FLOOR RES-6A RES-6A P-1 P-1 P-1 P-1 AT-1 --- --- WP-1
L110 TOILET FIRST FLOOR PWT-1 --- PWT-1 PWT-1…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .